Mining enterprise compliance management practice points seven: project construction compliance

来源: | 作者:佚名 | 发布时间 :2023-11-27 | 642 次浏览: | 🔊 Click to read aloud ❚❚ | Share:

2. Obtain environmental impact assessment approval

According to the relevant provisions on environmental impact assessment of construction projects, environmental impact reports shall be prepared for mine projects that may have a significant impact on the environment; For mines that may have a slight impact on the environment, an environmental impact report form shall be prepared. The construction unit shall, before starting construction, submit the environmental impact report and the environmental impact report form to the competent environmental protection administrative department with the power of examination and approval, and obtain the approval documents from the competent environmental protection administrative department.

3. Carry out geological hazard assessment

According to the relevant provisions on the prevention and control of geological disasters, in the feasibility stage of a mine project, a unit with appropriate qualifications shall be entrusted to carry out geological disaster risk assessment; After the geological disaster risk assessment report is reviewed by the expert group, the assessment unit shall file with the land and resources administrative department within one month. In 2014, the former Ministry of Land and Resources decided to cancel the geological disaster risk assessment filing system, and geological disaster risk assessment, as a mandatory assessment involving safety, is a prerequisite for construction units to handle land use procedures and other matters.

4. Complete the energy-saving review

Energy conservation review refers to the behavior of investment authorities to review the energy conservation of construction projects and form review opinions in accordance with energy conservation laws, regulations, policies and standards. The construction unit shall prepare a report on energy conservation of fixed assets investment projects and submit it to the competent investment department for examination. After accepting the energy conservation report, the competent investment department shall issue energy conservation review opinions within the time limit prescribed by law.

5. Obtain approval for water intake permit

Only when a construction project has obtained the approval document for the application for a water intake permit can the applicant construct any water intake project or facility. The applicant shall prepare a water resources demonstration report for the construction project, and the competent administrative organ shall organize relevant experts to review the water resources demonstration report for the construction project and submit written review opinions as the technical basis for examining and approving the application for water drawing. After accepting the application for water drawing by the construction unit, the competent administrative organ shall conduct a comprehensive review of the application materials for water drawing and decide whether to approve the application for water drawing after taking into account the impact that water drawing may have on the conservation and protection of water resources and economic and social development.

6. Obtain soil and water conservation program approval

Construction units shall, in accordance with the Provisions on the Administration of Compilation, Examination and Approval of Water and Soil Conservation Plans for Development and Construction Projects and other requirements, work out water and soil conservation plans and submit them to the competent administrative department for examination and approval. After accepting the application, the competent administrative department shall organize the examination in accordance with the relevant laws, regulations and technical norms, or entrust the relevant institution to carry out the technical review and make a decision on the examination.

7. Completed preliminary design preparation and review

The mining project construction unit shall entrust the design unit with the corresponding engineering design qualification to prepare the preliminary design. The design unit shall, in strict accordance with laws and regulations, safety regulations, technical specifications, industry standards and relevant provisions, prepare the outline and organize the design content with reference to the relevant preliminary design. Upon completion of the preliminary design, the examination authority shall examine the preliminary design in accordance with the law and relevant provisions.

8. Completed the project safety pre-evaluation and safety facility design review

During the feasibility study of a mine project, the construction unit shall entrust a safety evaluation institution with corresponding qualifications to conduct a safety pre-evaluation on its construction project in accordance with the prescribed standards and procedures, and prepare a safety pre-evaluation report.

When compiling the preliminary design of a mine project, a design unit with corresponding qualifications shall be entrusted to simultaneously design the safety facilities of the construction project and compile the safety facilities design. After the completion of the design of safety facilities, the construction unit shall submit an application for review to the department of production safety supervision and administration, and the department of production safety supervision and administration shall make an approval decision after review in accordance with law.

  • OEMAX NX-CPU700P PLC Controller
  • OEMAX NX-BASE10 PLC Backplane
  • OEMAX NX-AO4C 4-Channel Analog Output Module
  • OEMAX NX-AI8C 8-Channel Analog Input Module
  • OMACO GF0-57CQD-002 Industrial Control Module Precision Automation
  • OPTIMATE OP-620 Industrial Automation Control Module
  • OPTIMATE OM1510 Industrial Control Module Performance Solution
  • OPTO 22 SNAP-IDC5D Digital Input Module for Automation
  • OPTO 22 SNAP-AITM-2 Thermocouple Module
  • ORIENTAL A4722-9215KM Cooling Fan
  • ORIENTAL MOTOR 2GK180K Gearhead Specifications
  • OSRAM DULUX L 36W 840 865 Lamp Specification
  • OTHER FLASH SERIES 2 Memory Module Data
  • OVATION 1X00458H01 Control Module Specification
  • Emerson Ovation 1C31157G02 Event Sequence Module
  • Emerson Ovation 5X00070G04 Analog Input Module
  • OXIDE 0020-31655 Industrial Controller
  • ABB FAU810 C87-11006 / C10-12010 Flame Analyzer
  • Pilz PSSu E F 4DI Safety Input Module
  • Pepperl+Fuchs KFD2-UFC-1.D Frequency Converter
  • Pacific Scientific VDE0530-S1 Stepper Motor
  • Pacific Scientific 6410-001-N-N-N Stepper Drive
  • PACIFIC LA23GCKC-1Y Servo Motor Reliable Automation Motion Solution
  • PACIFIC LA23GCKX-P500A Servo Motor Advanced Industrial Motion Control
  • PACIFIC LA23GCKC-P500A High Precision Servo Motor for Industrial Automation
  • Pacific Scientific E32NCHA-LNN-NS-00 Hybrid Stepper Motor
  • Pacific Scientific SCE903A3-002-01 Servo Drive
  • Pacific Scientific 6410-024-N-N-N Stepper Motor Drive
  • PALCLEAN JD-BXG Industrial Control Module
  • Panametrics 704-673-20 Ultrasonic Flow Meter
  • Panasonic MSD043A1XX AC Servo Driver
  • Panasonic KX-FT936CN Plain Paper Fax Machine
  • Panasonic DL-1109CWS Electric Bidet Toilet Seat
  • PACIFIC SCIENTIFIC 33VM52-000-29 LDA-196-1000CE Servo Motor Controller
  • PACIFIC LA23GCKC-1G Linear Actuator Specifications
  • PACIFIC PC3406AI-001-E Stepper Controller Manual
  • PACIFIC SCE904AN-002-01 Servo Drive Analysis
  • PACIFIC 6445-001-K-N Digital Servo Drive Details
  • PACIFIC SCIENTIFIC R43HCNA-R2-NS-VS-00 Motor Data
  • Pacific Scientific H32NCHA-LNN-NS-00 Hybrid Motor Performance
  • ABB DSAI130DK01 3BSE020828R1 Analog Input Module
  • Parker 466966-0001-3820 Industrial Component Data
  • PARKER ZETA6104 Microstepping System
  • PARKER COMPAX 2500S/F3 Servo Drive Manual Details
  • PARKER CX-DH Indexer Drive Technical Specifications
  • PARKER 6K8 Motion Controller Features and Specifications
  • PARKER EVM32-BASE I/O Module Base Technical Specification
  • ABB Pb PN-112718 Digital Input Module
  • Pb PN-45734 PN-73899 Industrial Automation Module
  • Control Techniques Pb PN-40856 Industrial Control Module
  • Pb PN-104412 4002910956 Industrial Control Module
  • Siemens Pb PN-41513 Industrial Ethernet Module
  • Pelco PA30-0065-00-A1 PTZ Decoder Module
  • Pentek FILTER 3F11 800000919 Pleated Filter Cartridge
  • Pepperl+Fuchs RSD-TI-EX8 Temperature Input Module
  • PERITEK AC7-00712-1113 Industrial Interface Module
  • PFEIFFER EVR116 Vacuum Control Module
  • Pepperl+Fuchs RSD-CI-EX8 Hazardous Area Interface Module
  • PEPPERL+FUCHS 2108HAT Intrinsic Safety Barrier Module
  • Philips 958481320201 PROC+ Processing Unit
  • Philips 958481321300 PSB Power Supply Board
  • Philips 958481321220 PD208 Power Module
  • PHILIPS 958481321200 PD216 Control Module
  • PHILIPS 958481320201 PROC PLUS Control Module
  • Philips 958481320400 PIF Interface Module
  • Philips 958481320100 LCB Control Board
  • PHILIPS 958481223220 Industrial Control Module
  • PHILIPS 958481223223 Industrial Control Module
  • PHILIPS 958481321300 Industrial Control Module
  • PHILIPS SCM040 Digital Output Synchronization Module
  • PHILIPS DSI020 Data Storage Interface Module
  • PHILIPS OPM010 Optoelectronic Control Module
  • PHILIPS VBM010 Industrial Automation Module
  • PHILIPS VBM030 Turbine Supervisory Instrumentation
  • PHILIPS PR1613 Industrial Control Module
  • PHOENIX PATG1/23 1013847 Ground Terminal Block
  • Phoenix Contact IB ST 24 AI 4/SF Analog Input
  • Phoenix Contact OPC5315-004-AB Industrial PC
  • Phoenix Contact UMK-SE11.25-1 Side Element
  • PHOENIX 2961192 Relay Module
  • PHOENIX IB ST ZF 24 AI 4/SF Analog Input Module
  • Phoenix Contact PLC-BSC-24DC/21 Relay Base
  • Phoenix Contact UK6N Feed-Through Terminal Block
  • Phoenix Contact UK4-T Disconnect Terminal Block
  • Phoenix UK3N Screw Terminal Block
  • Phoenix QUINT-PS-100-240AC/10 Power Supply
  • Phoenix QUINT PS-100-240AC/24DC/10 Power Supply
  • Phoenix UT 6-HE SI Surge Protection Terminal Block
  • Phoenix UT 4-MTD Feed-through Terminal Block
  • Phoenix UT 4-HE SI Surge Protection Terminal Block
  • Phoenix IBS 24BK-I/O-T Bus Coupler
  • Phoenix Contact HDFK4 High-Current Terminal Block
  • PHOENIX ST-SI-UK4 Fuse Terminal Block
  • PHOENIX FLMC10BASE-T/FO G850 Fiber Media Converter
  • PHOENIX CONTACT QUINT-PS-100-240AC/24DC/40 Power Supply
  • PHOENIX CONTACT QUINT-DIODE/40 Redundancy Module
  • Phoenix Contact 2884208 Wireless I/O MUX
  • Photonetics 3646 HE 1540 Tunable Laser Source
  • PI C-663.12 Mercury Multi-Axis Step Motor Controller
  • PI C-663.10 Mercury Step Motor Controller
  • Pillar CB6687-2L Industrial Communication Board
  • Pilz DE-106712 A.F.051.5/01 Safety Module
  • Pilz 680003 Safety Relay Module Set
  • Pilz 301140 PNOZ X3 Safety Relay
  • Pilz P1U-1NB Safety Relay
  • Pioneer PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3326B-6-1-2-E Power Supply
  • Pioneer Magnetics HYRSP-1500-56 Power Supply
  • Pioneer Magnetics PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3328BP-6 Power Supply
  • Potter & Brumfield SDAS-01-7Y2S1024 Relay
  • Powec PMP10.48 SIC High-Efficiency Rectifier
  • Powerbox PU200-31C Industrial DC-DC Converter
  • PIONEER MAGNETICS PM3398BP-6-1-3-E Power Supply Module
  • PIONEER MAGNETICS PM1253AL-6-3-Z03 Power Supply Module
  • Powerex PD411811 Rectifier Diode Module
  • Power-One MAP55-1024 AC-DC Power Supply
  • ProSoft MVI56-MDA4 ControlLogix Multi-Protocol
  • POLYSPED PRD2-200 Industrial Drive Module
  • P-OPEN P-OPEN-P4-150 PAC-OP150 Operator Panel
  • ABB Processor 958481321210 350211080320 Rugged CPU
  • ABB Processor 958481320201 350211080460 Safety CPU
  • ABB Processor 958481321200 350211080320 CPU Module
  • ABB Processor 958481321220 350211080320 CPU Module
  • ABB Processor 958481320100 350211080090 CPU Module
  • Pro-Face PL5901-T42-24V HMI Touch Panel
  • PROFIBUS PB3-VME-1-E V1.2.2 Interface Card
  • PROMESS 850040060P Force Displacement Monitor