Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Crack the "difficult to find pile", our country to layout new energy vehicle charging infrastructure

F: | Au:佚名 | DA:2023-12-05 | 269 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Charging infrastructure provides charging and replacing services for electric vehicles, which is an important transportation and energy integration infrastructure. At present, China's new energy vehicle market is booming, but there are still problems such as imperfect layout, unreasonable structure, unbalanced service, and inadequate operation of charging infrastructure.

In order to strengthen the construction of charging infrastructure, further release the consumption potential of new energy vehicles, and better support the development of the new energy vehicle industry, The General Office of the State Council issued the Guiding Opinions on Further Building a High-quality Charging Infrastructure System not long ago, and strengthened the layout of new energy vehicle charging infrastructure.

How is the current development and construction of China's charging infrastructure?

With the development of many years, China's new energy vehicles have entered a new stage of large-scale rapid development, and have built a charging infrastructure system with the largest number, the largest service scope and the most complete variety in the world.

Data show that from 2015 to 2022, the number of charging infrastructure in China increased from less than 100,000 units to 5.21 million units, an average annual growth of more than 700,000 units. As of the end of May this year, the scale of charging infrastructure has reached 6.356 million units. In terms of user attributes, public charging piles account for about 33% and private charging piles account for about 67%. The coverage rate of public charging pile facilities in the central urban areas of first-tier cities exceeds 80%, and 65% of the country's highway service areas have charging conditions.

Ou Hong, deputy secretary-general of the National Development and Reform Commission, said that on this basis, the opinions put forward the overall goal of China's charging infrastructure development, that is, by 2030, the basic construction of a high-quality charging infrastructure system with extensive coverage, moderate scale, reasonable structure and perfect functions, effectively support the development of the new energy automobile industry, and effectively meet the people's travel charging needs.

In terms of network coverage, a charging network with urban plane, highway line and rural point-like layout should be built. In large and medium-sized cities above, the proportion of operating parking lots with standardized charging conditions should strive to exceed the proportion of urban registered electric vehicles, and the coverage rate of charging services in rural areas has steadily increased. In terms of functional services, the charging infrastructure is complementary, intelligent and open, the charging service is safe and reliable, economic and convenient, the standards and norms and market supervision system are basically improved, the industry supervision and governance capabilities are basically modernized, and the technical equipment and scientific and technological innovation have reached the world advanced level.

"Find pile difficult" "into the community difficult" "road charging difficult" how to break?

At present, many new energy vehicle owners have mileage anxiety, and generally encounter a series of problems such as difficult to find a charging pile, difficult to charge the charging pile into the community, and difficult to charge on the highway, which have put forward targeted solutions.

In response to the "difficulty in finding piles", the opinions put forward, on the one hand, strengthen the coverage of charging infrastructure network, build a well-structured urban charging network, focusing on residential areas, office areas, business centers, industrial centers, leisure centers; On the other hand, the information network platform with full access to all kinds of charging infrastructure should be built.

In view of the "difficult to enter the community", the opinions specifically proposed to actively promote the construction of residential charging infrastructure: in the installation of facilities, it is required to accelerate the installation of fixed parking space charging infrastructure in the existing residential areas, and strictly implement the requirements for the allocation of charging infrastructure in the new residential areas; In terms of coordination mechanism, the city is required to speed up the development of residential charging infrastructure construction management guidelines, optimize facility construction support policies and management procedures; In terms of service guarantee, charging operation enterprises are encouraged to accept the commissioning of owners and provide unified charging infrastructure construction, operation, maintenance and other services.

In response to the "road charging is difficult", three measures are proposed: to build a convenient and efficient intercity charging network, and to speed up the shortcomings of the charging infrastructure of the road network between key cities; Strengthen the charging service of the expressway service area, requiring that the new expressway service area should simultaneously build the charging infrastructure, and accelerate the transformation of the charging infrastructure of the existing expressway service area; Build an interconnected charging network in urban agglomerations metropolitan areas, strengthen unified planning and collaborative construction of charging infrastructure, and improve the accessibility of electric vehicles in urban agglomerations, metropolitan areas and key cities.

  • Omron NS12-TS01B-V2 Touch Screen HMI
  • Mitsubishi FX3GE-24MT/ESS PLC Controller
  • Grundig NEA02 AES 0 PLC I O Module
  • Beckhoff EP3204-0002 EtherCAT Box Module
  • Mitsubishi MDS-A-CV-220 Power Supply Unit
  • MCX20B2 080G0330 Motion Controller
  • Toyo Keiki P CARD5 Interface Board YH-212
  • National Instruments NI 9242 Analog Input Module
  • B&R 3AM055.6 PLC Module
  • Omron CJ1W-ETN21 Ethernet Module PLC
  • Allen-Bradley 2711P-T15C4A7 PanelView Plus 1500 Guide
  • Pilz 777602 Safety Module XV1P Specifications
  • NI cFP-2220 and cFP Modules Technical Guide
  • Keyence XG-EC80 Camera Input Unit Overview
  • Dynatronix CRS9-10 DC Power Supply Manual
  • Omron G3PW-A220EC-S-FLK Power Controller Manual
  • EVO SP SYSTEM PLC Control Panel Overview
  • B&R X20IF10G3-1 Interface Module Specifications
  • NL8060BC21-11 Industrial LCD Screen Specification
  • SK-G9-FAN1-F6 Cooling Fan Technical Specifications
  • US Drives 3000-4220-4-4 PLC Add-on Module
  • Allen-Bradley 2002-NX70-HSC4 High-Speed Counter
  • Schneider TM258LF42DR PLC Controller
  • Harris 8800-00002-02 PLC Power Control Center
  • NLT NL8060BC21-11C 8.4 LCD Panel
  • ABB PLUTO S20 V2 CFS Safety PLC
  • Omron NS12-TS00B-V2 NS12-TS00B-ECV2 HMI
  • 7-29 10 00 A PLC Expansion Module
  • B&R X20DC2395 PLC Module
  • Omron NE1A-SCPU02 Network Controller
  • GE IC200UEX624-C VersaMax Micro PLC
  • Rexroth GIV50-11 Position Limit Switch Assembly
  • B&R X20SLX410 Safety Logic Module
  • Omron CJ1W-NC433 Position Control Unit
  • Inovance AM600-CPU1608TP PLC Controller
  • ABB Pluto S20 V2 CFS Safety PLC
  • Omron CJ1W-NC113 Position Control Unit
  • Grundig NEA02 AES 0 PLC I O Module
  • Fanuc A16B-2202-0432 Control PCB Board
  • Siemens 6SN1124-1AA00-0DA0 Simodrive LT Module
  • B&R X20AO2632 Analog Output Module Specifications
  • Georges Renault 6159187760 PLC Board Technical Guide
  • IDEC PLC FC6A-D32K3CEE MicroSmart Controller Manual
  • 6ES7226-6BA32-0XB0 Fail-Safe Digital Input Guide
  • Programmable Controller PLC EC20-4040BRA Specification
  • Grundig PLC NEA02 AES 0 I/O Card Specification
  • Seiki POS-M 10-22-01 Card Positioning Board Manual
  • Ormec Systems PMC960 Motion Controller CPU Guide
  • GEFRAN U16-NS 6YC000000000002 PCB Technical Specification
  • ABB SPAJ 140 C Overcurrent Relay Technical Manual
  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board