Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Study on ecological restoration status and treatment countermeasures of abandoned mines left over from history

F: | Au:佚名 | DA:2023-12-27 | 793 Br: | 🔊 点击朗读正文 ❚❚ | Share:

China has about 800,000 mines, of which about 400,000 are in need of restoration due to ecological damage. The "China Mineral Resources Report (2020)" and the "2020 Coal Industry Development Report" pointed out that about 40% of the old problems have not been treated, but the annual control rate of newly damaged land is only about 40%. In the early stage of economic development, the mining development mode is simple and extensive, and the environmental pollution control is not paid enough attention. After the establishment of the Ministry of Land and Resources in 1998, the state level supported the restoration and management of mining geological environment. In 2006, the Ministry of Finance, the Ministry of Land and Resources and the State Environmental Protection Administration jointly issued the Guiding Opinions on Gradually Establishing the Responsibility Mechanism for Mine Environmental Management and Ecological Restoration, which put forward the basic ideas of the deposit system for mine geological environment restoration and management. The difficulty of mine environmental management is the low level of restoration technology and the relative lack of professional personnel.

In order to solve the outstanding problems existing in the process of ecological restoration of mines, national and local policies have been introduced, for example, Notice on carrying out the National Verification Work of Historical Mines, Opinions on Exploring the use of market-oriented methods to promote the ecological restoration of Mines, Notice on Supporting the ecological restoration Demonstration Project of Historical abandoned Mines, Measures for the Implementation and Management of Ecological Restoration of Mines in Shandong Province, Action Plan for Comprehensive Management of Mines in Hebei Province, and on Strengthening the control and protection of mineral development Decision of state environment, etc. According to the overall framework of ecological civilization construction, follow the principle of government-led and market operation, encourage social capital to participate in the ecological restoration and management of mines through concept changes and policy guidance, adopt a systematic, scientific and standardized governance model, improve the ecological restoration capacity of mines, and achieve the ecological restoration goal.

The abandoned mines left over from history destroy the natural landscape, and there are hidden dangers of geological disasters such as landslides and collapses. The environmental pollution caused by mining reduces the local biological population, so it is imperative to restore the ecological management of mines. There are many deficiencies in the main aspects of the restoration system, such as the restoration mechanism, the restoration fund, the restoration mode, the restoration project, and the restoration technology, which lead to the low quality and slow speed of the restoration. Therefore, summarizing the problems of the mine ecological restoration and putting forward targeted measures and suggestions are conducive to forming a complete mine restoration system and accelerating the progress of the mine restoration.

l. Management status of historical mines

1.1 Large inventory and heavy task

Remote sensing survey and monitoring data show that by the end of 2018, the country's mining occupied about 3.60×l04km2 of damaged land; The land occupied and damaged by historical and mining mines is about 2.27×l04km2 and 1.33×l04km2 respectively. The storage of solid waste such as state-owned tailings ponds and waste slag fields occupies a large amount of land, and many environmental problems are left after private mining. Most of the mines left over from history are small and medium-sized mines with disorderly exploitation and scattered distribution, which have serious ecological damage and wide influence. Mine restoration is a complex systematic engineering, involving geology, hydrology, environment and many other aspects, the engineering amount is huge, the restoration period is long.

1.2 Strong governance needs

Mining is mostly open-pit mining, the mountain and vegetation damage is more serious, the natural habitat of wild animals and plants is damaged, the mountain collapse and landslide, flash floods and debris flows and other disasters occur from time to time, seriously affecting the life of the people around the mining area. To restore the geological environment and ecological environment of the mine, control the pollution caused by mining, and make it coordinate with the surrounding natural environment, the public has an urgent need for the treatment of abandoned mines. In 2021, the second round of central ecological environmental protection inspectors received a large number of complaints from the masses about pollution caused by mining, some mines illegally occupied woodlands, large areas of mountains were exposed, dust polluted the atmosphere, heavy metal polluted orchards and other serious phenomena, which have been reported on the official website of the Ministry of Ecology and Environment as typical cases of inspectors.

1.3 Low land reclamation rate

Some developed countries have a long history of mining, and their governance concepts, measures and technologies started earlier. Since 1940, Germany has been reducing the destruction of the ecological environment in the mining process, while taking into account the ecological changes and residents' requirements for the environment from a macro perspective to carry out mine restoration and management. After 1960, some countries began to develop a variety of restoration methods for ecological restoration, and technology was at the forefront. Land reclamation is the main way of ecological restoration in mining areas. The land reclamation rate in European and American countries is more than 80%, while the land reclamation rate in Chinese mining areas is only about 20%, which is far lower than the international average level of 50%-70%. The State Council promulgated the "Regulations on Land Reclamation" in 1989, the "Regulations on Land Reclamation" in 2011, and the "Measures for the Implementation of the Regulations on Land Reclamation" in 2019. In the same year, the "Regulations on the Protection of the Geological Environment of Mines" were revised, and the State's policies, funding, governance methods and priorities for mine restoration have gradually improved and improved with the development of The Times.

1.4 Construction Difficulties

Before the mine restoration construction, a series of data such as start-up procedures, planning instructions, environmental impact reports and approvals, geological disaster assessment reports, geological exploration reports, etc., are the "blocking points" of mine treatment projects, such as tedious data preparation and approval procedures, difficult approval, and time-consuming handling. During the construction process, the local government needs to coordinate multiple relationships among departments, construction units, mining areas, and villagers. Most of the land occupied by the mining area is collective land. After construction, farmers need to deal with the issue of land transfer rent payment. Villagers are worried about the quality of land after reclamation and are unwilling to accept reclaimed land and other social problems.

2. Repair existing problems and improve measures

2.1 Repair Mechanism

The central and local governments attach great importance to the ecological restoration of mines, and have introduced more detailed systems to promote mine restoration. Local governments should strengthen the implementation of policies to maximize the enthusiasm of mining enterprises and various social resources. Local governments have rationalized the powers and obligations among departments related to mine restoration, formed a scientific and standardized system with natural resources departments as the main body and the active participation of ecological environment, forestry, water conservancy and other departments, refined the constraint and incentive mechanism, promoted coordination and communication among departments, and improved the enforcement power of ecological environment and forestry departments in the evaluation and supervision of ecological restoration quality. Improve the restoration speed and treatment rate of historical mining areas.

2.2 Restoration Funds

There is a huge demand for mine restoration funds, and the restoration funds of historical mines are more short, requiring financial allocation support, the total amount of special funds allocated by the central government is small, and the matching funds of local and enterprise are not high. As of the end of 2017, the central government had invested a total of about 30 billion yuan, and local governments and enterprises had raised a total of nearly 70 billion yuan, which could not meet the needs of large-scale mine restoration, and the funding problem had become a bottleneck restricting the ecological restoration of mines. The sources and channels of special funds for mine ecological restoration are not perfect, and mining laws and regulations give natural resources, forestry, ecological environment, water conservancy and other departments the right to collect fees related to ecological damage, and the lack of centralized management of fees has caused scattered uses and not all of them are used for mine restoration. The effect of ecological restoration is slow, the income is small, the profit method is single, and the participation of social capital is low. The Regulations on the Protection of Mine Geological Environment issued by the former Ministry of Land and Resources established a deposit system for the restoration of mine environmental governance, which is only applicable to newly built mines or mines under development, and does not include the environmental governance and ecological restoration of historical mines.

The central government will increase support for special funds for the restoration of abandoned mines left over from history, and promote the availability of matching funds from local governments and enterprises. The ecological damage fees collected by local government departments shall be centrally managed and incorporated into a unified special account for ecological restoration, and the supervision of funds shall be strengthened and earmarked for special purposes to ensure that all fees are used for mine restoration. Drawing on the successful experience of water environment (PPP) governance projects, the state encourages social capital to participate in mine ecological restoration, and supports and helps enterprises in project implementation, tax incentives, financial subsidies, etc., and implements the reward mechanism of "who repairs, who benefits". Expand the scope of application of the deposit, and use a certain proportion of funds for the restoration of abandoned mines left over from history to further meet the needs of national and local special funds for mine restoration.

2.3 Restoration Mode

The problems of mine ecological environment include landscape type destruction, environmental quality type destruction and biological type destruction. The traditional restoration model mainly focuses on landscape recurrence restoration (eliminating geological hazards and vegetation coverage), and less takes into account environmental quality restoration (controlling water, air and soil pollution) and biological restoration (restoring biological communities and species). At present, the mode of mine environmental treatment and restoration is simple, resulting in the economic and social benefits are not obvious, and the investment and return have not formed a virtuous cycle.

Adhere to the priority of ecological restoration and management, adopt the "development, governance", according to the type of mine and regional location of the ecological environment state index and the degree of damage to the surrounding environment, classified policies, regional control, hierarchical governance, step by step. On the basis of the landscape reproduction model, we should expand a variety of potential restoration models, and transition from land reclamation to a diversified development trend that takes into account the benefits of all aspects. At present, there are not many examples of mine parks, country parks and creative and cultural industry models in China, and they have not formed a scale and industrial chain, which can become the future direction of operation. Seize the opportunity of the country to vigorously implement the rural revitalization strategy, make full use of various policies to help and benefit agriculture, and repair and manage abandoned mines well while building new rural areas.

2.4 Restoration Works

In recent years, the implementation effect of the mine rehabilitation project has made obvious progress, but there are still problems such as unreasonable restoration plans and goal setting, lack of scientific and normative, low restoration standards for most management projects, low participation in funds, less acceptance standards and norms, and uneven acceptance quality.

Local governments and restoration enterprises should work out different types of mine restoration plans according to factors such as the type of mine pollution, the degree of ecological environmental damage, and human geography, with phased indicators and the completion time of the overall restoration target, and conduct strict review with high standards to avoid loopholes in the plans. Mine restoration funds are strictly managed as a whole, and their use is supervised and inspected by means of "random sampling of inspection objects in the supervision process, random selection of law enforcement inspectors, and timely disclosure of random inspection and investigation results to the public" (referred to as "double random, one public") to ensure that all funds are reasonably used in restoration projects. Revise and improve the acceptance standards of the project, hire qualified and experienced mine restoration related institutions, third-party design institutes and mine management companies to carry out the one-by-one acceptance inspection of the mine treatment plan, medium-term objectives and ecological restoration after treatment, and put forward targeted improvement plans for the problems and deficiencies found in the acceptance, so as to promote rectification through acceptance and avoid inadequate treatment measures. The phenomenon of substandard treatment projects occurs.

2.5 Repair Techniques

Mining has caused serious damage to topography and landform, and there are subsidence areas, tailings ponds and waste discharge fields covering a large area, etc. As of 2018, a total of 1.2×l04 ground collapse disasters have occurred in abandoned mines in China, and the solid waste stock is 4.96×1010t, with high construction technical requirements. Compared with water pollution and air pollution, mine restoration has less attention, less research on related technologies, and the existing technologies are relatively simple, mainly in geological environment management, secondary disaster prevention and control, vegetation restoration and land reclamation. In the "National Soil Pollution Survey Announcement" published in 2014, 1,672 soil points in 70 mining areas accounted for 33.4% of the exceeded points, and the main pollutants were cadmium, arsenic, lead and polycyclic aromatic hydrocarbons. The soil pollution control technology was weak, the plant survival rate was low, and no integrated control system was formed. In recent years, some new technologies have achieved good results, but the cost is high and the application is limited. In 2013, the Technical Code for the Protection and Restoration of the Ecological Environment in Mines (Trial) issued the development of industry standards, which did not enforce and play its due role in guiding technical requirements for the protection and restoration of the ecological environment, including waste dumps, open-pit stopes, tailings ponds, special roads for mining areas, mining industrial sites, subsidence areas, gangue yards, polluted sites, etc. The regulations on pollution prevention and control involving air, water and soil are relatively simple, and there are no more detailed technical guidelines and norms for one aspect, and no new technical norms have been issued since then.

In accordance with the differences in the types and mining methods of mines under different natural conditions, the state formulates standardized and serialized restoration standards and treatment technical norms to improve operability, enforce implementation, raise the level of mine treatment, and reduce the number of mines that do not meet the treatment standards. Strengthen the basic theoretical research of mine ecological restoration, improve the level of scientific and technological support, and reduce the application cost. At present, ecological restoration technology is mainly based on physical restoration, chemical restoration, biological restoration and joint restoration. Single restoration technology often cannot meet the needs of mine ecological restoration, and joint restoration technology will be more and more applied to mine restoration. Under the premise of ensuring the treatment of geological environment and the elimination of heavy metals and other major pollution, the mine restoration can improve the survival rate of vegetation, achieve the reconstruction of biodiversity and the restoration of regional ecological functions.

Step 3: Advice

3.1 Coordination mechanism of mine comprehensive treatment work

There are many fields and departments involved in the mine restoration and treatment project, and the corresponding work has been carried out with the focus on the restoration project and certain progress has been made, but there are still problems such as the overlapping responsibilities of various departments and the inconsistency of rights and functions. Therefore, the local government should set up a comprehensive mine management office, identify the member units, formulate working rules such as cooperation, consultation and information sharing, and transmit responsibility pressure at various levels to ensure that the mine restoration and management work is carried out effectively and orderly.

3.2 Improving laws and regulations

There are relatively few laws and regulations related to mine ecological restoration. The Mineral Resources Law is mainly aimed at exploration and mining, and does not deal with mine rehabilitation and pollution control. Although the Regulations on the Protection of Mine Geological Environment put forward relevant requirements for the restoration and protection of mine environment, many regulations have not been fully implemented. The relevant laws on mineral resources need to be further improved, the link of mine restoration and treatment should be set up, the original "protection provisions" should be upgraded to the level of regulations or legal provisions, and the environmental legal provisions should be coordinated to form a collaborative legal support system.

3.3 Detailed inspection and assessment of abandoned mine conditions

In the ongoing national verification of historical mines, the national database and inventory list of historical mines established only include the mine name, location, mineral species, map spot number, central point coordinates, area and other elements, with little information. On the basis of the catalog list, detailed investigation and environmental risk assessment of mining methods, land ownership, environmental problems, impact scope, ecological restoration budget and other projects should be carried out, and a series of software such as mine status distribution map and management progress map should be made to help managers timely grasp the mine overview and restoration progress, and carry out overall planning and management.

3.4 Ecological and Environmental supervision

The ecological environment inspector found that some historical mines were included in the local management plan and carried out management, and there were phenomena such as surface management and restoration measures were not strong. Environmental inspectors should set up special actions for mine restoration, investigate all mines using drone technology, and compare with historical images to strengthen ecological environmental supervision, effectively inhibit and eliminate the phenomenon of "grasping the economy, not grasping the environmental protection" of local governments and departments. Strengthen cooperation between mineral law enforcement inspectors and ecological environment inspectors, and transfer major ecological environmental damage problems found in mineral law enforcement to ecological environment inspectors for treatment.

3.5 Tracking and monitoring after ecological restoration

It is necessary to formulate guidelines for tracking and evaluating the effects of ecological restoration within the corresponding period after treatment, strengthen the maintenance, monitoring and management of the legacy mines after treatment, and incorporate them into the national ecological environment and geological environment monitoring network to form a systematic and long-term monitoring system and supervision mechanism.

3.6 Special laboratory of mine restoration engineering

Treatment work is a multi-disciplinary and multi-professional system engineering involving geology, mining, agriculture and forestry, environmental protection, etc. Mine restoration technology is not mature and perfect, lack of professional engineering research institutions, the existing technology can not meet the needs of restoration. To strengthen the theoretical research and technological research and development in the restoration of ecological functions of mines, and improve the level of science and technology, it is necessary to establish a special laboratory of mine restoration engineering combining production, learning, research and application, and establish the research and development and promotion of key technologies in small, pilot and large-scale practice.


  • Hydraulik Elektronik EPM8900 91221 Proportional Module
  • ABB XZ C828 A101 Didt Dioder Snubber 3BHE039453R0101
  • ABB 3BHE032593R0001 Isolated Power Supply
  • ABB 3BHB02722R0001 single-phase charging transformer
  • ABB 3BHE006412R0101 UFC762AE101 main control board
  • ABB XVC770BE101 3BHE021083R0101 interface board
  • ABB 3BHE024747R0101 GD C801 Overvoltage Protection Motherboard
  • ABB 3BHE021887R0101 3BHB002751R0102 Variable Frequency Control Board
  • ABB SD812 power module 3BSC610023R0001
  • Automotive LC4A00010 Brushless Motor Controller
  • Doric NC500 Neuroscience Data Acquisition System
  • Honeywell X-DCS2000/EN Broadcast Manager
  • Kollmorgen S60600 servo drive 6A 480V
  • Honeywell 30751044-008 ROM Card
  • Honeywell 5SE1-12 Micro Switch Specifications
  • Schneider AS-BDAU-204 Analog Output Module
  • K93712 Expansion Kit Industrial Module
  • MGE DCHEN 3400116300 Circuit Board
  • Siemens 6SE7036-1EE85-1HA0 Rectifier Board
  • Renesas UPD70F3624GBA1 Microcontroller
  • Omron E5AC-CX4A5M-014 Temperature Controller Parameters
  • GE IS200TBCIH1BCE Contact Input Board
  • Fanuc A05B-2255-C101#EAW Teach Pendant Data
  • Rieter RMC186C RMC RIO-1 PLC Controller
  • Siemens PXC24.2-EF32.A Building Automation Controller
  • Fanuc A16B-1200-0220 PC Memory Board F3
  • Omron CJ2M-CPU33 PLC CPU Module
  • Beckhoff EL1918 Safety Input Terminal EtherCAT
  • Fanuc A16B-1212-0871 CNC PCB Board
  • GE Fanuc IC697BEM713J PLC Module
  • Mitsubishi A2ACPU-R21 PLC CPU Module
  • Programmable Relay 230V AC 16 Inputs 8 Outputs T2UK
  • Schneider F3SP71-4S Safety PLC Module
  • NEED-24DC- T2UK Programmable Relay 24V 16in 8out
  • Siemens 3RT1075-6SP36 SIRIUS Power Contactor 200kW
  • GE 1C31170G02 Printed Circuit Board Module 94V-0
  • BPT 67200020 Multifunction Touch Terminal 50Hz
  • Fanuc A16B-2200-0931 Option Board with Daughter Cards
  • Honeywell FC-SDOL-0424 I/O Module Board
  • Lenze EMF2179IB DeviceNet Communication Module
  • Yaskawa CIMR-JC4A0007BAA J1000 VFD 0.4kW
  • Yokogawa PSBCMNBN Bus Continuation Module ProSafe-PLC
  • Phoenix Contact PLC-BPT-24DC/1/SEN Solid-State Relay
  • Allen-Bradley 193-EC2AB E3 Plus Overload Relay
  • GE DS200TCTGG1AFF Turbine Control Board
  • Westinghouse 1C31170G02 Ovation Module
  • Mitsubishi A2ACPU21 Programmable Controller Review
  • 710-95045-AD PLC I/O Operation Console Cable
  • Allen-Bradley 1785-L11B PLC-5 Processor Specifications
  • BEMAC UST-202-D 1307D V08B2 Circuit Board
  • Pilz 312070 PSSu H PLC1 FS Safety Module
  • Keyence QS-MB1 Safety Network Module Overview
  • GE Fanuc IC693CPU372 CPU Module 90-30 Series
  • Mitsubishi RJ71EIP91 EtherNet/IP Module
  • Schneider LXM62DD27D21000 Lexium 62 Servo Drive
  • Mitsubishi Q13UDEHCPU Universal PLC CPU Module
  • B&R X20CP3585 Programmable Controller X20 CPU
  • Siemens 6FC5203-0AF02-0AA0 Sinumerik Operator Panel
  • IWKA PG02 VKR TEL-Z Self-Sufficient Measuring System
  • Schneider BMXCPS2010 PLC Power Supply Modicon M340
  • Mitsubishi A171SCPU Motion Servo CPU Specifications
  • PLC Board with Finder 44.52 Relay Module 6A 250V
  • Honeywell DOP 09436601 Measurex Module Data
  • Fanuc A20B-8101-0320 CNC Circuit Board
  • KUAX 680I V.24 PLC Module 68142304
  • Allen Bradley 1785-L30B PLC 5/30 Processor
  • Phoenix ILC 191 ETH 2TX 2700976 Ethernet Controller
  • Siemens 6SY7000-0AC80 PLC Power Supply Module
  • Reliance Electric MACS 804.46.20 CWW PLC Drive
  • Omron CP1E-N60DR-D PLC CPU 36 Input 24 Output
  • Mitsubishi Melsec PLC System A2ACPU A63P AY13E AX82
  • Square D PAF361600DC1680 2000A Circuit Breaker
  • MERLIN GERIN STR 58U 5000A Electronic Trip Unit
  • Omron CJ1W-SCU21-V1 Serial Communication Unit
  • SICK S30A-6011EA S3000 Safety Laser Scanner
  • Mitsubishi Q00JCPU-S8 Universal Programmable Controller
  • Allen-Bradley 20AB9P6C3AYNANC0 PowerFlex 70 AC Drive
  • SYSMELEC Handheld Robot Automation Controller
  • LG Display LB315WRM-SVA1 32 Inch 4K LCD Panel
  • Mitsubishi Kakoki E Series PLC I/O Modules
  • Allen-Bradley 1440-VST02-01RA Dynamic Measurement Module
  • Beckhoff EL5042 EtherCAT Encoder Terminal
  • Beckhoff CX5010-0112 Embedded PC Controller
  • Guardmaster 440R-D22R2 Safety Relay Specifications
  • NL12880BC20-10ND Industrial Display Panel Data
  • LFI 12X5326-S1 Slide-in Control Board Technical Data
  • Modicon AS-9370-001 Programmable Controller Data
  • Mitsubishi Kakoki E-01B-4130 PLC Module Overview
  • Guardmaster 440R-D22S2 Dual Input Safety Relay Data
  • NL10276AC30-48D Industrial LCD Display Panel Data
  • GE ICMFA000000-ABAC Field Control Module Specification
  • Siemens 6SN1123-1AB00-0BA1 SIMODRIVE Module Review
  • Siemens 6SL3210-1SE23-2AA0 Power Module Technical Data
  • Schmersal T.250-11z-t Limit Switch
  • Schmersal T.250-11z-t Limit Switch
  • Honeywell 900H32-0102 ControlEdge 900 PLC
  • Siemens 6FX1132-1BA01 PCB B84141-A-A40
  • BEMAC UST-202-D 1307D PLC Circuit Board
  • Mitsubishi HS-MF23-S2A Servo Motor
  • B&R 3AI775.6 Analog Input Module
  • Omnipure 69003 Rev 11 3-Phase Gate Board PCB
  • Pilz 751134 PNOZ s4 C Safety Relay
  • Proface PFXGM4301TAD HMI Graphic Panel
  • Keyence KV-RC8BXR Programmable Controller
  • Siemens 6GK7243-1BX30-0XE0 CP 1243-1 Ethernet Module
  • Mitsubishi GT2310-VTBA GT2310-VTBD HMI 10.4 Inch
  • Schmersal SRB-NA-R-C.21-24V Safety Relay Module
  • Emotron 01-2520-40 M20 Shaft Power Monitor 3x380-500V
  • Omron CQM1 SYSMAC PLC System PA203 ID211 OC221
  • ABB CI830 3BSE013252R1 Profibus DP V1 Module
  • B&R 4PP035.0300-01 Power Panel PLC Module
  • SICK S30A-6111CL S3000 PROFINET Safety Laser Scanner
  • Siemens 6ES7215-1HG40-0XB0 CPU 1215C AC/DC/RLY
  • Automation Direct H2-ECOM100 Ethernet Module Details
  • Siemens 6GK1143-0TB01 CP 1430 TF Module Review
  • Siemens Simatic 505 10 Slot PLC Rack Technical Review
  • Automation Direct EZ-SP Message Display Unit
  • Mitsubishi A1SJ71QE71N-B5T Ethernet Interface Unit
  • Modicon AS-P810-000 Modbus Plus Processor Unit
  • Honeywell 51309241-175 TK-PPD011 PWA Specifications
  • Omron S8AS-24006N Smart Power Supply Specifications
  • Beckhoff EL3218-0018 EtherCAT Terminal Specifications
  • Omron CJ1W-PRT21 PROFIBUS-DP Interface Unit
  • Inovance AC810-0122-U0R0 PLC Controller
  • Cypress CY7C1021CV33-10ZXCT 1Mb SRAM IC
  • GE Fanuc IC695CPU315-CD PLC CPU Module RX3i
  • Drager 8312088 PCB Safety Module PAC 5500
  • Weltronic H70-T02A S430-V1.2 Weld Timer PLC