Notice on matters related to development and construction of wind power and photovoltaic power generation in 2021

F: | Au:佚名 | DA:2023-12-23 | 789 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Q: What is the background of the Circular?

A: 2021 is the first year of the "14th Five-Year Plan", and it is also the first year that wind power and photovoltaic power generation will be online at parity.  It has set up a new beacon for China's energy revolution and green low-carbon transformation, and defined new tasks for the development of wind power and photovoltaic power generation. The boundary conditions of the development of wind power and photovoltaic power generation in China have undergone profound changes, and the development logic, development concept and development ideas also need to be adjusted accordingly. It is necessary to introduce new annual policies in accordance with the goal orientation, improve the development mechanism, release the consumption space, optimize the development environment, give the industry and enterprises more clear expectations, and effectively enhance the confidence of market players. We will promote the large-scale, high-proportion and high-quality development of wind power and photovoltaic power generation.

To this end, since the beginning of this year, the National Energy Administration has repeatedly organized local energy authorities, investment and development enterprises, manufacturing enterprises, industry associations, research institutions and other relevant units to hold symposiums, and through written solicitations, public solicitations and other ways, widely solicit and fully absorb the adoption of opinions and suggestions from all aspects, research and improve policy ideas, and finally formed the "Notice" document.

Q: In the face of the new situation and new tasks, what long-term mechanisms have been established in the Circular?

A: The "Notice" is based on the current situation, the development and construction of wind power and photovoltaic power generation projects in 2021, and it also takes a long-term view and establishes a long-term mechanism in three aspects:

First, the establishment of the absorption responsibility weight guidance mechanism. The state no longer issues the annual construction scale and indicators of the provinces (regions and cities), but adhere to the goal orientation, calculate the annual renewable energy power consumption responsibility weight of the provinces, guide the local arrangement of wind power, photovoltaic power generation project construction, and promote cross-provincial and cross-regional wind power trading.

The second is to establish a multiple guarantee mechanism for grid connection. In order to do a good job of large-scale wind power and photovoltaic power generation projects, the future wind power and photovoltaic power generation projects will be divided into two categories. First, the new grid-connected projects necessary for the provinces (regions and municipalities) to complete the annual minimum absorption responsibility weight of non-hydropower are guaranteed grid-connected projects, which are implemented by power grid enterprises. Second, the projects that are still willing to connect to the grid outside the scope of guarantee grid-connection are market-oriented grid-connection projects. After the grid-connection conditions can be implemented through market-oriented ways such as self-construction, co-construction and sharing or purchase of services, grid enterprises will be connected to the grid to promote the overall flexibility of the power system. The guarantee and market grid-connected only have different grid-connected conditions, and the two types of projects implement the same consumption policy after grid-connected.

Third, establish a competitive allocation mechanism for ensuring grid connection. According to the calculation of the absorption responsibility weight, the scale of the guarantee grid connection is limited, which projects can be included in the scope of the guarantee grid connection, the provinces need to be unified by the provincial energy authorities through competitive allocation. The project feed-in tariff shall be implemented in accordance with the relevant policies of the State pricing authority.

Q: How to determine the scale of provincial guarantee grid connection?

A: The "Notice" clearly, the provincial energy authorities can be based on the regional annual non-hydropower minimum absorption responsibility weight and the whole society's electricity consumption, calculate the annual non-hydropower renewable energy power consumption in the region, and then calculate and determine the regional annual must be added to the scale of security grid-connected installed capacity, which is the bottom line goal necessary to complete the minimum absorption responsibility weight of non-hydropower.

For the implementation of non-hydropower absorption responsibility weight through cross-provincial and cross-regional power transactions, the guaranteed grid-connected scale can be replaced between provinces, and after the sending and receiving provinces negotiate and sign a long-term agreement with the power grid enterprises, the guaranteed grid-connected scale of the receiving province can be reduced according to the transmission (transaction) of new energy electricity, and increased to the sending province.

Q: How to implement the guaranteed grid connection scale in 2021?

A: The wind power and photovoltaic power generation projects to be connected to the grid in 2021 are mainly stock projects, including wind power projects that have been approved before the end of 2020 and within the validity period of approval, affordable wind power photovoltaic projects and bidding photovoltaic projects in 2019 and 2020, with a scale of about 90 million kilowatts. These projects are approved (filed) and in line with policies. The "Notice" makes it clear that the guaranteed grid-connected scale in 2021 is mainly used to arrange stock projects; Inventory projects do not need to participate in competitive allocation, and are directly included in the scope of provincial (autonomous regions and municipalities) guaranteed grid-connected projects.

For the provinces (autonomous regions and municipalities) that still cannot meet this year's minimum non-hydropower absorption responsibility weight requirements after the stock projects are connected to the grid, and there is still room for guaranteed grid-connection, the provincial energy authorities should pay close attention to organizing competitive allocation according to the remaining guaranteed grid-connection scale, accelerate the construction of projects, and ensure that the grid is connected and put into operation within the year.

The inventory projects that failed to be connected to the grid during the year were coordinated by the provincial energy authorities and directly included in the scope of subsequent annual guaranteed grid connection.

Q: How to arrange household photovoltaic power generation this year?

A: In order to promote the development of household photovoltaic power generation, there are still subsidies for household photovoltaic power generation this year, and the budget limit of financial subsidies is 500 million yuan, and the specific subsidy intensity is implemented according to the relevant policies of the price department. Household photovoltaic power generation construction management continues to be implemented in accordance with the relevant requirements of the Notice of the National Energy Administration on Matters related to the construction of wind power and photovoltaic power generation projects in 2019 (National Energy Development New Energy (2019) No. 49). Household photovoltaic power generation projects are guaranteed to be connected to the grid by power grid enterprises.

Q: How to do a good job in 2022 wind power, photovoltaic power generation project reserves?

A: Considering the project construction cycle, in order to ensure that the 2022 wind power and photovoltaic power generation projects are connected to the grid on schedule and ensure the completion of the 2022 renewable energy power consumption responsibility weight, it is necessary to reserve the 2022 grid-connected projects this year.

To this end, the "Notice" requires that in addition to focusing on promoting the grid connection of stock projects and steadily promoting the construction of household photovoltaic power generation, it is also necessary to do a good job in the reserve and construction of grid-connected projects next year. Recently, the state will release the 2021 and 2022 provincial administrative regions of renewable energy power consumption responsibility weight, all localities should determine the 2022 annual guarantee grid connection scale in accordance with the 2022 non-hydropower renewable energy power consumption responsibility weight, combined with the implementation of renewable energy development "14th Five-Year Plan", pay close attention to the organization of competitive allocation of guaranteed grid connection projects. Organize the approval (record) of a number of new wind power and photovoltaic power generation projects, do a good job of project reserves, and promote the timely construction of projects to achieve continuous development.

Q: Under the new situation, how to do a good job of wind power, photovoltaic power generation grid consumption?

A: The "Notice" puts forward clear requirements for grid enterprises to do a good job of grid-connected consumption. First, it is necessary to ensure that the guaranteed grid-connected projects and market-oriented grid-connected projects included in the annual construction plans of the provinces achieve "can do all"; Second, promote the new energy cloud platform, simplify the network connection process, facilitate the network connection procedures, and strengthen the construction of network connection projects; Third, we will work with the national new energy consumption monitoring and warning center to timely announce the grid-connected consumption situation and forecast analysis of provincial administrative regions, guide market players to make independent decisions, rational investment, orderly construction, and ensure that the utilization rate of wind power and photovoltaic power generation is at a reasonable level.

The National Energy Administration and its agencies will organize comprehensive supervision of clean energy consumption this year to promote a high level of consumption and utilization of wind power and photovoltaic power generation.

Q: What measures will be taken to optimize the development environment of wind power and photovoltaic power generation?

A: In order to implement the goal of reaching the peak of carbon and carbon neutrality, and promote the rapid development of large-scale, high-proportion and high-quality wind power and photovoltaic power generation, it is crucial to optimize the development and construction environment.

The Notice requires local energy authorities to optimize the business environment, standardize the order of development and construction, and shall not use supporting industries as the threshold of project development and construction; It is necessary to increase coordination with natural resources, forestry and grassland, ecological environment, housing construction and other departments, urge the implementation of project construction conditions, promote the introduction of land, fiscal, tax, financial and other support policies, and reduce the unreasonable burden of new energy development and construction. Power grid enterprises shall not attach additional conditions to the guaranteed grid-connected projects and market-oriented grid-connected projects included in the annual development and construction plan.

The National Energy Administration will strengthen policy coordination, form policy synergy, create a good policy environment for the development of wind power and photovoltaic power generation, and promote the sustainable and healthy development of wind power and photovoltaic power generation and high-quality development.


  • Siemens 6EP3437-8SB00-0AY0 Power Supply 20A
  • Pasaban MC-2006 03 CAN Bus PLC Card
  • ETAS ES600.2 PLC Module Prototyping
  • ABB ACS800-01-0005-3+P901 Frequency Converter
  • Omron NX102-1100 PLC Module Machine Automation
  • Square D BMXCPS3500 PLC Power Supply Module
  • Allen-Bradley 96657704 Fiber Optic Converter 1771-AF
  • Corcom 20VK1 Power Line Filter
  • Novellus 2805-11407 PLC Rack Assembly
  • Sick RLY3-EMSS100 Safety Relay Module
  • Microchip PIC12F508-I/P Microcontroller
  • Fanuc A02B-0098-B511 Motherboard
  • Merlin Gerin PB80 PLC Rack Module
  • ABB Pluto S20 V2 CFS Safety PLC
  • Honeywell TK-PRR021 Redundancy Module
  • B&R 7XX419L.50-1 Bus Controller
  • Mitsubishi NV400-SW 3P 300A Breaker
  • B&R X20AT2222 Temperature Module
  • Corcom 20VK1 EMI RFI Filter
  • Novellus 2805-11407 PLC Rack Assy
  • Mitsubishi FXAOM01BD Analog Output Module 4CH
  • NORIS A1-91 PCB Rack Module A1-91-4 A1-91-5 A1-91-6 A1-91-7 A1-91-8
  • Omron ZFV-SC50 Smart Camera Vision Sensor
  • Schneider Electric EOCR-PMZ Motor Protection Relay
  • B&R X20 SO 6300 PLC Module Safety Output
  • Mitsubishi A2ACPU21-S1 CPU Module MELSEC
  • Siemens 6ES7405-0KA02-0AA0 PS405 10A Power Supply
  • Samsung PVU-2424 Power Supply Unit DC24V 24W
  • ATTO controlSYS ATT0-CPU44 PLC with Display
  • Lenze EPZ-10203 CANPT010W3E Absolute Encoder
  • GE IS215WEMAH1A+IS210BPPBH2CAA Mark VIe Embedded Processor and Backplane Power Distribution Board
  • GE IS215AEPAH1CH+IS210BPPBH2CAA Mark VIe Application Processor and Backplane Power Distribution Board
  • GE IS215WECAH1B+IS210BPPBH2CAA Mark VIe Control Platform
  • GE PCM Regulator for EX2100e Power Conversion Module 151X1235DB15SA1
  • Lenze ECSEA048C4B servo drive
  • ABB PM665 3BDS005799R1 redundant CPU module
  • BAUMULLER b maXX 3000 Servo Controller BM3401-LIFBO-ACOOOCB-G-02-O-02
  • R&S EPL10200-W EMI Test Receiver
  • Schneider M522220000 16 way relay output module
  • ABB 3HAC031851-001 SMB Unit Technical Manual
  • Fuji NB1U56X-01 Programmable Controller Guide
  • Siemens 6AG1153-2BA02-7XB0 SIPLUS IM 153-2 Manual
  • Beckhoff EL6631 PROFINET Terminal Manual
  • Lenze E82EV302-4C Frequency Inverter Manual
  • Siemens 6SE7038-6EK84-1JC2 IGD8 Board Specifications
  • Pilz 774595 Safety Relay Specifications
  • Fanuc A20B-8200-0847 PLC Board Specification
  • Allen Bradley 1785-L60B/E PLC CPU Manual
  • PASABAN MC-2006 03 PLC Card Specifications
  • B&R X20CP1382 PLC Control Module X20 CPU
  • B&R X20DC2395 PLC Module Digital Output
  • AS-2P-70M-B Industrial PLC Communication Cable 70M
  • Siemens 6ES7136-6BA00-0CA0 PLC Module ET 200SP
  • Siemens 1FK7083-5AF71-1EB3 Servo Motor SIMOTICS S
  • WAGO 750 Series I/O Modules 750-842 750-530 750-430 750-602 750-514 750-600
  • Microchip TC9401CPD F/V Converter 100kHz 14DIP
  • Mitsubishi GT2310-VTBA GT2310-VTBD HMI Touch Screen 10.4 Inch
  • Siemens 3RT2036-1AN20 AC Contactor SIRIUS
  • Mitsubishi GT2708 HMI Touch Screen GT2708-VTBA VTBD STBA STBD
  • Siemens 6FC5110-0CB01-0AA0 CNC PLC CPU
  • ABB SINT4130C PCB Board
  • Omron NX1P2-1040DT PLC Controller
  • Fuji FRN3.7C1S-2J VFD
  • PLC-60/75 /E2UK Shielded Braided Cable
  • Omron CJ1W-NC434 Position Control Unit
  • Omron NX-AD2208 Analog Input Module
  • PASABAN MC-2006 03 PLC Card
  • Schneider 9038CR34 Pressure Switch
  • Pilz 240340 Safety Control Module
  • Mitsubishi A2NCPU Programmable Controller MELSEC
  • Mitsubishi Alpha XL Alarm Modem M20 Expansion
  • AutomationDirect D0-06DD2-D PLC DL06 Controller
  • Toshiba COMW01-21 PCB Control Board Turbine
  • Siemens 6FX1122-1AC02 Coupling Module SINUMERIK
  • Omron CVM1-CPU21-V2 CPU Unit Programmable
  • Beckhoff EL7041 Stepper Motor Terminal EtherCAT
  • B&R X20AI4622 Analog Input Module 4 Channels
  • OAT PMC25.2-003 Programmable Controller Module
  • Fanuc A16B-2200-0350 Graphic Board Series 16
  • Eaton Cutler Hammer 6-26-2 Contactor Contact Kit
  • Omron D4SL-NSK10-LK-K Safety Switch
  • Siemens C98043-A7001-L24 CUD1 Control Board
  • Mitsubishi A2NCPUR21-S1 PLC Module
  • National Instruments NI-9242 4-channel analog input module
  • BEMAC UST-202-D PLC Interface Board
  • Omron CJ1W-DA08C Analog Output Module
  • Mitsubishi QX521 CNC Interface Board
  • Schneider BMEP586040 High-Performance PLC Processor
  • Emerson 5X00875G01 Process Control PLC
  • Siemens SIMODRIVE 611 Power Module 6SN1145-1AA01-0AA0
  • Siemens 840C NC-CPU 486DX4 6FC5110-0BB04-0AA1
  • Mitsubishi GT2708 Series Operation Panel Touch HMI
  • Fanuc A04B-0103-C220 Programmable Controller Module
  • IFM CR2530 Programmable Controller for Mobile Automation
  • Omron FH-3050 Vision Controller i7-2715QE High Performance
  • National Instruments NI-9242 4-Ch Analog Input Module
  • B&R X20AI4632 Analog Input Module 4 Channels
  • Pilz 773600 Input Module Safety Automation
  • Panasonic AFPX-C60P Programmable Controller PLC
  • Siemens 6ES7414-2XL07-0AB0 S7-400 CPU Manual
  • Cutler Hammer WM34V Interlock Kit Manual
  • Pilz 777587 Safety Relay Specifications
  • Omron CJ2H-CPU64-EIP CPU Module Manual
  • B&R X20AI1744-3 Analog Input Module Guide
  • Schneider LC1G185BEEA Contactor Specification
  • Sharp LM64P101 LCD Screen Specifications
  • B&R X20AT4222 Temperature Module Guide
  • Mitsubishi A2UCPU-S1 Controller Specifications
  • Stein Sohn E 083.1 Rack Module Technical Guide
  • Omron CK3W-AX1515N Motion Controller
  • Schneider TSXP572634M PLC Processor
  • Epson RAIOC-33 Programmable Controller
  • GRID T&D iRTUe-D1R1-W.125 I/O Module
  • Fanuc A20B-2002-0520 Control Board
  • B&R X20IF1030 Interface Module
  • Schneider ATV320U55N4B VFD
  • Omron NA5-9W001B-V1 HMI Touchscreen
  • Mitsubishi A2NCPU PLC CPU Unit
  • Omron CJ2M-CPU34 PLC CPU Unit
  • Omron NS12-TS01B-V2 Touch Screen HMI
  • Mitsubishi FX3GE-24MT/ESS PLC Controller
  • Grundig NEA02 AES 0 PLC I O Module
  • Beckhoff EP3204-0002 EtherCAT Box Module
  • Mitsubishi MDS-A-CV-220 Power Supply Unit
  • MCX20B2 080G0330 Motion Controller
  • Toyo Keiki P CARD5 Interface Board YH-212
  • National Instruments NI 9242 Analog Input Module
  • B&R 3AM055.6 PLC Module