Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • Inverter Emerson EV6000G
    ❤ Add to collection
  • Inverter Emerson EV6000G

    • ¥57842.00
      ¥56564.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:0.000KG
    • Quantity:
    • (Inventory: 26)
Description



Communication module

Fieldbus adapter

Model :TDS-PA01

Through the TDS-PA01 fieldbus adapter, the ENYDRIVE series inverter can be transferred. Connect to the PROFIBUS fieldbus network. The PROFIBUS fieldbus network

In the system, the inverter will work as a slave station.

Implementation functions:

l) Send control commands to the inverter (such as: start, stop, point, etc.);

2) Send the speed or frequency given signal to the inverter:

3) Read the working status information and actual value from the inverter;

4) Reset the inverter.

Built-in expansion card options

PG expansion card

The EV60-PGABS Differential Incremental PG speed card is a 5V differential incremental encoder interface that supports PG's ABZUVW signal for speed or position feedback and synchronization

Control.

EV60-PGSIN Sine-cosine PG speed measurement card supports sin/cos encoder and can be used for synchro control.

EV60-PGRLV Rotary transformer PG speed measurement card supports Resolver encoder and can be used for synchro control. See the EV60-PGRLV Speed Card User Manual for details.


Inverter installation environment

Installed in indoor, well-ventilated places, generally should be installed vertically.

When selecting an installation environment, note the following:

The ambient temperature must be in the range of -10 ° C to 40 ° C. If the temperature exceeds 40 ° C, external heat dissipation or derating is required.

Humidity requirements are lower than 95%, no condensation:

Installed in places with vibration less than 5.9m/s²(0.6g);

Avoid installation in direct sunlight:

In order to prevent unauthorized personnel from reaching the inverter, it is generally required to be installed in the cabinet and meet the requirements of pollution level 2 defined by IEC60664-1;

In the absence of a cabinet, the frequency converter shall be installed in a restricted area that is protected from unauthorized persons and meets the requirements of pollution level 2 as defined by IEC60664-1.

If there are special installation requirements, please consult and confirm in advance.

Installation of plastic cover plate:

Install the top cover first, and then the bottom cover as follows:

1) Insert the mounting claw at the top of the top cover plate into the mounting hole at the top of the chassis;

2) Press the lower part of the top cover plate and insert its mounting claw into the box until the cover plate is installed in place;

3) Align the mounting screw holes under the top cover plate and screw:

4) Insert the mounting claw at the top of the bottom cover plate into the mounting hole at the bottom of the top cover plate;

5) Press the lower part of the bottom cover plate and insert its mounting claw into the box until the cover plate is installed in place;

6) Align the mounting screw holes under the bottom cover plate and fasten the screws.


Choose Xiamen control Smith after sale worry

Excellent product quality

Only cooperate with manufacturers of first-line brands in the industry

Imports/Products

Good pre-sale service

Communicated with customers repeatedly about product model, quality, price and delivery date

Work with the customer to determine the best solution

Address user concerns in advance

Business execution in place

Ordered products delivered on time

Make perfect delivery plan to ensure the time limit

Assist users to handle the acceptance procedures

Perfect after-sales service

During the warranty period, problems will only be replaced and not repaired

Never put a problem on the back of your head

Service hotline 7x24 hours service

Solemn promise

1. All the items sold by the company, module card parts, etc., the quality problems arising from normal use during the warranty period are replaced free of charge, and there is no evasion.

2. For materials and equipment that have not been discontinued beyond the warranty period, only the cost of relevant parts will be charged for quality problems.

3. Provide replacement models and equipment replacement process services for discontinued materials and equipment.

4. Customers have purchased materials and equipment, lifetime free upgrade system software, related technical information provided free of charge.

5. Visit the use of materials purchased by customers from time to time, and solve any problems in time.

6. The company hotline provides 24-hour service, and the questions raised by customers are answered within 1 hour.

7. Not done, the company spirit of "thoughtful service, responsible to the end" attitude, from the customer's point of view to solve the problem, with serious and rigorous enterprise style, dedicated to each customer service.


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Advantest R6144 Programmable DC Voltage/Current Source (Calibration Source) Calibration and Maintenance
  • Aerotech UNIDEX 100/U100i single axis motion controller
  • Aerotech Ndrive MP Ultra Compact PWM Digital Servo Driver
  • Aerotech Ndrive HPe 10/20/30 High Performance PWM Digital Servo Drive
  • Aerotech Ndrive HLe maintenance replacement
  • Aerotech Ndrive CP maintenance replacement
  • Aerotech Ndrive Linear Drive Selection
  • Aerotech NDrive HL linear drive maintenance replacement
  • Aerotech NDrive HP 10/20/30 Maintenance and Replacement
  • Aerotech NDrive CP10 Servo Drive Guide
  • SIGMATEK TAE1941 Display Unit Replacement and Troubleshooting
  • SIGMATEK TAE151 Replacement and Troubleshooting
  • SIGMATEK AKM Servo Motor Replacement and Troubleshooting Guide
  • SIGMATEK S-DIAS Control System Replacement and Upgrade Guide
  • SIGMATEK ETT Series HMI Replacement and Selection Guide
  • SIGMATEK DIAS Drive 310-23 servo amplifier
  • SIGMATEK CCP 521 C-DIAS processor module
  • Megmeet L6 electric drive troubleshooting
  • Sysmex XN-1000/2000 Technical Guide
  • Sysmex XN-L blood analyzer maintenance and troubleshooting
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting
  • KUKA KR AGILUS-3 ultra maintenance troubleshooting
  • KUKA KR 300 R2700-2 C-F maintenance troubleshooting
  • KUKA KR 20 R1820-2 E Maintenance Troubleshooting and Replacement Practice
  • KUKA AGILUS-3 troubleshooting
  • KUKA KR AGILUS-2 maintenance troubleshooting
  • KUKA KR 1000 titan PA troubleshooting
  • KUKA KR 700 PA maintenance troubleshooting
  • KUKA KR18 R1450-3 PP Operation and Maintenance Essentials
  • KUKA KR12 SCARA Operations Essentials
  • KUKA KR4 R600 Operation and Maintenance Essentials
  • KUKA KR 3 AGILUS Operation and Maintenance Safety Essentials
  • KUKA LBR iiwa CR Cleanroom Troubleshooting and Maintenance
  • Troubleshooting and Maintenance of KUKA KR AGILUS sixx
  • KUKA KR60 SCARA CS Maintenance Guide
  • KUKA KR 23 SCARA-2 Robot Installation and Maintenance Detailed Explanation
  • KUKA KR 20 SCARA CS Robot Selection and Maintenance Guide
  • KUKA KR 15 DELTA-2 Robot Installation and Maintenance
  • KUKA KR 13 SCARA-2 CS Detailed Explanation
  • KUKA KR 3 D1200 Robot Operation and Maintenance
  • KUKA KR 3 D1200 HM Robot Operation and Maintenance Guide
  • KUKA LBR Med Medical Robot Integration Guide
  • KUKA iiwa Robot Safety Operation and Maintenance
  • KUKA LBR iiwa CR Operations and Troubleshooting
  • Lauer PCS Series Operation Console Configuration Guide
  • Installation and Maintenance Guide for KUKA LBR iisy Series Collaborative Robots
  • KUKA LBR iisy 3 R760 Collaborative Robot Debugging Guide
  • KUKA LBR iico Robot Installation and Debugging Technical Guide
  • Lauer Starline LCA 300/320/325 Text Display Application Guide
  • Lauer PCS 950 Operation Console Application Guide
  • Lauer EPC series industrial computer configuration
  • Bonfiglioli Precision Planetary Gearbox Selection and Application Guide
  • Installation and heat dissipation of Bonfiglioli Vectron cold plate frequency converter
  • Bonfiglioli Vectron EM-RES-02 Expansion Module Installation and Configuration Guide
  • Bonfiglioli Vectron EM-RES-01 Expansion Module Rotary Transformer Interface Configuration Guide
  • Bonfiglioli Vectron EM-IO-04 module KTY temperature measurement and digital port configuration
  • Bonfiglioli Vectron EM-IO-03 Expansion Module Dual Analog Output and PTC Configuration
  • Installation of Bonfiglioli Vectron EM-IO-02 Expansion Module and PTC Temperature Monitoring Configuration
  • Bonfiglioli Vectron EM-IO-01 Expansion Module Installation and System Bus Configuration Guide
  • Bonfiglioli F series gearbox spare parts identification and replacement guide
  • Installation, maintenance, and troubleshooting of Bonfiglioli HF series reducers for hoisting applications
  • Bonfiglioli 300 series reducer installation, maintenance, and troubleshooting guide
  • Selection and integration guide for Bonfiglioli R3 series planetary gearboxes in primary crushing equipment
  • Bonfiglioli C-series ATEX gearbox selection and explosion-proof application guide
  • Bonfiglioli Vectron EM-ENC-05 Full Function Expansion Module Integration Guide
  • Bonfiglioli Vectron EM-ENC-04 Multi functional Expansion Module Complete Configuration Guide
  • Bonfiglioli Vectron EM-ENC-03 Second Encoder Interface and System Bus Expansion Guide
  • Bonfiglioli Vectron EM-ENC-02 Expansion Module Integration and Encoder Interface Guide
  • Bonfiglioli Vectron CM-CAN CANopen Communication Configuration and DS402 Control Guide
  • Bonfiglioli Vectron EM-SYS System Bus Networking and Virtual Link Configuration Guide
  • Bonfiglioli Vectron CM-PDP Profibus DP Configuration and Debugging Guide