2. Obtain environmental impact assessment approval
According to the relevant provisions on environmental impact assessment of construction projects, environmental impact reports shall be prepared for mine projects that may have a significant impact on the environment; For mines that may have a slight impact on the environment, an environmental impact report form shall be prepared. The construction unit shall, before starting construction, submit the environmental impact report and the environmental impact report form to the competent environmental protection administrative department with the power of examination and approval, and obtain the approval documents from the competent environmental protection administrative department.
3. Carry out geological hazard assessment
According to the relevant provisions on the prevention and control of geological disasters, in the feasibility stage of a mine project, a unit with appropriate qualifications shall be entrusted to carry out geological disaster risk assessment; After the geological disaster risk assessment report is reviewed by the expert group, the assessment unit shall file with the land and resources administrative department within one month. In 2014, the former Ministry of Land and Resources decided to cancel the geological disaster risk assessment filing system, and geological disaster risk assessment, as a mandatory assessment involving safety, is a prerequisite for construction units to handle land use procedures and other matters.
4. Complete the energy-saving review
Energy conservation review refers to the behavior of investment authorities to review the energy conservation of construction projects and form review opinions in accordance with energy conservation laws, regulations, policies and standards. The construction unit shall prepare a report on energy conservation of fixed assets investment projects and submit it to the competent investment department for examination. After accepting the energy conservation report, the competent investment department shall issue energy conservation review opinions within the time limit prescribed by law.
5. Obtain approval for water intake permit
Only when a construction project has obtained the approval document for the application for a water intake permit can the applicant construct any water intake project or facility. The applicant shall prepare a water resources demonstration report for the construction project, and the competent administrative organ shall organize relevant experts to review the water resources demonstration report for the construction project and submit written review opinions as the technical basis for examining and approving the application for water drawing. After accepting the application for water drawing by the construction unit, the competent administrative organ shall conduct a comprehensive review of the application materials for water drawing and decide whether to approve the application for water drawing after taking into account the impact that water drawing may have on the conservation and protection of water resources and economic and social development.
6. Obtain soil and water conservation program approval
Construction units shall, in accordance with the Provisions on the Administration of Compilation, Examination and Approval of Water and Soil Conservation Plans for Development and Construction Projects and other requirements, work out water and soil conservation plans and submit them to the competent administrative department for examination and approval. After accepting the application, the competent administrative department shall organize the examination in accordance with the relevant laws, regulations and technical norms, or entrust the relevant institution to carry out the technical review and make a decision on the examination.
7. Completed preliminary design preparation and review
The mining project construction unit shall entrust the design unit with the corresponding engineering design qualification to prepare the preliminary design. The design unit shall, in strict accordance with laws and regulations, safety regulations, technical specifications, industry standards and relevant provisions, prepare the outline and organize the design content with reference to the relevant preliminary design. Upon completion of the preliminary design, the examination authority shall examine the preliminary design in accordance with the law and relevant provisions.
8. Completed the project safety pre-evaluation and safety facility design review
During the feasibility study of a mine project, the construction unit shall entrust a safety evaluation institution with corresponding qualifications to conduct a safety pre-evaluation on its construction project in accordance with the prescribed standards and procedures, and prepare a safety pre-evaluation report.
When compiling the preliminary design of a mine project, a design unit with corresponding qualifications shall be entrusted to simultaneously design the safety facilities of the construction project and compile the safety facilities design. After the completion of the design of safety facilities, the construction unit shall submit an application for review to the department of production safety supervision and administration, and the department of production safety supervision and administration shall make an approval decision after review in accordance with law.
email:1583694102@qq.com