How to avoid the risk of open-pit mining, 24 prevention and control points to ensure production safety

F: | Au:佚名 | DA:2023-11-28 | 546 Br: | 🔊 点击朗读正文 ❚❚ | Share:

In recent years, the rapid development of the stone industry in China, stone mines have also expanded, stone mines can be seen everywhere in China, and the new mines have not been significantly reduced because of the severity of the national environmental protection storm. Although China's stone mines have a certain level of safety management, due to the increasing number of stone mines, coupled with China's higher education and vocational education, there is no stone mine professional, resulting in a serious shortage of professionals engaged in stone mine management, especially the stone mine safety management personnel are even more scarce, and safety accidents in stone mines are often heard. Stone mining has a certain negative effect on the stone industry.

The safety management level of stone mines should be improved, personnel engaged in the safety management of stone mines, and even those engaged in the production of stone mines should understand and understand the identification and prevention knowledge of stone mine safety risk points, and apply this knowledge to daily work to form a "firewall" of safe production. Only in this way can we ensure zero casualty accidents in stone mining, in order to ensure the sustainable development of stone mines and the prosperity of stone mining enterprises.

The safety risk points described in this paper mainly refer to the links and factors that are easy to lead to safety accidents in the production of open-pit stone mines. If these links and factors are identified early and measures are taken to control and prevent them, the occurrence of safety accidents can be greatly reduced to ensure the safety of mining personnel, equipment, property, forests, plants and the environment around the mine.

First, open-pit stone mine road safety risk points and prevention and control

Open-pit stone mine road is an important link between the stone mining area and the outside world, the external production material to be transported into the mining area, mining area mined out of the raw material to be shipped outside sales, no road, stone mine production will stagnate. Because the mining characteristics of stone mines are temporary, few mining for decades. Therefore, the life of the road can not be long-term, and the cost of building a road is very high, few stone companies are willing to spend a lot of money to build a high-grade road, which also leads to the road of open-pit stone mines there is a greater safety risk, is a focus of open-pit stone mine safety risk control. First, there are safety risks on the mining road during the mining process, and the vehicles are destroyed and the losses are great. Figure 1 shows a winding road leading to a quarry at the top of the hill.

1, stone open-pit mine road construction requirements

Open-pit mine road design specifications mainly have the following points:

(1) Design specification requirements for turning radius

In order to ensure the road safety of stone mines, the construction of mine roads should be strictly in accordance with the requirements of road design specifications. When the mine is developed by road transportation, the road construction is designed in accordance with the requirements of GB22-87.

Mine highway roadbed width is not less than 5.5m, road width is not less than 3.5m; The roadbed width of the staggered road section is not less than 11m, the road width is not less than 7m, and the bend radius of the mining road is not less than 15m.

(2) Design specification requirements for slope

The maximum slope of the mine road is not greater than 9%, and the heavy truck downhill is allowed to increase by 1%. When the slope of the mine road is 8%-9%, the longitudinal slope length shall not exceed 200m, and the length of the gentle slope section shall not be less than 50m.

(3) Requirements for the design of mine road surfaces by open-pit stone factories

FIG. 2 shows the road leading from an open-air stone factory to each working face in the mining area. The road surface is clay and mud. If this kind of pavement is required according to the standard of the design specification, it is obviously not required. This kind of yellow mud road is still passable when the weather is fine, and there is a great safety hazard in the rainy season or winter. The reason why the quarry factory uses this simple road surface, the key is that the investment of mine road is not a small cost, saving construction costs, investors do not build from the safety point of view to meet the design specifications of the road.

2. Open-pit stone mines are prone to safety accidents

Open-pit stone mines are prone to safety accidents because of the risks existing in roads. Common safety accidents include rollover accident, crash and collision accident, vehicle sinking accident, vehicle skid accident and so on.

(1) rollover accident

Due to the tortuous road of open-pit stone mines, the road condition is poor, and most of them are hillside roads. As a result, rollover accidents often occur. Road rollover accident is a safety risk point in stone open-pit mine. FIG. 3 shows a downhill turning mine road, which is easy to overturn.

(2) Vehicle sinking accident

Because the stone open-pit mine road is not strictly built in accordance with the mine road design specifications, the road is not compacting, in case of bad weather, the road softens and sinks, when the vehicle is driving on the softened road, there will be a sinking phenomenon, resulting in vehicle driving map difficult, and even accidents.

(3) Vehicle skid

The slope of the mine road is steep, the road slope is large, and the road is slippery, and the skid of the mine vehicle is common. If it is serious, it will even cause the vehicle to tip over and cause a major safety accident. Figure 4 is a granite mine, and the mining surface forms an obvious steep slope compared with the highway, which is easy for the vehicle to slip.

(4) Vehicle breakdown on the road

Vehicle failure, vehicle overload leads to trapped in the road accident. Although the vehicle breaking down on the road does not lead to serious safety accidents, it will seriously affect the normal progress of production and cannot be underestimated.

(5) Road collapse

Due to the large investment in the construction of roads in open-pit stone mines, some mine owners will not invest a lot of money in the road construction that does not produce a return on the principle of saving on the province, resulting in mine roads not strictly in accordance with the requirements of the design Code for open-pit mine road construction, resulting in road landslides seriously affecting mine production.

3. Prevention and control of road safety risk points in open-pit mines

(1) Risk prevention and control of vehicle rollover accidents

The prevention and control of vehicle accident risk in stone open-pit mines should pay attention to the following aspects: road construction should be carried out in strict accordance with the "Code for Road Design in open-pit Mines", and the construction quality of road construction should be well paid to reduce the accident risk of vehicle rollover caused by poor road construction quality.

Mine road conditions should be checked regularly, timely detection of road safety hazards, strengthen the management of vehicle drivers, and prohibit unlicensed driving. Strengthen the management of vehicle personnel, strictly prohibit illegal driving, and improve the sense of responsibility of drivers. Vehicles and quarrying operations are strictly prohibited in bad weather.

Risk warning signs should be set up in sections with large cliffs and drops to remind vehicle drivers to drive safely, and firm safety protection facilities should be set up to prevent the further deterioration of safety accidents when vehicles roll over.

(2) Risk prevention and control of vehicle sinking accidents

Vehicle sinking accidents are mostly caused by soft road surface and roadbed collapse. The key to control this kind of accident risk is to strengthen the control of road pavement construction quality. The road construction should be carried out in strict accordance with the "Code for Road Design of Open Pit Mines" to improve the construction quality of mine roads. Regular inspection of mine road conditions, timely detection of road safety hazards.

Strictly control vehicle overloading and speeding. Overload is a common phenomenon in stone mines. Mining enterprises in order to produce more ore, truck drivers in order to DORA goods to make money, regardless of safety risks. In order to curb the risk of vehicle sinking, subjective management in this respect should be strengthened, and the behavior of overloading and speeding should be severely cracked down on.

(3) Prevention and control of vehicle skid risk

The prevention and control of vehicle skid risk should be strengthened from the following points:

Road construction is carried out in strict accordance with the "Code for Road Design in Open Pit Mines", and the construction quality of road construction is paid attention to, especially the quality of road pavement. Mine road conditions should be inspected regularly, and mine roads should be regularly maintained, repaired and compacted. Eliminate the safety hazard of road slip. Vehicles and mining operations are strictly prohibited in inclement weather such as snow, ice and heavy rain. Anti-skid measures should be taken when work is necessary

(4) Risk prevention and control of vehicle breakdown

The risk of vehicle throwing wrong on the road is mostly due to vehicle failure. The focus of risk control is to strengthen vehicle inspection and strengthen daily maintenance and repair.

Strengthen the maintenance and inspection of roads, and clean up stones that are easy to puncture tires. It is strictly prohibited to overload and control the load of the vehicle.

(5) Prevention and control of road collapse risk

The risk of road collapse is mostly caused by major problems in road quality, strengthen the quality of road construction, daily inspection of roads, timely discovery of road safety hazards, and timely repair.

Road subgrade and road slope are the key places of road collapse risk management. Mine management personnel should establish technical data file management for roadbed and slope with wall risk, and have technical measures and emergency plans to prevent road collapse.

(6) Stone open-pit mine road safety warning signs

Strengthen the road safety management of stone open pit mine, control the various safety risks of vehicles on the road, mine road safety warning signs are very important auxiliary means, which is of great significance to reduce the various safety risks of stone open pit mine road.

2. Safety risk points and prevention and control of electrical facilities in stone open-pit mines

The high mountains and far roads of the stone open-pit mines are mostly located in the underdeveloped and remote mountain villages, and the stone open-pit mines are mostly private enterprises, so there are many safety risk points in the electrical aspects of the mines, which is an important aspect of the safety risk prevention and control of stone open-pit mines.

The possible safety risks of electrical facilities in stone open-pit mines include mine power interruption, substation failure, electric shock accident for operators, and substation operation stop due to natural disasters.

Safety risks and prevention methods of electrical facilities in stone open-pit mines:

(1) Prevention and control of safety risks of high-voltage lines

Design the circuit according to the requirements of the factory and mine electricity code. The high voltage line maintenance and management personnel are all professionals who hold work certificates. Special personnel regularly check the use of high-voltage lines, and form inspection records; The hidden dangers in the inspection are rectified in time. The high-voltage line is strictly prohibited as the mining area, and there is a safe distance between the high-voltage line and the mining operation area. Necessary safety warning signs shall be set up in the high-voltage line area.

(2) Substation safety risk prevention and control

The safety risks of substation mainly include:

① External risk. The external risks of the substation are natural forces, and the impact of human damage on the normal operation of the substation. In order to prevent external risks, some signs should be set up at the substation where non-staff members are forbidden to enter, and walls or guardrails should be set up to prohibit outsiders and animals from entering.

(2) Natural environmental risks. Natural environmental risks are unavoidable for substations. Natural wind, frost, rain, snow, sun, these risk factors to the substation lines and equipment more or less caused varying degrees of damage, leading to a variety of safety accidents, power failures, and even the entire power system in serious cases. The prevention of natural environment risk is the focus of substation management.

③ Staff risk. In the control process of substation operation and maintenance risk, the staff's risk awareness and strong sense of responsibility are crucial to the normal operation of the substation. In addition, the substation maintenance staff left their posts without authorization, which increased the risk of substation operation and maintenance to a large extent. The types of lines and equipment in the substation are more complex and the number is larger, which has high requirements for the technical level of the substation maintenance personnel.

(3) Substation risk prevention and control


  • Basler Electric 9289902106 Circuit Board
  • Basler Electric BE1-32R Protective Relay A1E E1P BOS1P
  • Basler Electric RAL6144-16GM GigE Line Scan Camera with Lens
  • Basler Electric BE3-49R-5I5A1 Temperature Relay
  • Basler Electric BE1-32R Power Relay B3E E1R A0N1F
  • Basler Electric SR4A2B06B3A Static Voltage Regulator Features
  • Basler Electric 9121000106 Manual Voltage Control MVC Guide
  • Basler Electric SR32A-2B15B3E Static Voltage Regulator
  • Basler Electric SR4A2B06B3A Static Voltage Regulator Guide
  • Basler Electric 801A193F02 Hammond Transformer Module
  • Basler Electric BE1-24 Volts Per Hertz Relay A1E F1J D1S0F
  • Basler Electric AEC63-7 Analog Excitation Controller 220-277V
  • Basler Electric BE132R Power Relay T245579
  • Basler Electric MVC 108 Manual Voltage Control 90 37000 102
  • Basler Electric 9022900-103 Control Transformer 6-7VA 60Hz
  • Basler Electric BE1-79M Plug Adapter 9170111102
  • Basler Electric 9 2007 00 100 Current Boost System CBS 305
  • Basler Electric SR4A2B01B3A Static Voltage Regulator 120V
  • Basler Electric BE1-32R Power Solid State Relay E2E A10 A0N0F
  • Basler Electric PRS250 Veri-Sync Relay 9088800102
  • Basler DECS 125-15-B2C Digital Excitation Control
  • Basler BE 13693 002 Transformer
  • Basler BE1-59N Ground Fault Overvoltage Relay
  • Basler BE1-79A Reclosing Relay
  • Basler 9-1051-00-105 Overload Protection Module
  • Basler BE1-32R Power Relay – Directional Overcurrent Guide
  • Basler 9319700103 BE3-27T/59T-3A1N3 Voltage Relay
  • Basler BE1-87G Generator Differential Relay
  • Basler BE3-25-1D1N4 9319100106 480V Relay
  • Basler SR8A2B07B3A Static Voltage Regulator
  • Basler Electric BE4-27/59 Over/Under Voltage Relay 307-2552
  • Basler Electric SR32A2B05B3E Static Voltage Regulator
  • Basler Electric BE1-27 A3E C3J A1N6F Solid State Protective Relay
  • Basler Electric 9174700-100 Excitation Limiter Generator
  • Basler Electric BE1-87G Generator Differential Relay 09833
  • Basler Electric 9310200100 Power Supply Module
  • Basler Electric TIEE1CD0N07 Control Module
  • Basler Electric BE1-59N Ground Fault Relay T214750
  • Basler Electric SR8A2B10B3AX Static Voltage Regulator 9060200126
  • Basler Electric SSR 125-12 Voltage Regulator
  • Rolls Royce H1111.0204 Ship Main Controller
  • Basler Electric BE3-32-3AC Reverse Power Relay 9 1376 00 105
  • Basler Electric BE3-25-1A1N4 Synch Check Relay 9319100100
  • Basler Electric SR4A-2B15B3A Static Voltage Regulator
  • Basler Electric SR4A-2B15B3E Static Voltage Regulator
  • Basler Electric 9170818100 Solid State Protective Relay
  • Basler Electric AEC63-7 Analog Excitation Controller
  • Basler Electric 17483 Auxiliary Module
  • Basler Electric BE1-59 Over Voltage Relay
  • Basler Electric 21600-101 Control Module
  • Basler Electric KR2F Generator Voltage Regulator 9056600100
  • Basler BE1-CDS Current Differential System
  • Basler Electric CBS 212 Current Boost System 9 2650 00 100
  • Basler Electric IFM-150 Firing Circuit Chassis
  • Basler Electric BE1-60 Voltage Balance Relay C1F A1P D0C3F
  • Basler Electric BE1-32R Power Relay A2E D1R A0N0F
  • Basler Electric BE1-32R Power Relay A2E D1R A0N0F
  • Basler Electric 8650C80G01 Isolation Transducer PCB Board
  • ETEL EA-P2M-300-4/7.5A-0100-01 AccurET Modular 300 Servo Drive
  • Basler Electric 87T Transformer Differential Relay
  • Basler Electric BE-6868 Power Transformer 5950007559202
  • Basler Electric PRS250 Veri-Sync Relay 9088800102
  • Basler Electric SCP-250-G-60 VAR Power Factor Controller
  • Basler DECS-150 AVR 1NS2V1N1S Voltage Regulator
  • Basler UFOV 260A Under Frequency Overvoltage Module
  • Basler MOC2 199 Motor Operated Control – Overview and Setup
  • Basler BE3-49R-5K5A1 Temperature Relay – Complete Guide
  • Basler BE 20035 001 Transformer – Technical Data and Installation
  • Basler BE 02727 001 Transformer – Specifications and Usage
  • Basler BE127 Under Voltage Relay – Features and Application Guide
  • Basler CBS377 Current Boost System – Complete Technical Guide
  • Basler BE1-87G P/N 9170818100 Differential Relay – In-Depth Specs
  • Basler BE1-87G Generator Differential Relay – Technical Overview
  • Basler Electric SR4A2B16 SVR Static Voltage Regulator – Complete Guide
  • Basler Electric 9261500101 Power Supply Module
  • Basler Electric AEM-2020 Analog Expansion Module
  • Basler Electric DGC-2020 Digital Genset Controller 51BRBNEAH001
  • Basler Electric BE1-59N Ground Fault Overvoltage Relay
  • Basler Electric BE1-59N-A5E-E1L-N0S1F Neutral Overvoltage Relay
  • Basler Electric MOC2499 Motor Operator Control Potentiometer 9072300430
  • Basler Electric BE1-50/51M Overcurrent Relay
  • Basler Electric 9148100106 MOC3502 Solid State Relay 250VDC 0.25A
  • Basler Electric CBS 212 Current Boost System 9265000100
  • Basler Electric 10493002 Control Module
  • Basler BE1-32R D3E E1R A0N1F Power Relay
  • Basler SR8A2B15B3A Static Voltage Regulator
  • Basler IFM-105 Firing Circuit Chassis 9324100105
  • Basler SR4A2B05B3A Static Voltage Regulator
  • Basler BE151G1EB6PB0N0F Protective Relay
  • Basler BE1-59 Electric Over Voltage Relay
  • Basler 277 Static Programmable Powerline Carrier Channel
  • Basler BE1-32R D1E A1P A0N1F Power Relay
  • Basler SR4A1B07B3A Static Voltage Regulator
  • Basler Electric BE1-700 Digital Protective Relay
  • Basler Electric SR8A-2B01B3A Static Voltage Regulator
  • Basler Electric SR4A-2B01B3E Static Voltage Regulator
  • Basler Electric 9017709102 PC Board
  • Basler Electric SR4A-2B01B3A Static Voltage Regulator
  • Basler Electric PRS-250 Veri-Sync Relay
  • Basler Electric 9066800102 Excitation Support System
  • Basler Electric BE1-87G Generator Differential Relay 9 1708 18 100
  • Basler Electric 36T865-2 BE03752001 Power Supply
  • Basler Electric M-300 149D940G02 Power Supply
  • Basler Electric ACA2040-25GM 4Mp 25Fps Area Scan Camera
  • Basler BE1-87G-S1A-A1C-A0N0 Differential Relay
  • Basler SR8A-2B06B3E Static Regulator SR8A2B06B3E
  • Basler SCP-210 Frequency Controller 9095400100
  • Basler BE1-59-A3E-A1J-N1N3F Overvoltage Relay BE159A3EA1JN1N3F
  • Basler 9 2011 11 100 Bracket Mounted Terminal Unit
  • Basler 9 1606 00 101 Voltage Regulator
  • Basler CBS-377 Current Boost System 9109600102
  • Basler 8650C72 Exciter Control Module PCB Rev 5
  • Basler C2EE1PA0N1F BE1-32R Reverse Power Relay
  • ADLINK HPCI-14S12U - Industrial Control Backplane 12PCI Backplane PCI-14S Passive Backplane
  • ADLINK PCIe-GIE74C - image acquisition card 4-CH GigE Vision PoE+ Frame Grabber
  • ADLINK PCI-8164 - control card 4-Axis Advanced Motion Controller Board
  • ADLINK PCIe-U304 - 4 Port USB3 PCIe Frame Grabbers USB Screw Hole Card
  • ADLINK PCI-9112 - Multi-Function Data Acquisition Card DAQ Card
  • ADLINK PCI-7432 - 51-12013-0A50 4-CH Isolated Numérique I/O PCI Cartes Digital I/O Card
  • ADLINK PCA-6106P3-0C1 REV.C1 - backplane 6-Slot Passive Backplane Board
  • ADLINK PCI-7224 - 24-CH Opto-Isolated Digital I/O PCI Board
  • ADLINK CPCI-7433R(G) - Digital Input Board Rear I/O CompactPCI Card
  • ADLINK EBP-13E4 - 51-46703-0A30 Industrial PC Backplane Passive Backplane
  • ADLINK PCIE-HDV62 - Image acquisition card High Definition Video Frame Grabber
  • ADLINK EBP-13E4 - 51-46703-0A30 Industrial Backplane Board Passive Backplane
  • ADLINK 90111-B1 / CPCI-6770 - PCB CPU MODULE CompactPCI Single Board Computer
  • ADLINK PCI-7248 - DATA ACQUISITION PCI CARD 48-CH Parallel Digital I/O Board
  • ADLINK PCI-7230 - 51-12003-0a50 board PCI7230 32-CH Isolated Digital I/O Card