Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

A brief discussion on the existing problems and countermeasures in the safety management of non-coal mines

来源: | 作者:佚名 | 发布时间 :2023-11-28 | 244 次浏览: | Share:

1 Introduction

Security is an eternal theme in the process of human survival and development. With the development and progress of society, security issues have received more and more attention. Mining enterprises as a high-risk industry, the number of accidents and casualties ranked second after traffic accidents, as mining workers, how to grasp the implementation of the system, effectively do a good job of safety management at the grass-roots level, to achieve scientific and effective safety production management, and really promote the continuous improvement of safety management, is the current urgent task.

2 Problems existing in the safety production management of non-coal mines in China

At present, there are still many outstanding problems and weak links in the field of non-coal safety production in China, which need to be further strengthened and implemented. Generally speaking, China is currently in the stage of accelerated industrialization development, in the production safety accident "prone period". The outstanding performance is that the overall stable and improving development trend coexists with the still severe status quo. With the scarcity of mineral resources in the world, the price of mineral products has also soared, and the temptation of huge benefits has made many people go above the law, and illegal mining has been repeatedly banned, causing chaos in the mining industry and seriously affecting the safety of production.

3. Influencing factors of safety production management in non-coal mines

3.1 Uneven development of mine safety production management

Some departments do not understand the work of mine safety production management, the organization of mine safety production management is weak, the foundation is unclear, there is a phenomenon of laissez-faire, and the implementation of mine safety production management is not in place.

3.2 The safety foundation of mining enterprises is poor and the investment is insufficient

The safety foundation of non-coal mining enterprises is poor, the investment is insufficient, the safety investment is insufficient, the safety awareness of managers and practitioners is weak, the quality is poor, and the management is not subject to management. I am not familiar with most of the mine safety technical standards and regulations of a series of laws and regulations such as the "Safety Production Law" and the "Mine Safety Law".

3.3 Mining enterprises are not standardized

Mining technology chaos is a prominent problem in the current safety production of non-coal mines, many non-coal mines lack detailed mining design and program, and some mining with mining design program are completely not in accordance with the requirements of the program. Concentrated in excess mining and cross-border mining, some non-coal mining mountains do not carry out their own mining after obtaining the mining right, but illegally transferred the mining right to other contractors for mining, the contractor mining qualification audit is extremely not strict, resulting in unlicensed mining and indiscriminate mining phenomenon, which brings great difficulties to the safety production management of non-coal mining mountains.

3.4 The mine layout is not reasonable

There are also unreasonable problems in the layout of non-coal mines. The layout of non-coal mines has not been scientifically and reasonably planned, resulting in many large mines opening small, which is undoubtedly a great waste of resources. In recent years, after special rectification by the state, many non-coal mines that do not meet the mining qualifications have been shut down, but at this stage, there are still a large number of small non-coal mines with unreasonable layout, most of these small mines have irregular mining technology and serious waste of resources. In view of the many problems of small mines, the state adopts the policy of "small for big", and the actual integration is also difficult.

3.5 Mining management is difficult

At present, there are many obstacles to the management of non-coal mining. A large number of non-coal mine owners have a very inadequate understanding of the national policy, most of them do not realize the ownership of mine resources by the state, and adopt a very narrow concept, which directly leads to more difficult management. In addition, some owners will take the initiative to handle non-coal mining licenses and safety production licenses, but because of the long processing time and complex procedures, many owners will adopt the mode of mining while handling, making mine production in a legal and illegal awkward situation for a long time.

4 Non-coal mine safety production management measures

4.1 Mining shall comply with the basic safety production conditions

The stage height, platform width and slope Angle of open-pit mine can meet the requirements of safe operation slope stability. The fireproof drainage system on the ground has measures to prevent surface water from leaking into the open pit. Mine fire control facilities, power supply system, storage of blasting materials in accordance with the state regulations. The dump site shall have measures to prevent the occurrence of mud-rock flow and other hazards.

4.2 The enterprise shall establish rules and regulations of production safety responsibility system

Mining enterprises must implement the safety production policy of "safety first, prevention first", and gradually realize scientific and standardized safety management. Enterprises must establish and improve the responsibility system for safe production. In particular, the mine manager, as the first person responsible for safety in production of his own enterprise, must earnestly implement the production Safety Law, the Mine Safety Law and other relevant provisions of laws and regulations on production safety, formulate the production safety management system of his own enterprise, appoint qualified safety personnel, conduct follow-up inspections at each site, and take effective measures to improve the working conditions of employees. To ensure the timely supply of materials, equipment, instruments and labor protection required for safe production, and conduct safety education and training for employees in accordance with the requirements of relevant laws and regulations.

4.3 Strengthen employee safety education

Employees must receive three levels of safety education before working. They must observe labor discipline, do not drink alcohol before or during work, concentrate on work, do not read, sleep, do private work, bring children to work, and do not leave work without permission; Before going to work, you must wear labor protective equipment, work near the machine, should tie the sleeves, pants, women should pull the hair into the work cap, before work must carefully check the mechanical equipment, tools and the site is safe, work must strictly implement the post operating rules and relevant rules and regulations. Where to work in the danger area, first of all, there must be safety measures, unit leaders to disclose to the staff, eliminate unsafe factors, otherwise not allowed to work. It is strictly prohibited to risk operation in violation of regulations, in addition to paying attention to their own safety, but also pay attention to the safety of people around. Accident should be reported in time and try to rescue.

4.4 Establish and improve the work safety supervision system

The establishment of vertical to the end, horizontal to the edge of the safety production supervision system: non-coal mine production is a large system project involving many production personnel, the relevant management personnel to coordinate the organization and the environment and staff optimization configuration, so the establishment of a comprehensive safety production supervision system, training professional and experienced supervisors is necessary. In the supervision process, it is not only necessary to clarify the post responsibility system, but also to regularly assess the supervisors, stimulate their work enthusiasm, and play their own application role. In the process of development of non-coal mine, gradually improve the safety management system, make it meet the development needs of the new era, and provide an effective guarantee for the production safety of flying coal mine. Establish education and training system to continuously improve the safety quality of all staff: non-coal mine production safety issues are mainly for the staff participating in the production process, relevant departments should be based on the actual situation, sum up the correct production experience at the same time, standardize the safety behavior of production personnel, to regularly organize safety education and training and carry out regular assessment; Specify a sound reward and punishment system, improve the enthusiasm and enthusiasm of production personnel, and strengthen the construction of safety culture. In addition, it is also necessary to regularly designate different production personnel to share their safety experience, full participation, mutual exchange, and enhance the weight of safety production in the minds of staff.

4.5 Strengthen the construction of safety management mechanisms

Establish and improve the safety management and mass prevention and governance mechanism of the Party, government and work groups: The development of non-coal mountains is based on scientific development, and the party and government departments in charge of coal mine production in the production process should establish a corresponding safety management mechanism, carry out comprehensive publicity and education, attach great importance to the safety of non-coal mine mountains, achieve mass prevention and treatment, and improve the characteristics of each link in the production process. Leaders and organizations at all levels should also carry out safety education in various forms, take safety as the core, and create a good production atmosphere. Establish and improve the risk pre-control and management mechanism, and comprehensively promote the standardization of safety quality and essential safety management: Non-coal mine production itself is very risky, and with the changes of The Times, the traditional risk prevention management mechanism has gradually been eliminated, and the types of risks are also changing. Only by actively exploring new safety management concepts and approaches, seizing the initiative of safety production, and improving the risk management mechanism can we promote the safety production quality of non-coal mine in a more comprehensive way. Establish and improve the accident emergency rescue mechanism, and constantly improve the accident emergency rescue ability: the occurrence of non-coal mine production safety accidents is not specific, but once it occurs, it will bring huge economic losses and personnel safety problems. It is necessary to establish a set of emergency rescue mechanism to prevent emergency rescue measures and control the situation comprehensively and quickly in the event of an accident to reduce the waste of resources. Relevant departments should regularly organize emergency rescue drills when accidents occur, improve the emergency rescue ability of production operators, and achieve prevention and control for non-coal mine production safety.


  • GE HYDRAN 201Ti Single Channel Gas Monitoring Transmitter
  • GE Hydran M2-X Transformer Online Monitoring Equipment
  • GE Hydran M2 Transformer Monitoring System
  • Kollmorgen Seidel 65WKS-CE310/6PB - Servo Drive Control
  • Kollmorgen U9M4T - Servodisc DC Motor, With Harmonic Drive Transmission
  • KOLLMORGEN TT-2952-1010-B - INLAND BRUSH SERVO MOTOR WITH TACH
  • ONE VF-RA2474N-5/10/12/15 - Servo Drive Power Cable
  • Kollmorgen S30601-NA - Servostar 346 + EtherCat
  • Kollmorgen HDIL100P1 - Direct Drive Linear Hall Effect Assembly
  • Kollmorgen TT-4239-1010-AA - DC Servo Motor 875 RPM
  • PMI Kollmorgen 00-00907-999 - ServoDisc DC Motor 0.5" Diameter Shaft
  • INLAND KOLLMORGEN TT-2952-1010-B - MOTOR (USES RESOLVER)
  • KOLLMORGEN CTI-187-2 - BRUSHLESS MOTOR DANAHER MOTION
  • Kollmorgen 12-0857 - Lead Screw Electric Cylinder without Motor
  • Kollmorgen AKM13C-ANCNR-00 - Servo Motor
  • kollmorgen 6sm, 10m - Cable
  • KOLLMORGEN ME2-207-C-94-250 - GOLDLINE SERVOMOTOR-ENCODER COMMUTATED
  • Kollmorgen MT308A1-R1C1 - GoldLine Motor
  • Kollmorgen 73 & 54 cm Travel - Ironless Linear Motors on THK Rail
  • Kollmorgen AKM53H-ACCNR-00 - Servo Motor
  • Kollmorgen PA5000 - Power Supply
  • KOLLMORGEN D082M-12-1310 - GOLDLINE DDR DIRECT DRIVE ROTARY MOTOR 230Vrms 300 RPM
  • Kollmorgen RBEH-01210-A14 - Brushless Motor, Heidenhain D-83301
  • KOLLMORGEN Servotronix PRD-CC18551H-11 - Servo Board
  • Kollmorgen DH083M-13-1310 - Ho Direct Drive Rotary. Max Speed: 400/500 RPM
  • KOLLMORGEN BMHR-4.8XX - INLAND MOTOR
  • Kollmorgen Seidel 84421 - Motor Cable 20 Metre 6SM 27/37 AKM DBL Engines
  • Kollmorgen AKD1207-NBCC-0000 - Drive
  • HP Indigo / Kollmorgen VLM32H-ALNR-00 - Motor
  • SUPERIOR ELECTRIC / KOLLMORGEN GM05009005 - POWERSTAT 50 AMP VARIAC w/ PMI MOTOR
  • Kollmorgen CM12A1-015-033-00 - MOTOR CABLE for AKD B/P/T/M Motor AKM 1-7 Cable
  • Kollmorgen U9M2 - DC Motor
  • Kollmorgen AKM11C-ANMN2-00 - 3-Phase PM Servo Motor 110W
  • Kollmorgen 60-023168-000 - MOTOR GEARBOX ASSEMBLY SERVODISC DC NO REAR SHAFT
  • Kollmorgen AS10300 - servo drive servo star Cincinnati
  • Kollmorgen AKM23D-EFC2C-00 - Servo Motor AKD Drive
  • KOLLMORGEN E33HRFB-LNK-NS-01 - STEPPER MOTOR 2.7AMP 251W 1500RPM 170V
  • Kollmorgen AKM21G-ENM2DB00 - Servomotor
  • KOLLMORGEN SERVO STAR 620-AS - 230-480V 20A Servo Drive
  • Kollmorgen CFE0A1-002-006-00 - Encoder Cable 6.00m
  • KOLLMORGEN AKM21C-ANM2DBOO - PM SERVOMOTOR
  • Kollmorgen 03200-2G205A - ServoStar Servo Drive
  • Kollmorgen CR10251 - SERVOSTAR CD AC Servo Driver
  • Kollmorgen VF-DA0474N-03-0 - 10 Ft Feedback Cable
  • KOLLMORGEN AKM21S-ANMNR-03 - Servo Motor
  • Danaher Motion Kollmorgen S403AM-SE - Servostar 443M-S Servo Drive
  • Kollmorgen Seidel digifas 7204 - Servo Amplifier Digital
  • Kollmorgen Industrial Drive B-406-B-A1-B3 - Goldline Brushless Servomotor
  • Danaher Motion S20630-CNS - Servo Kollmorgen S200 Series
  • KOLLMORGEN B-206-A-31-B3 - GOLDLINE BRUSHLESS PM SERVO MOTOR 1400RPM
  • Kollmorgen Seidel SR6-6SMx7 - 4m Cable
  • Cincinnati Milacron Kollmorgen Vickers PSR4/5-250-7500 - Power Supply
  • Kollmorgen AKM 13C-ANCNR-00 - Gripper Handling with Neugart PLE 40 gears
  • Kollmorgen SERVOSTAR 403 A-P - 3a servo drive
  • KOLLMORGEN S6M4H - INDEXER ASSY SERVO MOTOR
  • SERVOMOTOR KOLLMORGEN SEIDEL 6SM 57M-3.000-G-09 - Servo Motor
  • Kollmorgen VP-507BEAN-03 - Valueline AKD 10 Ft Power Cable
  • KOLLMORGEN 28454 - SERVO DRIVE, SERVOSTAR 300 SERVOSTAR 310
  • KOLLMORGEN TT-4205-4017-C - INDUSTRIAL DRIVE DC MOTOR
  • Kollmorgen T150551 - Servostar 343 Control Drive
  • Kollmorgen ICD05030A1C1 - Platinum DDL Direct Drive Linear Motor w/ 30" Rail Way
  • Kollmorgen SERVOSTAR 303 S30361-SE - Servo Drive
  • Kollmorgen 00-00907-002 - ServoDisc DC Motor Varian Semiconductor 3500054
  • Kollmorgen CM12A1-025-005-00 - MOTOR CABLE for AKD B/P/T/M Motor AKM 1-7 Cable
  • KOLLMORGEN MOTION TECH IL18100A3TRC1 - BRUSHLESS LINEAR MOTOR PLATINUM DDL
  • Kollmorgen SERVOSTAR 406 M-C - Servo Drive FW: 7.36
  • Kollmorgen IC11030A1P1103 - platinum direct drive linear motor
  • W&T 10/100BaseT - Com Server Highspeed 3×RS232/RS422/RS485
  • Kollmorgen S30361-NA - drive brand
  • Kollmorgen Industrial Drives PSR3-208/50-01-003 - Power Supply
  • Kollmorgen RBE-03011-A00 - Brushless Frameless Servo Motor, OD: 5-5/64"/129mm
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Industrial Drives SBD2-20-1101-5301C2/160-20 - Servo Amplifier Board For Parts
  • Kollmorgen IC44030A2P1 - LINEAR DRIVE MOTOR
  • KOLLMORGEN AKM22E-ANS2R-02 - servo motor + Micron X-TRUE 60
  • Kollmorgen 18442-01B - Pendant (E2)
  • Kollmorgen AKD-P00306-NBEC-0069 - Drive
  • Kollmorgen AKM53H-ACCNR-00 - Servomoteur
  • Kollmorgen AKD-P01207-NACN-0056 - Servo Drive
  • Kollmorgen SERVOSTAR 403a-c - Servo Drive
  • Kollmorgen B-204-B-39-016 - Servo Motor
  • Giddings & Lewis Dahaner Motion Kollmorgen M.1017.3140 R3 - Output Module
  • Kollmorgen KNSG300 - Emergency Light Unit
  • KOLLMORGEN 62-0050 Model T31V-EM-C0 - Servo Motor Shaft Size 3/8" Dia 1-1/4" Long
  • Kollmorgen S30601-NA-ARM9 - SERVOSTAR346 Controller w/o Fan As Is
  • Kollmorgen PMI Motors 00-00903-010 - ServoDisc DC Motor Type U9M4H 1/2" shafts
  • Kollmorgen PMI Motion U12M4 - Servo Disc DC Motor Universal Instruments 11467000
  • Kollmorgen AKM53H-accnr-00 - Servo Motor
  • DANAGER MOTION / KOLLMORGEN ACD4805-W4 - (70A ) Vehicle / Motor Controller
  • Kollmorgen s60300 - SERVOSTAR 603 3 x 230-480v 2kva
  • KOLLMORGEN B-404-C-21 - GOLDLINE BRUSHLESS P.M. SERVOMOTOR
  • Kollmorgen T-5144-A - GE Aviation 739034-01 Direct Drive DC Torque Motor
  • KOLLMORGEN M.1302.8761 - CABLE, POWER
  • Kollmorgen CE03250 - Servostar Servo Drive
  • Kollmorgen K-342 - dual axis automatic autocollimator
  • Kollmorgen TT-4500-1010-B - Inland Motor
  • Kollmorgen S20260-Srs - Synqnets200 Series Servo Drive Forparts
  • Kollmorgen PRDRHP720SND-65 - drive CR06703-R
  • KOLLMORGEN S70362-NANANA - driver
  • Kollmorgen CR06260-000000 - SERVOSTAR CD AC Servo Driver
  • KollMorgen akd-m00306-mcec-D000 - Multi-Axis Master Programmable Drive AKD PDMM
  • KOLLMORGEN S61000 - SERVOSTAR 610 3X230-480V 10A
  • Kollmorgen AKD-P00306-NBCC-0000 - AKD Servo Drive
  • KOLLMORGEN CP306250 - SERVOSTAR SP Servo Drive
  • Kollmorgen MPK411 - controller
  • Kollmorgen S64001 - SERVOSTAR 640, factory-certified
  • Kollmorgen Servotronix Prdr0087006Z-00 - Lvd Servo Drive
  • Kollmorgen AKD-P00306-NAAN-0000 - Servo Drive Controller, 1.2KVA, 240Vac, 3 Phase
  • Kollmorgen MCSS08-3232-001 - MCSS06-3224-001 ServoStar Drives (AS-IS)
  • Kollmorgen CR06250-2D063A - drive
  • YASKAWA SGDP-04APA - SERVOPACK SERVO DRIVE
  • Kollmorgen s62001 - servostar 620-as 14kva 20a ip2o 3x 230-480v
  • Kollmorgen Seidel S60100 - Servostar 601 Servo Drive
  • KOLLMORGEN CR06703-R - HP SERVOSTAR CD CONTROLLER
  • kollmorgen Prdr0052200z-05 - graco inter Servo Component
  • KOLLMORGEN S403AM-SE - drive SERVOSTAR 443M-S
  • YASKAWA SGDP-01APA - SERVOPACK SERVO DRIVE
  • Kollmorgen CE06200-1H348H - SERVOSTAR CD Servo Driver
  • Kollmorgen S71262-NANANA - S700 Servo Amplifier 208Y/120V 480Y/277V
  • Kollmorgen S70302-NANANA-NA - S700 Servo Driver
  • KOLLMORGEN S61401-560 - ATS-SERVOSTAR 614-AS Servo Drive
  • KOLLMORGEN Industrial Drives BDS4A-103J-0001/102A21P - Servo Controller
  • Kollmorgen S71202-NANANA-NA-024 - S700 Servo Driver
  • KOLLMORGEN S70302-NANANA - driver
  • Kollmorgen CR06250 - SERVOSTAR Servo Drive
  • Kollmorgen CE03550 - drive
  • Kollmorgen S71202-NANANA - S700 Servo Driver