Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

We will work hard to improve the quality of infrastructure services

来源: | 作者:佚名 | 发布时间 :2023-12-05 | 251 次浏览: | Share:

Focusing on the "seven goals" and the "five characteristics", we will strengthen the coordination of urban planning, construction and management, promote the optimization of infrastructure functions, improve the quality of infrastructure services, and make people's lives more convenient, efficient and comfortable.

1. Strengthen integration with urban functions

Efforts should be made to optimize the layout of infrastructure structures, enrich infrastructure service functions, sort out and clarify the layout relationship between infrastructure and ground space at all levels, and promote the integrated development of infrastructure and urban functions.

We will accelerate the integrated development of railway stations and cities. Coordinate rail construction with urban spatial structure adjustment and function layout optimization, strengthen planning guidance and control, focus on the construction of rail micro-centers, guide land resources and construction indicators to gather around the site, and coordinate the layout of urban functions such as public services, culture and entertainment, and residence around appropriate sites, so as to realize the coupling of traffic functions and urban functions of the site, and create an urban vitality center. The pilot with Shougang station, Yizhuang station and suburban railway Huoying (Loess store) station, Wangjing Station and other rail transit stations as the core, delimit key implementation units, promote pilot construction and play a demonstration role. We will improve the mechanism by which proceeds from comprehensive land development feed back into rail construction, and promote the synchronous and coordinated development of rail transit and cities. Orderly implementation of the transformation of existing stations, continue to promote the opening of existing railway station entrances and exits, add rapid transfer channels and entrances, and strengthen the direct communication with surrounding office and commercial facilities; Adjust the transfer distance between the ground bus station and the subway, and improve the convenience and accessibility of rail transit service. Optimize the connection organization around rail transit stations, and improve the transfer efficiency of citizens by opening microcirculation buses, building P+R parking lots, regulating bicycle parking management and other measures.

Guide the organic integration of bus stations and urban functions. Combined with the needs of residents around bus stops, make up for the shortcomings of regional urban functional services, promote the deep integration of bus stops such as Fushuling and Zhuxinzhuang with urban functions such as convenience services, green landscape, sports and leisure, intensive and efficient use of land resources, create convenient, efficient and diverse new bus stops, and promote the transformation of bus stops from transportation-oriented functions to community-based functions. Dredging and improving the functions of the bus stops in the core area, moving the bus stops in the historical and cultural street, promoting the parking maintenance functions of the bus stops in the core area such as Qianmen, Yongdingmen, Guang 'anmen and the dispersal of the tourism distribution center, and reusing the bus stops after the functional dredging according to the regional needs.

Overall use of underground space to improve urban functions. Formulate long-term development strategies, start legislative work, formulate special plans, and promote multi-level development and utilization of underground space. Take the initiative to plan the functional positioning of each floor, and study the use of shallow space to build various public facilities and deep space to build comprehensive pipe corridors and other facilities. Strengthen the development and utilization of underground space of rail transit, and strengthen the construction of underground space connectivity between rail transit stations and surrounding public services and businesses. Promote the underground development of ground facilities, explore the use of new parks, green Spaces, bus stations and other underground parking lots, and rely on the underground space to set up water storage facilities for water treatment. Promote the construction of comprehensive pipe corridors in accordance with local conditions and the principle of economic applicability. Optimize and improve the mechanism of "pipeline interaction", and promote the simultaneous implementation of road overhaul and pipeline concealment, and new roads and pipelines.

2. Strive to optimize and improve standards and norms

Implement high-quality development requirements, benchmark international first-class, pay attention to standards first, sort out and improve relevant standards and norms, gradually achieve full coverage of standards and norms in the field of infrastructure construction management, strengthen the standardization of urban operation and management, and improve the level of fine management.

Fine preparation of standard specifications. Improve the infrastructure standard system, fill in the gaps in existing standards and specifications, formulate functional construction standards lists and investment cost guidance lists, etc., to achieve full coverage of infrastructure construction investment links. Optimize and adjust urban roads, terminal stations, integrated management corridors, urban parks, slow traffic systems and other standards and norms, strengthen the organic connection between the standards and norms of various industries and fields, pay attention to the combination of public needs and urban functions, and standard new national requirements and urban development needs, timely update, so that fine construction management rules to follow, promote high-quality infrastructure development.

Strengthen the implementation of standards and norms. Focus on strengthening the implementation of standards and norms in the fields of municipal infrastructure, urban public transportation, information infrastructure, resource conservation and environmental protection, as an important basis for planning and design, investment and construction, operation and management, and provide support for improving the level of urban fine management.

3. Create high-quality ecological living space

We will further expand ecological Spaces such as rivers, parks and green Spaces, improve the living and working environment of citizens, and improve service functions such as recreation, parent-child and sports according to local conditions, so as to provide high-quality and inclusive ecological Spaces for citizens to enjoy nearby.

Improve the pattern of water ecology. We will intensify the battle against clear water, accelerate the treatment of confluence overflows and initial stormwater pollution in central urban areas, strengthen regulation, storage and purification, control the mixing and misconnecting of rain and pollution, and upgrade 100 kilometers of pipe networks in accordance with local conditions. We will further improve the sewage collection and treatment capacity in urban areas, continue to promote the construction of sewage treatment facilities in new cities and towns, build and rebuild 1,000 kilometers of sewage collection pipelines, and basically achieve full coverage of sewage collection networks in built-up areas. To open up the links between river and lake systems, build a water network system with river basins being coordinated, multi-line connections, multi-layer circulation and ecological health, enhance the mobility of river and lake water bodies, improve the self-purification capacity and pollution absorption capacity of water bodies, improve the overall level of the water environment in the central urban area, and form a pattern of "three rings of blue water around the capital". To study the ecological water quantity and water source guarantee scheme of key river channels, ensure the ecological water use of key rivers and lakes, and increase the regeneration water to supplement the ecological water use of river channels. The breeding and release of suitable species should be carried out in rivers and lakes where conditions permit, so as to maintain the ecological balance and optimize the water environment.

Expand the public's hydrophilic space. Continue to expand the hydrophilic area to better meet the various hydrophilic needs of citizens such as leisure, entertainment and viewing experience. The Qinghe River, Bahe River, Tonghui River and other urban river and lake landscape upgrading projects will be implemented to improve the design quality of river landscape and hydraulic buildings. By 2025, the length of landscape water system in the central urban area will reach 350 kilometers. Relying on the construction of the Grand Canal Cultural Belt, we will accelerate the construction of supporting facilities such as waterways, locks and wharves along the route, gradually restore the landscape of the historic waterway, and realize the navigation of the whole section of the North Canal, the Tonghui River, the Liangma River, and some sections of the Chaobai River. Further enhance the accessibility and openness of waterfront walks in built-up areas, improve the supply of diversified hydrophilic services, set up fishing, skating, kayaking and other service areas according to local conditions, and realize the opening of local fishing areas and skating rink in rivers and lakes.

Improve the quality of parks and green Spaces. We will improve the system of community parks, urban parks and country parks, and develop "growth parks". Through the construction of small and micro green Spaces and pocket parks, expand community green Spaces and realize open door green. Seven first green barrier urban parks, including Nanyuan Wetland Forest Park and Aobei Forest Park, have been built to complete the "One Green Barrier Urban Park Ring", and 10 second green Barrier country parks, including Wenyu River Park and Chaobai River National Forest Park, have been added, and the "Two Green Barrier Country Park rings" have been continuously improved. The functions of existing parks have been upgraded in an orderly manner, and more than 50 "all-age friendly" parks have been transformed into green Spaces. According to the needs of citizens, cultural facilities, sports venues, parking, emergency shelter and other functional facilities are set up according to local conditions. Combined with new technologies such as smart scene application, 30 demonstration natural recreation places of different types have been built. By 2025, the city will achieve 1,200 hectares of new urban green space, the urban green coverage rate will reach 49%, and the coverage rate of the 500-meter service radius of the city's park green space will reach 90%.

Improve the greenway network. Overall planning of river and lake water systems, parks and green Spaces, slow traffic and other Spaces, further improve the urban greenway network, build a municipal greenway system of "one core, two rings, five belts, and ten districts", and further enhance the systematic and connectivity of the city's ecological space. The Yongding River, Chaobai River, Tonghui River and other waterfront greenways, the Chaoyang Shuangao Green Way and the Xishan Green Way have been completed, and 350 kilometers of new urban greenways have been added. Relying on the municipal greenway node, 44 star-rated greenway service stations have been built to further improve the greenway service function. In the countryside and mountain areas, we plan to build a "hundred thousand" forest trail system, build a 100 km forest recreation trail connecting the mountain plain, 10 forest marathon trails, 100 10 km fitness trails, and 1,000 3-5 km mini trails, and create a distinctive full, half and mini marathon track.

4. Improve the level of smart service management

The goal is to build a new global smart benchmark city by 2025, make deep use of new technologies such as artificial intelligence, big data, and the Internet of Things, and accelerate the construction of intelligent infrastructure that is accurate and efficient, shared and coordinated.

Improving the intelligence of traditional infrastructure. Based on the overall development goal of Beijing Smart City 2.0, we will comprehensively strengthen the full cycle of smart management services such as infrastructure perception, operation, safety, supervision, and decision-making. Integrate the resources of private networks such as government affairs and emergency response, gradually promote the construction of smart city private networks, and rely on private networks to further promote the development of smart applications. The third phase of the transportation Integrated Decision Support and Monitoring and early Warning platform (TOCC) has been built to realize comprehensive perception, intelligent analysis, real-time scheduling, and rapid emergency management in important hub areas such as Beijing Daxing International Airport. Reserving conditions in the road planning and construction stage, accelerating the implementation of collaborative information transformation of vehicles and roads in autonomous driving demonstration zones to meet the needs of future technological development such as unmanned driving. Strengthen off-site law enforcement in traffic management, build 1,700 smart signal lights in the city, and comprehensively promote smart traffic law enforcement. Build a smart water 1.0 basic system, accelerate the construction of water awareness platforms and big data centers, and realize the digitization of water business processes. Promote the smart management of the park, and realize the real-time aggregation of visitors, analysis and judgment, diversion and scheduling, and intelligent early warning. We will deepen regional coordinated and smart management, complete the joint operation of monitoring and command of traffic operations for the Beijing 2022 Winter Olympics and Paralympic Winter Games in high quality, strengthen the sharing of hydrological and water quality data of trans-boundary rivers, and improve the coordinated operation of flood control.

We will strengthen the capacity for joint governance and sharing of infrastructure. The use of artificial intelligence, big data and other technologies to achieve "proactive governance" and "handling before litigation", and play the role of social participation in supervision. It is convenient for the public to report traffic violations by means of "taking photos" and "Posting". The Integrated Travel Service Platform (MaaS) version 2.0 has been built to realize unified payment, parking guidance, and carbon incentives for green travel. Promote the special action of "multi-meter integration", implement the intelligent upgrading and renovation of water, electricity, natural gas, and heating metering appliances, strengthen the integration of data collection, and create a demonstration area of "multi-meter integration" in the core area and the urban sub-center.


  • FOXBORO P0926KK PLC system functional module
  • FOXBORO P0924AW wireless pressure transmitter
  • FOXBORO P0916NK differential pressure transmission cable
  • FOXBORO P0916JQ PLC module
  • FOXBORO P0916JP I/A series control module
  • FOXBORO P0916GG Digital Input Module
  • FOXBORO P0916DV I/A series digital input module
  • FOXBORO P0916DC Terminal Cable
  • FOXBORO P0916DB I/A series PLC module
  • FOXBORO P0914ZM recognition module
  • FOXBORO P0902YU control module
  • FOXBORO P0901XT Process Control Unit
  • FOXBORO P0800DV fieldbus extension cable
  • FOXBORO P0800DG Standard Communication Protocol Module
  • FOXBORO P0800DB Universal I/O Module
  • FOXBORO P0800DA Industrial Control Module
  • FOXBORO P0800CE control module
  • FOXBORO P0700TT Embedded System
  • FOXBORO P0500WX Control System Module
  • FOXBORO P0500RY Terminal Cable Assembly
  • FOXBORO P0500RU control module
  • FOXBORO P0500RG Terminal Cable
  • FOXBORO P0400ZG Node Bus NBI Interface Module
  • FOXBORO P0400GH fieldbus power module
  • FOXBORO FBM207B Voltage Monitoring/Contact Induction Input Module
  • FOXBORO FBM205 Input/Output Interface Module
  • FOXBORO FBM18 Industrial Controller Module
  • FOXBORO FBM12 Input/Output Module
  • FOXBORO FBM10 Modular Control System
  • FOXBORO FBM07 Analog/Digital Interface Module
  • FOXBORO FBM05 redundant analog input module
  • FOXBORO FBM02 thermocouple/MV input module
  • FOXBORO FBI10E fieldbus isolator
  • FOXBORO DNBT P0971WV Dual Node Bus Module
  • FOXBORO CP30 Control Processor
  • FOXBORO CM902WX Communication Processor
  • FOXBORO AD202MW Analog Output Module
  • FOXBORO 14A-FR Configuration and Process Integration Module
  • FOXOBORO 130K-N4-LLPF Controller
  • FUJI FVR004G5B-2 Variable Frequency Drive
  • FUJI FVR008E7S-2 High Efficiency Industrial Inverter
  • FUJI FVR008E7S-2UX AC driver module
  • FUJI RPXD2150-1T Voltage Regulator
  • FUJI NP1PU-048E Programmable Logic Control Module
  • FUJI NP1S-22 power module
  • FUJI NP1AYH4I-MR PLC module/rack
  • FUJI NP1BS-06/08 Programmable Controller
  • FUJI NP1X3206-A Digital Input Module
  • FUJI NP1Y16R-08 Digital Output Module
  • FUJI NP1Y32T09P1 high-speed output module
  • FUJI NP1BS-08 Base Plate​
  • FUJI A50L-2001-0232 power module
  • FUJI A50L-001-0266 # N Programmable Logic Control Module
  • GE GALIL DMC9940 Advanced Motion Controller
  • GE DMC-9940 Industrial Motion Control Card
  • GE IS200AEADH4A 109W3660P001 Input Terminal Board
  • GE IC660HHM501 Portable Genius I/O Diagnostic Display
  • GE VMIVME 4140-000 Analog Output Board
  • GE VMIVME 2540-300 Intelligent Counter
  • GE F650NFLF2G5HIP6E repeater
  • GE QPJ-SBR-201 Circuit Breaker Module
  • GE IC200CHS022E Compact I/O Carrier Module
  • GE IC695PSD140A Input Power Module
  • GE IC695CHS016-CA Backboard
  • GE IC800SS1228R02-CE Motor Controller
  • GE IS215WEMAH1A Input/Output Communication Terminal Board
  • GE CK12BE300 24-28V AC/DC Contactor
  • GE CK11CE300 contactor
  • GE DS3800NB1F1B1A Control Module
  • GE VMIVME2540 Intelligent Counter
  • GE 369B1859G0022 High Performance Turbine Control Module
  • GE VME7865RC V7865-23003 350-930007865-230003 M AC contactor
  • GE SR489-P5-H1-A20 Protection Relay
  • GE IS200AEPGG1AAA Drive Control Module
  • GE IS215UCCCM04A Compact PCI Controller Board
  • GE VME7768-320000 Single Board Computer
  • GE SR489-P5-LO-A1 Generator Protection Relay
  • GE IS215WETAH1BB IS200WETAH1AGC Input/Output Interface Module
  • GE D20 EME210BASE-T Ethernet Module
  • GE IS200EXHSG3REC high-speed synchronous input module
  • GE IS200ECTBG1ADE exciter contact terminal board
  • GE VPROH2B IS215VPROH2BC turbine protection board
  • GE F650BFBF2G0HIE feeder protection relay
  • GE SLN042 IC086SLN042-A port unmanaged switch
  • GE SR489-P1-HI-A20-E Generator Management Relay
  • GE IS400JPDHG1ABB IS410JPDHG1A track module
  • GE IS410STAIS2A IS400STAIS2AED Industrial Control Module
  • GE IS410STCIS2A IS400STCIS2AFF Industrial Control Module
  • GE DS200DCFBG2BNC DS200DCFBG1BNC DC Feedback Board
  • GE VME5565 VMIVME-5565-11000 332-015565-110000 P Reflective Memory
  • GE VMIVME-7807 VMIVMME-01787-414001 350-00010078007-414001 D module
  • GE IS220PDOAH1A 336A4940CSP2 Discrete Output Module
  • GE VMIVME-4150 Analog Output Module
  • GE WESDAC D20 PS Industrial Power Module
  • GE 369B1860G0031 servo drive module
  • GE 369B1859G0021 Input/Output Module
  • GE 208D9845P0008 Motor Management Relay
  • GE IS420UCSCH1A-F.V0.1-A Independent Turbine Controller
  • GE D20EME10BASE-T 820-0474 Ethernet Interface Module
  • GE DS200DCFBG2BNC MRP445970 DC Feedback Board
  • GE IC800SSI228RD2-EE servo motor controller
  • GE IS200JPDMG1ACC S1AT005 Digital Input/Output (I/O) Module
  • GE IS200TSVCH1AED servo input/output terminal board
  • GE IS200TTURH1CCC S1DF00Z Terminal Turbine Plate
  • GE IS200TSVCH1ADC S1CX01H servo input-output board
  • GE IS200TRPGH1BDD S1C5029 Trip Solenoid Valve Control Board
  • GE IS220YAICS1A L Analog Input/Output Module
  • GE UCSC H1 IS420UCSCH1A-F-VO.1-A Controller Module
  • GE UCSC H1 IS420UCSCH1A-B Communication Processing Module
  • GE IC697VDD100 Digital Input Module
  • GE V7768-320000 3509301007768-320000A0 Controller Module
  • GE IS410TRLYS1B Relay Output Module
  • GE IS415UCVGH1A V7666-111000 VME Control Card
  • GE IC800SSI216RD2-CE servo motor controller
  • GE VMIVME-5565-010000 332-01565-010000P Reflective Memory
  • GE IC695ALG508-AA Analog Input Module
  • GE IC660EPM100J Power Monitoring and Control Module
  • GE RS-FS-9001 362A1052P004 Redundant Fan System Module
  • GE IS220UCSAH1AK independent processor module
  • GE 369-HI-0-M-0-0-0-E Motor Management Relay
  • GE CIFX50-C0 interface board
  • GE SR469-P5-H-A20-T Motor Management Relay
  • GE WES5120 2340-21005 power module
  • GE WES5120 2340-21003 Control Module
  • GE D20MIC10BASE-T 820-0756 Ethernet Module
  • GE WES13-3 5167-001-0210 Mechanical Relay Output Module
  • GE WES13-3 2508-21001 Control Board Module
  • GE D20ME 526-2005-216943 Input/Output Module