Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

How do green mines take the next step?

F: | Au:佚名 | DA:2023-12-21 | 947 Br: | 🔊 点击朗读正文 ❚❚ | Share:

 There is less dust, more green, less pollution, and higher resource utilization rate.Behind these visible changes is the awakening of the concept of ecological civilization in the mining industry, and the new green picture of mines is slowly unfolding.

 There are still problems to be solved in the policy mechanism

 When the whole society realizes that green and sustainable development is an inevitable trend and gives a thumbs-up to green mines, the reality is that the number of green mines is less than 10% of the total number of mines in China. This makes people think: why is the construction of green mines still slow? For a long time, there are problems of insufficient positive incentives and weak reverse constraints in the construction of green mines in many places.In order to improve the enthusiasm of enterprises, the Opinions put forward an incentive policy system to increase support for green mines from land use, mineral use, fiscal and taxation, financial credit and other aspects.But due to the lack of relevant supporting documents, it is difficult for local authorities to implement in actual operation, resulting in low enthusiasm of some mining enterprises, especially small and medium-sized mining enterprises. For example, in terms of land use, the construction land needed in the construction of green mines is not guaranteed in priority, and there is a lack of corresponding operation measures for how to better use the land after reclamation and revitalization.In addition, the mining right is tilted towards green mines, which violates the policy requirements of open competition for the transfer of mining right.In terms of restraint mechanism, some provinces have issued relevant policies.For example, Guangdong, Hunan and other places require mines that cannot meet the standards of green mines to rectify within a certain period, and the penalties include temporary suspension of registration, suspension of production rectification and policy closure.But at present, the revision of the Mineral Resources Law has not been completed, and local competent authorities have concerns: without the support of the higher law, relevant policies are easy to trigger administrative litigation.

 Different provinces have different mineral resources endowments and different levels of economic and social development, which also causes uneven construction proportion and level of mines in different regions, different minerals and different scales. Some local competent authorities believe that the current evaluation standard system of green mines should be further improved for these considerations.

 The low degree of inter-departmental coordination, low efficiency and unequal power and responsibility are also an important factor restricting the acceleration of green mines. Some grassroots cadres of the natural resources department reflect that as a multi-department collaborative work, in the process of green mine construction, some departments only participate in meetings and issue documents, but do not make actual contributions.In some places, the problems related to production safety and environmental protection, such as overload, sewage discharge, dust and noise, are under the control of the natural resources department, resulting in passive work and great pressure.In addition, the shortage of funds is also a major problem for many enterprises in the process of green mine construction.Some mining enterprises said that environmental governance, intelligent mine construction and other fields need a large amount of capital investment, and it is difficult to see returns in the short term, making enterprises hard to afford.In addition to objective factors, there are also some small and medium-sized mining enterprises that do not have a deep understanding of the connotation of green mine.Some believe that green mine is simply "greening", do the surface work on the line, the lack of a comprehensive and accurate understanding of the concept of green development, and the implementation of the concept is not thorough.At the same time, the lack of subjective initiative is also one of the reasons for the slow construction of green mine.For example, some mining enterprises do not have a deep understanding of the urgency of green mine construction, do not pay enough attention, and lack the enthusiasm of active construction. There are also some enterprises with inert thinking, once awarded the title of green mine "lying flat", green achievements are difficult to maintain, and even gradually "return to ash".

 Multiple measures to "break the situation" difficulties

 In terms of strengthening the overall leadership, Liaoning set up a special class for promoting the "Green Liaoning" project with the vice governor as the leader, promoting green mines as one of the high-level projects, and including the completion of green mine construction tasks into the annual performance assessment of the municipal governments.

 Kuancheng Manchu Autonomous County, Chengde City, Hebei Province is rich in gold and iron resources, and is a typical mining county.The county set up a leading group for green mine construction with the county party secretary as the leader, set up a green mine construction office, with special personnel, special classes and special responsibilities.In addition, the county has also established a green mine expert resource database, absorbing experts to form a think tank to provide guidance for green mines.At present, more than 80% of the large and medium-sized mines in the county have been built into green mines.

  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series