Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Do a good job of civilized construction and actively create a green site

F: | Au:佚名 | DA:2023-11-16 | 822 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Strive to promote standardized management:

Anhui Huainan shed renovation project by the Central Plains company to build, hired He Steel Group Xingda Labor Co., Ltd. to participate in the management. At the beginning of the establishment of the project, it was arranged and implemented with the goal of "creating a standardized site". Walking into the construction site, "standardization" can be seen everywhere, the site gate with blue characters on a white background is quiet and atmospheric, the clean and tidy staff dormitory gives people the feeling of home, and the propaganda slogans and posters can be seen everywhere on the walls of the road to show the corporate culture and strength of MCC Tiangong Group to the outside world. All kinds of rules and regulations on the wall of the office area provide the basis for the standardized management of the project, the neat model room not only improves the quality of the project, but also reduces the waste of rework in the construction process, the eye-catching hazard warning sign warns the on-site workers, the solar street lamp and the water heater effectively save electricity, the workers' dormitory is equipped with a 36-volt safe voltage mobile phone charging port and lights, Put an end to the workers private pull random, effectively prevent the occurrence of fire...

To build a civilized construction environment:

With the continuous development of various works, the project department has established a civilized construction responsibility system for each construction position, from dust and noise reduction to energy saving and emission reduction, from rational use of the site to the completion of the work, from the establishment of various reward and punishment systems to inspection and evaluation, the responsibility is clear, and a complete and mature responsibility mechanism has been formed to promote the standardization, standardization and scientific construction management of construction civilization.

In 2017, under the background of the "blue Sky Action" carried out by the state, the environmental protection department of Huainan City also made great efforts to rectify environmental pollution. As a large key resettlement project in Huainan City, coupled with the background of the unit's "central enterprise", Huainan shed reform project naturally became the focus of the local government. The project department is well aware of the importance of livelihood projects and the social responsibilities and obligations of central enterprises, attaches great importance to them, actively cooperates and adopts a series of measures to build a civilized environment.

In terms of dust control, the project department arranged special personnel to take charge of dust control work in various areas, and purchased a large number of green nets to cover exposed materials, soil piles and sites. Wheat is planted on the off-site soil pile, which not only beautifies the environment, but also effectively controls the dust, and can also be used as a living supply for the project department. At the same time, the sprinkler of the project department continuously sprinkles the roads inside and outside the site every day, and closes the buildings with a dense net to prevent dust during the construction process. The PM2.5 environmental monitoring instrument is also installed at the construction site to pay attention to the dust situation at all times. In terms of noise reduction, according to the current national standards, the project department has formulated practical control measures from the source of noise, transmission channels and personnel training, and tested the noise value of the construction site.

During the earthwork construction phase, the project department has carried out environmental protection education for the operators, stipulating that all construction machinery must meet environmental protection standards, strictly control the amount of bulldozer and loader loading during the construction process, and prohibit overload operation. At the same time, strengthen the maintenance of construction machinery, shorten the maintenance cycle, and ensure that the mechanical equipment is in a good technical state. During the construction phase of the structure, low noise equipment is used to keep the technical state of the vehicle intact and reduce the speed appropriately. The formwork and scaffolding must be handled lightly when being set up, dismantled and handled, and people must be passed from top to bottom. Strengthen the training and responsibility education of concrete pump and concrete tank truck operators to ensure the smooth operation of concrete tank trucks. In terms of energy conservation and emission reduction, the project department has installed solar street lights, solar water heaters, drainage ditches and sedimentation tanks, and collected domestic wastewater and on-site precipitation are used for flushing toilets, road watering, etc., which not only saves water resources, but also prevents on-site wastewater from directly discharging into municipal sewage networks and rivers causing pollution.

We will give full play to the role of grass-roots Party organizations

The grass-roots party organization is the executer of the party's line and policy, and the grass-roots party building work is not only the political resources of the enterprise, but also the embodiment of soft power, and the main driving force for the steady development of the enterprise. At the beginning of the establishment of the Party branch of Huainan Project, it also walked in the grassroots party organization party building activities "past tense", symbolically carried out some document learning, exchange discussions, daily work is also limited to collecting party fees, writing summaries, such "activities" have no vitality, directly affecting the role of the party organization.

All say that the party building work is done well, the project management must not be bad, this is not false. Huainan project department leaders, Party branch secretary aware that grassroots party building must "go to the heart", must overcome the constraints of the site and number of people, to avoid the wrong form of meeting to implement the meeting, in order to truly grasp the party building work, promote project construction. Therefore, combined with the Huainan project region, project characteristics, management methods and requirements, the project party branch not only mobilized project party members, but also included labor dispatch employees and external team personnel, and carried out quality competition and excellence activities to ensure the benign operation of the project. At the same time of evaluating the quality and progress, the civilized construction of the site is rewarded and punished, deepening the awareness of green construction and civilized construction, increasing the investigation and punishment, actively supporting each team to carry out standardized site creation, and rationally using the credit evaluation system to deduct points from the uncivilized team, a series of measures have greatly stimulated the enthusiasm of the majority of employees and labor teams to participate in green construction. During the dust control period, a full-time dust control assistant was added to inspect the dust control situation in the whole site from time to time.

At the same time, the Party branch of the project strengthened the multi-dimensional training of young party members through the theme Party day, "three meetings and one lesson", etc., cultivated the backbone talents of the construction site into excellent party cadres, and cultivated the party cadres into all-round talents who can take charge of the construction site alone, thus enhancing their post responsibility and strengthening the consciousness of creating a green construction site. The prestige of the party organization in project management has been intrinsically improved.

On the occasion of the 96th anniversary of the founding of the Party, the Party branch of Huainan Project was awarded the 2016-2017 "Advanced Party Branch" of MCC Tiangong Group.

Green civilization construction is the basis of safe construction, but also the embodiment of a good image of enterprises. Anhui Huainan shed renovation project Department to do a good job of civilized construction, actively create a green site, made contributions to environmental governance, better to Huainan people to show the good image of MCC Tiangong Group and strong management strength, for the expansion of a broader market laid a solid foundation. We MCC people cast the world with our hearts, and we believe that as long as we do it with our hearts, we will certainly make it.


  • Mitsubishi A2NCPU Programmable Controller MELSEC
  • Mitsubishi Alpha XL Alarm Modem M20 Expansion
  • AutomationDirect D0-06DD2-D PLC DL06 Controller
  • Toshiba COMW01-21 PCB Control Board Turbine
  • Siemens 6FX1122-1AC02 Coupling Module SINUMERIK
  • Omron CVM1-CPU21-V2 CPU Unit Programmable
  • Beckhoff EL7041 Stepper Motor Terminal EtherCAT
  • B&R X20AI4622 Analog Input Module 4 Channels
  • OAT PMC25.2-003 Programmable Controller Module
  • Fanuc A16B-2200-0350 Graphic Board Series 16
  • Eaton Cutler Hammer 6-26-2 Contactor Contact Kit
  • Omron D4SL-NSK10-LK-K Safety Switch
  • Siemens C98043-A7001-L24 CUD1 Control Board
  • Mitsubishi A2NCPUR21-S1 PLC Module
  • National Instruments NI-9242 4-channel analog input module
  • BEMAC UST-202-D PLC Interface Board
  • Omron CJ1W-DA08C Analog Output Module
  • Mitsubishi QX521 CNC Interface Board
  • Schneider BMEP586040 High-Performance PLC Processor
  • Emerson 5X00875G01 Process Control PLC
  • Siemens SIMODRIVE 611 Power Module 6SN1145-1AA01-0AA0
  • Siemens 840C NC-CPU 486DX4 6FC5110-0BB04-0AA1
  • Mitsubishi GT2708 Series Operation Panel Touch HMI
  • Fanuc A04B-0103-C220 Programmable Controller Module
  • IFM CR2530 Programmable Controller for Mobile Automation
  • Omron FH-3050 Vision Controller i7-2715QE High Performance
  • National Instruments NI-9242 4-Ch Analog Input Module
  • B&R X20AI4632 Analog Input Module 4 Channels
  • Pilz 773600 Input Module Safety Automation
  • Panasonic AFPX-C60P Programmable Controller PLC
  • Siemens 6ES7414-2XL07-0AB0 S7-400 CPU Manual
  • Cutler Hammer WM34V Interlock Kit Manual
  • Pilz 777587 Safety Relay Specifications
  • Omron CJ2H-CPU64-EIP CPU Module Manual
  • B&R X20AI1744-3 Analog Input Module Guide
  • Schneider LC1G185BEEA Contactor Specification
  • Sharp LM64P101 LCD Screen Specifications
  • B&R X20AT4222 Temperature Module Guide
  • Mitsubishi A2UCPU-S1 Controller Specifications
  • Stein Sohn E 083.1 Rack Module Technical Guide
  • Omron CK3W-AX1515N Motion Controller
  • Schneider TSXP572634M PLC Processor
  • Epson RAIOC-33 Programmable Controller
  • GRID T&D iRTUe-D1R1-W.125 I/O Module
  • Fanuc A20B-2002-0520 Control Board
  • B&R X20IF1030 Interface Module
  • Schneider ATV320U55N4B VFD
  • Omron NA5-9W001B-V1 HMI Touchscreen
  • Mitsubishi A2NCPU PLC CPU Unit
  • Omron CJ2M-CPU34 PLC CPU Unit
  • Omron NS12-TS01B-V2 Touch Screen HMI
  • Mitsubishi FX3GE-24MT/ESS PLC Controller
  • Grundig NEA02 AES 0 PLC I O Module
  • Beckhoff EP3204-0002 EtherCAT Box Module
  • Mitsubishi MDS-A-CV-220 Power Supply Unit
  • MCX20B2 080G0330 Motion Controller
  • Toyo Keiki P CARD5 Interface Board YH-212
  • National Instruments NI 9242 Analog Input Module
  • B&R 3AM055.6 PLC Module
  • Omron CJ1W-ETN21 Ethernet Module PLC
  • Allen-Bradley 2711P-T15C4A7 PanelView Plus 1500 Guide
  • Pilz 777602 Safety Module XV1P Specifications
  • NI cFP-2220 and cFP Modules Technical Guide
  • Keyence XG-EC80 Camera Input Unit Overview
  • Dynatronix CRS9-10 DC Power Supply Manual
  • Omron G3PW-A220EC-S-FLK Power Controller Manual
  • EVO SP SYSTEM PLC Control Panel Overview
  • B&R X20IF10G3-1 Interface Module Specifications
  • NL8060BC21-11 Industrial LCD Screen Specification
  • SK-G9-FAN1-F6 Cooling Fan Technical Specifications
  • US Drives 3000-4220-4-4 PLC Add-on Module
  • Allen-Bradley 2002-NX70-HSC4 High-Speed Counter
  • Schneider TM258LF42DR PLC Controller
  • Harris 8800-00002-02 PLC Power Control Center
  • NLT NL8060BC21-11C 8.4 LCD Panel
  • ABB PLUTO S20 V2 CFS Safety PLC
  • Omron NS12-TS00B-V2 NS12-TS00B-ECV2 HMI
  • 7-29 10 00 A PLC Expansion Module
  • B&R X20DC2395 PLC Module
  • Omron NE1A-SCPU02 Network Controller
  • GE IC200UEX624-C VersaMax Micro PLC
  • Rexroth GIV50-11 Position Limit Switch Assembly
  • B&R X20SLX410 Safety Logic Module
  • Omron CJ1W-NC433 Position Control Unit
  • Inovance AM600-CPU1608TP PLC Controller
  • ABB Pluto S20 V2 CFS Safety PLC
  • Omron CJ1W-NC113 Position Control Unit
  • Grundig NEA02 AES 0 PLC I O Module
  • Fanuc A16B-2202-0432 Control PCB Board
  • Siemens 6SN1124-1AA00-0DA0 Simodrive LT Module
  • B&R X20AO2632 Analog Output Module Specifications
  • Georges Renault 6159187760 PLC Board Technical Guide
  • IDEC PLC FC6A-D32K3CEE MicroSmart Controller Manual
  • 6ES7226-6BA32-0XB0 Fail-Safe Digital Input Guide
  • Programmable Controller PLC EC20-4040BRA Specification
  • Grundig PLC NEA02 AES 0 I/O Card Specification
  • Seiki POS-M 10-22-01 Card Positioning Board Manual
  • Ormec Systems PMC960 Motion Controller CPU Guide
  • GEFRAN U16-NS 6YC000000000002 PCB Technical Specification
  • ABB SPAJ 140 C Overcurrent Relay Technical Manual
  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board