Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

We will strengthen safety in mine production and strictly prohibit the organization of production with excessive capacity and strength

F: | Au:佚名 | DA:2023-12-27 | 632 Br: | 🔊 点击朗读正文 ❚❚ | Share:

At present, the situation of work safety in China is grim and complex, especially in recent years, there have been frequent mine accidents, such as the "November 29" flood in Yuan Jiangshan Coal Mine Leiyang, Hunan Province, and the "December 4" fire in Longshuitong Coal Mine Yongchuan, Chongqing. The "1·10" major explosive explosion accident of Qixiwushan Gold mine and the "2·17" major fire accident of Zhaoyuan Caojiawa Gold Mine occurred in Yantai, Shandong Province within more than a month, which caused serious losses to people's lives and property, and also caused serious social adverse effects. The accident exposed that some enterprises' "people first, life first" concept is not strong, the responsibility for safety production is suspended, the management of outsourcing projects is chaotic, the package management only does not care about the package, illegal fire, illegal storage and use of civil explosives and other problems are prominent. Some local governments and regulatory departments are not strict in their work style, have not learned deep lessons, have taken superficial rectification measures, have not grasped the root causes and essential problems, and have not really been implemented to the grassroots and enterprises, resulting in repeated mistakes.

 In accordance with the provisions of the Production Safety Law, the Mine Safety Law and other laws and regulations, the urgent notice on strengthening the work of production safety in mines is as follows:

1. Illegal blasting and hot operation are strictly prohibited

Mining enterprises that illegally transport, store, distribute or use civilian explosives shall be sealed up or detained according to law; If it constitutes a major potential accident, it shall be ordered to stop production for rectification according to law.

If the mining enterprise has not formulated and implemented the safety operation rules for blasting operations, if the underground explosive storage does not meet the design specifications, if the artillerist does not hold a certificate to work, or if the coal mine does not strictly implement the provisions of "one artillery-three inspections" and "three-person chain blasting", it shall be ordered to make corrections immediately and be given a heavier punishment according to law.

When mining enterprises use electric and gas welding for cutting and welding, they must formulate special safety measures and strictly follow the approval procedures prescribed in the regulations. Electric welding (gas cutting) workers who do not have the qualifications are strictly prohibited from entering the well for hot work. In the event of hot operation at the wellhead and in the wellbore, all operators must be evacuated from the well; All personnel on the return air side must be evacuated in case of hot operation in the main air inlet lane.

Mining enterprises that illegally conduct hot operations at wellheads or underground shall be ordered to stop their operations, immediately eliminate hidden dangers of accidents, and be given a heavier punishment according to law.

2. Illegal subcontracting of underground engineering is strictly prohibited

Where a mining enterprise attaches to a mine or contracts a project to be subcontracted in violation of the law, or a construction unit attaches its construction qualification in violation of the law, it shall be ordered to stop production for rectification and shall be given a heavier punishment according to law.

Where a mine that has been determined for closure arbitrarily organizes production in the name of withdrawal or contracts the withdrawal project to an unqualified enterprise, it shall be shut down immediately, its illegal income shall be confiscated and it shall be given a heavier punishment according to law.

Mining enterprises or holding enterprises shall strengthen the centralized and unified management of the safety of their mines, and shall not delegate responsibility for safety management to other ways such as increasing the level of the company, and investigate the responsibility of higher-level companies in accordance with laws and regulations when accidents occur or there are major accident risks.

Third, it is strictly prohibited to use the eliminated equipment process

Mining enterprises that illegally use non-flame retardant air ducts, conveyor belts, cables, glass fiber reinforced plastics or illegally use dry brake trackless rubber wheels shall be ordered to stop using them immediately; Those who refuse to make corrections shall be ordered to stop production for rectification according to law.

Mining enterprises that use equipment and facilities that are included in the administration of safety standards but fail to obtain safety marks for mining products according to regulations shall be ordered to stop using them immediately; Those who refuse to make corrections shall be ordered to stop production for rectification according to law.

If a coal mine uses a reactive polymer material that has not obtained the safety mark for mining products, it shall be ordered to stop using it immediately, and if it refuses to make corrections, it shall be ordered to stop production for rectification according to law.

Fourth, it is strictly prohibited to organize production without adequate control of major disasters

If a mining enterprise fails to invest the funds necessary to ensure the conditions of safe production in accordance with the regulations and fails to control hidden dangers due to insufficient investment, it shall be ordered to make corrections within a time limit; If it constitutes a potential accident, it shall be ordered to stop production for rectification according to law; If an accident occurs, the principal person in charge and the investor (including the actual controller) of the individual business shall be given a heavier punishment according to law; If the case constitutes a crime, the relevant personnel shall be investigated for criminal responsibility according to law.

If the mine has a serious water disaster and fails to take effective measures of "three special, two exploration and one withdrawal" (equipped with professional and technical personnel, special water exploration and release team, special water exploration and release equipment, using geophysical exploration and drilling to explore and release water, and immediately stopping production and withdrawal of personnel after finding signs of seepage), the implementation of major disaster control measures such as coal mine gas, coal and gas outburst, rock burst and so on is not in place shall be ordered to correct immediately; If it constitutes a major potential accident, it shall be ordered to stop production for rectification.

Fifth, it is strictly prohibited to organize production with super ability and super strength

Mining enterprises that organize production with super capacity shall be ordered to take immediate measures to limit production, and those that pose potential risks of major accidents shall be ordered to stop production for rectification according to law.

In coal mines where mining is out of order and gas is not pumped or not up to standard, production shall be ordered to stop production for rectification according to law.

Where a production plan or business target is issued by a competent department or company at a higher level, it shall be ordered to make corrections immediately and be dealt with seriously in accordance with relevant provisions.

6. It is strictly prohibited to organize production and construction without approval

If a mining enterprise fails to go through the formalities for obtaining its license in full or arbitrarily organizes production and construction without going through the formalities for extending its license as required, it shall be ordered to stop production and construction according to law. Mines that have stopped production for rectification and resume work without approval for inspection and acceptance shall be investigated and dealt with seriously according to law, and those whose circumstances are serious shall be shut down immediately according to law.

If a coal mine crosses the boundary to destroy the security coal pillar, or the mine conceals the place of operation to evade supervision, it shall be ordered to stop production for rectification according to law, and be given a heavier punishment according to law.

Seven, strict safety monitoring facilities and equipment management

Mining enterprises that fail to install safety monitoring systems and personnel location monitoring systems in accordance with regulations or systems that fail to operate normally, modify, delete or shield system data information to evade supervision, shall be ordered to stop production for rectification according to law; If the case constitutes a crime, the relevant personnel shall be investigated for criminal responsibility according to law.

Those who fail to install an online safety monitoring system in operation of the tailings pond shall be ordered to make rectification within a time limit, and those who fail to make rectification within the time limit shall be closed according to law.

8. Strictly lead the class down the well and safety education and training

Mining enterprises that fail to strictly implement the system of mine leaders leading down Wells shall be ordered to make corrections immediately, and the enterprises and principal responsible persons shall be severely punished according to law; Those who fail to conduct safety education and training for underground operators according to regulations, or those who work for special operators without licenses shall be ordered to make corrections and fined according to law, and in serious cases shall be ordered to stop production for rectification.

If a coal mine fails to recruit full-time mine directors, chief engineers and deputy mine directors in charge of safety, production and mechanical and electrical engineering in accordance with regulations, it shall be ordered to stop production for rectification according to law.

9. Strictly implement supervision and supervision instructions

If a mining enterprise is ordered to stop production for rectification, stop construction, stop using relevant equipment and facilities, or immediately take rectification measures to remove the danger, but refuses to carry out the order, it shall be punished by revoking its license or closing down according to law.

Coal mines that are still in production if they are found to have hidden dangers of major accidents twice or more times within three months shall be shut down according to law.

Local safety committees at all levels should grasp the organization and implementation of the above nine measures of "six strictly prohibited and three strictly" in light of local realities, timely study and solve the problems in the work, and focus on carrying out mine safety investigations, and resolutely curb the momentum of mine accidents. The reform of the mine safety supervision and supervision system is to bring the safety of non-coal mines into the scope of national supervision, and the safety supervision of non-coal mines is still responsible for emergency management departments at all levels. Emergency management departments at all levels, departments responsible for coal mine safety supervision and mine safety supervision agencies should strictly perform their duties, strictly implement the responsibility of mine safety supervision and supervision, and close mines, shut down mines, technical transformation mines, infrastructure mines and production mines, tailings ponds, etc. into the scope of supervision, and go to the grassroots to openly and secretly investigate problems and promote rectification. Implement all safety responsibility measures in detail; We will strictly implement the relevant provisions on the connection between the execution of penalties for violations of work safety, and promptly transfer those suspected of constituting crimes to judicial organs in accordance with the law.

All relevant local departments shall, in accordance with the requirements of "the management of industry must be in charge of safety, the management of business must be in charge of safety, and the management of production and operation must be in charge of safety", seize the relevant fields of mine safety work; All localities should actively promote the elimination and withdrawal of mines that do not meet the national industrial policies and safety standards, and severely crack down on illegal mines. If the responsibility for safety supervision is not implemented, illegal mines have not taken effective measures to stop the accident, and illegal power supply and illegal supply of civil explosive materials, the relevant clues will be handed over to the discipline inspection and supervision organ for handling.


  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series