Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Build a high-quality charging infrastructure system

来源: | 作者:佚名 | 发布时间 :2023-12-05 | 145 次浏览: | Share:

I. General requirements

(1) Guiding ideology.  Implement the main responsibility, continue to improve the network, improve the facility capacity, improve the service level, further build a high-quality charging infrastructure system, better meet the needs of the people to purchase and use new energy vehicles, and help promote the green low-carbon transformation of transport and the construction of modern infrastructure system.

(2) Basic principles.

Scientific layout. Strengthen the top-level design of charging infrastructure development, adhere to the construction should be built to the fullest extent, according to local conditions, balanced and reasonable, scientific planning of construction scale, network structure, layout function and development mode. According to the national space planning, we will promote the integration of charging infrastructure planning with power and transportation planning.

Moderately ahead of time. Combined with the development trend of electric vehicles, the charging infrastructure construction is appropriately advanced, leaving a margin in terms of total scale, structure and function, and construction space, so as to better meet the charging needs of different fields and different scenarios. Continue to improve the charging infrastructure standard system, and promote the internationalization of Chinese standards.

Innovation and integration. Give full play to the role of innovation as the first driving force, improve the level of digital, intelligent and integrated development of charging infrastructure, encourage the development of new technologies, new business forms and new models, and promote energy and information interconnection between electric vehicles and charging infrastructure networks, telecommunications networks, transportation networks and power networks.

Safe and convenient. Adhere to safety first, strengthen the full life cycle safety management of charging infrastructure, strengthen quality safety, operation safety and information security, and strive to improve reliability and risk prevention. Continuously improve the economy and convenience of charging services, expand diversified effective supply, and comprehensively improve the efficiency of service quality.

3. Development goals. By 2030, a high-quality charging infrastructure system with extensive coverage, moderate scale, reasonable structure and perfect functions will be basically completed, which will effectively support the development of the new energy vehicle industry and effectively meet the people's travel charging needs. A charging network with urban surface, highway line and rural point-like layout should be built, and the proportion of parking Spaces with standardized charging conditions in large and medium-sized urban operational parking lots should strive to exceed the proportion of urban registered electric vehicles, and the coverage of charging services in rural areas should steadily increase. Charging infrastructure is complementary, intelligent and open, charging services are safe, reliable, economical and convenient, standards and norms and market supervision system are basically improved, industry supervision and governance capabilities are basically modernized, and technical equipment and scientific and technological innovation have reached the world's advanced level.

Second, optimize and improve the network layout

(1) Build a convenient and efficient intercity charging network. Focusing on the main skeleton of the national comprehensive three-dimensional transportation network of "6 axes, 7 corridors and 8 channels", we will speed up the shortcomings of the charging infrastructure of the road network between key cities, strengthen the effective connection between charging lines, and create an intercity charging network that effectively meets the needs of medium and long-distance travel of electric vehicles. Expand the coverage of the charging infrastructure of the national highway network, optimize the point layout of facilities by encryption, and strengthen the charging network connectivity of key nodes. New highway service areas should simultaneously build charging infrastructure, accelerate the transformation of existing highway service areas charging infrastructure, new facilities should adopt high-power charging technology in principle, and improve the relevant design standards and construction management norms of highway service areas. Promote the scientific layout of charging infrastructure in accordance with local conditions in ordinary national and provincial trunk highway service areas (stations), and strengthen basic charging services along the highway.

(2) Building an interconnected charging network in urban agglomerations. Strengthen the unified planning and collaborative construction of charging infrastructure, strengthen the exchange and sharing of charging service data in different cities, accelerate the intelligent upgrading and transformation of charging networks, realize the effective connection of cross-regional charging services, and improve the accessibility of electric vehicles in urban agglomerations, metropolitan areas and key cities. With the Beijing-Tianjin-Hebei region, the Yangtze River Delta, the Guangdong-Hong Kong-Macao Greater Bay Area, and the Chengdu-Chongqing Twin City Economic Circle as the focus of the construction of charging networks, to build a fast charging network connecting major cities in the region, and strive to reach the world's advanced level of charging technology, standards and services.

(3) Building a well-structured urban charging network. Based on the urban road transportation network, with the focus on "two districts" (residential and office areas) and "three centers" (commercial centers, industrial centers, and leisure centers), the urban charging network will be promoted from the central urban area to the urban edge and from priority development areas to other regions in an orderly manner. Vigorously promote the integrated planning, construction and management of urban charging infrastructure and parking facilities to achieve comprehensive coverage of all types of urban parking scenarios. Rational use of the space adjacent to urban roads, the construction of public charging infrastructure with fast charging as the main and slow charging as the supplement, and encourage the construction of centralized charging infrastructure with a certain scale. The residential area actively promotes the charging infrastructure of intelligent orderly slow charging and emergency fast charging. Office areas and "three centers" and other urban special and public areas according to local conditions to build a combination of fast and slow public charging infrastructure. We will promote effective connectivity between urban charging networks and intercity, urban agglomeration and metropolitan area charging networks.

(4) The construction of effective coverage of rural charging network. Promote the integrated development of charging networks in rural areas with urban and intercity charging networks, and accelerate the effective coverage of charging infrastructure in rural areas suitable for the use of electric vehicles. Actively promote the construction of public DC fast charging stations in county-level urban areas. In combination with the construction of village-level charging networks and the development of transmission and distribution networks, we will accelerate the planning and layout of charging networks in large villages and towns, relocation and centralized resettlement areas in easy places, and key villages and towns for rural tourism, and vigorously promote the construction of public charging infrastructure in township offices, enterprises and institutions, commercial buildings, transportation hubs, public parking lots, and logistics bases. In combination with the promotion of urbanization construction with county seats as an important carrier, demonstration counties and demonstration towns for the construction and application of charging infrastructure will be created in areas with good infrastructure according to needs.

3. Accelerating development in key areas

(1) Actively promote the construction of residential charging infrastructure. In the existing residential areas, the charging infrastructure of fixed parking Spaces should be fully installed and the public charging infrastructure should be optimized. Compacting the main responsibility of the construction unit of the new residential area, strictly implementing the requirements for the allocation of charging infrastructure, ensuring that the fixed parking space is 100% constructed of charging infrastructure or reserved for installation conditions, and meeting the requirements for direct installation of meters and power connections. The city as a unit to accelerate the development of residential charging infrastructure construction management guidelines, optimize facility construction support policies and management procedures, implement the responsibilities of sub-district offices, residents committees and other grass-roots management bodies, establish a "one-stop" coordination and promotion and complaint handling mechanism. Encourage charging operation enterprises to accept the commissioning of owners, carry out the "unified construction and uniform service" of residential charging infrastructure, and provide unified construction, operation, maintenance and other services. In conjunction with the pilot work of building complete communities, the construction of parking and charging facilities will be integrated and promoted. Encourage the construction of charging infrastructure to be included in the renovation of basic facilities in old residential areas, and carry out the construction of supporting power supply and distribution facilities simultaneously.

(2) Vigorously promote the construction of charging infrastructure in public areas. With the focus on the construction of parking lots in buildings such as "three centers" and public parking lots such as transportation hubs and park-and-ride (P+R), we will accelerate the construction of public charging infrastructure and promote charging operation enterprises to gradually increase the proportion of fast charging facilities. Accelerate the construction of charging infrastructure in internal parking lots such as government offices, enterprises and institutions, and industrial parks, and encourage their opening to the public. Under the premise of ensuring safety, public fast charging and power exchange facilities will be built in refueling (gas) stations that have the conditions, and comprehensive energy supply service stations that integrate refueling (gas) and charging and power exchange services will be actively promoted. According to the charging needs of special vehicles such as urban public transport, rental, road passenger transport and logistics, the construction of special charging stations in parking lots and other stations will be accelerated. To speed up the construction of public charging infrastructure in tourist attractions, scenic spots above grade A should build charging infrastructure in combination with tourist reception and charging demand, and scenic spots above grade 4A should set up public charging areas for electric vehicles.

Fourth, improve the level of operation service

1. Promoting social development and operation Promote diversified investment in charging infrastructure, guide all kinds of social capital to actively participate in construction and operation, and form a unified, open, competitive and orderly charging service market. Promote the sharing mode of charging parking Spaces, and improve the utilization efficiency of parking Spaces and charging infrastructure. Encourage charging operation enterprises to actively explore business cooperation models with vehicle enterprises and Internet enterprises. Strengthen monitoring, research and judgment, and appropriately put mobile charging infrastructure in areas with large traffic flow and during major holidays to enhance the resilience of the charging network.

2. Formulating and implementing unified standards. In combination with the development trend of intelligent and connected electric vehicles and the construction needs of new energy systems, we will continue to improve the standard system of charging infrastructure, strengthen the iterative updating of standards such as construction, operation and maintenance, product performance, and interconnection, accelerate the revision of advanced charging and replacement technology standards, and enhance the ability to lead the internationalization of standards. Encourage the inclusion of intelligent and orderly charging into the functional range of pile products. Promote the formulation of comprehensive energy supply service station construction standards and management systems. Through policy tools such as special measures to relax market access, relevant units are encouraged to take the lead in formulating and implementing relevant standards.

(3) Building an information network platform. Promote the construction of a national charging facilities monitoring service platform. Adhere to government guidance and market operation, encourage provinces (autonomous regions, municipalities directly under the Central Government) to build charging infrastructure supervision and operation service platforms, and strive to strengthen the connectivity of provincial platforms. Standardize the information management of charging infrastructure, unify the information exchange protocol, clarify the boundaries of information collection and the scope of use, promote the full access of public charging infrastructure, guide the orderly access of "unified construction and uniform service" charging infrastructure in residential areas, and encourage voluntary access of private charging infrastructure. Strengthen data interconnection with electric vehicles, urban and highway travel service networks, and timely release public charging infrastructure Settings and real-time usage through various convenient channels such as Internet map service platforms.

(4) Strengthen the management of industry norms. Improve the access conditions and management policies of charging infrastructure manufacturing, installation, construction, operation and maintenance enterprises, build an evaluation system with a focus on standardized management and service quality, and promote the establishment of a credit system for charging equipment product quality certification operators. Compacts the product quality and safety responsibility of electric vehicles, power batteries and charging infrastructure production enterprises, strictly controls the quality and safety management of charging infrastructure construction and installation, and establishes a liability check system for fire and explosion accidents. Improve the operation and maintenance system of charging infrastructure, implement the main responsibility of charging operation enterprises, and improve the availability rate of facilities and troubleshooting ability. Clarify the identification standards and management methods of long-term failure charging piles, and establish and improve the exit mechanism. Guide charging infrastructure investment and operation enterprises to take out product liability insurance.

Fifth, we will strengthen leadership in scientific and technological innovation

(1) Enhance the two-way interaction capacity of the vehicle network. Vigorously promote the application of intelligent charging infrastructure, new charging infrastructure should adopt intelligent facilities in principle, and promote the intelligent transformation of existing charging infrastructure. Actively promote the intelligent transformation of the distribution network, and strengthen the ability to regulate the charging and discharging behavior of electric vehicles. Give full play to the important role of new energy vehicles in the electrochemical energy storage system, strengthen the energy interaction between electric vehicles and the power grid, improve the response ability of the power grid, such as peak regulation and frequency regulation, safety and emergency response, and promote the pilot demonstration of vehicle networking, vehicle network interaction, source network load and storage integration, and optical storage and charging.

2. Encouraging innovative application of new technologies Give full play to the main role of enterprise innovation, and create a smart integration innovation platform for vehicles, piles and networks. Accelerate research on technologies such as fast charging and replacement, high-power charging, intelligent orderly charging, wireless charging, and optical storage and charge collaborative control, and demonstrate the construction of wireless charging lines and parking Spaces. Strengthen information sharing and unified settlement system, power distribution system security monitoring and early warning technology research. Continue to optimize the technical performance of electric vehicle batteries, and strengthen technical research on new system power batteries and battery echelon utilization. Promote the popularization of mechanical, three-dimensional and mobile parking and charging facilities.

6. Strengthen support and guarantee

(1) The main responsibility of compaction. Effectively strengthen organizational leadership, consolidate the main responsibility of local governments to coordinate and promote the development of charging infrastructure, and take the construction and management of charging infrastructure as an important focus to improve infrastructure and public services. To give full play to the leading role of planning, provincial governments focus on the construction of high-quality charging infrastructure system, scientific layout planning, and do a good job of integration with the transportation network system; The municipal and prefecture-level governments focus on "two districts" and "three centers", formulate layout plans with districts and counties as the basic units, optimize the charging infrastructure structure by scenario, strengthen the layout of public piles and special piles, and incorporate the "one map" implementation supervision information system for territorial spatial planning.

2. Improving supporting policies. Implement the peak and valley time-of-use price policy, and guide users to widely participate in intelligent and orderly charging and vehicle network interaction. Before 2030, centralized charging and replacing facilities with two-part electricity prices will be exempted from demand (capacity) electricity charges. Local governments at all levels are encouraged to implement phased reductions in the rent of charging infrastructure sites. Power grid enterprises are encouraged to give priority to the construction of charging infrastructure in terms of power grid access and capacity increase.

3. Strengthening factors of production. Local governments at all levels should further strengthen the guarantee of factors for the development of charging infrastructure, meet the development needs of charging infrastructure and supporting power grid construction land and corridor space, and provide financial support according to local conditions. Encourage local governments to establish operation subsidy standards linked to service quality, increase subsidies for demonstration projects such as high-power charging and vehicle network interaction, and support the construction of qualified charging infrastructure projects through local government special bonds. Improve financial service capabilities, make full use of existing financial support policies, promote pledged financing methods such as equity, project income rights, and franchise rights, and broaden financing channels for charging infrastructure investment and operation enterprises and equipment manufacturers through green bonds. Encourage development financial institutions to innovate financing support models, and implement the "one network" project for urban parking and charging.

4. Strengthen coordinated progress. The National Development and Reform Commission and the National Energy Administration, together with all relevant parties, will coordinate and promote the implementation of these Guidelines, strengthen departmental coordination, strengthen guidance and supervision over all localities, regularly evaluate the implementation, promptly summarize and promote typical experience and practices, and timely report major situations to the Party Central Committee and The State Council. Local governments at all levels have established a mechanism for coordinated promotion of the construction of charging infrastructure in close cooperation with relevant departments of development and reform, energy, transportation, natural resources, industry and information technology, housing and urban-rural construction, commerce, fire rescue, urban management, etc., to comprehensively map out the basic situation, scientifically assess construction needs, simplify construction procedures, and establish and improve standards and policy systems. Continue to track and solve key and difficult problems, and realize information sharing and policy linkage.


  • Honeywell TK-IAH161 - 1PC ANALOG INPUT New Shipping DHL or FedEX
  • Honeywell PX45A - "8 Points/mm (203dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet,"
  • Honeywell 51309276-150 - / 51309276150 (NEW NO BOX)
  • Honeywell 82408217-001 - / 82408217001 (NEW NO BOX)
  • Honeywell BK-G100 - Elster U160 Gas Meter DN100 #3485
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx) #H254CC YD
  • Honeywell 621-9938R-RP - Serial Input/Output Module 22572 Vr 3.2 94V-0
  • Honeywell U2-1018S-PF - NEW flame detector DHL Fast delivery
  • Honeywell TK-PRR021 - 51309288-475 redundancy module
  • Honeywell 50129828-003 - Temperature Transmitter
  • Honeywell 3151080 - RING SET P/N (HONEYWELL) NS COND # 11344 (4)
  • Honeywell 4DP7APXPR311 - CIRCUIT BOARD
  • Honeywell MG-818 - Symbol Generator P/N 7011675-818
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty#XR
  • Honeywell 51304800-100 - 30731808-004 Regulator Card REV B
  • Honeywell MU-FOED02 - UCN EXTENDER PN:51197564-200 REV F
  • Honeywell MC-PAIL02 - 51304907-100 Specii Input/Output Module Rev E
  • Honeywell SPS5713 - 51199930-100 NSMP
  • Honeywell XS858A - Mode S Transponder 7517401-960 Removed Working
  • Honeywell SK-5208 - Fire Panel Maintenance Service 6MonWarri UPS Express SK5208 Zy
  • Honeywell 51403422-150 - NEW HDW COMM CTRL CONTROLLER
  • Honeywell IBI-AD - Yamatake- 82407390-001/ 82408215-001 PCB Card
  • Honeywell 51401635-150 - / 51401635150 (USED TESTED CLEANED)
  • Honeywell ANT67A - TCAS Antenna 071-01548-0100 w/ March 2024 Overhauled 8130
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty
  • Honeywell 620-3632C - CPU. . (UK And EU Buyers Read)
  • Honeywell PX45A - "12 Points/mm (300dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet"
  • Honeywell K4LCN-4 - 51402755-100 Processor Card Rev: F 51305099-100 B
  • Honeywell 2001-400-150-126-200-20-100001-1-0-00 - REPAIRED PNEUMATIC ACTUATOR
  • Honeywell GGSI - 51401914-100 HDW B FW A R400 51400996-100 Rev C PLC Board Module
  • Honeywell 184637 - TRANSDUCER P/N (HONEYWELL) NS CONDITION #12517
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell 620-0073C - / 6200073C (USED TESTED CLEANED)
  • Honeywell 05704-A-0144 - / 05704A0144 (NEW NO BOX)
  • Honeywell RI-406 - P/N 4026206-940 (Sperry) Instrument Remote Controller
  • Honeywell AAU-32/A - ALTIMETER ENCODER P/N 99251-3252011-0101 REP TAG # 12197
  • Honeywell T-1204-1174 - 51304907-100 Spcii I/O Module
  • Honeywell TK-PRS021 - Control Processor Expedited Shipping TKPRS021 Spot Goods Zy
  • Honeywell VITO - Enraf Lt Interface 762 Up 762 Aga / Z
  • Honeywell QPP-0001 - FC-QPP-0001 Module
  • Honeywell TC-PRS021 - / TCPRS021 (USED TESTED CLEANED)
  • Honeywell 51403698-100 - / 51403698100 (USED TESTED CLEANED)
  • Honeywell XCL8010A - 24V NSMP
  • Honeywell 91884 - "Target, 15.620 X 12.846 X 0.250"" BTL, 07-613, 5N TI, 118305"
  • Honeywell 51403776-100 - / 51403776100 (USED TESTED CLEANED)
  • Honeywell LG1093AC01 - UV Flame Sensor/Detector
  • Honeywell CC-PCNT02 - Controller Module Expedited Shipping CCPCNT02 Spot Goods Zy
  • Honeywell FFSB14ER10KS2 - / FFSB14ER10KS2 (NEW IN BOX)
  • Honeywell RF600 - Radio Frequency Unit 7516240-60060 Removed Working
  • Honeywell 51196881-100 - NEW UPGRADE KIT EC W/ODEP 51196881100
  • Honeywell CC-IP0101 - 51410056-175 Brand New Expedited Shipping
  • Honeywell AL300 - Alt Preselect Command Controller 7002412-904 w/ August 2011 Repaired 8130
  • Honeywell 094377-00 - / 09437700 (USED TESTED CLEANED)
  • Honeywell IRTP271 - Tata Printed Circuit Board Rev.0 DPCB21010003
  • Honeywell TVMUGR-888880-020-52-3-030-0U000G-000 - MULTITREND GR GRAPHIC RECORDER
  • Honeywell RM850 - Radio Management Unit 7012100-811 w/ December 2017 Repaired 8130
  • Honeywell PGM-7360 - Gas Detector
  • Honeywell WU660 - Radar RTA 7021450-601 w/ April 2024 Overhauled 8130
  • Honeywell 9243201 - / 9243201 (NEW NO BOX)
  • Honeywell AZ850 - Micro Air Data Computer 7014700-601 Removed Working
  • Honeywell DCP550 - Yamatake- Digital Programmable Controller Temperature
  • Honeywell FF-SEDGE6G2-1M-C - / FFSEDGE6G21MC (USED TESTED CLEANED)
  • Honeywell FC-RUSIO-3224 - Brand New Expedited Shipping Via DHL
  • Honeywell RM850 - Radio Management Unit 7012100-801 w/ March 2021 Tested 8130
  • Honeywell HIMA-6E-B - Large System Controller Via DHL or FedEx
  • Honeywell RM855 - Radio Management Unit 7013270-973 w/ April 2024 Modified 8130
  • Honeywell MP-DNCF02-200 - REV B Upper & Lower / 51305072-300 51305072-200 REV L.
  • Honeywell 80360206-001 - / 80360206001 (USED TESTED CLEANED)
  • Honeywell DE132-0-A-BB-0-Z-1-0C-EE0-00 - Chart Recorder
  • Honeywell 51403519-160 - NSNP
  • Honeywell 627-1002RC - / 6271002RC (USED TESTED CLEANED)
  • Honeywell 51400997-100 - / 51400997100 (USED TESTED CLEANED)
  • Honeywell J-AOM10 - Yamatake- /J-A0M10 Analog Output Module 24Vdc 480Ma Hw/Fw Rev: C
  • Honeywell AZ800 - Digital Air Data Computer 7000700-953 w/ July 2016 Repaired EASA Form 1
  • Honeywell FC-RUSIO-3224 - Brand New
  • Honeywell BZ-2RW82272-A2 - Micro Switch 1a 125vac
  • Honeywell FC-RUSIO-3224 - 1PC Brand New
  • Honeywell 10268S-1-020-201-0-2-03100-000-00 - Electric Actuator 121va 120v-ac
  • Honeywell 14CE102-1RS - Limit Switch IP65
  • Honeywell FC-PSU-UNI2450U - Brand New Fast Shipping FedEx or DHL
  • Honeywell 696658-1 - SUPPORT ASSY. NS 11764 (3)
  • Honeywell TK-PRR021 - ONE New 51309288-475 DC
  • Honeywell PSU-UNI2450 - (AS PICTURED) NUPI
  • Honeywell 80360146-011 - / 80360146011 (USED TESTED CLEANED)
  • Honeywell EGWPM - MODULE Assembly 7028419-1904 Inspected/Tested Jun. 2021
  • Honeywell DE131-0-A-0B-0-Z-1-0B,0C-EE0-000 - "Chart Recorder"
  • Honeywell 51454493-126 - / 51454493126 (NEW IN BOX)
  • Honeywell 965-1186-003 - "MK VI, GPWS Computer, EASA FORM ONE/FAA 8130 Guaranteed"
  • Honeywell 51401996-100 - / 51401996100 (USED TESTED CLEANED)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118222"
  • Honeywell SPS5785 - 1pc 51198651-100 Power Supply Brand New Fast shipping
  • Honeywell FX-USI-0002 Security Manager System Module 5Vdc
  • Honeywell SPS5785 - 51198651-100 power supply
  • Honeywell HIMA-6E-B - Large System Controller Fast Shipping
  • Honeywell 51301882-100 - RTD MUX Terminal Board
  • Honeywell 51198821-100 - 1PC new module PLC One year warranty free Shipping#XR
  • Honeywell EAMR - 51401996-100 E CARD card
  • Honeywell 51305734-100 - / 51305734100 (USED TESTED CLEANED)
  • Honeywell 50065674 - Basic Display PWA Assembly HNWG50049911-001
  • Honeywell TSENCOBTM-07889 - "15.620X12.913X0.125 MPS-5-002/M TARGET, 109953"
  • Honeywell 86220000 - / 086220000 (USED TESTED CLEANED)
  • Honeywell CC-IP0101 - C300 system card Brand new fedex or DHL
  • Honeywell WU880 - Radar Antenna 7021450-801 w/ May 2024 Repaired 8130
  • Honeywell CC-IP0101 - ONE Profibus DP Gateway Module NEW
  • Honeywell 397124-2-4 - Gulfstream Valve New Overhauled
  • Honeywell PGM-7340 - RAE 3000 VOC Detector Shipping DHL or FedEX
  • Honeywell RCZ850 - Integrated Communication Unit 7510100-731 w/ March 2024 Tested 8130
  • Honeywell STS103-001-00006-12-1137 - NSNP
  • Honeywell AL300 - Altitude Preselect Command Ctlr 7002412-906 w/ March 2024 Overhauled 8130
  • Honeywell 2119020-8000 - Series 1 N1 Digital Electronic Engine Control
  • Honeywell 51198685-100 - Power Module Brand New Shipping FedEx or DHL
  • Honeywell 620-0073C - / 6200073C (NEW IN BOX)
  • Honeywell GTS-3PA-B - "Timer 0-60 Sec, 220v 50/60 Hz"
  • Honeywell IVA81D - TCAS Vertical Speed Indicator 066-01171-2804 w/ January 2020 Tested 8130
  • Honeywell 51403299-200 - / 51403299200 (NEW NO BOX)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118221"
  • Honeywell AT860 - Loop Sense Antenna 7510300-901 w/ May 2024 Tested 8130
  • Honeywell XL2000B3A - 1PCS USED /
  • Honeywell CC-PCNT02 - C300 Controller Module
  • Honeywell ASDX015D44R - SenSym Pressure Sensor Micro Switch 0-15 psi 8 pin DIP
  • Honeywell 900CS15-00 - Touch Panel NEW SHIP DHL OR EMS 1 Year Warranty cl
  • Honeywell FC-SCNT01 - S300 Control Module 51454926-176 Security Control - 400mA
  • Honeywell DC1010CR-301000-E - Digital Temperature Controller 85-265VAC
  • Honeywell TK-PRR021 - redundancy module 51309288-475
  • Honeywell K4LCN - 51402755-100 Motherboard SS 51201795-400
  • Honeywell XL2000B3A - plc new FREE EXPEDITED SHIPPING
  • Honeywell FC-SCNT02 - 51460114-176 S300 Controller Module 78-4
  • Honeywell BVS - 99ATEX2259X 03ATEXG016X Tester new