Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

We will accelerate the construction of charging infrastructure

F: | Au:佚名 | DA:2023-12-05 | 294 Br: | 🔊 点击朗读正文 ❚❚ | Share:

First, innovate the operation and maintenance mode of rural charging infrastructure construction

(1) Strengthen the layout of public charging infrastructure. Support local governments to carry out county and township public charging network planning in light of actual conditions, and do a good job of connecting with territorial spatial planning, distribution network planning, etc., and accelerate the realization of regional charging stations suitable for the use of new energy vehicles, "full coverage of counties" and "full coverage of charging piles". Rationally promote the construction of centralized public charging stations, prioritize the allocation of public charging facilities in county and township enterprises and institutions, commercial buildings, transportation hubs (stations), service areas (stations) along highways and other places, and extend them to relocation centralized resettlement areas and key rural tourism villages, and accelerate the construction of charging piles along highways and gas stations with conditions in combination with the development of rural self-driving Tours.

(2) Promoting community sharing of charging infrastructure construction. Accelerate the construction of charging facilities in existing residential communities in rural areas, carry out the renovation of charging facilities construction conditions according to local conditions, and residential communities with installation conditions can be equipped with a certain proportion of public charging parking Spaces. Implement the requirements for the allocation of charging infrastructure in new residential communities, and promote the construction of charging facilities in fixed parking Spaces or reserve installation conditions to meet the needs of direct meter installation and power connection. Implement the management responsibilities of grass-roots management agencies such as sub-district offices, increase the guidance and supervision of residential community management units, and establish a "one-stop" coordination and complaint resolution mechanism. Residential community management units should actively assist users to install charging facilities, and can explore mechanisms for cooperation with charging facility operators. Guide the community to promote the sharing mode of "adjacent parking space sharing", "community time-sharing" and "multiple cars and one pile".

(3) Increase support for the construction and operation of charging networks. Encourage qualified localities to introduce special support policies for the construction and operation of public charging infrastructure in rural areas. We will use local government special bonds and other tools to support the construction of qualified highways and ordinary national and provincial trunk road service areas (stations), public tram stations and car passenger stations. Overall consideration should be given to the construction of village-level charging networks and the development of transmission and distribution grids, and support efforts should be increased such as land security, the construction and transformation of supporting power grids should be carried out to enhance the support and security capacity of rural power grids. By 2030, centralized charging and replacing facilities with two-part electricity prices will be exempted from demand (capacity) electricity charges, relax the constraints on the efficiency of distribution network construction investment of power grid enterprises, and fully include the recovery of transmission and distribution electricity prices.

(4) Promote new models such as intelligent and orderly charging. Improve the intelligent level of new charging infrastructure, incorporate intelligent and orderly charging into the functional scope of charging infrastructure and new energy vehicle products, encourage new energy vehicles to be equipped with charging piles with orderly charging functions, and accelerate the formation of unified industry standards. Encourage research on key technologies such as bidirectional interaction between electric vehicles and the grid (V2G) and cooperative control of optical storage and charge, and explore the construction of charging infrastructure that provides integrated photovoltaic power generation, energy storage and charging in rural areas where the utilization rate of charging piles is low. Implement the peak-valley time-of-use electricity price policy to encourage users to charge during off-peak periods.

(5) Improve the charging infrastructure operation and maintenance service experience. Based on the environment of charging facilities in rural areas, basic conditions of power grids, operation and maintenance requirements, the standard system revision and typical design of charging facilities construction are carried out. Improve the operation and maintenance system of charging facilities, improve the availability of facilities and fault handling capacity, and promote the interconnection of public charging and replacement network operator platforms. Encourage parking lot and charging facility operation enterprises to innovate technology and management measures, guide fuel vehicles and new energy vehicles to park in zones, and maintain a good charging order. The use of technical means to study and judge the period and location of the concentration of charging demand in advance, and do a good job in service guarantee.

Second, support the purchase and use of new energy vehicles in rural areas

6. Enriching the supply of new energy vehicles. Encourage new energy vehicle enterprises to optimize the configuration through differentiation strategies for the characteristics of consumers in rural areas, and develop more economical and practical models, especially new energy cargo micro-surface, micro-card, light truck and other products. Improve the evaluation system for new energy used cars, strengthen the inspection and renovation of new energy used cars, and encourage enterprises to provide high-quality new energy used cars for the market in rural areas.

7. Accelerating applications in the public sector. Accelerate the promotion and application of new energy vehicles in county and township party and government organs, schools, hospitals and other units, increase the proportion of new energy vehicles used in official vehicles according to local conditions, and play a leading and exemplary role. Encourage local conditions to increase support for the application of new energy vehicles in public transport, road passenger transport, taxi, law enforcement, environmental sanitation, logistics and distribution.

(8) Provide diversified purchase support policies. Where conditions permit, encourage rural residents to purchase new energy vehicles within the county where their household registration is located, and give them support such as consumption vouchers. Encourage relevant automobile enterprises and qualified places to provide trade-in incentives for the purchase of new energy vehicles by phasing out low-speed electric vehicles. Encourage local governments to strengthen the linkage between government and enterprises, and carry out activities such as giving charging coupons for car purchases. Increase the support for auto consumer credit in rural areas, and encourage financial institutions to reasonably determine the down payment ratio, loan interest rate and repayment term under the premise of law and compliance and risk control.

Third, strengthen the publicity and service management of new energy vehicles in rural areas

9. Intensify publicity and guidance. Through news reports, expert comments, Internet new media and other ways to actively promote, support local governments and industry institutions to organize new energy vehicle manufacturers to carry out brand joint exhibition, test drive and other activities, encourage new energy vehicle enterprises to carry out free "battery physical examination" activities in rural areas within three years of car purchase with upstream battery enterprises in the industrial chain, and enhance consumer acceptance of new energy vehicles.

(10) Strengthen sales and service network. Encourage new energy vehicle enterprises to dip into the sales network, guide car enterprises and third-party service enterprises to speed up the construction of joint business outlets, establish a supporting after-sales service system, regularly carry out maintenance and after-sales service activities to the countryside, provide emergency rescue and other services, and alleviate concerns about purchase and use. Vocational colleges are encouraged to train new energy vehicle maintenance technicians for rural areas, and provide related vocational education such as vehicle maintenance and charging pile maintenance, which will promote the effective connection between local employment and support for new energy vehicle consumption.

11. Strengthening safety oversight. Improve the safety supervision system for new energy vehicles, use a variety of means according to local conditions, improve the quality and safety level of new energy vehicles and batteries, strictly manage charging facilities in rural areas, guide charging facility operators to access the government's charging facility supervision platform, strictly comply with the safety conditions of supporting power supply and centralized charging sites, and ensure compliance with relevant laws and regulations, national standards or industry standards. Strengthen the safety business training of management personnel, and regularly check the hidden dangers of the stock charging piles. Guide rural residents to install and use independent charging piles, and reasonably equip leakage protectors and grounding equipment to improve the safety level of electricity consumption.

All regions and relevant departments should effectively strengthen organizational leadership, clarify the division of responsibilities, take the initiative to promote relevant policies and measures as soon as possible, improve the purchase and use policies, further improve the charging infrastructure network, ensure that "someone built, someone managed, can be sustainable", and create a good environment for the promotion and use of new energy vehicles in rural areas. Better meet the people's needs in production and life.


  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series