Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Southeast Mining: Let the mine and the countryside coexist

来源: | 作者:佚名 | 发布时间 :2023-12-21 | 349 次浏览: | Share:

White water Mingtian outside, green peak out of the mountain. A warm spring breeze Wan Qing yellow, rapeseed flowers all over the ground gold. Wuxue Southeast Mining Co., Ltd. is located in the picturesque Hubei Province level ecological civilization demonstration village Bifeng Mountain village.

Along the road into the eight peaks mountain village, everywhere is the mountains, trees into the shade, the beautiful scenery of the mountains and rivers. Southeast Mining Co., Ltd. is like a pearl inlaid in this beautiful native land. In the mining area, the wide and clear lake, the green lawns, the clean and tidy roads, and the well-arranged workshops complement the surrounding environment and complement each other.

"Protect the green mountains, develop Jinshan silver mountain. Through the construction of the green mine, Southeast Mining Co., Ltd. not only protects the green waters and green mountains, but also adds glory to the provincial ecological civilization demonstration village of Bifeng Mountain Village, which also drives the local economic development and promotes the construction of beautiful villages." Said Lu Wulong, chairman of Southeast Mining Company.

one

Green development and beautiful mine construction

"Clear water and green mountains are gold and silver mountains." Entering Southeast Mining Co., LTD., the first thing you see is a landscape sculpture composed of several large white characters on the green lawn and blue small characters of "Protect the clear water and blue sky, build a green home", as well as green leaves and mountains.

Around the lawn, although it is a clean, wide, spotless mining road, but there is no shadow of vehicles. "We processed the product and shipped it directly to the dock on the belt, so there were no delivery vehicles at all in the mine." It seems to spy out the doubts of reporters, Lu Wulong explained with a smile.

It is understood that in September 2018, Southeast Mining Co., Ltd. carried out strategic cooperation with Wuxue Minbi Mineral Resources Development Co., LTD., becoming the holding subsidiary of MinBI Group, which is the raw material supply base of Wuxue Makou New building Materials Industrial Park and MinBI Group's calcium oxide project and 30 million tons of machine-made sand project. This also provides a source of power and a rare opportunity for the company to create green mines and achieve high-quality development.

"Green mine, concept first. We should truly realize the significance of green mine construction from the ideological perspective, really do a good job in green mine construction, adhere to the problem-oriented, goal oriented, result-oriented, on the basis of unified thinking and improving understanding, do a good job in top-level design, overall layout of green mine construction, and create beautiful mining areas." At the green mine mobilization conference, Lv Wulong's words ignited the passion of the company's employees to create green mines.

Time is not waiting for me. Let's do it!

The company has set up a special green mine leading group, with the green mine construction six plates as the starting point, one by one to the standard, one by one rectification, one by one implementation, one by acceptance, and finally by the green mine leading group on the completion of the indicators in a timely comparison and analysis, and strive to meet or exceed the national standards for each indicator.

Green mine construction depends on details. In order to achieve green processing and green transportation, the company's total investment of more than 1 billion yuan, the original production line, belt corridor large-scale transformation, now has two fully closed environmental protection production lines, two 7.5km belt corridor environmental protection transport lines and advanced washing screening process and sludge treatment system, always reflects the concept of leading technology, safety and environmental protection.

In the mining area, they built a mountain road, planted seedlings on the roadside, opened up from the top down, a step every 12 meters, layered mining, the original "one wall" mining to top-down mining, and the slope pile soil to green. At the same time, they will be the original lower has formed the stage of temporary mining for the green, so as to standardize the mining order, change the traditional understanding of mining, but also greatly improve the mining environment. In drilling construction, they use oil to gas drilling RIGS to achieve green construction, energy saving and emission reduction. The company introduced a new process of energy saving and emission reduction (centralized high-pressure remote air drilling: no oil burning, no ash, no high voltage line), achieved 30% energy saving in the mine, greatly reduced carbon dioxide emissions, improved the overall safety technology level, and greatly reduced the impact on the environment during the operation.

In the necessary link blasting construction, the company changed the traditional blasting method, adopted the 12-meter step medium-deep hole differential extrusion blasting method, and used the domestic advanced 3Dmine mining professional software for blasting simulation design, and selected RTK for drilling positioning and level measurement and control. The internationally mature Orica surface millisecond detonator and hole millisecond detonator are formed into a micro-delay blasting network, which realizes hole by hole blasting, reduces blasting vibration and noise, improves blasting efficiency, and minimizes the impact on the surrounding ecological environment.

Crushing is the core of sand and gravel mine and also the top priority of environmental protection work. The company adopts a completely closed crushing and screening process, through the enclosed workshop, the key dust production points using pulse bag dust collector centralized dust collection, additional workshop atomization dust removal, to ensure dust-free continuous production. At the same time, they installed the sprinkler line to the side of the main mine road, and used the sprinkler to continuously sprinkle water and dust to ensure that the mining area was free of dust.

As a bulk product, the transportation problem of sand and stone aggregate has always been a major difficulty in the green development of mines. In transportation, the company uses closed belt corridors to transport high-quality mixed materials and finished materials directly to the logistics park of the group company, and then washed and screened for deep processing into finished products, warehousing, and directly transported to the riverside dock for delivery, greatly reducing environmental damage along the way, reducing safety hazards and dust pollution brought by road transportation.

"We take the construction of green mining development demonstration zone in Wuxue City as an opportunity to be the vanguard." In the mining area, the goal is to build a green factory, so that all green areas should be restored to green. In mining area, the mining technology is optimized to minimize the visual impact on the surrounding environment. The road and green space in the public areas outside the mining area shall be protected and constructed with green environment, and the greening of the mine shall be ensured to cover all corners." Lv Wulong introduced that the company promoted transformation and upgrading through scientific and technological innovation, completely changed the image of the traditional mining industry as "dirty and bad", truly changed the miners from "blue collar" to "white collar", and built a new image of modern mines in the new era. Entering the "14th Five-Year Plan" new development stage, they will always be led by green innovation, low-carbon environmental protection development, and high-quality development to create a new industrial pattern.

Ii.

Technology leads to create smart mines

Intelligent and digital is the core of green mine construction. Southeast Mining Co., Ltd. has taken the initiative to carry out in-depth cooperation with major universities, geological prospecting units, high-tech companies, etc., and established a science and technology research and development platform integrating production, learning and research, which has improved the level of green mine construction and enhanced the core competitiveness of the mine.

The company has continuously improved the intelligent level of mines by introducing advanced talents and adding supporting production facilities. They have invested tens of millions of yuan, the existing production line equipment process automation, digital, intelligent transformation; Integrate and establish the digital management platform of measurement, reporting, approval, etc., and establish the 3D mine reserve model; Install and set up mine intelligent detector to realize 24-hour online monitoring. They have also set up a quality control laboratory for continuous sampling and quality control of manufactured products.

With the goal of building an intelligent production supervision platform, the company purchased a blasting site video surveillance system to monitor the blasting operation site in real time.

Referring to the intelligent production system of automation and informatization established by the company, Lv Wulong said: "Our intelligent mining management system includes the preparation of a centralized control center, remote monitoring system of open-pit mining, three-dimensional system of mine reality, online environmental monitoring system, etc., which can carry out digital and intelligent supervision of mine production, environmental protection, safety and other aspects."

At the same time, the company actively linked with the group's strategy, with sand aggregate 4.0 and 4.0+ as the development direction, the construction of "mining + sand aggregate + commercial concrete + concrete products, component manufacturing +PC building + calcium oxide + high-tech calcium, sponge city permeable products + mine ecological restoration" as one of the intelligent building materials industrial park. Promote the revitalization of villages around mining areas.

The company also actively increase the adjustment and optimization of industrial structure, under the existing management mode, driven by scientific and technological innovation, laboratory quality control as the starting point, constantly improve product quality, expand product channels, accelerate the construction of green factories, green mines, green parks, green supply chain, and strive to promote the high-quality development of sand and gravel industry, to make new and greater contributions to local economic development.

"By building a life community of mountains, rivers, forests, fields, lakes and grasses, we realize the green mining and processing of stone mines, as well as the comprehensive utilization of construction solid waste, tailings, waste rock and other resources, so as to achieve the best restoration of the ecological environment of stone mines, solid waste landfills, abandoned mines, and truly achieve industrial support, win-win cooperation, maximize the use of materials, and sustainable development." Lu Wulong said.

3

Sharing and win-win efforts to boost rural revitalization

Mining a place, it will benefit one side. Southeast Mining Co., Ltd. attaches great importance to the harmonious development of the mine, and gives strong support to the local villagers in education and public welfare through fixed-point assistance, increase of employment, donation and other ways.

In recent years, the company has invested more than 3 million yuan to fund the upgrading of village committee facilities and the construction of village-level roads. At the beginning of 2020, in the face of the sudden epidemic, the company actively responded to the call, and donated goods and money while organizing manpower and material resources to participate in the epidemic prevention and control. When the flood came, the company actively organized personnel to participate in flood rescue. According to statistics, the company invested 1.1 million yuan in the fight against the epidemic and the flood, successfully completed the activities organized by the Dafa Temple Town government, and assumed the social responsibility of the enterprise.

It is understood that the company has always adhered to the development concept of "high-quality development, green first, harmonious and win-win", and has achieved tax revenue of more than 10 million yuan for many years, and placed more than 100 people in employment, ranking first among enterprises in the town. At the same time, they will integrate the final mining site with the local environment through stratified mining in the mining area and greening, and the dust-free garden production in the factory area, and turn the industrial and mining waste land after mining into a pastoral complex to benefit the local people.

"Wuxue City is listed as a green mining development demonstration zone by the Ministry of Natural Resources, which is both an opportunity and a challenge for us." Southeast Mining will give full play to its innovation-driven advantages, set up a pilot and strive to be a model in the digitization, intelligence and green construction of the mining area, and provide scientific and technological support and power guarantee for the green and high-quality development of the mining area through all-round innovation in concept, technology and mode." Lv Wenlong finally said that the company is actively promoting the construction of Wuxue City Makou new building materials Industrial Park project (metallurgical lime 4.5 million tons/year, fine mechanism sand 30 million tons/year, new wall materials, building parts construction and PC prefabricated parts, new lightweight insulation and energy-saving partition, sponge city permeable brick, etc.). Speed up the provincial key project calcium oxide lime project resource matching work.

Through the high-quality development of the whole industrial chain of the mine, Southeast Mining Co., Ltd. has truly explored a sustainable development path of promoting agriculture by industry and mutual benefit between industry and agriculture, achieved mutual benefit and win-win development with the surrounding villages, and made positive contributions to the revitalization of the countryside and the construction of beautiful villages.


  • GE IS230PCAAH1B Core Analog I/O Module
  • GE IS230PCAAH1A core analog I/O module
  • Alstom vajh13yf1001aba - Automatic Trip Relay 220-250 V
  • ALSTOM Servo Inverter Type:ALSPA MV 1007-IT - - 3.0 kW
  • ALSTOM Cegelec Interface Modnet 1 / MB+ Fbk Mbp S1/S - Interface Module
  • Alstom Input / Output Card I/O Module SA44647.A - Module
  • Alstom Plug-in card Input/Output module SA44650.C - Module
  • ALSTOM Adjustment Module Keypad Alspa MV1000 - Keypad
  • Alstom Operating module Keypad Alspa MV1000 - Keypad
  • Alstom Plug-In Input/Output Module Sa 45629.B - Module
  • ALSTOM Adjustment Module Keyboard Alspa MV1000 - Keyboard
  • ALSTOM Control Set - 15 V 029.069642/26472/1011 - Voltage regulator
  • Alstom Input/Output Card Module SA44650.C - Module
  • Alstom Input / Output Card I/O Module - Module
  • Alsthom Alstom Plug-In Input/Output Module SA41630 B - Module
  • ALSTOM Servo Inverter Type: ALSPA MV 1007-IT - - 3.0 kW
  • Alstom Plug-In Input/Output I/O Module SA44647.A - Module
  • Alstom Plug-In Input/Output Module Sa 45629.B - Module
  • Alstom Plug-in card Input/Output module SA46623.B - Module
  • ALSTOM Control Module Keyboard Alspa MV1000 - Keyboard
  • Alstom Plug-In Input/Output Module SA46623.B - Module
  • Alstom Plug-In Input/Output Module SA44650.C - Module
  • Alstom Plug-In Input/Output Module SA43610.E - Module
  • Alstom Insertion Card Input / Output Module SA43610.E - Module
  • Alsthom Alstom Plug-In Input/Output Module SA41630 B - Module
  • Alstom Plug-In Input/Output I/O Module - Module
  • Alstom Plug-In Input/Output Module SA46623.B - Module
  • Alstom Plug-in card Input/Output I/O module SA44647.A - Module
  • Alstom Plug-in card Input/Output I/O module SA44647.A - Module
  • Alstom Plug-in card Input/Output module SA 45629.B - Module
  • ALSTOM Alspa VF Inverter Type : VF 4004b - - 1.5 Kw
  • Alstom Plug-In Input/Output Module SA46617.B - Module
  • Alstom PS 431 - Control Unit
  • Alstom Plug-In Input/Output Module Sa 46624.A - Module
  • Alstom Plug-In Input/Output Module SA44650.C - Module
  • Alstom Plug-In Input/Output Module SA43610.E - Module
  • ALSTOM Alspa MV1000 Frequency Type : Alspa MV1032 - - 15 Kw
  • Alstom Input/Output Card Module SA46617.B - Module
  • Alstom Input/Output Card Module Sa 45629.B - Module
  • Alstom Input/Output Card Module SA46623.B - Module
  • ALSTOM Servo-Converter Type : ALSPA MV 1007-IT - - 3.0 Kw
  • ALSTOM Frequency Type : ALSPA MD2000 - 43-400 (49-460)
  • ALSTOM Servo-Converter Type : ALSPA MV 1007 - - 3.0kW
  • Alstom PS 431 - Control
  • ALSTOM Alspa Cegelec Guide Value Transmitter 029.087.176/98N115099109 - Transmitter
  • Alstom Input/Output Card Module Sa 46624.A - Module
  • ALSTOM Control Set - 15 V 029.069642/26472/1011 - Voltage regulator
  • ALSTOM Alspa Module Control Set 029.111.890/27347/1018 - Module
  • ALSTOM Alspa Module Control Set 029.063.255/25443/1044 - Module
  • ALSTOM Alspa Cegelec Module Control Set 029.063.292/25943/1008 - Module
  • ALSTOM Microverter D 4-8/500/029.130.005 - Inverter
  • Alstom ISTAT M233 M233X2GUYECAL0A - Measurement unit M233X2GUYECAL0A NEW
  • ALSTOM Alspa Cegelec Guide Value Transmitter 029.087.176/98N115099109 - Transmitter
  • Alstom Input/Output Module SA 46624.A - Plug-in card
  • ALSTOM Cegelec Interface Modnet 1 / MB + Fbk - Mbp S1/S
  • ALSTOM MAE 00-11 - 8 Channel isolated analog i/o termination panel LC11-13 24118b
  • Alstom MMLG01 137945N - Test block electric panel 715209M T&D protection and control
  • ALSTOM Mae 00-11 - Channel Isolated Analog I/O Terminal Panel LC11-13 24118b Al
  • CONVERTEAM S20X4262/50 / S20X426250 - Module
  • CONVERTEAM MV530A4C1A / MV530A4C1A - Inverter
  • CONVERTEAM C100/5302 / C1005302 - Module
  • CONVERTEAM 20X4355B1L / 20X4355B1L - (new without box)
  • CONVERTEAM GM0020002 / GM0020002 - Module
  • CONVERTEAM P111-6052 / P1116052 - Module
  • Alstom PS 431 - Controller
  • ALSTOM Type : Alspa BC 32 - Brake Chopper Unit
  • ALSTOM Alspa MV500 SE23400075/MV502A4C1A - - 0.75kW Inverter
  • Alstom M30-Tx200 DIN931 - Hexagon screw stamped 8A B screw GE Alstom SW 46
  • Alstom Sa 46624.A - Plug-In Input/Output Module
  • ALSTOM Adjustment Module Keyboard Alspa MV1000 - Keyboard
  • Alstom PA20397/2186-03-H01 - Circuit Board
  • Alstom KBCH12001H12MEL 228633J - Relay Differential KBCH120
  • Alstom MMLG01 137945N - TestBlock Electric Panel 715209M T&D Protection & Control
  • Alstom KBCH12001H12MEL 228633J - Differential Relay KBCH120
  • Alstom MMLG01 137945N - Test Block Electrical Panel 715209M T&d Protection &
  • ALSTOM Mae 00-11 - 8 Channel Isolated Analog I/O Terminal Panel LC11-13 24118b
  • Alstom KBCH12001H12MEL 228633J - Differential Relay KBCH120 and extended warranty
  • Alstom MMLG01 137945N - Test Block Electrical Panel 715209M T & D Protection & De
  • Alstom DFI-110-0340F - DFI1100340F Diagnostic Flame Indicator
  • KCGG142 KCGG14201D20EEA - 287362J
  • ALSTOM MAE 00-11 - Channel isolated analog i/o termination panel LC11-13 24118b Al
  • KCGG122 KCGG12201DEED - 463055L and extended warranty
  • Alstom MMLG01 137945N - Test Block Electrical Panel T&D Protection & Control
  • Alstom 3FAFA5100A - Voltage Sensor TN7 112 003 Alstom T&D Protection & Control
  • Used ALSTOM PIB100 F 3BEB0169 - Board
  • Alstom Keypad - Alspa MV 1000
  • Alstom MMLG01 137945N - Test Block Electrical Panel 715209M T & D Protection &
  • ALSTOM PS441 - Overcurrent protection - Used
  • Alstom Power 2506305 - Circuit Board
  • ALSTOM PS431 - CONTROL UNIT
  • ALSTOM MV502S2B1A - 1 pc X Frequency Drive Alspa MV500
  • Alstom 3VAFS5500A - Voltage Sensor TN7105 002 Alstom T&D Protection & Control
  • ALSTOM MV507A2D1A - 1 pc X Frequency Drive Alspa MV500
  • KCGG KCGG12201L20EED - 655002M and extended warranty
  • ALSTOM TRVP059753000 - AGC3X-007 BLOCK ENCODER TRVP05975400
  • KCGG KCGG14202l20EEB - 654833M and extended warranty
  • Alstom 029 204 538 - cegelec Interface RS422/RS232 Alspa MV 1000
  • ALSTOM PIB100 F - 3BEB0169 Board
  • CONVERTEAM 8321-4002 / 83214002 - (new with box)
  • CONVERTEAM MVAJ14D1GA0774A / MVAJ14D1GA0774A - Relay
  • CONVERTEAM 8178-4002 / 81784002 - (new with box)
  • CONVERTEAM QTWIE2-VD4A / QTWIE2VD4A - (new with box)
  • CONVERTEAM A48DI-40DX-B7/95 / A48DI40DXB795 - Meter
  • CONVERTEAM V96LC/0-400RPM / V96LC0400RPM - Meter
  • CONVERTEAM A72DI-5-40X4/95 / A72DI540X495 - Meter
  • CONVERTEAM 8321-4002 / 83214002 - Module
  • CONVERTEAM 029.081-942 / 029081942 - Module
  • CONVERTEAM V96LC/0-600RPM / V96LC0600RPM - Meter
  • CONVERTEAM 20X4524B1L / 20X4524B1L - Module
  • CONVERTEAM EGS3C-ST11001 / EGS3CST11001 - Module
  • CONVERTEAM S8503-4001 / S85034001 - Module
  • CONVERTEAM MVAX12B1DA0752A / MVAX12B1DA0752A - Relay
  • CONVERTEAM 11P408ND8268/7 / 11P408ND82687 - (new without box)
  • CONVERTEAM MVAJ26L1BB0502A / MVAJ26L1BB0502A - Relay
  • CONVERTEAM C100/5120 / C1005120 - Module
  • CONVERTEAM D-984-0578 / D9840578 - Board
  • CONVERTEAM GDS1017-4001 / GDS10174001 - Enhancement Card
  • CONVERTEAM MBC101F1AD0761A / MBC101F1AD0761A - Module
  • CONVERTEAM GDS1006-4001 / GDS10064001 - Keypad
  • CONVERTEAM 25X8521/10 / 25X852110 - Module
  • CONVERTEAM VSELC1011A1AB / VSELC1011A1AB - (new without box)
  • CONVERTEAM RTS-13060102-R / RTS13060102R - Relay
  • CONVERTEAM LGPG-11101P55LEF / LGPG11101P55LEF - Relay
  • CONVERTEAM 203-399 / 203399 - Module
  • CONVERTEAM MV516A4C1 / MV516A4C1 - Inverter
  • CONVERTEAM SW867577-007 / SW867577007 - Module
  • CONVERTEAM MCGG22D1CD0503D / MCGG22D1CD0503D - Relay
  • CONVERTEAM MV506A4C1A / MV506A4C1A - Inverter