Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • DS200SVAAG1A | General Electric Mark V Voltage Attenuator Card
    ❤ Add to collection
  • DS200SVAAG1A | General Electric Mark V Voltage Attenuator Card

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia
    DS200SVAAG1A | General Electric Mark V Voltage Attenuator Card
    • ¥1455.00
      ¥6898.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:2.500KG
    • Quantity:
    • (Inventory: 3)
Description
DS200SVAAG1A | General Electric Mark V Voltage Attenuator Card

DS200SVAAG1A | General Electric Mark V Voltage Attenuator Card

Product Description P/N: IS200TREGH1BDB DESCRIPTION / SPECIFICATIONS Description IS200TREGH1BDB is a Turbine Emergency Trip Terminal Board developed by GE. It is a part of Mark VI control system. The terminal board plays a crucial role in supplying power to three emergency trip solenoids within the system. Technical Specifications Brand General Electric Size 7.0 in x 13.0 in Part Number IS200TREGH1BDB Temperature rating 0 to 60 oC Trip interlock filter Hardware filter, 4 ms Product Type Turbine Emergency Trip Terminal Board Series Mark VI Information 

About IS200TREGH1BDB The General Electric Mark VI IS200TREGH1BDB Turbine Emergency Trip Terminal Board is a highly specialized component designed to provide critical safety functions in industrial turbine control systems. As part of GE's renowned Mark VI series, this terminal board exemplifies the advanced engineering and reliability necessary for demanding industrial applications. The IS200TREGH1BDB is a Turbine Emergency Trip Terminal Board, which plays a vital role in ensuring the safe and efficient operation of turbine systems. Its primary function is to execute emergency shutdown procedures in the event of a system fault or hazardous condition, thereby preventing potential damage to equipment and ensuring the safety of personnel. 

 With dimensions of 7.0 inches by 13.0 inches, the IS200TREGH1BDB is designed to be compact yet robust, allowing for easy integration into existing control panel setups. Its size ensures that it can be installed in space-constrained environments without compromising its performance or reliability. The terminal board operates within a temperature range of 0 to 60 C, making it suitable for various industrial environments. 

This temperature rating ensures that the IS200TREGH1BDB can maintain optimal performance even under fluctuating environmental conditions, which is crucial for maintaining the integrity of the turbine control system. One of the key features of the IS200TREGH1BDB is its hardware trip interlock filter with a 4 ms response time. This hardware filter ensures that the terminal board can rapidly and accurately detect and respond to trip conditions, thereby providing a reliable safety mechanism for turbine systems. The fast response time of the trip interlock filter is essential for minimizing the risk of damage and ensuring that the turbine system can be safely and quickly shut down in an emergency. 

 The IS200TREGH1BDB is constructed using high-quality materials and components, ensuring durability and long-term reliability. This robust construction enables the terminal board to withstand the harsh conditions often encountered in industrial settings, such as exposure to dust, moisture, and temperature variations. The board resilience ensures consistent performance, reducing the need for frequent maintenance and minimizing downtime. The Mark VI series, known for its advanced technology and robust design, includes the IS200TREGH1BDB, upholding these standards through rigorous testing and quality control processes. Each board is manufactured to meet stringent specifications, ensuring it can withstand the harsh environments often found in industrial settings. This reliability is crucial for maintaining the continuous and efficient operation of control systems. 

 The IS200TREGH1BDB is designed for straightforward installation and integration, with clearly labeled connectors and mounting points. This ease of installation reduces setup time and allows for quick implementation into existing systems. The board compatibility with other components in the Mark VI series ensures that it can be easily integrated into comprehensive turbine control solutions. General Electric commitment to quality and innovation is evident in every aspect of the IS200TREGH1BDB. The board undergoes rigorous testing and quality control processes to ensure it meets the highest standards of performance and reliability. 

This dedication to excellence ensures that users can trust the IS200TREGH1BDB to deliver consistent and accurate performance, even in the most challenging industrial environments. In summary, the General Electric Mark VI IS200TREGH1BDB Turbine Emergency Trip Terminal Board is an essential component for any industrial turbine control system requiring reliable and rapid emergency shutdown capabilities. Its advanced design, robust construction, and reliable performance make it an ideal choice for enhancing the safety and efficiency of turbine operations. With the IS200TREGH1BDB, users can ensure the integrity and safety of their turbine systems, benefiting from the high standards and innovative technology of GEMark VI series.

 Manufacturer information General Electric (GE) is a multinational conglomerate founded in 1892, based in the United States. It operates in various industries, including aviation, healthcare, renewable energy, and power. GE is known for its innovations in technology, manufacturing, and infrastructure solutions. IQElectro is not an authorized distributor. QElectro LLC (IQElectro) is NOT an Authorized Distributor or in any way affiliated with Rockwell Automation, Siemens, or any other Manufacturers. IQElectro is NOT an Authorized Dealer of this product. The product may be of older version, date codes, or design than that available from authorized dealers. As IQElectro is not an authorized dealer of this product, the Original Manufacturer's Warranty and Support DO NOT apply.IQElectro sells SURPLUS onlyand DOES NOT SELL SOFTWARE or FIRMWARE licenses For more detailed information, please refer to the full version of our disclaimer policy Disclaimer Policy.

  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • ADLINK PXIe-9908 SMU Deployment and Configuration Guide
  • ADLINK PXIe-9852 High Speed Digitizer Configuration Guide
  • ADLINK PXIe-9848 High Speed Digitizer Configuration Guide
  • ADLINK PXIe-9834 High Speed Digitizer Configuration Guide
  • ADLINK PXIe-9529H Dynamic Signal Acquisition Configuration Guide
  • ADLINK PXIe-3988 Xeon Deployment Optimization Guide
  • ADLINK PXIe-3987/3977/3937 Deployment and Debugging
  • ADLINK PXIe-3987 Installation and Configuration Programming Guide
  • ADLINK-PXIe-3988-3987-3977-3937-TL Controller Deployment and Maintenance Guide
  • ADLINK PXI-2020/2022 Synchronous Acquisition Card Configuration and Synchronization Guide
  • ADLINK DAQ/PXI-2000 series synchronous acquisition card configuration and triggering
  • ADLINK PXES-2788 series chassis deployment and maintenance
  • ADLINK PXES-2785 18 Slot Gen3 Chassis Deployment and Maintenance Guide
  • ADLINK PXES-2780 18 Slot PXIe Chassis Deployment Configuration
  • ADLINK PXES-2596 Gen3 Chassis Installation and Maintenance Guide
  • ADLINK PXES-2590 Chassis Deployment and System Management
  • ADLINK PXES-2314T Chassis Deployment and Troubleshooting Guide
  • ADLINK PXES-2301 Chassis Installation Monitoring and Troubleshooting
  • ADLINK PCIe-U300 Series USB3 Vision Acquisition Card Deployment Guide
  • ADLINK PCIe PXIe-8565 Expansion Kit Remote Control and Compatibility
  • Installation and troubleshooting of ADLINK PCIe GIE74V four channel PoE acquisition card
  • ADLINK PCIe GIE7x Poe+Acquisition Card Configuration and Triggering Troubleshooting
  • Advanced triggering and multi card synchronization of ADLINK PCIe-CPL64V image acquisition card
  • ADLINK PCIe-CPL64 Image Acquisition Card Hardware Trigger and Encoder Application
  • Application and troubleshooting of ADLINK PCIe-8560/PXI-8565 expansion kit
  • ADLINK PCIe 8332/PCIe 8334/PCIe 8338 EtherCAT Motion Controller Multi axis Synchronous Control
  • ADLINK PCIe-7432 32 channel isolated I/O card interrupt and driver
  • ADLINK PCIe-7256 Industrial I/O Card Interruption and Relay
  • ADLINK PCIe-833x EtherCAT Motion Controller Debugging and Maintenance
  • ADLINK PCIe-10GPoE 10GigE Visual Acquisition Card Practical Use
  • ADLINK PCI-8254/8258 Motion Controller Debugging and Maintenance
  • Application and Maintenance of ADLINK PCI-8158 Multi axis Motion Control Card
  • ADLINK PCI-8134A Maintenance and Troubleshooting Guide
  • ADLINK PCI-7250 Series Relay Output Card Configuration and Protection Circuit Guide
  • ADLINK PCI-6308 Series Isolated Analog Output Card Configuration and Programming
  • ADLINK PanKonix Series HMI Panel Selection and Deployment Guide
  • ADLINK NuDAM-6100 Series I/O Module Deployment and Protocol Optimization
  • Deployment and Calibration of ADLINK NuDAM-6000 Data Acquisition Module
  • ADLINK NEON-2000-Ono Intelligent Camera Deployment and Trigger Optimization
  • ADLINK NuDAM-65xx Communication Module Networking and Configuration Guide
  • ADLINK NuDAM-60xx Series Digital I/O Module Deployment and Watchdog Optimization
  • ADLINK MXE-5300 Fanless Industrial Control Computer Deployment and Troubleshooting Manual
  • ADLINK MXE-310 edge computing Platform Hardware Installation and BIOS Tuning
  • ADLINK MXE-230 series Alder Lake platform industrial computer deployment and maintenance manual
  • ADLINK MXE-210 Compact Fanless Industrial Control Computer Hardware Deployment and Debugging Guide
  • ADLINK MXC-3300/3340 Embedded Industrial Control Computer Hardware Integration and Debugging Manual
  • ADLINK MXA-312M Edge AI Platform Hardware Integration and Debugging Guide
  • ADLINK MXA-200 IoT Gateway Hardware Installation and Linux System Debugging Complete Guide
  • ADLINK MVP-6200 Industrial Control Computer: PCIe Gen4 and PCI Hybrid Expansion
  • ADLINK MVP-6100 Industrial Control Computer: PCI/PCIe Expansion and Robust Design
  • ADLINK MVP-5200 Industrial Control Computer: High Performance Multi Display and TSN Network
  • ADLINK MVP-5100 Fanless Industrial Control Computer Deployment and Development Guide
  • ADLINK MVP-3100 and MVP-3120 Embedded Systems
  • ADLINK MNET-J3/S23/MIA/DA2/SAN Single Axis Module Installation and Wiring Guide
  • ADLINK MNET-4XMO/C Motion Module Installation and Debugging Guide
  • ADLINK MCM-216/218 Edge DAQ Deployment Configuration Guide
  • ADLINK LPCIe-8124-C Encoder Card Trigger Configuration Guide
  • ADLINK IM/OM Series Industrial Display Installation and Debugging Guide
  • ADLINK GW-01 Industrial IoT Gateway Configuration and Debugging Guide
  • EURESYS Grablink Collection Card Selection and Trigger Configuration Guide
  • ADLINK Express HL Module Selection and Heat Dissipation Configuration Guide
  • ADLINK EOS-2000 Visual System Installation and Troubleshooting
  • ADLINK EOS-1200 Installation, Configuration, and Troubleshooting
  • Application and Configuration of ADLINK ECS-8582-4S Extension System
  • ADLINK DIN-814P-A4 Panasonic servo adapter board configuration
  • ADLINK DIN-814M-J3A Mitsubishi servo adapter board configuration
  • ADLINK DIN-814-GP Universal Adapter Board Configuration
  • Application and Configuration of ADLINK DIN-812M Adapter Board
  • Application and Configuration of ADLINK DIN-814Y Adapter Board
  • ADLINK DAQ/DAQE/PXI-250x waveform generation complete guide
  • ADLINK DAQ/DAQE/PXI-220x acquisition card fully configured
  • Application and Configuration of ADLINK cPCI-9116 Data Acquisition Card
  • ADLINK cPCI/PCI-8554/R: A Complete Guide from Architecture to Application
  • ADLINK cPCI-7432/7433/7434 isolated I/O card
  • ADLINK cPCI-3544/3534/3538 Serial Cardcard Configuration Practice
  • ADLINK cPCI-3534/3538/3544 Multi Serial Port Card Configuration Complete Solution
  • Complete Technical Guide for Euresys Coaxlink CXP Capture Card
  • ADLINK AMP-304C Advanced Motion Control Card Complete Guide
  • ADLINK AMP-104C Four Axis Motion Control Card
  • ADLINK NEON-1020/1040 Smart Camera
  • ADLINK USB-7230/7250 Isolation I/O Module Operation Manual
  • ADLINK SP-15W03 Intelligent Panel Integration and Configuration Manual
  • ADLINK AMP-20xC Interface Configuration and Wiring Guide
  • ADLINK 3488A GPIB Interface Card Selection Guide
  • Complete solution of ETEL TMB+torque motor selection parameters
  • ADLINK RTV series frame grabber deployment guide
  • ADLINK PCIe-FIW64/62 Image Acquisition Card Configuration Guide
  • ADLINK 6208/6216-GL Analog Output Card
  • ADLINK 723X Isolation I/O Card Configuration Guide
  • ADLINK PCI-9118 series high-speed DAQ card selection and DMA configuration
  • ADLINK PCI-9114 (A) Data Acquisition Card Selection and Configuration Guide
  • ADLINK PCI-7442/7443/7444 Isolation I/O Card Selection and Safety Configuration
  • ADLINK PCI-7250/7251 Relay Output Card Selection and Expansion Guide
  • Selection and Protection Configuration of Advantech PCI-1610CU Multi Serial Port Card
  • ADLINK NEON-1000-MDX Smart Camera Deployment and Trigger Configuration
  • ADLINK MXE-1300 Industrial Control Computer Selection and Deployment Guide
  • ADLINK MXE-200 Industrial Control Computer Deployment and BIOS Optimization Guide
  • ADLINK LPCIe-3488A GPIB Card Installation and Configuration Guide
  • Guidelines for Key Technologies of ETEL LMG/LMS Linear Motor Integration
  • ETEL IL+/LM Linear Motor Selection and Integration Guide
  • ETEL DSCDP/DSCDL/DSCDM Dual Axis Controller Debugging Guide
  • ETEL DSCDL Dual Axis Controller Hardware Integration Guide
  • ETEL DSB2P Series Servo Amplifier Connection and Configuration Guide
  • ETEL DSC2P/DSC2V Servo Controller Debugging Guide
  • DFI HD636-H81CS Industrial Motherboard Deployment and Debugging
  • Integration and Optimization of ADLINK DAQ-20xx Synchronous Acquisition Card
  • ADLINK cPCI-6530 Core i7 Blade Computer Deployment Guide
  • ADLINK cPCI-3610 Blade Computer Integration and Debugging
  • ADLINK AMP-204C/208C Troubleshooting Guide
  • ADLINK AmITX ALN Industrial Motherboard Characteristics and Application Analysis
  • ADLINK NuPRO-850 Motherboard Installation and Configuration Guide
  • ADLINK MI-965 Motherboard Installation and BIOS Configuration Guide
  • ADLINK M-302 Industrial Motherboard Installation and BIOS Optimization Guide
  • ADLINK PXI-3920/3910 Controller Installation and Configuration Guide
  • ADLINK PCI-8132 Motion Control Card Installation, Programming, and Debugging Guide
  • ADLINK cPCI-6760D/P7/P8 Module Installation and Hot Plug Guide
  • ADLINK ACL-7122 Digital I/O Card Installation and Programming
  • ADLINK NuPRO-775 Industrial Motherboard Installation and BIOS Configuration Detailed Explanation
  • ETEL Accuret MODULAR 300/400/600 Controller Selection Guide
  • Edwards CTI Kryogenics On Board 8F Enhanced Cryopump Explanation
  • ADLINK PCI-9112 Multi functional Data Acquisition Card
  • ADLINK PCI-8102 Two Axis Pulse Motion Control Card
  • ADLINK PCI-9812/10 high-speed synchronous acquisition card
  • ADLINK PCI-7200 High Speed Digital I/O Card
  • ADLINK MXE-1000 series fanless industrial computer
  • ADLINK IMB-T10 Mini ITX Embedded Motherboard
  • ADLINK HSL-DO32-M-N/P distributed I/O module
  • ADLINK DAQ-2500 Series Multi Channel Analog Output Card