Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Study on ecological restoration status and treatment countermeasures of abandoned mines left over from history

来源: | 作者:佚名 | 发布时间 :2023-12-27 | 342 次浏览: | Share:

China has about 800,000 mines, of which about 400,000 are in need of restoration due to ecological damage. The "China Mineral Resources Report (2020)" and the "2020 Coal Industry Development Report" pointed out that about 40% of the old problems have not been treated, but the annual control rate of newly damaged land is only about 40%. In the early stage of economic development, the mining development mode is simple and extensive, and the environmental pollution control is not paid enough attention. After the establishment of the Ministry of Land and Resources in 1998, the state level supported the restoration and management of mining geological environment. In 2006, the Ministry of Finance, the Ministry of Land and Resources and the State Environmental Protection Administration jointly issued the Guiding Opinions on Gradually Establishing the Responsibility Mechanism for Mine Environmental Management and Ecological Restoration, which put forward the basic ideas of the deposit system for mine geological environment restoration and management. The difficulty of mine environmental management is the low level of restoration technology and the relative lack of professional personnel.

In order to solve the outstanding problems existing in the process of ecological restoration of mines, national and local policies have been introduced, for example, Notice on carrying out the National Verification Work of Historical Mines, Opinions on Exploring the use of market-oriented methods to promote the ecological restoration of Mines, Notice on Supporting the ecological restoration Demonstration Project of Historical abandoned Mines, Measures for the Implementation and Management of Ecological Restoration of Mines in Shandong Province, Action Plan for Comprehensive Management of Mines in Hebei Province, and on Strengthening the control and protection of mineral development Decision of state environment, etc. According to the overall framework of ecological civilization construction, follow the principle of government-led and market operation, encourage social capital to participate in the ecological restoration and management of mines through concept changes and policy guidance, adopt a systematic, scientific and standardized governance model, improve the ecological restoration capacity of mines, and achieve the ecological restoration goal.

The abandoned mines left over from history destroy the natural landscape, and there are hidden dangers of geological disasters such as landslides and collapses. The environmental pollution caused by mining reduces the local biological population, so it is imperative to restore the ecological management of mines. There are many deficiencies in the main aspects of the restoration system, such as the restoration mechanism, the restoration fund, the restoration mode, the restoration project, and the restoration technology, which lead to the low quality and slow speed of the restoration. Therefore, summarizing the problems of the mine ecological restoration and putting forward targeted measures and suggestions are conducive to forming a complete mine restoration system and accelerating the progress of the mine restoration.

l. Management status of historical mines

1.1 Large inventory and heavy task

Remote sensing survey and monitoring data show that by the end of 2018, the country's mining occupied about 3.60×l04km2 of damaged land; The land occupied and damaged by historical and mining mines is about 2.27×l04km2 and 1.33×l04km2 respectively. The storage of solid waste such as state-owned tailings ponds and waste slag fields occupies a large amount of land, and many environmental problems are left after private mining. Most of the mines left over from history are small and medium-sized mines with disorderly exploitation and scattered distribution, which have serious ecological damage and wide influence. Mine restoration is a complex systematic engineering, involving geology, hydrology, environment and many other aspects, the engineering amount is huge, the restoration period is long.

1.2 Strong governance needs

Mining is mostly open-pit mining, the mountain and vegetation damage is more serious, the natural habitat of wild animals and plants is damaged, the mountain collapse and landslide, flash floods and debris flows and other disasters occur from time to time, seriously affecting the life of the people around the mining area. To restore the geological environment and ecological environment of the mine, control the pollution caused by mining, and make it coordinate with the surrounding natural environment, the public has an urgent need for the treatment of abandoned mines. In 2021, the second round of central ecological environmental protection inspectors received a large number of complaints from the masses about pollution caused by mining, some mines illegally occupied woodlands, large areas of mountains were exposed, dust polluted the atmosphere, heavy metal polluted orchards and other serious phenomena, which have been reported on the official website of the Ministry of Ecology and Environment as typical cases of inspectors.

1.3 Low land reclamation rate

Some developed countries have a long history of mining, and their governance concepts, measures and technologies started earlier. Since 1940, Germany has been reducing the destruction of the ecological environment in the mining process, while taking into account the ecological changes and residents' requirements for the environment from a macro perspective to carry out mine restoration and management. After 1960, some countries began to develop a variety of restoration methods for ecological restoration, and technology was at the forefront. Land reclamation is the main way of ecological restoration in mining areas. The land reclamation rate in European and American countries is more than 80%, while the land reclamation rate in Chinese mining areas is only about 20%, which is far lower than the international average level of 50%-70%. The State Council promulgated the "Regulations on Land Reclamation" in 1989, the "Regulations on Land Reclamation" in 2011, and the "Measures for the Implementation of the Regulations on Land Reclamation" in 2019. In the same year, the "Regulations on the Protection of the Geological Environment of Mines" were revised, and the State's policies, funding, governance methods and priorities for mine restoration have gradually improved and improved with the development of The Times.

1.4 Construction Difficulties

Before the mine restoration construction, a series of data such as start-up procedures, planning instructions, environmental impact reports and approvals, geological disaster assessment reports, geological exploration reports, etc., are the "blocking points" of mine treatment projects, such as tedious data preparation and approval procedures, difficult approval, and time-consuming handling. During the construction process, the local government needs to coordinate multiple relationships among departments, construction units, mining areas, and villagers. Most of the land occupied by the mining area is collective land. After construction, farmers need to deal with the issue of land transfer rent payment. Villagers are worried about the quality of land after reclamation and are unwilling to accept reclaimed land and other social problems.

2. Repair existing problems and improve measures

2.1 Repair Mechanism

The central and local governments attach great importance to the ecological restoration of mines, and have introduced more detailed systems to promote mine restoration. Local governments should strengthen the implementation of policies to maximize the enthusiasm of mining enterprises and various social resources. Local governments have rationalized the powers and obligations among departments related to mine restoration, formed a scientific and standardized system with natural resources departments as the main body and the active participation of ecological environment, forestry, water conservancy and other departments, refined the constraint and incentive mechanism, promoted coordination and communication among departments, and improved the enforcement power of ecological environment and forestry departments in the evaluation and supervision of ecological restoration quality. Improve the restoration speed and treatment rate of historical mining areas.

2.2 Restoration Funds

There is a huge demand for mine restoration funds, and the restoration funds of historical mines are more short, requiring financial allocation support, the total amount of special funds allocated by the central government is small, and the matching funds of local and enterprise are not high. As of the end of 2017, the central government had invested a total of about 30 billion yuan, and local governments and enterprises had raised a total of nearly 70 billion yuan, which could not meet the needs of large-scale mine restoration, and the funding problem had become a bottleneck restricting the ecological restoration of mines. The sources and channels of special funds for mine ecological restoration are not perfect, and mining laws and regulations give natural resources, forestry, ecological environment, water conservancy and other departments the right to collect fees related to ecological damage, and the lack of centralized management of fees has caused scattered uses and not all of them are used for mine restoration. The effect of ecological restoration is slow, the income is small, the profit method is single, and the participation of social capital is low. The Regulations on the Protection of Mine Geological Environment issued by the former Ministry of Land and Resources established a deposit system for the restoration of mine environmental governance, which is only applicable to newly built mines or mines under development, and does not include the environmental governance and ecological restoration of historical mines.

The central government will increase support for special funds for the restoration of abandoned mines left over from history, and promote the availability of matching funds from local governments and enterprises. The ecological damage fees collected by local government departments shall be centrally managed and incorporated into a unified special account for ecological restoration, and the supervision of funds shall be strengthened and earmarked for special purposes to ensure that all fees are used for mine restoration. Drawing on the successful experience of water environment (PPP) governance projects, the state encourages social capital to participate in mine ecological restoration, and supports and helps enterprises in project implementation, tax incentives, financial subsidies, etc., and implements the reward mechanism of "who repairs, who benefits". Expand the scope of application of the deposit, and use a certain proportion of funds for the restoration of abandoned mines left over from history to further meet the needs of national and local special funds for mine restoration.

2.3 Restoration Mode

The problems of mine ecological environment include landscape type destruction, environmental quality type destruction and biological type destruction. The traditional restoration model mainly focuses on landscape recurrence restoration (eliminating geological hazards and vegetation coverage), and less takes into account environmental quality restoration (controlling water, air and soil pollution) and biological restoration (restoring biological communities and species). At present, the mode of mine environmental treatment and restoration is simple, resulting in the economic and social benefits are not obvious, and the investment and return have not formed a virtuous cycle.

Adhere to the priority of ecological restoration and management, adopt the "development, governance", according to the type of mine and regional location of the ecological environment state index and the degree of damage to the surrounding environment, classified policies, regional control, hierarchical governance, step by step. On the basis of the landscape reproduction model, we should expand a variety of potential restoration models, and transition from land reclamation to a diversified development trend that takes into account the benefits of all aspects. At present, there are not many examples of mine parks, country parks and creative and cultural industry models in China, and they have not formed a scale and industrial chain, which can become the future direction of operation. Seize the opportunity of the country to vigorously implement the rural revitalization strategy, make full use of various policies to help and benefit agriculture, and repair and manage abandoned mines well while building new rural areas.

2.4 Restoration Works

In recent years, the implementation effect of the mine rehabilitation project has made obvious progress, but there are still problems such as unreasonable restoration plans and goal setting, lack of scientific and normative, low restoration standards for most management projects, low participation in funds, less acceptance standards and norms, and uneven acceptance quality.

Local governments and restoration enterprises should work out different types of mine restoration plans according to factors such as the type of mine pollution, the degree of ecological environmental damage, and human geography, with phased indicators and the completion time of the overall restoration target, and conduct strict review with high standards to avoid loopholes in the plans. Mine restoration funds are strictly managed as a whole, and their use is supervised and inspected by means of "random sampling of inspection objects in the supervision process, random selection of law enforcement inspectors, and timely disclosure of random inspection and investigation results to the public" (referred to as "double random, one public") to ensure that all funds are reasonably used in restoration projects. Revise and improve the acceptance standards of the project, hire qualified and experienced mine restoration related institutions, third-party design institutes and mine management companies to carry out the one-by-one acceptance inspection of the mine treatment plan, medium-term objectives and ecological restoration after treatment, and put forward targeted improvement plans for the problems and deficiencies found in the acceptance, so as to promote rectification through acceptance and avoid inadequate treatment measures. The phenomenon of substandard treatment projects occurs.

2.5 Repair Techniques

Mining has caused serious damage to topography and landform, and there are subsidence areas, tailings ponds and waste discharge fields covering a large area, etc. As of 2018, a total of 1.2×l04 ground collapse disasters have occurred in abandoned mines in China, and the solid waste stock is 4.96×1010t, with high construction technical requirements. Compared with water pollution and air pollution, mine restoration has less attention, less research on related technologies, and the existing technologies are relatively simple, mainly in geological environment management, secondary disaster prevention and control, vegetation restoration and land reclamation. In the "National Soil Pollution Survey Announcement" published in 2014, 1,672 soil points in 70 mining areas accounted for 33.4% of the exceeded points, and the main pollutants were cadmium, arsenic, lead and polycyclic aromatic hydrocarbons. The soil pollution control technology was weak, the plant survival rate was low, and no integrated control system was formed. In recent years, some new technologies have achieved good results, but the cost is high and the application is limited. In 2013, the Technical Code for the Protection and Restoration of the Ecological Environment in Mines (Trial) issued the development of industry standards, which did not enforce and play its due role in guiding technical requirements for the protection and restoration of the ecological environment, including waste dumps, open-pit stopes, tailings ponds, special roads for mining areas, mining industrial sites, subsidence areas, gangue yards, polluted sites, etc. The regulations on pollution prevention and control involving air, water and soil are relatively simple, and there are no more detailed technical guidelines and norms for one aspect, and no new technical norms have been issued since then.

In accordance with the differences in the types and mining methods of mines under different natural conditions, the state formulates standardized and serialized restoration standards and treatment technical norms to improve operability, enforce implementation, raise the level of mine treatment, and reduce the number of mines that do not meet the treatment standards. Strengthen the basic theoretical research of mine ecological restoration, improve the level of scientific and technological support, and reduce the application cost. At present, ecological restoration technology is mainly based on physical restoration, chemical restoration, biological restoration and joint restoration. Single restoration technology often cannot meet the needs of mine ecological restoration, and joint restoration technology will be more and more applied to mine restoration. Under the premise of ensuring the treatment of geological environment and the elimination of heavy metals and other major pollution, the mine restoration can improve the survival rate of vegetation, achieve the reconstruction of biodiversity and the restoration of regional ecological functions.

Step 3: Advice

3.1 Coordination mechanism of mine comprehensive treatment work

There are many fields and departments involved in the mine restoration and treatment project, and the corresponding work has been carried out with the focus on the restoration project and certain progress has been made, but there are still problems such as the overlapping responsibilities of various departments and the inconsistency of rights and functions. Therefore, the local government should set up a comprehensive mine management office, identify the member units, formulate working rules such as cooperation, consultation and information sharing, and transmit responsibility pressure at various levels to ensure that the mine restoration and management work is carried out effectively and orderly.

3.2 Improving laws and regulations

There are relatively few laws and regulations related to mine ecological restoration. The Mineral Resources Law is mainly aimed at exploration and mining, and does not deal with mine rehabilitation and pollution control. Although the Regulations on the Protection of Mine Geological Environment put forward relevant requirements for the restoration and protection of mine environment, many regulations have not been fully implemented. The relevant laws on mineral resources need to be further improved, the link of mine restoration and treatment should be set up, the original "protection provisions" should be upgraded to the level of regulations or legal provisions, and the environmental legal provisions should be coordinated to form a collaborative legal support system.

3.3 Detailed inspection and assessment of abandoned mine conditions

In the ongoing national verification of historical mines, the national database and inventory list of historical mines established only include the mine name, location, mineral species, map spot number, central point coordinates, area and other elements, with little information. On the basis of the catalog list, detailed investigation and environmental risk assessment of mining methods, land ownership, environmental problems, impact scope, ecological restoration budget and other projects should be carried out, and a series of software such as mine status distribution map and management progress map should be made to help managers timely grasp the mine overview and restoration progress, and carry out overall planning and management.

3.4 Ecological and Environmental supervision

The ecological environment inspector found that some historical mines were included in the local management plan and carried out management, and there were phenomena such as surface management and restoration measures were not strong. Environmental inspectors should set up special actions for mine restoration, investigate all mines using drone technology, and compare with historical images to strengthen ecological environmental supervision, effectively inhibit and eliminate the phenomenon of "grasping the economy, not grasping the environmental protection" of local governments and departments. Strengthen cooperation between mineral law enforcement inspectors and ecological environment inspectors, and transfer major ecological environmental damage problems found in mineral law enforcement to ecological environment inspectors for treatment.

3.5 Tracking and monitoring after ecological restoration

It is necessary to formulate guidelines for tracking and evaluating the effects of ecological restoration within the corresponding period after treatment, strengthen the maintenance, monitoring and management of the legacy mines after treatment, and incorporate them into the national ecological environment and geological environment monitoring network to form a systematic and long-term monitoring system and supervision mechanism.

3.6 Special laboratory of mine restoration engineering

Treatment work is a multi-disciplinary and multi-professional system engineering involving geology, mining, agriculture and forestry, environmental protection, etc. Mine restoration technology is not mature and perfect, lack of professional engineering research institutions, the existing technology can not meet the needs of restoration. To strengthen the theoretical research and technological research and development in the restoration of ecological functions of mines, and improve the level of science and technology, it is necessary to establish a special laboratory of mine restoration engineering combining production, learning, research and application, and establish the research and development and promotion of key technologies in small, pilot and large-scale practice.


  • Honeywell TK-IAH161 - 1PC ANALOG INPUT New Shipping DHL or FedEX
  • Honeywell PX45A - "8 Points/mm (203dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet,"
  • Honeywell 51309276-150 - / 51309276150 (NEW NO BOX)
  • Honeywell 82408217-001 - / 82408217001 (NEW NO BOX)
  • Honeywell BK-G100 - Elster U160 Gas Meter DN100 #3485
  • Honeywell MIDAS-M - 1PC MMC-A2U20000 Detector (DHL or FedEx) #H254CC YD
  • Honeywell 621-9938R-RP - Serial Input/Output Module 22572 Vr 3.2 94V-0
  • Honeywell U2-1018S-PF - NEW flame detector DHL Fast delivery
  • Honeywell TK-PRR021 - 51309288-475 redundancy module
  • Honeywell 50129828-003 - Temperature Transmitter
  • Honeywell 3151080 - RING SET P/N (HONEYWELL) NS COND # 11344 (4)
  • Honeywell 4DP7APXPR311 - CIRCUIT BOARD
  • Honeywell MG-818 - Symbol Generator P/N 7011675-818
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty#XR
  • Honeywell 51304800-100 - 30731808-004 Regulator Card REV B
  • Honeywell MU-FOED02 - UCN EXTENDER PN:51197564-200 REV F
  • Honeywell MC-PAIL02 - 51304907-100 Specii Input/Output Module Rev E
  • Honeywell SPS5713 - 51199930-100 NSMP
  • Honeywell XS858A - Mode S Transponder 7517401-960 Removed Working
  • Honeywell SK-5208 - Fire Panel Maintenance Service 6MonWarri UPS Express SK5208 Zy
  • Honeywell 51403422-150 - NEW HDW COMM CTRL CONTROLLER
  • Honeywell IBI-AD - Yamatake- 82407390-001/ 82408215-001 PCB Card
  • Honeywell 51401635-150 - / 51401635150 (USED TESTED CLEANED)
  • Honeywell ANT67A - TCAS Antenna 071-01548-0100 w/ March 2024 Overhauled 8130
  • Honeywell TC-IAH161 - NEW PLC Module One year Warranty
  • Honeywell 620-3632C - CPU. . (UK And EU Buyers Read)
  • Honeywell PX45A - "12 Points/mm (300dpi), Rewind, LTS, Disp. (Color), RTC, Ethernet"
  • Honeywell K4LCN-4 - 51402755-100 Processor Card Rev: F 51305099-100 B
  • Honeywell 2001-400-150-126-200-20-100001-1-0-00 - REPAIRED PNEUMATIC ACTUATOR
  • Honeywell GGSI - 51401914-100 HDW B FW A R400 51400996-100 Rev C PLC Board Module
  • Honeywell 184637 - TRANSDUCER P/N (HONEYWELL) NS CONDITION #12517
  • Honeywell WEB-600E - Network Controller Via DHL or FedEx
  • Honeywell 620-0073C - / 6200073C (USED TESTED CLEANED)
  • Honeywell 05704-A-0144 - / 05704A0144 (NEW NO BOX)
  • Honeywell RI-406 - P/N 4026206-940 (Sperry) Instrument Remote Controller
  • Honeywell AAU-32/A - ALTIMETER ENCODER P/N 99251-3252011-0101 REP TAG # 12197
  • Honeywell T-1204-1174 - 51304907-100 Spcii I/O Module
  • Honeywell TK-PRS021 - Control Processor Expedited Shipping TKPRS021 Spot Goods Zy
  • Honeywell VITO - Enraf Lt Interface 762 Up 762 Aga / Z
  • Honeywell QPP-0001 - FC-QPP-0001 Module
  • Honeywell TC-PRS021 - / TCPRS021 (USED TESTED CLEANED)
  • Honeywell 51403698-100 - / 51403698100 (USED TESTED CLEANED)
  • Honeywell XCL8010A - 24V NSMP
  • Honeywell 91884 - "Target, 15.620 X 12.846 X 0.250"" BTL, 07-613, 5N TI, 118305"
  • Honeywell 51403776-100 - / 51403776100 (USED TESTED CLEANED)
  • Honeywell LG1093AC01 - UV Flame Sensor/Detector
  • Honeywell CC-PCNT02 - Controller Module Expedited Shipping CCPCNT02 Spot Goods Zy
  • Honeywell FFSB14ER10KS2 - / FFSB14ER10KS2 (NEW IN BOX)
  • Honeywell RF600 - Radio Frequency Unit 7516240-60060 Removed Working
  • Honeywell 51196881-100 - NEW UPGRADE KIT EC W/ODEP 51196881100
  • Honeywell CC-IP0101 - 51410056-175 Brand New Expedited Shipping
  • Honeywell AL300 - Alt Preselect Command Controller 7002412-904 w/ August 2011 Repaired 8130
  • Honeywell 094377-00 - / 09437700 (USED TESTED CLEANED)
  • Honeywell IRTP271 - Tata Printed Circuit Board Rev.0 DPCB21010003
  • Honeywell TVMUGR-888880-020-52-3-030-0U000G-000 - MULTITREND GR GRAPHIC RECORDER
  • Honeywell RM850 - Radio Management Unit 7012100-811 w/ December 2017 Repaired 8130
  • Honeywell PGM-7360 - Gas Detector
  • Honeywell WU660 - Radar RTA 7021450-601 w/ April 2024 Overhauled 8130
  • Honeywell 9243201 - / 9243201 (NEW NO BOX)
  • Honeywell AZ850 - Micro Air Data Computer 7014700-601 Removed Working
  • Honeywell DCP550 - Yamatake- Digital Programmable Controller Temperature
  • Honeywell FF-SEDGE6G2-1M-C - / FFSEDGE6G21MC (USED TESTED CLEANED)
  • Honeywell FC-RUSIO-3224 - Brand New Expedited Shipping Via DHL
  • Honeywell RM850 - Radio Management Unit 7012100-801 w/ March 2021 Tested 8130
  • Honeywell HIMA-6E-B - Large System Controller Via DHL or FedEx
  • Honeywell RM855 - Radio Management Unit 7013270-973 w/ April 2024 Modified 8130
  • Honeywell MP-DNCF02-200 - REV B Upper & Lower / 51305072-300 51305072-200 REV L.
  • Honeywell 80360206-001 - / 80360206001 (USED TESTED CLEANED)
  • Honeywell DE132-0-A-BB-0-Z-1-0C-EE0-00 - Chart Recorder
  • Honeywell 51403519-160 - NSNP
  • Honeywell 627-1002RC - / 6271002RC (USED TESTED CLEANED)
  • Honeywell 51400997-100 - / 51400997100 (USED TESTED CLEANED)
  • Honeywell J-AOM10 - Yamatake- /J-A0M10 Analog Output Module 24Vdc 480Ma Hw/Fw Rev: C
  • Honeywell AZ800 - Digital Air Data Computer 7000700-953 w/ July 2016 Repaired EASA Form 1
  • Honeywell FC-RUSIO-3224 - Brand New
  • Honeywell BZ-2RW82272-A2 - Micro Switch 1a 125vac
  • Honeywell FC-RUSIO-3224 - 1PC Brand New
  • Honeywell 10268S-1-020-201-0-2-03100-000-00 - Electric Actuator 121va 120v-ac
  • Honeywell 14CE102-1RS - Limit Switch IP65
  • Honeywell FC-PSU-UNI2450U - Brand New Fast Shipping FedEx or DHL
  • Honeywell 696658-1 - SUPPORT ASSY. NS 11764 (3)
  • Honeywell TK-PRR021 - ONE New 51309288-475 DC
  • Honeywell PSU-UNI2450 - (AS PICTURED) NUPI
  • Honeywell 80360146-011 - / 80360146011 (USED TESTED CLEANED)
  • Honeywell EGWPM - MODULE Assembly 7028419-1904 Inspected/Tested Jun. 2021
  • Honeywell DE131-0-A-0B-0-Z-1-0B,0C-EE0-000 - "Chart Recorder"
  • Honeywell 51454493-126 - / 51454493126 (NEW IN BOX)
  • Honeywell 965-1186-003 - "MK VI, GPWS Computer, EASA FORM ONE/FAA 8130 Guaranteed"
  • Honeywell 51401996-100 - / 51401996100 (USED TESTED CLEANED)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118222"
  • Honeywell SPS5785 - 1pc 51198651-100 Power Supply Brand New Fast shipping
  • Honeywell FX-USI-0002 Security Manager System Module 5Vdc
  • Honeywell SPS5785 - 51198651-100 power supply
  • Honeywell HIMA-6E-B - Large System Controller Fast Shipping
  • Honeywell 51301882-100 - RTD MUX Terminal Board
  • Honeywell 51198821-100 - 1PC new module PLC One year warranty free Shipping#XR
  • Honeywell EAMR - 51401996-100 E CARD card
  • Honeywell 51305734-100 - / 51305734100 (USED TESTED CLEANED)
  • Honeywell 50065674 - Basic Display PWA Assembly HNWG50049911-001
  • Honeywell TSENCOBTM-07889 - "15.620X12.913X0.125 MPS-5-002/M TARGET, 109953"
  • Honeywell 86220000 - / 086220000 (USED TESTED CLEANED)
  • Honeywell CC-IP0101 - C300 system card Brand new fedex or DHL
  • Honeywell WU880 - Radar Antenna 7021450-801 w/ May 2024 Repaired 8130
  • Honeywell CC-IP0101 - ONE Profibus DP Gateway Module NEW
  • Honeywell 397124-2-4 - Gulfstream Valve New Overhauled
  • Honeywell PGM-7340 - RAE 3000 VOC Detector Shipping DHL or FedEX
  • Honeywell RCZ850 - Integrated Communication Unit 7510100-731 w/ March 2024 Tested 8130
  • Honeywell STS103-001-00006-12-1137 - NSNP
  • Honeywell AL300 - Altitude Preselect Command Ctlr 7002412-906 w/ March 2024 Overhauled 8130
  • Honeywell 2119020-8000 - Series 1 N1 Digital Electronic Engine Control
  • Honeywell 51198685-100 - Power Module Brand New Shipping FedEx or DHL
  • Honeywell 620-0073C - / 6200073C (NEW IN BOX)
  • Honeywell GTS-3PA-B - "Timer 0-60 Sec, 220v 50/60 Hz"
  • Honeywell IVA81D - TCAS Vertical Speed Indicator 066-01171-2804 w/ January 2020 Tested 8130
  • Honeywell 51403299-200 - / 51403299200 (NEW NO BOX)
  • Honeywell TSENALMOX-08287 - "Target, 1.900 X 12.733 X 15.620"", 037-173-53, 118221"
  • Honeywell AT860 - Loop Sense Antenna 7510300-901 w/ May 2024 Tested 8130
  • Honeywell XL2000B3A - 1PCS USED /
  • Honeywell CC-PCNT02 - C300 Controller Module
  • Honeywell ASDX015D44R - SenSym Pressure Sensor Micro Switch 0-15 psi 8 pin DIP
  • Honeywell 900CS15-00 - Touch Panel NEW SHIP DHL OR EMS 1 Year Warranty cl
  • Honeywell FC-SCNT01 - S300 Control Module 51454926-176 Security Control - 400mA
  • Honeywell DC1010CR-301000-E - Digital Temperature Controller 85-265VAC
  • Honeywell TK-PRR021 - redundancy module 51309288-475
  • Honeywell K4LCN - 51402755-100 Motherboard SS 51201795-400
  • Honeywell XL2000B3A - plc new FREE EXPEDITED SHIPPING
  • Honeywell FC-SCNT02 - 51460114-176 S300 Controller Module 78-4
  • Honeywell BVS - 99ATEX2259X 03ATEXG016X Tester new