Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Notice on matters related to development and construction of wind power and photovoltaic power generation in 2021

来源: | 作者:佚名 | 发布时间 :2023-12-23 | 554 次浏览: | Share:

Q: What is the background of the Circular?

A: 2021 is the first year of the "14th Five-Year Plan", and it is also the first year that wind power and photovoltaic power generation will be online at parity.  It has set up a new beacon for China's energy revolution and green low-carbon transformation, and defined new tasks for the development of wind power and photovoltaic power generation. The boundary conditions of the development of wind power and photovoltaic power generation in China have undergone profound changes, and the development logic, development concept and development ideas also need to be adjusted accordingly. It is necessary to introduce new annual policies in accordance with the goal orientation, improve the development mechanism, release the consumption space, optimize the development environment, give the industry and enterprises more clear expectations, and effectively enhance the confidence of market players. We will promote the large-scale, high-proportion and high-quality development of wind power and photovoltaic power generation.

To this end, since the beginning of this year, the National Energy Administration has repeatedly organized local energy authorities, investment and development enterprises, manufacturing enterprises, industry associations, research institutions and other relevant units to hold symposiums, and through written solicitations, public solicitations and other ways, widely solicit and fully absorb the adoption of opinions and suggestions from all aspects, research and improve policy ideas, and finally formed the "Notice" document.

Q: In the face of the new situation and new tasks, what long-term mechanisms have been established in the Circular?

A: The "Notice" is based on the current situation, the development and construction of wind power and photovoltaic power generation projects in 2021, and it also takes a long-term view and establishes a long-term mechanism in three aspects:

First, the establishment of the absorption responsibility weight guidance mechanism. The state no longer issues the annual construction scale and indicators of the provinces (regions and cities), but adhere to the goal orientation, calculate the annual renewable energy power consumption responsibility weight of the provinces, guide the local arrangement of wind power, photovoltaic power generation project construction, and promote cross-provincial and cross-regional wind power trading.

The second is to establish a multiple guarantee mechanism for grid connection. In order to do a good job of large-scale wind power and photovoltaic power generation projects, the future wind power and photovoltaic power generation projects will be divided into two categories. First, the new grid-connected projects necessary for the provinces (regions and municipalities) to complete the annual minimum absorption responsibility weight of non-hydropower are guaranteed grid-connected projects, which are implemented by power grid enterprises. Second, the projects that are still willing to connect to the grid outside the scope of guarantee grid-connection are market-oriented grid-connection projects. After the grid-connection conditions can be implemented through market-oriented ways such as self-construction, co-construction and sharing or purchase of services, grid enterprises will be connected to the grid to promote the overall flexibility of the power system. The guarantee and market grid-connected only have different grid-connected conditions, and the two types of projects implement the same consumption policy after grid-connected.

Third, establish a competitive allocation mechanism for ensuring grid connection. According to the calculation of the absorption responsibility weight, the scale of the guarantee grid connection is limited, which projects can be included in the scope of the guarantee grid connection, the provinces need to be unified by the provincial energy authorities through competitive allocation. The project feed-in tariff shall be implemented in accordance with the relevant policies of the State pricing authority.

Q: How to determine the scale of provincial guarantee grid connection?

A: The "Notice" clearly, the provincial energy authorities can be based on the regional annual non-hydropower minimum absorption responsibility weight and the whole society's electricity consumption, calculate the annual non-hydropower renewable energy power consumption in the region, and then calculate and determine the regional annual must be added to the scale of security grid-connected installed capacity, which is the bottom line goal necessary to complete the minimum absorption responsibility weight of non-hydropower.

For the implementation of non-hydropower absorption responsibility weight through cross-provincial and cross-regional power transactions, the guaranteed grid-connected scale can be replaced between provinces, and after the sending and receiving provinces negotiate and sign a long-term agreement with the power grid enterprises, the guaranteed grid-connected scale of the receiving province can be reduced according to the transmission (transaction) of new energy electricity, and increased to the sending province.

Q: How to implement the guaranteed grid connection scale in 2021?

A: The wind power and photovoltaic power generation projects to be connected to the grid in 2021 are mainly stock projects, including wind power projects that have been approved before the end of 2020 and within the validity period of approval, affordable wind power photovoltaic projects and bidding photovoltaic projects in 2019 and 2020, with a scale of about 90 million kilowatts. These projects are approved (filed) and in line with policies. The "Notice" makes it clear that the guaranteed grid-connected scale in 2021 is mainly used to arrange stock projects; Inventory projects do not need to participate in competitive allocation, and are directly included in the scope of provincial (autonomous regions and municipalities) guaranteed grid-connected projects.

For the provinces (autonomous regions and municipalities) that still cannot meet this year's minimum non-hydropower absorption responsibility weight requirements after the stock projects are connected to the grid, and there is still room for guaranteed grid-connection, the provincial energy authorities should pay close attention to organizing competitive allocation according to the remaining guaranteed grid-connection scale, accelerate the construction of projects, and ensure that the grid is connected and put into operation within the year.

The inventory projects that failed to be connected to the grid during the year were coordinated by the provincial energy authorities and directly included in the scope of subsequent annual guaranteed grid connection.

Q: How to arrange household photovoltaic power generation this year?

A: In order to promote the development of household photovoltaic power generation, there are still subsidies for household photovoltaic power generation this year, and the budget limit of financial subsidies is 500 million yuan, and the specific subsidy intensity is implemented according to the relevant policies of the price department. Household photovoltaic power generation construction management continues to be implemented in accordance with the relevant requirements of the Notice of the National Energy Administration on Matters related to the construction of wind power and photovoltaic power generation projects in 2019 (National Energy Development New Energy (2019) No. 49). Household photovoltaic power generation projects are guaranteed to be connected to the grid by power grid enterprises.

Q: How to do a good job in 2022 wind power, photovoltaic power generation project reserves?

A: Considering the project construction cycle, in order to ensure that the 2022 wind power and photovoltaic power generation projects are connected to the grid on schedule and ensure the completion of the 2022 renewable energy power consumption responsibility weight, it is necessary to reserve the 2022 grid-connected projects this year.

To this end, the "Notice" requires that in addition to focusing on promoting the grid connection of stock projects and steadily promoting the construction of household photovoltaic power generation, it is also necessary to do a good job in the reserve and construction of grid-connected projects next year. Recently, the state will release the 2021 and 2022 provincial administrative regions of renewable energy power consumption responsibility weight, all localities should determine the 2022 annual guarantee grid connection scale in accordance with the 2022 non-hydropower renewable energy power consumption responsibility weight, combined with the implementation of renewable energy development "14th Five-Year Plan", pay close attention to the organization of competitive allocation of guaranteed grid connection projects. Organize the approval (record) of a number of new wind power and photovoltaic power generation projects, do a good job of project reserves, and promote the timely construction of projects to achieve continuous development.

Q: Under the new situation, how to do a good job of wind power, photovoltaic power generation grid consumption?

A: The "Notice" puts forward clear requirements for grid enterprises to do a good job of grid-connected consumption. First, it is necessary to ensure that the guaranteed grid-connected projects and market-oriented grid-connected projects included in the annual construction plans of the provinces achieve "can do all"; Second, promote the new energy cloud platform, simplify the network connection process, facilitate the network connection procedures, and strengthen the construction of network connection projects; Third, we will work with the national new energy consumption monitoring and warning center to timely announce the grid-connected consumption situation and forecast analysis of provincial administrative regions, guide market players to make independent decisions, rational investment, orderly construction, and ensure that the utilization rate of wind power and photovoltaic power generation is at a reasonable level.

The National Energy Administration and its agencies will organize comprehensive supervision of clean energy consumption this year to promote a high level of consumption and utilization of wind power and photovoltaic power generation.

Q: What measures will be taken to optimize the development environment of wind power and photovoltaic power generation?

A: In order to implement the goal of reaching the peak of carbon and carbon neutrality, and promote the rapid development of large-scale, high-proportion and high-quality wind power and photovoltaic power generation, it is crucial to optimize the development and construction environment.

The Notice requires local energy authorities to optimize the business environment, standardize the order of development and construction, and shall not use supporting industries as the threshold of project development and construction; It is necessary to increase coordination with natural resources, forestry and grassland, ecological environment, housing construction and other departments, urge the implementation of project construction conditions, promote the introduction of land, fiscal, tax, financial and other support policies, and reduce the unreasonable burden of new energy development and construction. Power grid enterprises shall not attach additional conditions to the guaranteed grid-connected projects and market-oriented grid-connected projects included in the annual development and construction plan.

The National Energy Administration will strengthen policy coordination, form policy synergy, create a good policy environment for the development of wind power and photovoltaic power generation, and promote the sustainable and healthy development of wind power and photovoltaic power generation and high-quality development.


  • ABB 1TGE120010R1300 Industrial Control Module
  • ABB 216BM61b HESG448267R1021 Advanced Process Control Module
  • ABB BDD110 HNLP205879R1 Digital I/O Module
  • ABB IEMPU02 Power Supply Module
  • ABB G3FE HENF452697R1 High performance control module
  • ABB G3FD HENF452692R1 High-Performance Industrial Control Module
  • ABB B5EC HENF105077R1 Electronic Motor Protection Relay
  • ABB G3EFa HENF450295R2 Industrial Automation Module
  • ABB B5EEd HENF105082R4 Electronic Motor Protection Relay
  • ABB O3EId HENF452777R3 Digital Output Module
  • ABB NWX511a-2/R HESG112548R12 Industrial Automation Module
  • ABB E3ES Power communication module
  • ABB O3EX HENF315845R2 Industrial Control Module
  • ABB O3EHa HENF315087R2 Digital Output Module
  • ABB E3ED High-Performance Industrial Controller
  • ABB O3EGb HENF315118R2 Digital Output Module
  • ABB O3ED Digital Input Module
  • ABB O3ES HENF445789R1 Digital Input Module
  • ABB G3ESa HENF318736R1 control module
  • ABB 8025-235 Industrial Control Module
  • ABB 216NG61A HESG441633R1 HESG216875/K main control board
  • ABB SCYC51020 58052582G programmable Logic Controller
  • ABB RED670 Line differential protection
  • ABB PP825A 3BSE042240R3 Touch Screen Panel
  • ABB SCYC51020 58052582/G pulse trigger board
  • ALSTOM COP232.2 VME A32/D32.029.232 446 Controller Unit
  • ABB AO2000 LS25 Laser analyzers
  • ABB LM80 Laser level transmitter
  • ABB PM803F 3BDH000530R1 Base Unit 16 MB
  • ABB SD822 3BSC610038R1 Power Supply Device
  • ABB PCD235B1101 3BHE032025R1101 Industrial Control Module
  • ABB AZ20/112112221112E/STD Control Module
  • ABB UAD142A01 3BHE012551R0001 Industrial Control Module
  • ABB 5SHY35L4503 3BHB004693R0001 3BHB004692R0002 5SXE01-0127 main control board
  • ABB FET3251C0P184C0H2 High-Performance Power Module
  • ABB CAI04 Ability ™ Symphony ® Plus Hardware Selector
  • ABB R474A11XE HAFAABAAABE1BCA1XE output hybrid module
  • ABB REF542PLUS 1VCR007346 Compact Digital Bay Control
  • ABB REF542PLUS 1VCF752000 Feeder Terminal Panel
  • ABB PPD113B03-26-100100 3BHE023584R2625 output hybrid module
  • ABB 3BHE022293R0101 PCD232A Communication Interface Unit
  • ABB CI857K01 3BSE018144R1 Module Controller
  • ABB 3ASC25H216A DATX132 Industrial Controller
  • ABB LWN2660-6 High-Voltage Industrial Controller
  • ABB 1MRK00008-KB Control Module
  • ABB SC540 3BSE006096R1 Submodule Carrier
  • ABB REF615C_C HCFFAEAGANB2BAN1XC feeder protection and measurement and control device
  • ABB S-073N 3BHB009884R0021 multi-function servo driver
  • ABB SK827005 SK827100-AS 480V 60HZ coil
  • GE 029.381208 module
  • ABB REF615E_E HBFHAEAGNCA1BNN1XE Module
  • ABB TP830 3BSE018114R1 Baseplate Module
  • ABB TK803V018 3BSC950130R1 Cable Assembly
  • ABB DSRF197 3BSE019297R1 Controller Module
  • ABB DSAO120A 3BSE018293R1 Advanced Analog Output Board
  • ABB DSDP170 57160001-ADF Pulse Counting Module
  • ABB DSBC176 3BSE019216R1 Bus Extender Board
  • ABB DSDO115A 3BSE018298R1 Digital Output Module
  • ABB PM865K01 3BSE031151R1 Processor Unit HI
  • ABB 5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101 auxiliary DC power supply unit
  • ABB TP853 3BSE018126R1 Power Supply Module
  • ABB REM545AG228AAAA High Precision Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB REM615C_D HCMJAEADAND2BNN1CD Motor protection and control
  • ABB TP857 3BSE030192R1 DCS System
  • ABB PP865A 3BSE042236R2 Touch Panel
  • ABB SCYC51020 58052582H Industrial Automation Control Module
  • ABB SCYC51090 58053899E Control Module
  • ABB CB801 3BSE042245R1 Profibus DP Slave Expansion Module
  • ABB 5SHY4045L0001 3BHB018162R0001 IGCT Module
  • ABB 5SHY6545L0001 AC10272001R0101 5SXE10-0181 High-Power IGCT Module
  • ABB RMU811 Module Termination Unit
  • ABB TVOC-2-240 1SFA664001R1001 Industrial Control Module
  • ABB LDSTA-01 63940143B Input/Output (I/O) Module
  • ABB GJR5252300R3101 07AC91H Analog Input/Output Module
  • ABB GJR5252300R3101 07AC91F Industrial Control Module
  • ABB TB711F 3BDH000365R0001 Industrial Control Module
  • ABB TU715F 3BDH000378R0001 I/O Terminal Unit (ITU)
  • ABB DC732F 3BDH000375R0001 Industrial Controller
  • ABB TTH300 Head-mount temperature transmitter
  • ABB UNS3670A-Z V2 HIEE205011R0002 Industrial Automation Module
  • ABB RC527 3BSE008154R1 Redundant System Control Module
  • ABB 5SHY5055L0002 3BHE019719R0101 GVC736BE101 Industrial Control Module
  • ABB PM866 3BSE050200R1 AC800M series PLC core controller
  • ABB UFC718AE01 HIEE300936R0001 Main Circuit Interface Board
  • ABB DSAI130A 3BSE018292R1 Industrial I/O Module Controller
  • ABB 07KT98 GJR5253100R0278 Advanced Controller Module
  • ABB PFTL101B-5.0kN 3BSE004191R1 Power Conversion Module
  • ABB 5SHX1445H0002 3BHL000387P0101 IGCT Module
  • ABB 3HNM07686-1 3HNM07485-1/07 Controller Module
  • ABB DSCS131 57310001-LM DS Communication Board
  • ABB DSBC172 57310001-KD BUS REPEATER
  • ABB DSRF180A 57310255-AV Digital Remote I/O Module
  • ABB DSTC175 57310001-KN Precision Control Module
  • ABB DSSB140 48980001-P Battery Unit Industrial Control Module
  • ABB UAC389AE02 HIEE300888R0002 PCB Board
  • ABB PFTL101B 20KN 3BSE004203R1 DCS Module
  • ABB UFC718AE101 HIEE300936R0101 PCB Circuit Board
  • ABB UNS2880b-P,V2 3BHE014967R0002 Control Board
  • ABB UNS0887A-P 3BHE008128R0001 Communication Module
  • ABB UNS2882A-P,V1 3BHE003855R0001 EGC Board
  • ABB UNS2882A 3BHE003855R0001 Interface Board
  • ABB UNS4881b,V4 3BHE009949R0004 Controller
  • ABB 216EA62 1MRB150083R1/F 1MRB178066R1/F 216EA62 Redundant system modules
  • ABB 216DB61 HESG324063R100/J Controller Module
  • ABB PFSK142 3BSE006505R1 Control board
  • ABB DSAI133A 3BSE018290R1 Analog Input Module
  • ABB PFTL201C-10KN 3BSE007913R0010 Load Cells
  • ABB CI858-1 3BSE018137R1 Industrial Module
  • ABB 5SHY35L4520 5SXE10-0181 AC10272001R0101 Controller
  • ABB TU847 3BSE022462R1 Module Termination Unit
  • ABB 6231BP10910 PLC Analog Output Module
  • ABB 07BR61R1 GJV3074376R1 Distributed I / O Coupler
  • ABB DI93A HESG440355R3 Digital Input Module
  • ABB IC660BBA104 6231BP10910 Industrial Control Module
  • ABB TP858 3BSE018138R1 Module Controller
  • ABB PFEA111-65 3BSE050090R65 Tension Electronics Module
  • ABB DSMB-02C 3AFE64666606 Power Supply Board
  • ABB MC91 HESG440588R4 HESG112714/B Wireless Router Modules
  • ABB PPD113-B03-23-111615 Excitation system controller
  • ABB AB91-1 HESG437479R1 HESG437899 Graphics Expansion Module
  • ABB IT94-3 HESG440310R2 HESG112699/B controller
  • ABB NF93A-2 HESG440280R2 HESG323662R1/HESG216665/K Module Controller
  • ABB IW93-2 HESG440356R1 HESG216678/B I/O module
  • ABB PM861K01 3BSE018105R1 Processor Module
  • ABB RB520 Dummy Module For Submodule Slot
  • ABB SR511 3BSE000863R1 SR511 Regulator 24V/5V
  • ABB DSDP140B 57160001-ACX Counter Board