Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

How to make abandoned mines green mountains and rivers?

来源: | 作者:佚名 | 发布时间 :2023-11-28 | 303 次浏览: | Share:

I. Background of mine ecological restoration

1. National policy

Party and state leaders attach great importance to the protection of geological environment in mines, and have repeatedly made important instructions on the protection of geological environment in mines.    On October 30, 2022, the Yellow River Protection Law of the People's Republic of China further clarified the responsibility of mine pollution prevention and ecological restoration, and put forward the requirements for mine restoration.

The report of the 19th National Congress of the Communist Party of China elevated the construction of ecological civilization to a "millennium project." The report clearly points out that "building an ecological civilization is a major plan for the sustainable development of the Chinese nation." More than 30 years of sustained and rapid economic growth has brought great pressure on resources and the environment. Alleviating this pressure is not a short-term success, and continuous efforts are needed. Moreover, resource conservation and ecological environment improvement are endless, so it has been upgraded to a millennium project.

The report of the 20th National Congress of the Communist Party of China pointed out that "Chinese-style modernization is the modernization of harmonious coexistence between man and nature", which clarified the strategic task of ecological civilization construction in China's new era, and the overall keynote is to promote green development and promote harmonious coexistence between man and nature. On the basis of fully affirming the achievements of ecological civilization construction, the report comprehensively and systematically expounds the strategic ideas and methods of China's continuous promotion of ecological civilization construction from the perspectives of overall industrial structure adjustment, pollution control, ecological protection, and coping with climate change, and puts forward a series of new viewpoints, new requirements, new directions and new arrangements for future ecological environmental protection.

2. Analysis of current situation

In recent years, with the rapid development of social economy, human production activities have caused more and more damage to the ecological environment. The excavation slope formed in the disorderly mining process of the original mine, the exposed wound formed by the construction of roads and facilities in the mining area, the waste material storage site, and the tailings pond stacked with slag powder have the characteristics of steep slope, hard surface and poor site conditions, and the vegetation damage is serious. Recovery is difficult. High and steep slopes, waste dumps, slag dumps, etc., not only have serious soil erosion, but also have security risks, which are easy to cause natural disasters.

The above human activities have destroyed a large number of surface vegetation, such as scars, seriously affecting the landscape, but also caused great harm to the ecological environment. Vegetation restoration of exposed slope is the key and difficult point of ecological restoration. In the social environment of "gold mountain and silver mountain is not as good as green water and green mountains", which concept to guide ecological restoration is an important link related to the sustainable development of human and nature, and also the fundamental standard to judge whether the ecological restoration technical measures taken are economic and effective.

Second, the way to participate in the ecological restoration of mines

1. EOD mode

Policy basis: "Opinions on Encouraging and Supporting Social Capital to participate in Ecological Protection and Restoration issued by The General Office of the State Council" proposed that social capital can adopt the way of "ecological protection and restoration + industry introduction" and use the right to use natural resource assets or franchise rights to develop appropriate industries.

EOD mode: The eco-environment-oriented development model is based on ecological protection and environmental governance, supported by the operation of characteristic industries, regional comprehensive development as the carrier, and adopts industrial chain extension, joint operation, combination development and other methods to promote the effective integration of ecological environmental governance projects with strong public welfare and poor profitability and related industries with good returns, and coordinated promotion and integrated implementation. Internalizing the economic value brought by ecological environment governance is an innovative way of project organization and implementation.

2. The government directly initiated projects for restoration

Policy basis: The Guiding Opinions on Strengthening the Restoration and Comprehensive Management of Mining geological environment clearly define the responsibility of mining geological environment management, and the mine geological environment problems left over from the planned economy period or the loss of responsible persons are historical problems left over by local governments at all levels to plan and restore.

Channels to apply for national funds:

According to the Notice of the General Office of the Ministry of Finance and the General Office of Natural Resources on Supporting the Ecological Restoration Demonstration Project of Historical Abandoned Mines

Operating points:

(1) Each province selects the best projects to declare. Each province shall declare no more than 2 projects, and the total investment of each project shall not be less than 500 million yuan, and the implementation period shall be 3 years;

(2) The declared project area shall belong to the historical abandoned mines under the responsibility of government governance, and the single or relatively concentrated contiguent area of the mine shall not be less than 10 square kilometers in principle.

(3) The project management mainly includes the elimination of geological safety hazards, terrain remodeling, vegetation restoration, reclamation and utilization of abandoned land, etc.

(4) The ecological restoration demonstration project of historical abandoned mines shall be approved by the provincial government and jointly submitted to the Ministry of Finance and the Ministry of Natural Resources by the provincial finance and natural resources departments.

(5) The application documents shall be attached with the project implementation plan, the performance target declaration form of the central government's special transfer payment project, the plan map, and the map spot data of the historical abandoned mines in the project area.

3. Land index replacement and restoration

Policy basis: Opinions on Exploring the use of market-oriented ways to Promote ecological restoration in Mines, Opinions on Encouraging and supporting Social capital to participate in ecological protection and restoration.

Operating points:

(1) For the restoration of mine stock and abandoned construction land into cultivated land, "referring to the policy of linking urban and rural construction land increase and decrease, the index of vacated construction land can be transferred and used within the province." Index transferers are not subject to the restrictions of poverty-stricken areas and counties.

(2) Mining enterprises engaged in restoration, construction land restoration for agricultural land can be used for the balance of occupation and compensation of the same type of land occupied by its mining activities, construction land restoration for business construction land, after paying the transfer fee can obtain its right to use.

(3) After the social capital restores the construction land in the restoration area to agricultural land and passes the acceptance, the vacated construction land index can be prioritized for the development of related industries, and the saving index can be transferred and used within the province in accordance with the policy of linking the increase and decrease of urban and rural construction land. If the main body of ecological protection and restoration restores the stock construction land obtained by itself into agricultural land, the construction land index vacated can be used for the agricultural land of the same type occupied by it within the province after the experience is qualified.

4. Use abandoned resources to restore

Policy basis: Opinions on Exploring the Use of market-oriented ways to Promote Ecological Restoration in Mines, Opinions on Encouraging and Supporting Social Capital to participate in Ecological Protection and Restoration

Operating points:

(1) For the waste soil and stone generated in the process of mine restoration, it can be included in the county-level public resources trading platform for external sales, and the sales proceeds are all used for regional ecological restoration to ensure the reasonable income of social investment subjects.

(2) In accordance with the ecological protection and restoration plan and its engineering design, the newly generated earth and stone materials such as reasonable slope cutting and load reduction, elimination of geological hazards, soil and stone materials left in place, silt and sediment generated by river dredging, as well as high-quality topsoil and native plants are allowed to be used by ecological protection and restoration subjects free of charge for this restoration project and included in cost management; If there is any surplus, it will be disposed of by local governments at or above the county level relying on the public resource trading platform system, and ensure reasonable benefits for ecological protection and restoration subjects.

Focus: Resource disposal rights

5. Industrial development and restoration

Policy basis: Opinions on Exploring the Use of market-oriented ways to Promote Ecological Restoration in Mines, Opinions on Encouraging and Supporting Social Capital to participate in Ecological Protection and Restoration

Source of funds: land development income

Operating points:

(1) The main bodies of ecological protection and restoration that have achieved a certain scale and expected goals in centralized contiguity of ecological restoration are allowed to obtain a certain share of the right to use natural resource assets in accordance with law and regulations, and engage in the development of tourism, health care, sports, facility agriculture and other industries; Among them, projects focusing on the restoration of forest and grass land can use no more than 3% of the restoration area to engage in ecological industry development.

(2) Implement the strictest cultivated land protection system, resolutely observe the red line of cultivated land, and resolutely curb the "non-agricultural" and "non-grain" cultivation of cultivated land. After the completion of the project, the land use shall be uniformly adjusted through the annual land change survey, and the real estate registration agency shall handle the relevant real estate registration according to the land use adjustment documents.

(3) Study and formulate relevant rules for ecosystem carbon sink projects to participate in national carbon emission rights trading, and gradually increase the ecosystem carbon sink trading volume.

(4) Guide social capital to scientifically prepare simple forest management plans, and enterprises with a certain scale of operation can independently prepare forest cutting quotas, and can independently cut trees according to laws and regulations upon examination and approval; Cutting down economic forest, energy forest, bamboo forest and non-forest trees.

National Reserve Forest Construction Plan (2018-2035) : China will build 20 million hectares of national reserve forest. We will promote new financing models such as "forest rights mortgage + government credit increase", PPP, "leading enterprises + forestry cooperatives + forest farmers", and enterprise independent management.

(5) Give full play to the driving role of government input, explore the introduction of social capital through PPP and other models to carry out ecological protection and restoration, and eligible people can enjoy corresponding preferential tax policies such as environmental protection, energy conservation and water saving according to regulations. Public welfare forests invested by social capital, which meet the conditions and are included in the zoning of public welfare forests according to regulations, can equally enjoy the relevant government subsidy policies. Support financial institutions to participate in ecological protection and restoration projects, broaden investment and financing channels, optimize credit evaluation methods, actively develop suitable financial products, and provide medium - and long-term financial support for projects in accordance with market-oriented principles.

Third, the impact of mining on ecological environment

1. Geomorphic landscape damage: mining damage the mountain terrain, damage the geomorphic landscape;

2. Destruction of land and soil resources: surface excavation, occupation, land destruction;

3. Mining geological disasters: the subsidence, collapse and collapse of the mining surface lead to landslide, debris flow and other secondary geological disasters;

4. Mine water, soil and air pollution: air, water environment, soil environment, noise, solid waste pollution;

5. Destruction of mine water resources: underground mining causes drainage of mine water and damages underground water system;

6. Destruction of mine biological resources: destruction and change of wildlife habitat environment, so that biodiversity is destroyed.


  • FOXBORO P0926KK PLC system functional module
  • FOXBORO P0924AW wireless pressure transmitter
  • FOXBORO P0916NK differential pressure transmission cable
  • FOXBORO P0916JQ PLC module
  • FOXBORO P0916JP I/A series control module
  • FOXBORO P0916GG Digital Input Module
  • FOXBORO P0916DV I/A series digital input module
  • FOXBORO P0916DC Terminal Cable
  • FOXBORO P0916DB I/A series PLC module
  • FOXBORO P0914ZM recognition module
  • FOXBORO P0902YU control module
  • FOXBORO P0901XT Process Control Unit
  • FOXBORO P0800DV fieldbus extension cable
  • FOXBORO P0800DG Standard Communication Protocol Module
  • FOXBORO P0800DB Universal I/O Module
  • FOXBORO P0800DA Industrial Control Module
  • FOXBORO P0800CE control module
  • FOXBORO P0700TT Embedded System
  • FOXBORO P0500WX Control System Module
  • FOXBORO P0500RY Terminal Cable Assembly
  • FOXBORO P0500RU control module
  • FOXBORO P0500RG Terminal Cable
  • FOXBORO P0400ZG Node Bus NBI Interface Module
  • FOXBORO P0400GH fieldbus power module
  • FOXBORO FBM207B Voltage Monitoring/Contact Induction Input Module
  • FOXBORO FBM205 Input/Output Interface Module
  • FOXBORO FBM18 Industrial Controller Module
  • FOXBORO FBM12 Input/Output Module
  • FOXBORO FBM10 Modular Control System
  • FOXBORO FBM07 Analog/Digital Interface Module
  • FOXBORO FBM05 redundant analog input module
  • FOXBORO FBM02 thermocouple/MV input module
  • FOXBORO FBI10E fieldbus isolator
  • FOXBORO DNBT P0971WV Dual Node Bus Module
  • FOXBORO CP30 Control Processor
  • FOXBORO CM902WX Communication Processor
  • FOXBORO AD202MW Analog Output Module
  • FOXBORO 14A-FR Configuration and Process Integration Module
  • FOXOBORO 130K-N4-LLPF Controller
  • FUJI FVR004G5B-2 Variable Frequency Drive
  • FUJI FVR008E7S-2 High Efficiency Industrial Inverter
  • FUJI FVR008E7S-2UX AC driver module
  • FUJI RPXD2150-1T Voltage Regulator
  • FUJI NP1PU-048E Programmable Logic Control Module
  • FUJI NP1S-22 power module
  • FUJI NP1AYH4I-MR PLC module/rack
  • FUJI NP1BS-06/08 Programmable Controller
  • FUJI NP1X3206-A Digital Input Module
  • FUJI NP1Y16R-08 Digital Output Module
  • FUJI NP1Y32T09P1 high-speed output module
  • FUJI NP1BS-08 Base Plate​
  • FUJI A50L-2001-0232 power module
  • FUJI A50L-001-0266 # N Programmable Logic Control Module
  • GE GALIL DMC9940 Advanced Motion Controller
  • GE DMC-9940 Industrial Motion Control Card
  • GE IS200AEADH4A 109W3660P001 Input Terminal Board
  • GE IC660HHM501 Portable Genius I/O Diagnostic Display
  • GE VMIVME 4140-000 Analog Output Board
  • GE VMIVME 2540-300 Intelligent Counter
  • GE F650NFLF2G5HIP6E repeater
  • GE QPJ-SBR-201 Circuit Breaker Module
  • GE IC200CHS022E Compact I/O Carrier Module
  • GE IC695PSD140A Input Power Module
  • GE IC695CHS016-CA Backboard
  • GE IC800SS1228R02-CE Motor Controller
  • GE IS215WEMAH1A Input/Output Communication Terminal Board
  • GE CK12BE300 24-28V AC/DC Contactor
  • GE CK11CE300 contactor
  • GE DS3800NB1F1B1A Control Module
  • GE VMIVME2540 Intelligent Counter
  • GE 369B1859G0022 High Performance Turbine Control Module
  • GE VME7865RC V7865-23003 350-930007865-230003 M AC contactor
  • GE SR489-P5-H1-A20 Protection Relay
  • GE IS200AEPGG1AAA Drive Control Module
  • GE IS215UCCCM04A Compact PCI Controller Board
  • GE VME7768-320000 Single Board Computer
  • GE SR489-P5-LO-A1 Generator Protection Relay
  • GE IS215WETAH1BB IS200WETAH1AGC Input/Output Interface Module
  • GE D20 EME210BASE-T Ethernet Module
  • GE IS200EXHSG3REC high-speed synchronous input module
  • GE IS200ECTBG1ADE exciter contact terminal board
  • GE VPROH2B IS215VPROH2BC turbine protection board
  • GE F650BFBF2G0HIE feeder protection relay
  • GE SLN042 IC086SLN042-A port unmanaged switch
  • GE SR489-P1-HI-A20-E Generator Management Relay
  • GE IS400JPDHG1ABB IS410JPDHG1A track module
  • GE IS410STAIS2A IS400STAIS2AED Industrial Control Module
  • GE IS410STCIS2A IS400STCIS2AFF Industrial Control Module
  • GE DS200DCFBG2BNC DS200DCFBG1BNC DC Feedback Board
  • GE VME5565 VMIVME-5565-11000 332-015565-110000 P Reflective Memory
  • GE VMIVME-7807 VMIVMME-01787-414001 350-00010078007-414001 D module
  • GE IS220PDOAH1A 336A4940CSP2 Discrete Output Module
  • GE VMIVME-4150 Analog Output Module
  • GE WESDAC D20 PS Industrial Power Module
  • GE 369B1860G0031 servo drive module
  • GE 369B1859G0021 Input/Output Module
  • GE 208D9845P0008 Motor Management Relay
  • GE IS420UCSCH1A-F.V0.1-A Independent Turbine Controller
  • GE D20EME10BASE-T 820-0474 Ethernet Interface Module
  • GE DS200DCFBG2BNC MRP445970 DC Feedback Board
  • GE IC800SSI228RD2-EE servo motor controller
  • GE IS200JPDMG1ACC S1AT005 Digital Input/Output (I/O) Module
  • GE IS200TSVCH1AED servo input/output terminal board
  • GE IS200TTURH1CCC S1DF00Z Terminal Turbine Plate
  • GE IS200TSVCH1ADC S1CX01H servo input-output board
  • GE IS200TRPGH1BDD S1C5029 Trip Solenoid Valve Control Board
  • GE IS220YAICS1A L Analog Input/Output Module
  • GE UCSC H1 IS420UCSCH1A-F-VO.1-A Controller Module
  • GE UCSC H1 IS420UCSCH1A-B Communication Processing Module
  • GE IC697VDD100 Digital Input Module
  • GE V7768-320000 3509301007768-320000A0 Controller Module
  • GE IS410TRLYS1B Relay Output Module
  • GE IS415UCVGH1A V7666-111000 VME Control Card
  • GE IC800SSI216RD2-CE servo motor controller
  • GE VMIVME-5565-010000 332-01565-010000P Reflective Memory
  • GE IC695ALG508-AA Analog Input Module
  • GE IC660EPM100J Power Monitoring and Control Module
  • GE RS-FS-9001 362A1052P004 Redundant Fan System Module
  • GE IS220UCSAH1AK independent processor module
  • GE 369-HI-0-M-0-0-0-E Motor Management Relay
  • GE CIFX50-C0 interface board
  • GE SR469-P5-H-A20-T Motor Management Relay
  • GE WES5120 2340-21005 power module
  • GE WES5120 2340-21003 Control Module
  • GE D20MIC10BASE-T 820-0756 Ethernet Module
  • GE WES13-3 5167-001-0210 Mechanical Relay Output Module
  • GE WES13-3 2508-21001 Control Board Module
  • GE D20ME 526-2005-216943 Input/Output Module