Development goal
Focusing on the goal of renewable energy becoming the main body of energy consumption increase, the implementation of renewable energy doubling action plan, and strive to achieve a "triple doubling" of total renewable energy consumption, installed capacity and electricity during the "14th Five-Year Plan" period compared with the end of the "13th Five-Year Plan".
-- Total consumption target. By 2025, the province's total renewable energy consumption will reach 46 million tons of standard coal, basically double that of 2020.
-- Installed capacity target. By 2025, the province's installed renewable energy power generation capacity will reach more than 90 million kilowatts, basically doubling from 2020. Among them, wind power is 25 million kilowatts, photovoltaic power generation is more than 57 million kilowatts, biomass power generation is 4 million kilowatts, hydropower (including pumped storage) is 4 million kilowatts.
-- Power target. By 2025, the annual power generation of renewable energy in the province will be about 120 billion KWH, and the renewable energy power in calls outside the province will reach more than 45 billion KWH, and the renewable energy power will basically double from 2020. Complete the weight of renewable energy electricity consumption responsibility issued by the state, and the proportion of renewable energy electricity increased to about 19%.
Key task
In accordance with the general idea of "overall layout, project driving, demonstration leading and collaborative promotion", we have focused on the project of "Building four bases, implementing four actions and strengthening four supports", leading and driving the large-scale and high-quality development of renewable energy in the province.
Build four bases. Adhere to the overall planning of land and sea, and plan to build large-scale renewable energy bases in regions with good resource endowments and favorable construction conditions in the province; Adhere to both internal and external importance, relying on the "foreign power into Shandong" power transmission channel, the construction of large-scale renewable energy power transmission base outside the province. Through the continuous large-scale development of renewable energy, it forms a strong support for leapfrog development.
-- Shandong Peninsula 10 million kilowatt offshore wind power base. Relying on the construction of the first batch of demonstration projects for the integrated development of offshore wind power and Marine pasture, we will improve the site selection, design, construction and installation level of offshore wind power farms, and accumulate experience in operation and management. Focusing on the three major areas of Bozhong, the north and the south of the Peninsula, in accordance with the overall plan and the principle of step-by-step implementation, we will focus on promoting the centralized and continuous development of a number of million-kilowatt projects to form scale and base effect, and build a ten-kilowatt offshore wind power base. Combined with wind power technology progress and future development trends, gradually promote the development of offshore wind power to the far-reaching sea, select some sites to carry out far-reaching offshore wind power parity demonstration, and promote innovative applications such as floating wind turbine foundation and flexible DC transmission technology. By 2025, the province strives to start 10 million kilowatts of offshore wind power and put 5 million kilowatts into operation.
-- The integrated base of 10 million kilowatt landscape storage in North Lubei saline-alkali shoal. Relying on Weifang, Binzhou and Dongying more saline-alkali shoal land and unused land resources, scientific assessment of development space, according to the "unified planning, scenery in the same field, centralized continuous, step by step implementation" method, optimize the proportion of various elements such as photovoltaic power generation, wind power, energy storage, planning and construction of North Lubei saline-alkali shoal land landscape storage integration base of 10 million kilowatts. Actively explore development and utilization methods such as the integration of source, network, load and storage, promote cooperation between upstream and downstream enterprises in the industrial chain, promote the integration of renewable energy power generation with modern agriculture, aquaculture, energy storage, hydrogen production, etc., promote the development of high-end new energy equipment industry and technological progress, and strive to create a multi-energy complementarity, industrial integration, smart management, landscape and storage integrated new energy innovation and development highland. To support the implementation of the national strategy for ecological protection and high-quality development in the Yellow River Basin. By 2025, Lubei Saline-alkali shoal landscape storage integrated base strives to build a landscape installed capacity of more than 10 million kilowatts.