Fan component (51454248-100): used for air circulation inside the cabinet to expand high-temperature operation capability;
ESD grounding point: a dedicated grounding pole located in the lower left corner of the cabinet, which releases static electricity during maintenance.

Communication Topology: Flexible Expansion from Point to Network
UPC supports two completely independent I/O communication architectures, which are mutually exclusive:
1. IO HIVE architecture based on CN100
Fiber optic direct connection to the Expert FTE network;
Support remote deployment of 10km (single-mode)/2km (multi-mode);
I/O channels can be dynamically allocated across controllers to achieve virtualized I/O.
2. Traditional I/O Link architecture based on FOE
Extend the I/O Link serial bus to C300 through optical fiber;
Each I/O Link A/B redundant fiber optic cable is independently wired;
Chrysanthemum chain: A single fiber optic cable can connect up to 7 UPCs in series;
Star shaped: Multiple FOEs on the C300 side are connected in parallel to multiple UPCs.
3. Power supply daisy chain
UPC supports cascading power supply of AC main power supply: The second layer terminal of the AC terminal block (TB2) of the first UPC can be connected to the second UPC, and so on, up to 3 UPCs share the same power supply input line. Each UPC must be independently connected to a protective ground wire.
Wiring and Distribution Solutions: From Traditional Terminals to Intelligent Signal Conditioning
UPC offers four wiring architectures, which users can flexibly choose based on project stage, explosion-proof requirements, and channel density.
1. Direct IOTA wiring (without terminal cabinet)
IOTA itself comes with wiring terminals;
Applicable to non explosion proof, low channel count, and cost sensitive projects.
2. Weidmuller on-site terminal assembly
Passive feedthrough wiring;
Each channel has a testing/disconnection function;
Supports 2-wire system, 3/4 wire system requires an additional 24V power supply terminal;
Intrinsic safety (IC) and non intrinsic safety field wiring are not supported.
3. VIPER Terminal Assembly (Phoenix Contact)
VIPER is the most powerful and high-density wiring solution in UPC:
8 channels per module, 6 wiring points per channel (A/B/C/D/SHC/SHF);
Supports 11 types of IOA (I/O attachments), hot swappable, and on-site reconfigurable:
Feedthrough module (IOA FEED-THRU/EX): 1:1 straight through, 1A;
Simulation protection module: 0.5A fuse, fuse indication, disconnect point, test point, supports 2/3/4 wire system;
Digital protection module: 1A insurance, supports 2/3/4 wire system;
HART I-I transparent transmission module (IOA RPSS-I-I/HART/EX): 3-port isolated relay power supply, supports 0 (4) -20mA input/output, HART transparent transmission;
Relay module: 24V/120V/230V DI/DO, NO/NC optional, 3A contacts.
Rules for intrinsically safe and non intrinsic safe wiring:
When using VIPER, if non intrinsic or intrinsic safety (IC) field circuits need to be supported, the 24V power fuse corresponding to the P1 terminal of the VIPER base must be removed;
The only exception is that the I-I-HART module requires power supply from the P2 terminal and is not subject to this limitation.
4. General signal conditioning component (CC-USCA01)
USCA is the core of Honeywell Universal Marshalling Solution:
16 channel integrated backplane, with a single MTC (Mass Termination Cable) connected to IOTA;
3 on-site wiring screw terminals per channel, with built-in fuses and disconnect points;
Supports 9 types of Signal Conditioning Adapter (SCA), single channel pluggable configuration:
CC-UPTA01: Direct, Passive;
CC-UDIR01/UDOR01: DI/DO relay adapter, low voltage;
CC-ULLI01: Low level input, supports TC, mV, RTD, Ω, 4-20mA output, channel isolation;
CC-UAIA01/UAOA01: AI/AO isolator, 4-20mA, HART, 3-port isolation;
CC-UDXA01: DI/DO self identifying isolator, supporting NAMUR;
CC-UGAIO1/UGAO01/UGDA01: AI/AO/DI/DO intrinsic safety isolation barriers.
Anti misplacement design: The USCA base is equipped with a physical encoding key. When the module is first inserted, the male key clicks into the base and the female key remains in the module. Only modules of the same type can be inserted into this slot in the future.
Engineering Planning and Installation: Rigorous Industrial Standards
The deployment of UPC must follow a series of mandatory engineering guidelines to ensure the effectiveness of IP66 protection, EMC compatibility, and hazardous area certification.
1. Transportation and Storage
Transportation method: shock-absorbing air cushion vehicle, horizontally fixed on wooden pallets, stacking prohibited;
Vibration limit: sine 0.5G;
Outdoor storage: Rainproof cover/sunshade must be used.
2. Installation location
Load bearing requirement: The supporting structure has a load capacity of ≥ 1200 pounds (544kg);
Installation bolt: M10 × 1.5mm, strength grade A2-70;
Space requirement: Adequate heat dissipation space should be reserved around the cabinet, and it is forbidden to block the top air outlet.
3. Cable entry
Unique entrance: Removable gland plate at the bottom of the cabinet;
Protection maintenance: All openings must use IP66 grade cable connectors or metal/high-strength plastic sealing components;