Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Measures for the administration of mine safety standards

来源: | 作者:佚名 | 发布时间 :2023-11-27 | 838 次浏览: | Share:

(1) Having a rigorous scientific attitude and good professional ethics;

(2) have a senior title and engaged in the professional field of work for at least 5 years;

(3) Be familiar with laws, regulations and policies related to mine safety;

(4) Proficient in standard writing knowledge, with strong writing ability;

(5) The standard system revision projects undertaken by the first person at the same time are not more than 2.

Article 18 The standard leading drafting unit shall complete the standard solicitation draft within 6 months from the date of issuance of the standard project plan, and submit the standard solicitation draft, the standard preparation explanation, the scope of solicitation suggestions and other relevant materials to the centralized technical committee. Where an international standard or an advanced foreign standard is adopted, the original foreign language and Chinese translation of the standard shall be submitted; Where the standard content involves a patent, the patent related materials shall be submitted.

The description of the standard preparation shall include the following contents and be supplemented in a timely manner according to the work process:

(a) A brief overview of the work, including the source of the task, the composition of the drafting group and the unit to which it belongs, and the formation process of the draft at each stage;

(2) the principles of standard preparation and the arguments for determining the main technical content of the standard (including tests, statistical data, etc.), and the basis and reasons for changes in the technical content of the standard should be put forward when revising the standard;

(3) Comparative analysis with international and foreign relevant laws, regulations and standards

(4) The relationship with relevant existing laws, administrative regulations and other relevant standards;

(5) The process and basis for handling major divergent opinions;

(6) Recommendations and reasons used as mandatory or recommended standards;

(7) Suggestions and basis for the implementation date of the standard, including the technical transformation required for the implementation of the standard, cost input, the time for the withdrawal of related products from the market, and the possible social impact of the implementation of the standard;

(8) Policies and measures related to the implementation of the standard;

(9) Proposals for abolishing or revising existing relevant standards;

(10) Relevant descriptions involving patents;

(11) The catalogue of products, processes and services covered by the standard;

(12) Other matters that should be explained.

For standards requiring validation, the validation report should be provided as an annex to the preparation note. Mandatory national standards should provide recommendations and reasons for the need for external notification.

Article 19 The technical committee shall, within 15 days, send the draft of the standard solicitation for comments, the preparation instructions and relevant annexes, and the solicitation form (see Annex 2) to all members or relevant experts for comments, and the time limit for solicitation is generally 15 days. After the end of the solicitation of comments, the relevant comments should be forwarded to the lead drafting unit of the standard within 5 days.

The mandatory standard project shall take a variety of ways to solicit opinions in accordance with the principle of convenience and effectiveness, and submit the policy, regulations and science and technology equipment department to the public through the government website of the National Mine Safety Administration for public soliciting opinions, and the public soliciting opinions period is not less than 60 days. In an emergency, the period for public consultation can be shortened, but generally not less than 30 days.

Article 20 The leading drafting unit of the standard shall, within 30 days, summarize, analyze and deal with the opinions transmitted by the technical committee, form a draft of the standard for review, a summary processing table for comments (see Annex 3), and a newly revised description of the preparation of the standard, and submit it to the Technical Committee for review.

Article 21 The Technical Committee shall organize and complete the review within 30 days after receiving the above materials. Review forms are divided into meeting review and letter review, with priority given to meeting review. Mandatory standards should be reviewed by meetings.

Article 22 The review of the meeting shall meet the following requirements:

(1) The examination group shall be composed of members of the Technical Committee or authoritative and representative experts invited in relevant fields, and the total number of the examination group shall not be less than 9 people, and the total number of the national standard examination group shall not be less than 15 people;

(2) Members of the standards drafting group shall not be members of the review team;

(3) The meeting shall reach a consensus in the examination, if it is necessary to vote, it shall be approved by more than three fourths of all members of the examination team, and the voting result shall be a resolution and filed;

  • Metso A413177 Digital Interface Control Module
  • METSO A413222 8-Channel Isolated Temperature Input Module
  • Metso A413313 Interface Control Module
  • METSO D100532 Control System Module
  • METSO A413310 8-Channel Digital Output Module
  • METSO A413659 Automation Control Module
  • Metso D100314 Process Control Interface Module
  • METSO A413665 8-Channel Analog Output Module
  • METSO A413654 Automation Control Module
  • Metso A413325 Interface Control Module
  • METSO A413110 8-Channel Analog Input Module
  • METSO A413144 Automation Control Module
  • Metso A413160 Digital Interface Control Module
  • METSO A413152 8-Channel Digital Input Module
  • METSO A413240A Automation Control Module
  • METSO A413146 Digital Interface Control Module
  • METSO A413150 Multi-Role Industrial Automation Module
  • METSO A413125 Automation Control / I/O Module
  • Metso A413111 Interface Control Module
  • METSO A413140 Automation Control Module
  • METSO 020A0082 Pneumatic Control Valve Component
  • METSO 02VA0093 Automation Control Module
  • METSO 02VA0153 Actuator Control Module
  • METSO 02VA0190 Automation Control Module
  • Metso 02VA0193 Pneumatic Control Valve Component
  • METSO 02VA0175 Valve Actuator Module
  • METSO D100308 Industrial Control Module
  • MOOG QAIO2/2-AV D137-001-011 Analog Input/Output Module
  • MOOG D136-002-002 Servo Drive or Control Module
  • MOOG D136-002-005 Servo Drive Control Module
  • MOOG D136E001-001 Servo Control Card Module
  • MOOG M128-010-A001B Servo Control Module Variant
  • MOOG G123-825-001 Servo Control Module
  • MOOG D136-001-008a Servo Control Card Module
  • MOOG M128-010 Servo Control Module
  • MOOG T161-902A-00-B4-2-2A Servo-Proportional Control Module
  • MOTOROLA 21255-1 Electronic Component Module
  • MOTOROLA 12967-1 / 13000C Component Assembly
  • MOTOROLA 01-W3914B Industrial Control Module
  • Motorola MVME2604-4351 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME162-513A VMEbus Embedded Computer Board
  • MOTOROLA MPC2004 Embedded PowerPC Processor
  • Motorola MVME6100 VMEbus Single Board Computer
  • MOTOROLA MVME162PA-344E VMEbus Embedded Computer Board
  • MOTOROLA RSG2PMC RSG2PMCF-NK2 PMC Expansion Module
  • Motorola APM-420A Analog Power Monitoring Module
  • MOTOROLA 0188679 0190530 Component Pair
  • Motorola 188987-008R 188987-008R001 Power Control Module
  • MOTOROLA DB1-1 DB1-FALCON Control Interface Module
  • MOTOROLA AET-3047 Antenna Module
  • Motorola MVME2604761 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME761-001 VMEbus Single Board Computer
  • MOTOROLA 84-W8865B01B Electronic System Module
  • Motorola MVIP301 Digital Telephony Interface Module
  • MOTOROLA 84-W8973B01A Industrial Control Module
  • MOTOROLA MVME2431 VMEbus Embedded Computer Board
  • MOTOROLA MVME172PA-652SE VMEbus Single Board Computer
  • Motorola MVME162-223 VMEbus Single Board Computer
  • MOTOROLA BOARD 466023 Electronic Circuit Board
  • Motorola MVME333-2 6-Channel Serial Communication Controller
  • MOTOROLA 01-W3324F Industrial Control Module
  • MOTOROLA MVME335 VMEbus Embedded Computer Board
  • Motorola MVME147SRF VMEbus Single Board Computer
  • MOTOROLA MVME705B VMEbus Single Board Computer
  • MOTOROLA MVME712A/AM VMEbus Embedded Computer Board
  • MOTOROLA MVME715P VMEbus Single Board Computer
  • Motorola MVME172-533 VMEbus Single Board Computer
  • Motorola TMCP700 W33378F Control Processor Module
  • MOTOROLA MVME188A VMEbus Embedded Computer Board
  • Motorola MVME712/M VME Transition Module
  • Motorola 30-W2960B01A Industrial Processor Control Module
  • MOTOROLA FAB 0340-1049 Electronic Module
  • Motorola MVME162-210 VME Single Board Computer
  • Motorola MVME300 VMEbus GPIB IEEE-488 Interface Controller
  • MOTOROLA CPCI-6020TM CompactPCI Processor Board
  • Motorola MVME162-522A VMEbus Single Board Computer
  • MOTOROLA MVME162-512A VMEbus Single Board Computer
  • MOTOROLA MVME162-522A 01-W3960B/61C VMEbus Single Board Computer
  • MOTOROLA MVME162-220 VMEbus Embedded Computer Board
  • Motorola MVME162-13 VMEbus Single Board Computer
  • MOTOROLA MVME162-10 VMEbus Single Board Computer
  • RELIANCE 57C330C AutoMax Network Interface Module
  • RELIANCE 6MDBN-012102 Drive System Module
  • RELIANCE 0-60067-1 Industrial Drive Control Module
  • Reliance Electric 0-60067-A AutoMax Communication Module
  • RELIANCE S0-60065 System Control Module
  • RELIANCE S-D4006-F Industrial Drive Control Module
  • Reliance Electric S-D4011-E Shark I/O Analog Input Module
  • RELIANCE S-D4009-D Drive Control Module
  • RELIANCE S-D4043 Drive Control Module
  • Reliance DSA-MTR60D Digital Servo Motor Interface Module
  • RELIANCE 0-60063-2 Industrial Drive Control Module
  • RELIANCE S-D4041 Industrial Control Module
  • Reliance Electric SR3000 2SR40700 Power Module
  • RELIANCE VZ7000 UVZ701E Variable Frequency Drive Module
  • RELIANCE VZ3000G UVZC3455G Drive System Module
  • Reliance Electric S-D4039 Remote I/O Head Module
  • RELIANCE 0-57210-31 Industrial Drive Control Module
  • RELIANCE 0-56942-1-CA Control System Module
  • Reliance Electric 0-57100 AutoMax Power Supply Module
  • RELIANCE 0-54341-21 Industrial Control Module
  • RELIANCE 0-52712 800756-21B Drive Interface Board
  • KEBA PS242 - Power Supply Module
  • KEBA BL460A - Bus Coupling Module
  • KEBA K2-400 OF457/A Operating Panel
  • KEBA T200-M0A-Z20S7 Panel PC
  • KEBA K2-700 AMT9535 Touch Screen Panel
  • KEBA T20e-r00-Am0-C Handheld Terminal
  • KEBA OP350-LD/J-600 Operating Panel
  • KEBA 3HAC028357-001 DSQC 679 IRC5 Teach Pendant
  • KEBA E-32-KIGIN Digital Input Card
  • KEBA FP005 Front Panel
  • KEBA BT081 2064A-0 Module
  • KEBA FP-005-LC / FP-004-LC Front Panel
  • KEBA SI232 Serial Interface
  • KEBA T70-M00-AA0-LE KeTop Teach Pendant
  • KEBA KEMRO-BUS-8 Bus Module
  • KEBA IT-10095 Interface Terminal
  • KEBA RFG-150AWT Power Supply Unit
  • KEBA C55-200-BU0-W Control Unit
  • KEBA Tt100-MV1 Temperature Module
  • KEBA E-HSI-RS232 D1714C / D1714B Interface Module
  • KEBA E-HSI-CL D1713D Interface Module
  • KEBA D1321F-1 Input Module
  • KEBA E-32-D Digital Input Card
  • KEBA C5 DM570 Digital Module
  • KEBA XE020 71088 Module
  • KEBA E-16-DIGOUT Digital Output Card