Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Anchoring carbon to peak carbon neutral goal "14th Five-Year" renewable energy ushered in high-quality development

来源: | 作者:佚名 | 发布时间 :2024-01-30 | 543 次浏览: | Share:

New situation: into the "high quality jump" stage

In recent years, with the continuous development of policies and the continuous upgrading of technology, China's renewable energy has achieved leapfrog development, installed capacity, utilization level, and industrial competitiveness to a new level, and has made remarkable achievements, laying a solid foundation for the further high-quality development of renewable energy. Data show that by the end of 2020, China's renewable energy power generation capacity reached 934 million kilowatts, accounting for 42.5% of the total installed power generation capacity.

At present, China is building a carbon peak carbon neutral "1+N" policy system, and the development of renewable energy is the focus of it. Peng Cheng, secretary of the Party Committee and chairman of the General Institute of Hydropower and Water Conservancy Planning and Design, pointed out that in the energy supply side, it is necessary to vigorously develop clean renewable energy, as far as possible to replace fossil energy with non-carbon energy generation and hydrogen production, and build a "new power system or energy supply system"; At the end of energy consumption, it is necessary to strive to replace fossil energy consumption with non-carbon energy such as electricity, hydrogen energy, geothermal energy and solar energy in most fields such as residential life, transportation, industry, agriculture and construction.

The relevant person in charge of the new energy Department of the National Energy Administration said that in the face of the new situation and new requirements, renewable energy on the one hand should "stand first", further shift and speed up, and become the main body of energy consumption increase; On the other hand, China's renewable energy not only needs to achieve continuous technological progress, continuous cost reduction, continuous improvement of efficiency, continuous enhancement of competitiveness, and comprehensive realization of subsidy-free parity and even low-price market-oriented development, but also needs to accelerate the solution of key issues such as high proportion of consumption, key technology innovation, industrial chain and supply chain security, stability and reliability, and further improve quality and efficiency. We will move faster into a new stage of high-quality development.

"Plan" put forward the development goal, by 2025, China's renewable energy consumption will reach 1 billion tons of standard coal, "fourteen five" period, renewable energy in the primary energy consumption increase will account for more than 50%. Among them, in terms of non-electric utilization, in 2025, the scale of non-electric utilization such as geothermal energy heating, biomass heating, biomass fuel, and solar thermal utilization will reach more than 60 million tons of standard coal.

In terms of renewable energy generation, the "Plan" requires that by 2025, annual renewable energy generation will reach 3.3 trillion KWH; During the "14th Five-Year Plan" period, the increase in renewable energy generation accounted for more than 50% of the increase in electricity consumption in the whole society, and wind and solar power generation doubled. At the same time, for the consumption of renewable energy electricity, it is clear that "by 2025, the national total consumption of renewable energy electricity responsibility weight reached about 33%, renewable energy electricity non-water consumption responsibility weight reached about 18%, renewable energy utilization rate remained at a reasonable level."

New path: Adhere to the "five simultaneous development" and "four development"

Entering the stage of "high-quality development", renewable energy will usher in a new development path. The "Plan" pointed out that during the "14th Five-Year Plan" period, the development of renewable energy will adhere to the "five simultaneous developments", that is, centralized and distributed simultaneous developments, onshore and offshore simultaneous developments, local consumption and export consumption simultaneous developments, single-variety development and multi-variety complementary developments, and single scene and comprehensive scenarios simultaneously.

In Peng Cheng's view, "single variety development and multiple varieties complement each other" and "single scene and comprehensive scene simultaneously" are new measures put forward in the face of land use space, consumption and system security and marketization issues. Among them, "single-variety development and multi-variety complementarities" requires that while doing a good job in the high-quality development of various types of renewable energy, it promotes the coordinated development of multiple varieties such as water scenery, water and fire storage in scenery, and regional coupled heating. "Single scenario and comprehensive scenario at the same time" requires the development of renewable energy power generation and energy supply itself, while promoting the integrated development of renewable energy with agriculture and forestry, ecological governance, and rural revitalization.

According to the "Plan", the specific measures to promote the development of renewable energy during the "14th Five-Year Plan" can be summarized as "four developments" : optimizing development with regional layout, supporting development with major bases, leading development with demonstration projects, and implementing development with action plans. Among them, the "Optimized development by regional layout" clearly promotes the large-scale development of wind power and photovoltaic power generation base in the "three North" region, coordinates the comprehensive development of water scenery in the southwest region, focuses on the local development of wind power and photovoltaic power generation in the southern Middle East region, and actively promotes the cluster development of offshore wind power in the eastern coastal region.

At the same time, as the "big base" construction that has attracted much attention this year, it is also the focus of renewable energy development during the "14th Five-Year Plan" period. As early as March, the 14th Five-Year Plan for National Economic and Social Development of the People's Republic of China and the Outline of the 2035 Vision Goals proposed to build nine large-scale clean energy bases. The construction of large-scale wind power photovoltaic base aims to give play to the large-scale and intensive effect of large-scale wind power photovoltaic base project construction, ensure the depth and strength of coordinated project promotion, and show the efficiency and effect of project implementation.

"At present, the first batch of large-scale wind power photovoltaic base projects of about 100 million kilowatts have started nearly 90%, and the planning layout of large-scale wind power photovoltaic base focusing on desert, Gobi and desert areas is accelerating the implementation." According to the relevant person in charge of the new energy Department of the National Energy Administration, the "Plan" clearly puts forward the focus on desert, Gobi and desert areas, and speeds up the construction of seven new energy bases on land, such as the upper reaches of the Yellow River, Hexi Corridor, Yellow River, North Hebei, Songliao, Xinjiang and the lower reaches of the Yellow River. At the same time, it is required to promote the construction of large-scale hydropower bases in a scientific and orderly manner, and coordinate the development and construction of the two major water-scenery comprehensive bases in Sichuan, Yunnan, Guizhou and southeast Tibet, focusing on the construction of five major offshore wind power base clusters in Shandong Peninsula, Yangtze River Delta, southern Fujian, eastern Guangdong and Beibu Gulf.

In addition, in order to cooperate with the national "rural revitalization" strategy, renewable energy to help rural energy reform has become an important mission of the "14th Five-Year Plan". To this end, the "Plan" proposed the implementation of "thousands of villages to control the wind action", "thousands of households Muguang action", rural energy station action, rural power grid consolidation and upgrading action plans, while improving the accessibility of rural energy, for the "beautiful rural construction".

New measures: Technology and system "two-pronged approach"

The relevant person in charge of the new energy Department of the National Energy Administration stressed that the high-quality development of renewable energy in the 14th Five-Year Plan, the task is more difficult, and it must be "two-pronged" in technology and system, adhere to innovation-driven, market-oriented development and high-quality development of renewable energy.

In terms of technology, adhere to innovation-driven, high-quality development of renewable energy. The "Plan" pointed out that to increase the efforts of renewable energy technology innovation, to carry out far-reaching sea breeze electricity technology, photovoltaic power generation outdoor demonstration, new high-efficiency photovoltaic cell technology, geothermal power generation technology and deep geothermal heating technology demonstration; Cultivate new models and forms of renewable energy development, actively promote the deep integration of renewable energy with new technologies, new industries, and new forms of business such as artificial intelligence and electric vehicles, vigorously develop comprehensive energy services, and innovatively promote the large-scale development of photovoltaic sand control; Upgrade the level of modernization of the industrial chain and supply chain of renewable energy, implement green manufacturing and intelligent manufacturing projects in the renewable energy industry, forge the long board of the industrial chain and supply chain, supplement the shortcomings of basic materials, basic parts and advanced basic processes, and improve the organizational system of technical standards, testing, certification and quality supervision of renewable energy; We will improve the renewable energy innovation chain, implement collaborative research in major science and technology and collaborative innovation in major engineering technologies, and accelerate the empirical verification of new technologies and the transformation of products and engineering applications.

In the institutional aspect, improve the institutional mechanism, market-oriented development of renewable energy. The "Plan" clearly states that, first, it is necessary to deepen the reform of "decentralization service" in the renewable energy industry, simplify the distributed renewable energy investment management procedures, establish a multi-departmental coordination mechanism, and promote "one-stop" service for project approval (filing). The second is to establish a development and construction management mechanism guided by the weight of renewable energy power consumption responsibility, strengthen the weight evaluation and incentive mechanism, and build a diversified grid-connected consumption mechanism composed of grid guarantee consumption, market independent consumption, and distributed generation transaction consumption. The third is to improve the market-oriented development mechanism of renewable energy, establish and improve the management mechanism of renewable energy development and construction, price formation and compensation mechanism, and market participation trading mechanism. The fourth is to establish and improve the green energy consumption mechanism, expand the scope of green certificate issuance, encourage parity projects to actively carry out green certificate trading, establish green energy consumption certification and identification system, encourage new energy equipment manufacturing enterprises to increase the proportion of green energy consumption, produce green products, and actively guide green energy consumption.


  • ABB 1TGE120010R1300 Industrial Control Module
  • ABB 216BM61b HESG448267R1021 Advanced Process Control Module
  • ABB BDD110 HNLP205879R1 Digital I/O Module
  • ABB IEMPU02 Power Supply Module
  • ABB G3FE HENF452697R1 High performance control module
  • ABB G3FD HENF452692R1 High-Performance Industrial Control Module
  • ABB B5EC HENF105077R1 Electronic Motor Protection Relay
  • ABB G3EFa HENF450295R2 Industrial Automation Module
  • ABB B5EEd HENF105082R4 Electronic Motor Protection Relay
  • ABB O3EId HENF452777R3 Digital Output Module
  • ABB NWX511a-2/R HESG112548R12 Industrial Automation Module
  • ABB E3ES Power communication module
  • ABB O3EX HENF315845R2 Industrial Control Module
  • ABB O3EHa HENF315087R2 Digital Output Module
  • ABB E3ED High-Performance Industrial Controller
  • ABB O3EGb HENF315118R2 Digital Output Module
  • ABB O3ED Digital Input Module
  • ABB O3ES HENF445789R1 Digital Input Module
  • ABB G3ESa HENF318736R1 control module
  • ABB 8025-235 Industrial Control Module
  • ABB 216NG61A HESG441633R1 HESG216875/K main control board
  • ABB SCYC51020 58052582G programmable Logic Controller
  • ABB RED670 Line differential protection
  • ABB PP825A 3BSE042240R3 Touch Screen Panel
  • ABB SCYC51020 58052582/G pulse trigger board
  • ALSTOM COP232.2 VME A32/D32.029.232 446 Controller Unit
  • ABB AO2000 LS25 Laser analyzers
  • ABB LM80 Laser level transmitter
  • ABB PM803F 3BDH000530R1 Base Unit 16 MB
  • ABB SD822 3BSC610038R1 Power Supply Device
  • ABB PCD235B1101 3BHE032025R1101 Industrial Control Module
  • ABB AZ20/112112221112E/STD Control Module
  • ABB UAD142A01 3BHE012551R0001 Industrial Control Module
  • ABB 5SHY35L4503 3BHB004693R0001 3BHB004692R0002 5SXE01-0127 main control board
  • ABB FET3251C0P184C0H2 High-Performance Power Module
  • ABB CAI04 Ability ™ Symphony ® Plus Hardware Selector
  • ABB R474A11XE HAFAABAAABE1BCA1XE output hybrid module
  • ABB REF542PLUS 1VCR007346 Compact Digital Bay Control
  • ABB REF542PLUS 1VCF752000 Feeder Terminal Panel
  • ABB PPD113B03-26-100100 3BHE023584R2625 output hybrid module
  • ABB 3BHE022293R0101 PCD232A Communication Interface Unit
  • ABB CI857K01 3BSE018144R1 Module Controller
  • ABB 3ASC25H216A DATX132 Industrial Controller
  • ABB LWN2660-6 High-Voltage Industrial Controller
  • ABB 1MRK00008-KB Control Module
  • ABB SC540 3BSE006096R1 Submodule Carrier
  • ABB REF615C_C HCFFAEAGANB2BAN1XC feeder protection and measurement and control device
  • ABB S-073N 3BHB009884R0021 multi-function servo driver
  • ABB SK827005 SK827100-AS 480V 60HZ coil
  • GE 029.381208 module
  • ABB REF615E_E HBFHAEAGNCA1BNN1XE Module
  • ABB TP830 3BSE018114R1 Baseplate Module
  • ABB TK803V018 3BSC950130R1 Cable Assembly
  • ABB DSRF197 3BSE019297R1 Controller Module
  • ABB DSAO120A 3BSE018293R1 Advanced Analog Output Board
  • ABB DSDP170 57160001-ADF Pulse Counting Module
  • ABB DSBC176 3BSE019216R1 Bus Extender Board
  • ABB DSDO115A 3BSE018298R1 Digital Output Module
  • ABB PM865K01 3BSE031151R1 Processor Unit HI
  • ABB 5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101 auxiliary DC power supply unit
  • ABB TP853 3BSE018126R1 Power Supply Module
  • ABB REM545AG228AAAA High Precision Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB REM615C_D HCMJAEADAND2BNN1CD Motor protection and control
  • ABB TP857 3BSE030192R1 DCS System
  • ABB PP865A 3BSE042236R2 Touch Panel
  • ABB SCYC51020 58052582H Industrial Automation Control Module
  • ABB SCYC51090 58053899E Control Module
  • ABB CB801 3BSE042245R1 Profibus DP Slave Expansion Module
  • ABB 5SHY4045L0001 3BHB018162R0001 IGCT Module
  • ABB 5SHY6545L0001 AC10272001R0101 5SXE10-0181 High-Power IGCT Module
  • ABB RMU811 Module Termination Unit
  • ABB TVOC-2-240 1SFA664001R1001 Industrial Control Module
  • ABB LDSTA-01 63940143B Input/Output (I/O) Module
  • ABB GJR5252300R3101 07AC91H Analog Input/Output Module
  • ABB GJR5252300R3101 07AC91F Industrial Control Module
  • ABB TB711F 3BDH000365R0001 Industrial Control Module
  • ABB TU715F 3BDH000378R0001 I/O Terminal Unit (ITU)
  • ABB DC732F 3BDH000375R0001 Industrial Controller
  • ABB TTH300 Head-mount temperature transmitter
  • ABB UNS3670A-Z V2 HIEE205011R0002 Industrial Automation Module
  • ABB RC527 3BSE008154R1 Redundant System Control Module
  • ABB 5SHY5055L0002 3BHE019719R0101 GVC736BE101 Industrial Control Module
  • ABB PM866 3BSE050200R1 AC800M series PLC core controller
  • ABB UFC718AE01 HIEE300936R0001 Main Circuit Interface Board
  • ABB DSAI130A 3BSE018292R1 Industrial I/O Module Controller
  • ABB 07KT98 GJR5253100R0278 Advanced Controller Module
  • ABB PFTL101B-5.0kN 3BSE004191R1 Power Conversion Module
  • ABB 5SHX1445H0002 3BHL000387P0101 IGCT Module
  • ABB 3HNM07686-1 3HNM07485-1/07 Controller Module
  • ABB DSCS131 57310001-LM DS Communication Board
  • ABB DSBC172 57310001-KD BUS REPEATER
  • ABB DSRF180A 57310255-AV Digital Remote I/O Module
  • ABB DSTC175 57310001-KN Precision Control Module
  • ABB DSSB140 48980001-P Battery Unit Industrial Control Module
  • ABB UAC389AE02 HIEE300888R0002 PCB Board
  • ABB PFTL101B 20KN 3BSE004203R1 DCS Module
  • ABB UFC718AE101 HIEE300936R0101 PCB Circuit Board
  • ABB UNS2880b-P,V2 3BHE014967R0002 Control Board
  • ABB UNS0887A-P 3BHE008128R0001 Communication Module
  • ABB UNS2882A-P,V1 3BHE003855R0001 EGC Board
  • ABB UNS2882A 3BHE003855R0001 Interface Board
  • ABB UNS4881b,V4 3BHE009949R0004 Controller
  • ABB 216EA62 1MRB150083R1/F 1MRB178066R1/F 216EA62 Redundant system modules
  • ABB 216DB61 HESG324063R100/J Controller Module
  • ABB PFSK142 3BSE006505R1 Control board
  • ABB DSAI133A 3BSE018290R1 Analog Input Module
  • ABB PFTL201C-10KN 3BSE007913R0010 Load Cells
  • ABB CI858-1 3BSE018137R1 Industrial Module
  • ABB 5SHY35L4520 5SXE10-0181 AC10272001R0101 Controller
  • ABB TU847 3BSE022462R1 Module Termination Unit
  • ABB 6231BP10910 PLC Analog Output Module
  • ABB 07BR61R1 GJV3074376R1 Distributed I / O Coupler
  • ABB DI93A HESG440355R3 Digital Input Module
  • ABB IC660BBA104 6231BP10910 Industrial Control Module
  • ABB TP858 3BSE018138R1 Module Controller
  • ABB PFEA111-65 3BSE050090R65 Tension Electronics Module
  • ABB DSMB-02C 3AFE64666606 Power Supply Board
  • ABB MC91 HESG440588R4 HESG112714/B Wireless Router Modules
  • ABB PPD113-B03-23-111615 Excitation system controller
  • ABB AB91-1 HESG437479R1 HESG437899 Graphics Expansion Module
  • ABB IT94-3 HESG440310R2 HESG112699/B controller
  • ABB NF93A-2 HESG440280R2 HESG323662R1/HESG216665/K Module Controller
  • ABB IW93-2 HESG440356R1 HESG216678/B I/O module
  • ABB PM861K01 3BSE018105R1 Processor Module
  • ABB RB520 Dummy Module For Submodule Slot
  • ABB SR511 3BSE000863R1 SR511 Regulator 24V/5V
  • ABB DSDP140B 57160001-ACX Counter Board