Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

We will strengthen work safety in non-coal mines

F: | Au:佚名 | DA:2023-11-28 | 672 Br: | 🔊 点击朗读正文 ❚❚ | Share:

I. General requirements and work objectives

1. Resolutely implement the spirit of the Notice and a series of important instructions and decisions of the Party Central Committee and The State Council on strengthening work safety, with the goal of effectively curbing the occurrence of major accidents in non-coal mines and continuing to reduce the total number of accidents, and further improve measures to deepen the "three actions" and "three construction" of work safety. Focus on prevention, strengthen supervision, implement responsibility, vigorously promote the implementation of the main responsibility of enterprise safety production, vigorously promote the fight against non-compliance, rectification and closure, resource integration, technological progress, strong foundation and other work, vigorously promote the construction of long-term mechanism of safety production, and strive to the end of 2013, Large and medium-sized metal and non-metallic mines have reached the level of safety standardization above level 3, all metal and non-metallic mines and tailings ponds have reached the level of safety standardization above level 5, and open-pit mines (excluding profile mines) all use medium-deep hole blasting, mechanical shovel loading, mechanical secondary crushing technology and equipment. All metal and non-metal underground mines (hereinafter referred to as underground mines) are installed and used in monitoring, personnel positioning, emergency avoidance, pressure and wind self-rescue, water supply rescue and communication systems, and all tailings ponds above grade 3 are installed in the whole process of online safety monitoring system. The system of the main responsible persons, safety management personnel and special operations personnel in mining enterprises working with certificates and the system of training employees before working has been fully implemented. By the end of 2013, we will strive to bring the death toll of production safety accidents in non-coal mines under 1,000, effectively curb major accidents, and further stabilize and improve the situation of production safety.

Second, comprehensively strengthen the basic safety management of non-coal mine enterprises

2. Improve the enterprise safety production responsibility system and various rules and regulations. Non-coal mining enterprises should establish and improve the safety production responsibility system at all levels with the legal representative responsibility system as the core. On that basis, It is necessary to improve the management of safety objectives, mine leaders down the well, safety regular meetings, safety inspections, safety education and training, production technology management, mechanical and electrical equipment management, labor management, safety cost extraction and use, major hazard monitoring, safety hazards investigation and management, safety technical measures approval, labor protection equipment management, occupational hazard prevention, production safety accident report and response Emergency management, safety production rewards and punishments, safety production file management and other systems, as well as various safety technical regulations.

3. Establish and improve the enterprise safety management organization. Non-coal mining enterprises shall set up special safety management agencies and be equipped with full-time safety management personnel. There are not less than 3 full-time safety management personnel in underground mines, not less than 2 people in open pit mines, and not less than 1 person in small open pit quarries, and each shift must ensure that there are dedicated (and concurrently) safety officers on duty. Large and medium-sized enterprises should have a security director and deputy director.

(4) Establish and strictly implement the underground mine leaders down the well shift system. Underground mining enterprises should establish and improve the mine leaders down the well with the shift system, and at the same time with workers down the well, up the well. Mine leaders should take the guarantee of safe production as the primary responsibility, effectively grasp the safety of the underground production situation on duty, strengthen the inspection and inspection of key parts and key links, timely discover and dispose of safety hazards, stop the "three violations" of illegal command, illegal operation and violation of labor discipline, and find major hidden dangers endangering the safety of workers. Mine leaders must immediately organize to stop production and withdraw personnel.

5. Strengthen production technology management of enterprises. Non-coal mining enterprises shall establish a general technical person in charge, and make it clear that the general technical person in charge of the enterprise under the leadership of the main person in charge of mine production technology work is responsible for the overall responsibility. At the same time, it is necessary to set up production technology management agencies, equipped with mining, mechanical and electrical, geological and surveying professional and technical personnel. Underground mines must also be equipped with specialized technical personnel such as ventilation. Mines that cannot afford professional and technical personnel must employ professional and technical personnel or entrust intermediary agencies such as evaluation, consultation and technical services to provide technical services. In strict accordance with the "Safety Regulations for Metal and non-metal mines" (GB16423-2006) and other relevant technical specifications, timely drawing of mine related measured drawings, drawings should be consistent with the actual. The general technical person in charge of the enterprise shall organize a technical analysis meeting every month, and it shall be convened at any time under special circumstances to timely study and solve the technical problems of safety production. Underground mining enterprises should carry out a safety and reliability assessment on mining, lifting, transportation, ventilation, drainage, power supply and distribution systems every year. If major hidden dangers arise due to failure to solve technical problems in production safety, the principal person in charge of the enterprise, the general person in charge of technology and relevant personnel shall be punished; Where a production safety accident occurs, responsibility shall be investigated according to law.

6. Effectively strengthen the professional management of enterprise security. In underground mines, effective measures should be taken to continuously strengthen the professional management of ventilation, lifting, blasting, roof, empty area, ground pressure, mechanical and electrical equipment and exploration and drainage. The monitoring and control of high and steep slope and waste dump should be strengthened continuously in open pit mines. The stability of the dam body, the monitoring and management of dam construction and flood discharge facilities should be strengthened continuously. Oil exploitation enterprises should continue to strengthen the "three high" (high sulfur, high production, high pressure) gas field well control, sulfur oil field hydrogen sulfide monitoring, offshore oil typhoon (storm surge) prevention work.

7. Effectively strengthen on-site safety supervision and inspection of enterprises. Non-coal mine enterprises shall implement the content, scope, frequency and method of on-site safety inspections, formulate on-site inspection lists, and implement responsible units and responsible persons. It is necessary to strictly inspect and dispose of various problems existing in various systems, various parts and various operating locations, and strictly investigate and punish the "three violations" and the behavior of super ability, super strength and over-quota production organization. Employees should be encouraged to supervise and report various violations and violations, and rewards should be given to whistleblowers.

8. Timely investigation and treatment of potential production safety hazards. Non-coal mining enterprises should strictly implement the safety production hidden danger investigation and management system in accordance with the "Interim Provisions on the investigation and management of hidden safety accidents" (Order No. 16 of the State Administration of Safety Supervision), and clarify the tasks, scope and responsibilities of daily investigation, regular investigation and hierarchical management. The main person in charge or responsible person in charge of the enterprise, and the chief technical person in charge of the enterprise shall organize at least one comprehensive security inspection every month with hidden danger investigation as the main content. All kinds of hidden dangers should be registered, and the rectification measures, responsibilities, funds, time limits and plans should be effectively implemented. It is necessary to establish a hidden danger rectification effect evaluation system led by safety production professionals to ensure that the rectification is in place. After the completion of the hidden danger rectification, the legal representative of the enterprise or the responsible person in charge, the general person in charge of technology to organize acceptance. Failure to rectify hidden dangers caused by production safety accidents, to be seriously investigated in accordance with the law responsible for the responsibility.

Non-coal mine enterprises have major safety hazards (see Annex 1 for classification), to immediately stop production, the main person in charge of the enterprise to organize the development and implementation of hidden dangers management plan, and at the same time to the county level and above safety supervision departments for the record. Safety supervision departments at or above the county level within 3 months found two (including two) more than the same major safety hazards and did not stop rectification of non-coal mine mountain enterprises, to be severely punished, serious nature, to request the local government to be closed.

9. Strengthen safety education and training for enterprise employees. The main person in charge, safety management personnel and special operations personnel of non-coal mining enterprises must be trained and qualified by relevant institutions and obtain corresponding qualification certificates before they can take up their posts. Strictly implement the safety education and training system for all employees, and conduct mandatory safety training for new employees in accordance with relevant regulations to ensure that they have the knowledge and skills required for safe operation, self-rescue and mutual rescue and emergency response. Any enterprise that takes up a post without training or a license shall stop production for rectification according to law. If there is no safety training and education for underground operators, or if an accident occurs due to the unlicensed work of special operators, it shall be closed down according to law.

10. Strengthen the safety management of outsourced construction teams. Outsourcing construction units engaged in non-coal mining construction must have mining engineering construction qualifications and obtain safety production licenses. Non-coal mining enterprises should sign safety production management agreements with outsourcing construction units, making it clear that non-coal mining enterprises are the main body of responsibility for safety production, and outsourcing construction units bear direct safety production responsibilities for undertaking projects. Before construction, the outsourcing construction unit shall file with the safety supervision department at or above the county level where the project is undertaken, otherwise it shall not start. A commercial blasting operation unit engaged in mining project blasting operations must obtain a safety production license for non-coal mining enterprises in accordance with the conditions of mining and excavation construction units.

11. Strengthen the standardization of enterprise safety. Large and medium-sized open-pit mines, underground mines and tailings ponds above Grade III shall reach the minimum level of safety standardization by the end of 2011; By the end of 2013, all metal and non-metal mines and tailings ponds must meet the minimum level of safety standardization. Those who fail to reach the minimum level of safety standardization within the prescribed time shall have their safety production license revoked in accordance with the law and request the local government at or above the county level to close it down in accordance with the law. After January 1, 2011, the replacement of the safety production license must reach the minimum level of safety standardization, otherwise it will not be extended to replace the license.

12. Strengthen the safety management of enterprise teams. Non-coal mine enterprises should take team safety management as an important link of safety production. It is necessary to improve the team safety management system, implement the team safety production responsibility, set up team safety personnel, establish team safety production ledger, carry out regular team safety activities, and improve the team's ability to prevent and respond to accidents and disasters.

Third, comprehensively strengthen the capacity building of non-coal mine enterprises to ensure production safety

13. Compulsory implementation of advanced and applicable technology and equipment. Open pit mines suitable for using medium and long hole blasting, mechanical shovel loading, mechanical secondary crushing technology and equipment, to adopt all the above technologies and equipment by the end of 2011, due to special reasons can not be used, to form a written report to the safety supervision department at or above the county level for the record; Underground mines shall install and use technical equipment such as monitoring and control system, underground personnel positioning system, emergency avoidance system, pressure air self-rescue system, water supply rescue system and communication and liaison system; The whole process online safety monitoring system should be installed for tailings ponds above Grade 3. Offshore oil exploration enterprises should be equipped with a dynamic tracking system for offshore personnel and complete it within three years. If the above requirements are not met within the time limit, the safety production license shall be temporarily withheld according to law. It is necessary to vigorously promote the application of ground pressure and goaf monitoring and monitoring system, high steep slope stability monitoring system, non-electric detonation, dry discharge, tailings filling and comprehensive utilization, high sulfur gas field exploration and development safety key technologies, oil and gas pipeline leakage detection technology (process) equipment. It is necessary to use the "Jin 'an" project to actively promote the information construction of safety production in non-coal mines, establish a comprehensive safety production management information platform, build a digital mine demonstration project, and improve the level of enterprise safety prevention.

14. Increase investment in safety and research and development of safety production technology. Non-coal mines shall withdraw and use production safety expenses in accordance with relevant regulations, increase investment in safety, and strive to improve production safety conditions. Large and medium-sized non-coal mining enterprises should rely on colleges and universities, research institutes and other units to carry out scientific and technological research and development of safety monitoring, safety protection, individual protection, disaster monitoring, special safety facilities and emergency rescue, and promote the upgrading of key technology and equipment for safety production.

15. Accelerate the pace of professional technology and skill personnel training. Non-coal mining enterprises should establish and improve personnel training and incentive mechanisms, strengthen cooperation with colleges and universities and vocational schools, and increase the training of non-coal mining, mechanical and electrical, geology, ventilation, safety management and other related professionals through cooperative schools, matching single recruitment, order training, etc. Speed up the training of non-coal mine professionals and production line urgently needed skilled talents. At the same time, it is necessary to encourage and support the development and research of technical backbone in related safety technology and equipment. Awards shall be given to units and individuals that have outstanding performance in scientific research, technological development and technological popularization of safety in non-coal mines.

16. Strengthen the construction of emergency rescue system for work safety in non-coal mines. It is necessary to rely on large mining enterprises and professional rescue forces to establish provincial and municipal regional non-coal mine emergency rescue bases or backbone teams. All non-coal mining enterprises should establish full-time and part-time emergency rescue teams, equipped with necessary emergency rescue equipment and materials; Without the ability to establish, to sign an emergency rescue service agreement with the surrounding regional emergency rescue base or backbone team. To improve all kinds of non-coal mine production emergency plans, especially according to the actual situation and safety production characteristics of the enterprise, on the basis of the overall plan, including slope landslide (collapse), flood, fire, poisoning and asphyxiation, falling tank (sports car), explosion, surface collapse (roof fall), tailings dam collapse, blowout out of control, hydrogen sulfide poisoning accidents and other special emergency plans. And strengthen emergency drills. It is necessary to strengthen the construction of emergency equipment, and equip full-time and part-time rescue teams with necessary rescue equipment, especially advanced and special equipment and personal protective equipment for handling major and complex accidents, so as to improve their emergency response and personal protection capabilities.

17. Establish and improve the early warning mechanism for enterprise production safety. Non-coal mine enterprises should establish and improve the dynamic monitoring and early warning and forecasting system of safety production, strengthen the contact with the resident safety supervision, meteorology, land and resources management and other departments, promptly take the initiative to understand the impact of local flood situation and geological disasters, regularly carry out safety risk analysis and hidden danger investigation and management according to the regulations, and do a good job in major hazard monitoring. We will prepare for and respond to disasters in advance. If there are signs of an accident, it is necessary to immediately issue early warning information and implement preventive and emergency measures. When the accident may affect the surrounding residents, the warning information must be reported to the local safety supervision department at the first time.

Fourth, comprehensively strengthen the safety supervision of non-coal mines

18. Crack down on illegal construction, production and business operations. Safety supervision departments at all levels should explore the establishment of a joint conference system for combating illegal and illegal activities in non-coal mining areas, and form a working system and mechanism for combating illegal construction and production and business activities in non-coal mining areas under unified government leadership, comprehensive coordination by the office of the Safety Committee, division of responsibilities by departments, and public participation and support. It is necessary to jointly crack down on illegal construction, production and business operations with relevant departments (see Annex 2 for details). Enterprises that resist law enforcement and their principal persons in charge shall be severely punished according to law and regulations; For those who refuse to implement safety supervision instructions, local governments shall be requested to ban and close them down according to law.

19. Establish and improve the system of listing and supervising the management of major hidden dangers. In accordance with the provisions of the "Work safety Duties of the member units of The State Council Work Safety Committee" (Safety Commission [2010] No. 2), the provincial safety supervision departments and relevant departments have implemented the listing supervision and announcement system for the management of major safety production hazards in non-coal mines.

20. Effectively strengthen the safety supervision of non-coal mine construction projects. Strict implementation of the non-coal mine construction project safety facilities and the main project simultaneously design, construction, production and use of the "three simultaneous" review system. If the safety facilities and the main project are not designed at the same time, they shall not be approved and construction shall not begin. If simultaneous construction fails, the construction shall be ordered to stop; Those that have not been put into use at the same time shall not be accepted for completion, shall not be produced, and shall not be issued a safety production license. Strictly implement the safety responsibilities of survey, construction, design, construction, supervision, supervision and other parties. If the project construction unit has illegal contracting, subcontracting, subcontracting and other acts, it shall be immediately ordered to suspend work or stop production for rectification according to law, and the project owner, contractor and other parties shall be investigated for their responsibilities.

21. Strictly manage the construction cycle of non-coal mine construction projects. Non-coal mine mountain construction projects shall be constructed in accordance with the construction period determined by the preliminary design, in the construction period is not completed on schedule, to be responsible for safety facilities design review and approval of the safety supervision department report, in the extension of the period still can not complete the construction, there is illegal construction while producing, by the safety supervision department to the local government to be closed according to law. A record system for pilot production (operation) shall be implemented. Safety facilities of construction projects shall not be put into production without the acceptance of completion organized by the safety supervision department. If trial production (operation) is really needed before completion and acceptance, the construction unit must organize the acceptance of a single project, formulate trial production (operation) plans and emergency plans, and submit them to the safety supervision department responsible for "three simultaneous" examination and approval for the record before trial production (operation) can be carried out. In principle, the trial production (operation) period shall not exceed 6 months. If the trial production (operation) period needs to be extended, an application shall be submitted to the safety supervision department to explain the situation, but the extension period shall not exceed 3 months. The construction unit shall submit an application for completion acceptance of safety facilities to the safety supervision department within 1 month before the end of trial production (operation), and shall be put into formal production and operation only after receiving qualified experience and applying for a safety production license.

22. Strict preconditions for safe production access. Provincial safety supervision departments should pay close attention to the development of local safety standards that are compatible with national safety production standards according to local realities. To meet the requirements of safety standards as a prerequisite for the access of non-coal mine enterprises, the implementation of strict safety standards approval system; It is necessary to formulate the minimum mining scale and minimum service life policies for metal and non-metal minerals in the region together with relevant departments, and resolutely refuse to approve those that fail to meet the requirements. At the same time, it is necessary to jointly review the mineral resources development and utilization plans of non-coal mine enterprises with the land and resources department, and demonstrate safety conditions to ensure safe production access from the source. Any construction that does not meet production safety standards and violates regulations shall be ordered to stop the construction, and if the circumstances are serious, the local government shall be requested to shut down the construction according to law. Where there are hidden dangers in lowering standards, the relevant personnel and responsible persons shall be held accountable.

23. Raise the safety access threshold for non-coal mines. The relevant departments shall not approve any of the following new non-coal mine construction projects: (1) those that are lower than the minimum production scale prescribed by the state or the local region; (2) The mining life of metal and non-metal mines is less than 3 years; (3) The minimum safe distance between the mining areas of adjacent open-pit mines is less than 300 meters; (4) not equipped with professional and technical personnel according to regulations; (5) not equipped with mining equipment in accordance with regulations; (6) Tailings ponds above Grade 3 do not adopt the whole process online safety monitoring and monitoring system; (7) The stability of the dam body of the tailings pool is affected by mining operations around the operational tailings pool; (8) Other safety production conditions required by laws and regulations.

24. Strengthen local supervision of production safety in non-coal mining enterprises. In accordance with the relevant provisions, the safety supervision department at or above the county level shall implement strict supervision and inspection of production safety and management of non-coal mine enterprises within the jurisdiction (among them, the safety supervision of non-coal mine enterprises belonging to the central enterprises shall be responsible for the safety supervision department at or above the municipal level). No mining enterprise shall, for any reason, hinder the safety supervision authorities from conducting on-site inspections.

25. Strengthen supervision over the use of special funds. Safety supervision departments at all levels should urge and guide relevant non-coal mine enterprises to effectively use the special funds for tailings pond management supported by central finance, and implement local and enterprise matching funds. At the same time, it is necessary to obtain the support of the government at the same level, explore the establishment of a special fund for safety production in non-coal mines, and give financial support to improve safety supervision equipment, close small mines, implement tailings treatment technology and advanced technologies such as goaf and ground pressure monitoring, large goaf and subsidence area management, and safety standardization construction.

26. Strengthen supervision over the extraction and use of safety production expenses in non-coal mines. Safety supervision departments at all levels should, in light of actual conditions, formulate measures for the extraction and use of production safety expenses in non-coal mines, strengthen supervision and inspection of the extraction and use of production safety expenses in non-coal mines, study and raise the lower limit standards for the extraction of production safety expenses in non-coal mines, improve the management system of production safety expenses in enterprises, and ensure that enterprises can extract production safety expenses in full before taxes. Improve work safety in non-coal mines.

27. Strengthen policy guidance for work safety in non-coal mines. Safety supervision departments at all levels shall, together with relevant departments, study and formulate policies to promote the research of non-coal mine safety production technology and the development and research of equipment. Encourage and guide non-coal mine enterprises to cooperate with colleges and universities and scientific research institutes to actively seek support from the national key science and technology research plan, the National Natural Science Foundation, the National high-tech Industrialization Project, and the National Innovation Fund for the research and development of safety production technology and equipment in non-coal mine mountains; Encourage and guide non-coal mining enterprises to independently develop or cooperate with scientific research institutions to develop advanced and applicable safety production technologies and mining products; Organize the implementation of safety production science and technology demonstration projects such as monitoring and monitoring of goaf areas in non-coal mines, monitoring and monitoring of high and steep slopes in open-pit mines, online monitoring of tailings ponds, and prevention of hydrogen sulfide poisoning, and promote non-coal mine enterprises to speed up the level of safety technology and equipment.

28. Further strengthen capacity building for safety supervision of non-coal mines. It is necessary to strengthen the construction of non-coal mine safety regulatory agencies, further strengthen the grass-roots safety regulatory forces, and strive to improve their ability to perform their duties. At the same time, it is necessary to strengthen the construction of non-coal mine safety supervision equipment, and equip non-coal mine safety supervision agencies with necessary supervision and monitoring means and office equipment to meet the needs of supervision work.

29. Strengthen supervision of professional service agencies for work safety. Safety supervision departments at all levels should formulate and improve the management methods of professional safety production service agencies, and strengthen supervision while giving full play to the role of professional service agencies, so as to ensure the professionalism, independence and objectivity of professional service agencies. All safety production evaluation, technical support, safety training, testing and other service institutions should actively carry out non-coal mine technical services, and standardize technical service behavior. Each professional service institution shall bear legal responsibility for the relevant evaluation, testing, inspection and appraisal conclusions. For service agencies that violate laws and regulations and practice fraud, safety supervision departments at all levels shall strictly investigate the responsibilities of relevant personnel and institutions in accordance with the law and regulations, and reduce or revoke relevant qualifications.


  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module
  • Alcatel-Lucent MDEE DPB11 Part 109773580 – Digital Processing Board
  • Alcatel 3EH76027ADAD OmniPCX Enterprise Communication Server R500/30.4
  • Alcatel-Lucent 3EH73084AEJD Gateway Driver Board GD-3 – Communication Interface
  • Alcatel-Lucent 9500-MPR ODU Radio MPT-HC V2 3DB20476BAAB04 23 GHz Microwave Outdoor Unit
  • Alcatel-Lucent 9396 Digital 2U NodeB Indoor – UMTS Base Station
  • Alcatel-Lucent 3HE03607AA CFM-XP Control Fabric Module – Switch Fabric Controller
  • Alcatel-Lucent 8232 DECT Mobile Handset – Cordless Enterprise Phone
  • Alcatel-Lucent 244-2082-201 Sierra NAC V3.1 Slave Package – Network Access Control
  • Alcatel-Lucent 408154912 CPU Rear I/O Pack Card – Backplane Interface Module
  • Alcatel-Lucent 3AL82037ADAA SFP Module
  • Alcatel-Lucent OMQ 408645968 Optical Module
  • Alcatel-Lucent 9500 MPR 8-Slot Shelf 3DB18485AB
  • Alcatel-Lucent 408154904 CPU I/O Card
  • Alcatel-Annecy 5150 CP Turbo Vacuum Pump
  • Alcatel-Lucent 3EH73084AEJD08 Card
  • Alcatel-Lucent 3EH73050ABAB Interface Card
  • Alcatel-Lucent 3HE06151ABAA01 SFP Line Card
  • Alcatel-Lucent 8DG59242AD Power Filter
  • Alcatel-Lucent IMM48-1GB-TX 48-Port Module
  • Alcatel Lucent 3CM03285MQ02 Module
  • Alcatel 3HE07158BA 7750 SR-12 IMM-2PCA-FP3 Optical Transceiver
  • Alcatel-Lucent 9396 Digital 2U NodeB Outdoor with Indoor Mainframe and Alarm Module
  • Alcatel Lucent MPX-16/64-T-L3 MPX1664TL3 Multiplexer Module
  • Alcatel Lucent 3EH73052AB Power Supply Module
  • Alcatel Lucent ASM2-155FM-2W-4C ASM2155FM2W4C Switch Fabric Module
  • Alcatel Lucent 3AL00124ABAB Interface Card
  • Alcatel-Lucent 1AB429380001 Cable Assembly
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA53065AA
  • Alcatel-Lucent 9500-MPR 11GHz MPT-HC ODU Microwave Packet Radio 3DB20371ACAA01
  • Alcatel-Lucent RRH1900-4x45 Remote Radio Head
  • Alcatel-Lucent 3HE00028AA Ethernet Line Card
  • Alcatel-Lucent 3HE04939CE CWDM SFP Transceiver
  • Nokia Alcatel-Lucent 3FE66546AA Fan Module
  • Alcatel-Lucent SSP-6 Speech Signal Processor Board
  • Alcatel-Lucent 500-1113-212 Channel Bank Assembly
  • Alcatel-Lucent EZ32-2 Board 3BA23265ADKE 01
  • Alcatel-Lucent GSM-FM-2W-4C Filter Module
  • Alcatel-Lucent 3AL00378AF Interface Card
  • Alcatel-Lucent 3AL00124ABAC Interface Module
  • Alcatel-Lucent BJB1 PWPQALGAAG 48V Independent Microprocessor Board
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8506-4 with 13 Modules
  • Alcatel Lucent 3AL00424AA Interface Card
  • Alcatel Lucent 3BA73012AB Power Supply Module
  • Alcatel Lucent ESX-100C-32W ESX100C32W Power Supply Module
  • Alcatel Lucent GSX-K-FM-2W GSXKFM2W Fan Module
  • Alcatel 8DG59247AA Optical Protection Switch Card
  • Alcatel Lucent 91-E03100-B 91E03100B Interface Module
  • Alcatel Lucent FSX-FM-1W FSXFM1W Fan Module
  • Alcatel Lucent RRH2X40-07L-AT Remote Radio Head
  • Alcatel-Lucent 9500-MPR MSS-8 Shelf 3DB18485CA
  • Alcatel Annecy ACP20 Vacuum Pump CP20
  • Alcatel-Lucent 9500 MPR P32E1DS1 E1 PDH Card
  • Alcatel-Lucent J98726AL-2 D4OI210DAA Module
  • Alcatel 409113651 RRH700L1 700MHz Remote Radio Head
  • Alcatel io2 3ba23050 PCB Card
  • Alcatel-Lucent MDR-8000 MDR-8706-8 Digital Radio
  • Alcatel-Lucent ACT2300M Turbo Pump Controller AF042134A
  • Alcatel-Lucent OmniPCX Office Medium PowerCPU PRA-TI
  • Alcatel-Lucent 9500 MPR 23GHz ODU 3DB23045HDAA01
  • Alcatel-Lucent 9500 MPR ODU Outdoor Unit 300 11GHz TX Low HP 3DB23035AAAA01
  • Alcatel-Lucent ECNT-C 3FE25676 BA AK 06 Termination Card
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8606-45 with 13 Modules
  • Alcatel-Lucent 849144415 KS-24829L1 Remote Radio Head v1.4
  • Alcatel CFF 450 Turbo Pump Controller 137171
  • Alcatel-Lucent ACS108 109579896 004 Access Controller
  • Alcatel-Lucent OS6850-48 Network Switch with PS-126W-AC Power Supply
  • Alcatel Lucent DFP-CM-14B/2T Filter DCMA Base Station
  • Alcatel Lucent ESX-K100C32W4 ESXK100C32W4 Power Supply Module
  • Alcatel Lucent 91-E03100-A 91E03100A Interface Module
  • Alcatel-Lucent STGR-LIM-A2P-72-HBI ADSL2+ High Bandwidth Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20547BBAA02
  • Alcatel Lucent Enterprise 4049-4059 MMK Keyboard Console Kit
  • Alcatel-Lucent RRH4X40-1900 Remote Radio Head
  • Alcatel Lucent OS6450-P48 Switch
  • Alcatel Lucent 625617-000-001 Cable Assembly
  • Alcatel Lucent 108320 Module
  • Alcatel Lucent TN801B Board
  • Alcatel-Lucent RRH2X50-800 LTE Remote Radio Head
  • Alcatel Lucent CPU8 Board 3BA23258AB OmniPCX 4400
  • Alcatel-Lucent 3EM22617AAAE 9500 MPT-HL Microwave Radio Transceiver
  • Alcatel-Lucent CPU7-2 3BA23259AAAD 7750 SR Control Processor Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20371BCAA01
  • Alcatel-Lucent Enterprise 4059 MMK Keyboard + Phone PAC Kit
  • Alcatel-Lucent Nokia 3HE10329AA 7750 SR Series Router Module
  • Alcatel-Lucent 7705 SAR-W IP MPLS Service Aggregation Router 3HE07349AA
  • Alcatel-Lucent-Nokia 3HE08429AARC01 7750 SR SFM5-7 Switching Module
  • Alcatel-Lucent 3HE00272DB 7750 SR-7 DC Chassis with PEM3+EFT
  • Alcatel-Lucent ACT 1300M/1600M HT Turbo Pump Controller
  • Alcatel Lucent IMM48-1GB-TX 3HE03625AAG01 48-Port 7750 SR-12 Interface Module
  • Alcatel-Lucent AP-500 Wireless Access Point
  • Alcatel-Lucent ATP-150 Power Supply
  • Alcatel-Lucent 622-8603-012 Optical Transceiver
  • Alcatel-Lucent 270-0038-010 10.5 VDC Power Supply
  • Nokia 9500-MPR Microwave Radio Module XPIC-RPS/3DB20116BCAA01
  • Alcatel-Lucent 3DB19017AB EAS Access Switch v2
  • Alcatel-Lucent 3AL81072AA Matrix Enhanced Unit - Cross-Connect Module
  • Alcatel-Lucent MDR-8606-135 6GHz Digital Microwave Radio