Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Southeast Mining: Let the mine and the countryside coexist

F: | Au:佚名 | DA:2023-12-21 | 680 Br: | 🔊 点击朗读正文 ❚❚ | Share:

White water Mingtian outside, green peak out of the mountain. A warm spring breeze Wan Qing yellow, rapeseed flowers all over the ground gold. Wuxue Southeast Mining Co., Ltd. is located in the picturesque Hubei Province level ecological civilization demonstration village Bifeng Mountain village.

Along the road into the eight peaks mountain village, everywhere is the mountains, trees into the shade, the beautiful scenery of the mountains and rivers. Southeast Mining Co., Ltd. is like a pearl inlaid in this beautiful native land. In the mining area, the wide and clear lake, the green lawns, the clean and tidy roads, and the well-arranged workshops complement the surrounding environment and complement each other.

"Protect the green mountains, develop Jinshan silver mountain. Through the construction of the green mine, Southeast Mining Co., Ltd. not only protects the green waters and green mountains, but also adds glory to the provincial ecological civilization demonstration village of Bifeng Mountain Village, which also drives the local economic development and promotes the construction of beautiful villages." Said Lu Wulong, chairman of Southeast Mining Company.

one

Green development and beautiful mine construction

"Clear water and green mountains are gold and silver mountains." Entering Southeast Mining Co., LTD., the first thing you see is a landscape sculpture composed of several large white characters on the green lawn and blue small characters of "Protect the clear water and blue sky, build a green home", as well as green leaves and mountains.

Around the lawn, although it is a clean, wide, spotless mining road, but there is no shadow of vehicles. "We processed the product and shipped it directly to the dock on the belt, so there were no delivery vehicles at all in the mine." It seems to spy out the doubts of reporters, Lu Wulong explained with a smile.

It is understood that in September 2018, Southeast Mining Co., Ltd. carried out strategic cooperation with Wuxue Minbi Mineral Resources Development Co., LTD., becoming the holding subsidiary of MinBI Group, which is the raw material supply base of Wuxue Makou New building Materials Industrial Park and MinBI Group's calcium oxide project and 30 million tons of machine-made sand project. This also provides a source of power and a rare opportunity for the company to create green mines and achieve high-quality development.

"Green mine, concept first. We should truly realize the significance of green mine construction from the ideological perspective, really do a good job in green mine construction, adhere to the problem-oriented, goal oriented, result-oriented, on the basis of unified thinking and improving understanding, do a good job in top-level design, overall layout of green mine construction, and create beautiful mining areas." At the green mine mobilization conference, Lv Wulong's words ignited the passion of the company's employees to create green mines.

Time is not waiting for me. Let's do it!

The company has set up a special green mine leading group, with the green mine construction six plates as the starting point, one by one to the standard, one by one rectification, one by one implementation, one by acceptance, and finally by the green mine leading group on the completion of the indicators in a timely comparison and analysis, and strive to meet or exceed the national standards for each indicator.

Green mine construction depends on details. In order to achieve green processing and green transportation, the company's total investment of more than 1 billion yuan, the original production line, belt corridor large-scale transformation, now has two fully closed environmental protection production lines, two 7.5km belt corridor environmental protection transport lines and advanced washing screening process and sludge treatment system, always reflects the concept of leading technology, safety and environmental protection.

In the mining area, they built a mountain road, planted seedlings on the roadside, opened up from the top down, a step every 12 meters, layered mining, the original "one wall" mining to top-down mining, and the slope pile soil to green. At the same time, they will be the original lower has formed the stage of temporary mining for the green, so as to standardize the mining order, change the traditional understanding of mining, but also greatly improve the mining environment. In drilling construction, they use oil to gas drilling RIGS to achieve green construction, energy saving and emission reduction. The company introduced a new process of energy saving and emission reduction (centralized high-pressure remote air drilling: no oil burning, no ash, no high voltage line), achieved 30% energy saving in the mine, greatly reduced carbon dioxide emissions, improved the overall safety technology level, and greatly reduced the impact on the environment during the operation.

In the necessary link blasting construction, the company changed the traditional blasting method, adopted the 12-meter step medium-deep hole differential extrusion blasting method, and used the domestic advanced 3Dmine mining professional software for blasting simulation design, and selected RTK for drilling positioning and level measurement and control. The internationally mature Orica surface millisecond detonator and hole millisecond detonator are formed into a micro-delay blasting network, which realizes hole by hole blasting, reduces blasting vibration and noise, improves blasting efficiency, and minimizes the impact on the surrounding ecological environment.

Crushing is the core of sand and gravel mine and also the top priority of environmental protection work. The company adopts a completely closed crushing and screening process, through the enclosed workshop, the key dust production points using pulse bag dust collector centralized dust collection, additional workshop atomization dust removal, to ensure dust-free continuous production. At the same time, they installed the sprinkler line to the side of the main mine road, and used the sprinkler to continuously sprinkle water and dust to ensure that the mining area was free of dust.

As a bulk product, the transportation problem of sand and stone aggregate has always been a major difficulty in the green development of mines. In transportation, the company uses closed belt corridors to transport high-quality mixed materials and finished materials directly to the logistics park of the group company, and then washed and screened for deep processing into finished products, warehousing, and directly transported to the riverside dock for delivery, greatly reducing environmental damage along the way, reducing safety hazards and dust pollution brought by road transportation.

"We take the construction of green mining development demonstration zone in Wuxue City as an opportunity to be the vanguard." In the mining area, the goal is to build a green factory, so that all green areas should be restored to green. In mining area, the mining technology is optimized to minimize the visual impact on the surrounding environment. The road and green space in the public areas outside the mining area shall be protected and constructed with green environment, and the greening of the mine shall be ensured to cover all corners." Lv Wulong introduced that the company promoted transformation and upgrading through scientific and technological innovation, completely changed the image of the traditional mining industry as "dirty and bad", truly changed the miners from "blue collar" to "white collar", and built a new image of modern mines in the new era. Entering the "14th Five-Year Plan" new development stage, they will always be led by green innovation, low-carbon environmental protection development, and high-quality development to create a new industrial pattern.

Ii.

Technology leads to create smart mines

Intelligent and digital is the core of green mine construction. Southeast Mining Co., Ltd. has taken the initiative to carry out in-depth cooperation with major universities, geological prospecting units, high-tech companies, etc., and established a science and technology research and development platform integrating production, learning and research, which has improved the level of green mine construction and enhanced the core competitiveness of the mine.

The company has continuously improved the intelligent level of mines by introducing advanced talents and adding supporting production facilities. They have invested tens of millions of yuan, the existing production line equipment process automation, digital, intelligent transformation; Integrate and establish the digital management platform of measurement, reporting, approval, etc., and establish the 3D mine reserve model; Install and set up mine intelligent detector to realize 24-hour online monitoring. They have also set up a quality control laboratory for continuous sampling and quality control of manufactured products.

With the goal of building an intelligent production supervision platform, the company purchased a blasting site video surveillance system to monitor the blasting operation site in real time.

Referring to the intelligent production system of automation and informatization established by the company, Lv Wulong said: "Our intelligent mining management system includes the preparation of a centralized control center, remote monitoring system of open-pit mining, three-dimensional system of mine reality, online environmental monitoring system, etc., which can carry out digital and intelligent supervision of mine production, environmental protection, safety and other aspects."

At the same time, the company actively linked with the group's strategy, with sand aggregate 4.0 and 4.0+ as the development direction, the construction of "mining + sand aggregate + commercial concrete + concrete products, component manufacturing +PC building + calcium oxide + high-tech calcium, sponge city permeable products + mine ecological restoration" as one of the intelligent building materials industrial park. Promote the revitalization of villages around mining areas.

The company also actively increase the adjustment and optimization of industrial structure, under the existing management mode, driven by scientific and technological innovation, laboratory quality control as the starting point, constantly improve product quality, expand product channels, accelerate the construction of green factories, green mines, green parks, green supply chain, and strive to promote the high-quality development of sand and gravel industry, to make new and greater contributions to local economic development.

"By building a life community of mountains, rivers, forests, fields, lakes and grasses, we realize the green mining and processing of stone mines, as well as the comprehensive utilization of construction solid waste, tailings, waste rock and other resources, so as to achieve the best restoration of the ecological environment of stone mines, solid waste landfills, abandoned mines, and truly achieve industrial support, win-win cooperation, maximize the use of materials, and sustainable development." Lu Wulong said.

3

Sharing and win-win efforts to boost rural revitalization

Mining a place, it will benefit one side. Southeast Mining Co., Ltd. attaches great importance to the harmonious development of the mine, and gives strong support to the local villagers in education and public welfare through fixed-point assistance, increase of employment, donation and other ways.

In recent years, the company has invested more than 3 million yuan to fund the upgrading of village committee facilities and the construction of village-level roads. At the beginning of 2020, in the face of the sudden epidemic, the company actively responded to the call, and donated goods and money while organizing manpower and material resources to participate in the epidemic prevention and control. When the flood came, the company actively organized personnel to participate in flood rescue. According to statistics, the company invested 1.1 million yuan in the fight against the epidemic and the flood, successfully completed the activities organized by the Dafa Temple Town government, and assumed the social responsibility of the enterprise.

It is understood that the company has always adhered to the development concept of "high-quality development, green first, harmonious and win-win", and has achieved tax revenue of more than 10 million yuan for many years, and placed more than 100 people in employment, ranking first among enterprises in the town. At the same time, they will integrate the final mining site with the local environment through stratified mining in the mining area and greening, and the dust-free garden production in the factory area, and turn the industrial and mining waste land after mining into a pastoral complex to benefit the local people.

"Wuxue City is listed as a green mining development demonstration zone by the Ministry of Natural Resources, which is both an opportunity and a challenge for us." Southeast Mining will give full play to its innovation-driven advantages, set up a pilot and strive to be a model in the digitization, intelligence and green construction of the mining area, and provide scientific and technological support and power guarantee for the green and high-quality development of the mining area through all-round innovation in concept, technology and mode." Lv Wenlong finally said that the company is actively promoting the construction of Wuxue City Makou new building materials Industrial Park project (metallurgical lime 4.5 million tons/year, fine mechanism sand 30 million tons/year, new wall materials, building parts construction and PC prefabricated parts, new lightweight insulation and energy-saving partition, sponge city permeable brick, etc.). Speed up the provincial key project calcium oxide lime project resource matching work.

Through the high-quality development of the whole industrial chain of the mine, Southeast Mining Co., Ltd. has truly explored a sustainable development path of promoting agriculture by industry and mutual benefit between industry and agriculture, achieved mutual benefit and win-win development with the surrounding villages, and made positive contributions to the revitalization of the countryside and the construction of beautiful villages.


  • Omron NS12-TS01B-V2 Touch Screen HMI
  • Mitsubishi FX3GE-24MT/ESS PLC Controller
  • Grundig NEA02 AES 0 PLC I O Module
  • Beckhoff EP3204-0002 EtherCAT Box Module
  • Mitsubishi MDS-A-CV-220 Power Supply Unit
  • MCX20B2 080G0330 Motion Controller
  • Toyo Keiki P CARD5 Interface Board YH-212
  • National Instruments NI 9242 Analog Input Module
  • B&R 3AM055.6 PLC Module
  • Omron CJ1W-ETN21 Ethernet Module PLC
  • Allen-Bradley 2711P-T15C4A7 PanelView Plus 1500 Guide
  • Pilz 777602 Safety Module XV1P Specifications
  • NI cFP-2220 and cFP Modules Technical Guide
  • Keyence XG-EC80 Camera Input Unit Overview
  • Dynatronix CRS9-10 DC Power Supply Manual
  • Omron G3PW-A220EC-S-FLK Power Controller Manual
  • EVO SP SYSTEM PLC Control Panel Overview
  • B&R X20IF10G3-1 Interface Module Specifications
  • NL8060BC21-11 Industrial LCD Screen Specification
  • SK-G9-FAN1-F6 Cooling Fan Technical Specifications
  • US Drives 3000-4220-4-4 PLC Add-on Module
  • Allen-Bradley 2002-NX70-HSC4 High-Speed Counter
  • Schneider TM258LF42DR PLC Controller
  • Harris 8800-00002-02 PLC Power Control Center
  • NLT NL8060BC21-11C 8.4 LCD Panel
  • ABB PLUTO S20 V2 CFS Safety PLC
  • Omron NS12-TS00B-V2 NS12-TS00B-ECV2 HMI
  • 7-29 10 00 A PLC Expansion Module
  • B&R X20DC2395 PLC Module
  • Omron NE1A-SCPU02 Network Controller
  • GE IC200UEX624-C VersaMax Micro PLC
  • Rexroth GIV50-11 Position Limit Switch Assembly
  • B&R X20SLX410 Safety Logic Module
  • Omron CJ1W-NC433 Position Control Unit
  • Inovance AM600-CPU1608TP PLC Controller
  • ABB Pluto S20 V2 CFS Safety PLC
  • Omron CJ1W-NC113 Position Control Unit
  • Grundig NEA02 AES 0 PLC I O Module
  • Fanuc A16B-2202-0432 Control PCB Board
  • Siemens 6SN1124-1AA00-0DA0 Simodrive LT Module
  • B&R X20AO2632 Analog Output Module Specifications
  • Georges Renault 6159187760 PLC Board Technical Guide
  • IDEC PLC FC6A-D32K3CEE MicroSmart Controller Manual
  • 6ES7226-6BA32-0XB0 Fail-Safe Digital Input Guide
  • Programmable Controller PLC EC20-4040BRA Specification
  • Grundig PLC NEA02 AES 0 I/O Card Specification
  • Seiki POS-M 10-22-01 Card Positioning Board Manual
  • Ormec Systems PMC960 Motion Controller CPU Guide
  • GEFRAN U16-NS 6YC000000000002 PCB Technical Specification
  • ABB SPAJ 140 C Overcurrent Relay Technical Manual
  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board