Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Chemical safeguard measure

来源: | 作者:佚名 | 发布时间 :2023-11-28 | 156 次浏览: | Share:

(1) Strict project construction requirements

New modern coal chemical projects must comply with the overall land use plan, and the requirements of the total energy consumption and intensity control indicators in the region where they are located, and meet the standards and specifications of urban planning, land use, safety and environmental protection, energy saving and water saving. The site selection and pollution control measures of the project should meet the relevant requirements of the "Environmental Access Conditions for Modern Coal Chemical Industry Construction Projects (Trial)", strictly control the emission of sulfur dioxide, nitrogen oxides, fine particles, volatile organic compounds and other toxic and harmful atmospheric pollutants, and achieve harmless treatment and resource utilization of solid waste and high-salt wastewater. The annual production capacity of a single series of olefin making devices is 500,000 tons and above, the overall energy efficiency is higher than 44%, the comprehensive energy consumption per unit of olefin products is lower than 2.8 tons of standard coal (calculated according to the "energy consumption quota of coal to olefin Unit product" (GB30180) method), and the consumption of fresh water is less than 16 tons. The annual production capacity of the coal-to-ethylene glycol device is 200,000 tons or more, and the comprehensive energy consumption per unit of ethylene glycol product is lower than 2.4 tons of standard coal and the consumption of fresh water is less than 10 tons. The construction requirements of coal-to-fuel projects such as coal-to-oil and coal-to-gas are implemented in accordance with the 13th Five-Year Plan for the demonstration of coal deep Processing Industry.

The modern coal chemical industry demonstration zone is preferentially adjacent to the integrated construction of large coal bases, fully considering the water function zoning and the total amount of pollutants limited, and is distributed in areas with strong water resource access capacity, good ecological environmental capacity, large carbon dioxide emission reduction potential, and far away from the ecological red line control area and centralized residential areas. The amount of coal base resources should ensure the needs of economic operation cycle of coal chemical industry demonstration zone. Public works and auxiliary facilities such as heating, sewage treatment facilities, solid waste treatment and recycling facilities, safety and environmental risk prevention and control facilities in demonstration areas should be built in a coordinated manner, and the carbon dioxide conversion plan and utilization level should be adapted to the industrialization progress of relevant technologies. Demonstration zones shall conform to urban and rural planning, and shall formulate overall development plans and special plans for safety, environmental protection and fire protection, and carry out environmental impact assessment and water resources demonstration for the overall development planning of demonstration zones in accordance with the law.

The modern coal chemical industry demonstration zone should carry out the construction of smart parks, and adopt information technologies such as cloud computing, big data, Internet of Things, and geographic information system to improve the application level of information technology. Relying on public service platforms such as online trading, modern logistics, inspection and testing, the park will improve its security management, environmental protection, energy management, emergency rescue and public service capabilities. Modern coal chemical enterprises should carry out intelligent manufacturing demonstration, so that the production and operation of enterprises have comprehensive self-perception, self-analysis, self-decision-making and self-execution capabilities, and improve the safety and environmental protection level of enterprises by information and intelligent means.

2. Standardizing procedures for examination and approval

New coal-to olefin and coal-to aromatics projects must be included in the "Modern Coal Chemical Industry Innovation and Development Layout Plan" and must meet the requirements of the "Modern Coal chemical Industry Construction Project Environmental Access Conditions (Trial)". Owners of coal chemical projects can independently carry out the preliminary work, and relevant departments can carry out urban planning, land pre-examination, environmental impact assessment, water resources demonstration and other work according to law. In accordance with the spirit of The State Council on streamlining administration and delegating power and the requirements of the Catalogue of Investment Projects approved by the Government (2016), the new coal-to-olefins and coal-to-aromatics projects (excluding coal-to-fuel projects such as coal-to-oil and coal-to-gas) that will be included in the "Modern coal chemical Industry Innovation and Development Layout Plan" will be devolved to the provincial government for approval.

3. Promoting rational allocation of resources

Take into account the sustainable development of the coal industry and the demand for coal in related industries, strengthen the comprehensive development and utilization of coal, and in high-sulfur coal producing areas, high-sulfur coal can be used as raw materials to develop modern coal chemical industry. Strengthen the management of the whole water system, encourage the use of waste water, secondary water, mine water reuse technology and air cooling, closed circulation cooling water systems and other water-saving technologies, implement strict water quota standards, constantly reduce the intensity of water resources consumption, improve utilization efficiency. Use state funds to support research and development and industrialization of major modern coal chemical technology and equipment. In combination with the pilot reform of transmission and distribution pricing, we will promote direct transactions between modern coal chemical enterprises and power generation enterprises, and support qualified modern coal chemical enterprises to carry out regional power grid pilot and incremental distribution business.

4. Strengthening oversight of safety and environmental protection

Accelerate the revision and improvement of safety protection, pollutant discharge, water resources protection and other standards, focusing on source control and process supervision to study pollution control methods of modern coal chemical industry, and further raise the entry threshold of modern coal chemical industry projects in terms of safety, environmental protection, and water resources protection. Guide enterprises to optimize production processes, strengthen equipment selection and material selection, improve design standards and construction quality, strengthen operation management, and standardize treatment facilities. Strict administrative licensing procedures for safety, environmental protection and water resources protection, and earnestly implement the "three simultaneous" safety and environmental protection facilities and pollutant discharge licensing system. We will strengthen the connection between urban construction and industrial development planning, and effectively implement the protective distance required for production safety and environmental protection.

Strengthen the daily supervision and inspection of project construction and production operation, and require enterprises to establish self-monitoring, information disclosure, record ledgers and regular reporting systems in accordance with the requirements of emission permits, so as to ensure long-term and stable emission according to the permits. For those that do not meet the requirements of safety, environmental protection and water resources protection, measures such as work stoppage and production rectification shall be taken in accordance with the law, and enterprises shall be urged to eliminate hidden dangers in a timely manner. Establish and improve the enterprise-park-government emergency response system, prevent safety and environmental risks, promptly investigate and handle safety and environmental violations, strictly investigate and handle accidents, and hold relevant personnel accountable according to law.

5. Improving the industrial organization structure

In accordance with the development model of park, large-scale and multi-production, it will guide the joint layout of modern coal chemical industry with coal, electric power, petrochemical and other industries to build a highly competitive industrial chain and industrial cluster. In accordance with the principle of combination of strong and complementary advantages, backbone enterprises in related industries are encouraged to form upstream and downstream integrated market entities. Actively develop the mixed ownership economy, promote joint ventures between state-owned enterprises and non-public enterprises, support private and foreign-funded enterprises to enter the modern coal chemical industry, and enhance the vitality of industrial development.

Production enterprises, institutions of higher learning, research institutes, intermediaries and other units are encouraged to form joint efforts to carry out research on major issues and put forward suggestions on industrial development policies. Establish and improve the industrial information statistics system, timely release of industry dynamics, timely start the early warning mechanism, reasonably guide enterprise investment, and prevent investment risks.

6. Strengthen leadership in organization and implementation

The National Development and Reform Commission, the Ministry of Industry and Information Technology, together with the Ministry of Land and Resources, the Ministry of Environmental Protection, the Ministry of Housing and Urban-Rural Development, the General Administration of Safety Supervision, the Energy Bureau and other departments, organized the implementation of the modern coal chemical industry innovation and development layout plan. Establish a program implementation working group composed of functional departments and bureaus of relevant departments, provincial development and reform Commission, project owners of provincial industry and information technology departments, consulting agencies, industry associations and other units, organize meetings in a timely manner, report the progress of work, check the implementation, study countermeasures and solve outstanding problems. Establish and improve the third-party evaluation mechanism, effectively evaluate the implementation of the program, and make timely adjustments and improvements according to the evaluation conclusions.

All relevant departments should fully understand the importance and urgency of implementing the layout plan for the innovation and development of the modern coal chemical industry, strengthen organizational leadership, actively cooperate and work together to do a good job of the work determined by the plan. Relevant localities should seriously do a good job in the planning and project management of modern coal chemical industry demonstration zones, strengthen the coordination, guidance, supervision and inspection of engineering project construction, and ensure the scientific and orderly implementation of projects. Industry associations and consulting institutions should give full play to the role of Bridges and links, actively assist in the interpretation and publicity of the program, and create a good atmosphere for the implementation of the program.


  • Honeywell TK-IAH161 - 1PC ANALOG INPUT New Shipping DHL or FedEX
  • Honeywell PX45A - "8 Points/mm (203dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet,"
  • Honeywell 51309276-150 - / 51309276150 (NEW NO BOX)
  • Honeywell 82408217-001 - / 82408217001 (NEW NO BOX)
  • Honeywell BK-G100 - Elster U160 Gas Meter DN100 #3485
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx) #H254CC YD
  • Honeywell 621-9938R-RP - Serial Input/Output Module 22572 Vr 3.2 94V-0
  • Honeywell U2-1018S-PF - NEW flame detector DHL Fast delivery
  • Honeywell TK-PRR021 - 51309288-475 redundancy module
  • Honeywell 50129828-003 - Temperature Transmitter
  • Honeywell 3151080 - RING SET P/N (HONEYWELL) NS COND # 11344 (4)
  • Honeywell 4DP7APXPR311 - CIRCUIT BOARD
  • Honeywell MG-818 - Symbol Generator P/N 7011675-818
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty#XR
  • Honeywell 51304800-100 - 30731808-004 Regulator Card REV B
  • Honeywell MU-FOED02 - UCN EXTENDER PN:51197564-200 REV F
  • Honeywell MC-PAIL02 - 51304907-100 Specii Input/Output Module Rev E
  • Honeywell SPS5713 - 51199930-100 NSMP
  • Honeywell XS858A - Mode S Transponder 7517401-960 Removed Working
  • Honeywell SK-5208 - Fire Panel Maintenance Service 6MonWarri UPS Express SK5208 Zy
  • Honeywell 51403422-150 - NEW HDW COMM CTRL CONTROLLER
  • Honeywell IBI-AD - Yamatake- 82407390-001/ 82408215-001 PCB Card
  • Honeywell 51401635-150 - / 51401635150 (USED TESTED CLEANED)
  • Honeywell ANT67A - TCAS Antenna 071-01548-0100 w/ March 2024 Overhauled 8130
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty
  • Honeywell 620-3632C - CPU. . (UK And EU Buyers Read)
  • Honeywell PX45A - "12 Points/mm (300dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet"
  • Honeywell K4LCN-4 - 51402755-100 Processor Card Rev: F 51305099-100 B
  • Honeywell 2001-400-150-126-200-20-100001-1-0-00 - REPAIRED PNEUMATIC ACTUATOR
  • Honeywell GGSI - 51401914-100 HDW B FW A R400 51400996-100 Rev C PLC Board Module
  • Honeywell 184637 - TRANSDUCER P/N (HONEYWELL) NS CONDITION #12517
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell 620-0073C - / 6200073C (USED TESTED CLEANED)
  • Honeywell 05704-A-0144 - / 05704A0144 (NEW NO BOX)
  • Honeywell RI-406 - P/N 4026206-940 (Sperry) Instrument Remote Controller
  • Honeywell AAU-32/A - ALTIMETER ENCODER P/N 99251-3252011-0101 REP TAG # 12197
  • Honeywell T-1204-1174 - 51304907-100 Spcii I/O Module
  • Honeywell TK-PRS021 - Control Processor Expedited Shipping TKPRS021 Spot Goods Zy
  • Honeywell VITO - Enraf Lt Interface 762 Up 762 Aga / Z
  • Honeywell QPP-0001 - FC-QPP-0001 Module
  • Honeywell TC-PRS021 - / TCPRS021 (USED TESTED CLEANED)
  • Honeywell 51403698-100 - / 51403698100 (USED TESTED CLEANED)
  • Honeywell XCL8010A - 24V NSMP
  • Honeywell 91884 - "Target, 15.620 X 12.846 X 0.250"" BTL, 07-613, 5N TI, 118305"
  • Honeywell 51403776-100 - / 51403776100 (USED TESTED CLEANED)
  • Honeywell LG1093AC01 - UV Flame Sensor/Detector
  • Honeywell CC-PCNT02 - Controller Module Expedited Shipping CCPCNT02 Spot Goods Zy
  • Honeywell FFSB14ER10KS2 - / FFSB14ER10KS2 (NEW IN BOX)
  • Honeywell RF600 - Radio Frequency Unit 7516240-60060 Removed Working
  • Honeywell 51196881-100 - NEW UPGRADE KIT EC W/ODEP 51196881100
  • Honeywell CC-IP0101 - 51410056-175 Brand New Expedited Shipping
  • Honeywell AL300 - Alt Preselect Command Controller 7002412-904 w/ August 2011 Repaired 8130
  • Honeywell 094377-00 - / 09437700 (USED TESTED CLEANED)
  • Honeywell IRTP271 - Tata Printed Circuit Board Rev.0 DPCB21010003
  • Honeywell TVMUGR-888880-020-52-3-030-0U000G-000 - MULTITREND GR GRAPHIC RECORDER
  • Honeywell RM850 - Radio Management Unit 7012100-811 w/ December 2017 Repaired 8130
  • Honeywell PGM-7360 - Gas Detector
  • Honeywell WU660 - Radar RTA 7021450-601 w/ April 2024 Overhauled 8130
  • Honeywell 9243201 - / 9243201 (NEW NO BOX)
  • Honeywell AZ850 - Micro Air Data Computer 7014700-601 Removed Working
  • Honeywell DCP550 - Yamatake- Digital Programmable Controller Temperature
  • Honeywell FF-SEDGE6G2-1M-C - / FFSEDGE6G21MC (USED TESTED CLEANED)
  • Honeywell FC-RUSIO-3224 - Brand New Expedited Shipping Via DHL
  • Honeywell RM850 - Radio Management Unit 7012100-801 w/ March 2021 Tested 8130
  • Honeywell HIMA-6E-B - Large System Controller Via DHL or FedEx
  • Honeywell RM855 - Radio Management Unit 7013270-973 w/ April 2024 Modified 8130
  • Honeywell MP-DNCF02-200 - REV B Upper & Lower / 51305072-300 51305072-200 REV L.
  • Honeywell 80360206-001 - / 80360206001 (USED TESTED CLEANED)
  • Honeywell DE132-0-A-BB-0-Z-1-0C-EE0-00 - Chart Recorder
  • Honeywell 51403519-160 - NSNP
  • Honeywell 627-1002RC - / 6271002RC (USED TESTED CLEANED)
  • Honeywell 51400997-100 - / 51400997100 (USED TESTED CLEANED)
  • Honeywell J-AOM10 - Yamatake- /J-A0M10 Analog Output Module 24Vdc 480Ma Hw/Fw Rev: C
  • Honeywell AZ800 - Digital Air Data Computer 7000700-953 w/ July 2016 Repaired EASA Form 1
  • Honeywell FC-RUSIO-3224 - Brand New
  • Honeywell BZ-2RW82272-A2 - Micro Switch 1a 125vac
  • Honeywell FC-RUSIO-3224 - 1PC Brand New
  • Honeywell 10268S-1-020-201-0-2-03100-000-00 - Electric Actuator 121va 120v-ac
  • Honeywell 14CE102-1RS - Limit Switch IP65
  • Honeywell FC-PSU-UNI2450U - Brand New Fast Shipping FedEx or DHL
  • Honeywell 696658-1 - SUPPORT ASSY. NS 11764 (3)
  • Honeywell TK-PRR021 - ONE New 51309288-475 DC
  • Honeywell PSU-UNI2450 - (AS PICTURED) NUPI
  • Honeywell 80360146-011 - / 80360146011 (USED TESTED CLEANED)
  • Honeywell EGWPM - MODULE Assembly 7028419-1904 Inspected/Tested Jun. 2021
  • Honeywell DE131-0-A-0B-0-Z-1-0B,0C-EE0-000 - "Chart Recorder"
  • Honeywell 51454493-126 - / 51454493126 (NEW IN BOX)
  • Honeywell 965-1186-003 - "MK VI, GPWS Computer, EASA FORM ONE/FAA 8130 Guaranteed"
  • Honeywell 51401996-100 - / 51401996100 (USED TESTED CLEANED)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118222"
  • Honeywell SPS5785 - 1pc 51198651-100 Power Supply Brand New Fast shipping
  • Honeywell FX-USI-0002 Security Manager System Module 5Vdc
  • Honeywell SPS5785 - 51198651-100 power supply
  • Honeywell HIMA-6E-B - Large System Controller Fast Shipping
  • Honeywell 51301882-100 - RTD MUX Terminal Board
  • Honeywell 51198821-100 - 1PC new module PLC One year warranty free Shipping#XR
  • Honeywell EAMR - 51401996-100 E CARD card
  • Honeywell 51305734-100 - / 51305734100 (USED TESTED CLEANED)
  • Honeywell 50065674 - Basic Display PWA Assembly HNWG50049911-001
  • Honeywell TSENCOBTM-07889 - "15.620X12.913X0.125 MPS-5-002/M TARGET, 109953"
  • Honeywell 86220000 - / 086220000 (USED TESTED CLEANED)
  • Honeywell CC-IP0101 - C300 system card Brand new fedex or DHL
  • Honeywell WU880 - Radar Antenna 7021450-801 w/ May 2024 Repaired 8130
  • Honeywell CC-IP0101 - ONE Profibus DP Gateway Module NEW
  • Honeywell 397124-2-4 - Gulfstream Valve New Overhauled
  • Honeywell PGM-7340 - RAE 3000 VOC Detector Shipping DHL or FedEX
  • Honeywell RCZ850 - Integrated Communication Unit 7510100-731 w/ March 2024 Tested 8130
  • Honeywell STS103-001-00006-12-1137 - NSNP
  • Honeywell AL300 - Altitude Preselect Command Ctlr 7002412-906 w/ March 2024 Overhauled 8130
  • Honeywell 2119020-8000 - Series 1 N1 Digital Electronic Engine Control
  • Honeywell 51198685-100 - Power Module Brand New Shipping FedEx or DHL
  • Honeywell 620-0073C - / 6200073C (NEW IN BOX)
  • Honeywell GTS-3PA-B - "Timer 0-60 Sec, 220v 50/60 Hz"
  • Honeywell IVA81D - TCAS Vertical Speed Indicator 066-01171-2804 w/ January 2020 Tested 8130
  • Honeywell 51403299-200 - / 51403299200 (NEW NO BOX)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118221"
  • Honeywell AT860 - Loop Sense Antenna 7510300-901 w/ May 2024 Tested 8130
  • Honeywell XL2000B3A - 1PCS USED /
  • Honeywell CC-PCNT02 - C300 Controller Module
  • Honeywell ASDX015D44R - SenSym Pressure Sensor Micro Switch 0-15 psi 8 pin DIP
  • Honeywell 900CS15-00 - Touch Panel NEW SHIP DHL OR EMS 1 Year Warranty cl
  • Honeywell FC-SCNT01 - S300 Control Module 51454926-176 Security Control - 400mA
  • Honeywell DC1010CR-301000-E - Digital Temperature Controller 85-265VAC
  • Honeywell TK-PRR021 - redundancy module 51309288-475
  • Honeywell K4LCN - 51402755-100 Motherboard SS 51201795-400
  • Honeywell XL2000B3A - plc new FREE EXPEDITED SHIPPING
  • Honeywell FC-SCNT02 - 51460114-176 S300 Controller Module 78-4
  • Honeywell BVS - 99ATEX2259X 03ATEXG016X Tester new