Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

"14th Five-Year Plan" urban sewage treatment and resource utilization Development planning

F: | Au:佚名 | DA:2023-11-22 | 799 Br: | 🔊 点击朗读正文 ❚❚ | Share:

I. Planning basis and situation outlook

Sewage collection, treatment and resource utilization facilities are the core of urban environmental infrastructure

Composition is an important starting point for in-depth fighting against pollution prevention and control, and for improving urban people

Living in the environment, promoting the modernization of urban governance system and governance capacity, and accelerating the construction of ecological civilization

Promoting high-quality development plays an important role.

Conscientiously implement the decisions and arrangements of the Party Central Committee and The State Council, and constantly increase urban sewage treatment facilities

Construction and operation management, sewage collection and treatment capacity level significantly improved, completed

"13th Five-Year Plan" national urban sewage treatment and recycling facilities construction planning "objectives. with

We should also be clearly aware that the development of urban sewage collection and treatment in our country is unbalanced and inadequate

Problems, weaknesses are still prominent. In particular, the construction and transformation of sewage pipe networks are lagging and dirty

The utilization level of water resources is low, the harmless disposal of sludge is not standardized, and the facilities are sustainable

There is still a gap between China's weak capacity and high-quality development.

The 14th Five-Year Plan period was the first century of our endeavor to build a moderately prosperous society in all respects

After fighting the goal, take advantage of the momentum to start a new phase of building a modern socialist country in an all-round way

The first five years of marching toward the second centenary goal is to enter a new stage of development

An important period to promote high-quality development. "Fourteenth Five-Year Plan" period, we should build high quality

Urban sewage treatment system as the theme, from the incremental construction of the main system to improve the quality and efficiency

Pay equal attention to structural adjustment and optimization, improve the stock, do the best increment, and systematically promote the urban sewage department

Management facilities of high quality construction and operation and maintenance, effectively improve the quality of urban water ecological environment,

We will continue to enhance people's sense of happiness, fulfillment and security.

Second, general requirements

(1) Guiding ideology

The spirit of the Fourth and Fifth Plenary Sessions of the CPC Central Committee should be based on the new development stage, implement the new development concept, and build

The new development pattern, adhere to the system concept, to improve the quality of the water ecological environment as the goal, to

Improve the efficiency of urban sewage collection and treatment, and focus on the strength and weakness of facilities

Hand, overall planning, focus on key points, problem-oriented, classified policies, and accelerate the formation of the layout

Reasonable, coordinated, safe, efficient, energy-saving and low-carbon urban sewage collection and treatment

The new pattern of source utilization, to achieve high-quality development of sewage treatment, sustainable development, meet

The people's growing need for a beautiful ecological environment.

(2) Basic principles

Planning leads, optimize the layout. Strengthen planning guidance and guidance, scientific determination of facilities

Scale and layout, promote river basin linkage, regional coordination, urban and rural overall planning, and achieve supply and demand

Constitutive phase equilibrium. We will make coordinated efforts to promote sewage treatment, improve black and odorous water bodies, and control waterlogging.

Make up the short board, improve the efficiency. We will speed up the collection, treatment and recycling of urban sewage

Utilization and sludge disposal facilities short board, promote the full coverage of urban sewage network, upgrade facilities

Processing power. Promote the integration of plant and network, equal emphasis on mud and water, construction and management, and improve operation management

To achieve stable and reliable operation of facilities and improve the overall efficiency of facilities.

Adopt policies according to local conditions. Combine the local water resources endowment and water environment carrying capacity

Capacity, development needs and economic and technical level and other factors, scientific establishment of facility capacity targets.

Choose economical, energy-saving and low-carbon process routes, and build sewage treatment facilities in different areas

Grant.

Government led, market operation. Give play to the decisive role of the market in allocating resources

So that the government can play its role. Clarify the main body of responsibility, strengthen the standard constraints, and strictly supervise the examination

Core. Improve the price mechanism, increase financial input, attract private capital, and form sustainable development

The construction and operation mode.

(3) Main objectives

-- By 2025, the direct discharge and collection of domestic sewage in urban built-up areas will be basically eliminated

Treatment facilities blank areas, the national urban domestic sewage centralized collection rate strive to reach 70%

Up; City and county sewage treatment capacity basically meet the needs of economic and social development, county

Sewage treatment rate reached 95% or above; The treatment of sewage in water environment sensitive areas has basically reached 1

Class A emission standard; The utilization rate of recycled water in water-scarce cities at the prefecture level and above has reached 25 percent

Above, the Beijing-Tianjin-Hebei region reached more than 35%, and the middle and lower reaches of the Yellow River basin were short at prefecture level and above

Water city strives to reach 30%; City and county sludge harmless, resource utilization level

Further improvement, urban sludge harmless disposal rate reached more than 90%; Yangtze river economy

Belt, the Yellow River basin, the Beijing-Tianjin-Hebei area of the town sewage collection and treatment capacity, sludge harmless

The level of chemical disposal has been significantly improved.

-- By 2035, the urban domestic sewage collection network will be basically covered and urban pollution will be eliminated

Full coverage of water treatment capacity, comprehensive realization of harmless sludge disposal, sewage sludge resources

The utilization level has been significantly improved, and urban sewage has been treated safely and efficiently, and the green is shared by all

Color, ecology, safe urban water ecological environment.

Third, promote the construction of facilities

(1) Make up the short board of the urban sewage network and improve the collection efficiency

1. Construction tasks. New centralized sewage treatment facilities will be built in the area

Sewage collection network to ensure effective collection of sewage. We will speed up the construction of villages and old cities in cities

Domestic sewage collection pipes in districts, towns, urban and rural fringe areas and resettlement areas for poverty alleviation in inhospitable areas

Network to fill the blank area of sewage collection network. New residential communities should be planned and constructed simultaneously

Sewage collection pipe network, promote the construction of branch pipe network and outbound pipe connection. Carry out old and broken

Diagnosis and repair of sewage pipe network and rain-sewage combined system pipe network that damage and easily cause waterlogging

Update, step by step to promote the pipe network misconnection, mixed connection and leakage transformation, improve the efficiency of sewage collection. big

We will implement the renovation and renewal of sewage pipe networks in cities and counties along the main stream of the Yangtze River at the prefecture level and above

Cities have basically solved the problem of mixing and misconnecting municipal sewage networks, and basically eliminated domestic sewage

Row. Diversion of rain and pollution shall be carried out in light of local conditions, and measures shall be taken if conditions are not available for the time being

Reduce the overflow pollution in rainy season. During the "14th Five-Year Plan" period, new and reformed sewage collection pipe network8

Ten thousand kilometers.

2. Technical requirements.

About sewage network checks. Comprehensive investigation of sewage pipe networks, rain and sewage combined pipe networks

Facility functions and operating conditions, misconnection, misconnection, misconnection and user access, etc., to find out the pollution

The bottom of the water pipe network, clarify the problem of sewage collection facilities. Based on geographic information system, etc

Periodic inspection and evaluation system. Urban people's governments organize residential communities, enterprises and institutions

The ownership units, property management units and their competent departments (units) carry out internal pollution

Water pipe network investigation, and carry out remediation.

Construction and renovation of sewage pipe network. New sewage collection pipe, except in arid areas

The network should adopt a split system. The shunt drainage system periodically carries out misconnection and mixed leakage

It is easy to inspect and transform the urban waterlogging pipe network and promote the diagnosis of pipe network diseases

And repair, strengthen the sewage collection network external water infiltration flow, backfilling investigation and treatment. steady

We will move forward with the diversion of rain and pollution, and give priority to the implementation of source drainage in residential communities, enterprises and public institutions

Renovation of water pipe network. We will prudently carry out rain and pollution diversion in old urban areas in arid and semi-arid areas

One size does not fit all.

On the treatment of direct discharge of domestic sewage. To carry out direct discharge of domestic sewage source tracing treatment in dry weather

Reason. The capacity of the subsequent sewerage system needs to be considered before terminal interception measures are taken

And the treatment capacity of downstream wastewater treatment plants. Construction dewatering and foundation pit drainage to ensure standards

Discharge, avoid water discharge into the sewage collection system, crowding out the sewage collection and treatment space, increase

Increase energy consumption.

About the systematic renovation of the area. Biochemical oxygen demand (BOD) of inlet water from municipal sewage treatment plant

If the concentration of (BOD) is less than 100 mg/L, the system should be investigated around the service area pipe network

The causes of low intake concentration, scientific determination of water quality improvement objectives, the development and implementation of "a plant

The "One policy" systematic treatment plan steadily improves the efficiency of sewage collection and treatment facilities.

On pollution control of combined flow control. The combined drainage area adopts the source according to local conditions

Reconstruction, overflow port reconstruction, interception well reconstruction, damage repair, pipe replacement, additional adjustment

Engineering measures such as storage facilities and diversion transformation of rain and pollution can reduce the overflow pollution of the combined pipe network in rainy season

Improve rainwater discharge capacity and reduce the risk of urban waterlogging.

About pipe network construction quality control. Strengthen the whole process of pipe network construction quality control, pipe

The material should be durable and applicable, the pipeline foundation should be supported, the pipeline interface should be tight, and the trench backfill should be

Tightness, tightness check should be standardized. Speed up the elimination of brick Wells, promote concrete cast-in-place or

Finished product inspection Wells, promoting ductile iron pipe, socket rubber ring interface reinforced concrete pipe, etc

Pipes.

(2) Strengthen the weak points of urban sewage treatment facilities and improve treatment capacity

1. Construction tasks. Cities and counties where existing sewage treatment capacity cannot meet demand,

We will speed up efforts to fill gaps in processing capacity. The new urban area should promote sewage collection synchronously with urban development

Construction of collective processing facilities. The construction scale of sewage treatment facilities in large and medium-sized cities can be appropriately exceeded

Before. Beijing-tianjin-hebei, Yangtze River Delta, Guangdong-Hong Kong-Macao Greater Bay Area, along the South-to-North Water Diversion Project, the Yangtze River

Economic belt cities and counties, cities along the main stream of the Yellow River to achieve centralized treatment of domestic sewage

Full force coverage. Overall planning, orderly construction, and steady promotion of municipal sewage treatment facilities

Construction, appropriate reserve space for development, centralized if appropriate, scattered if appropriate. Speed up

We will improve sewage collection and treatment capacity in key towns along the Yangtze River Economic Belt. Yangtze River basin and south

In local areas, classified measures should be taken to reduce the overflow pollution of the combined pipe network, and the combined system should be promoted according to local conditions

Construction of rapid purification facilities for overflow sewage. During the "14th Five-Year Plan" period, the sewage treatment capacity was added

20 million cubic meters per day.

2. Technical requirements.

About the layout of sewage treatment facilities. Take full account of urban population size, nature and land

Management conditions, spatial layout and industrial development, as well as sewage collection network construction and sewage resources

Source utilization needs, reasonable planning of urban sewage treatment plant layout, scale and service pattern

Wring. Densely populated areas with large sewage discharge should be mainly treated in a centralized manner

Areas with few mouths, relatively dispersed, and difficult to cover by centralized treatment facilities in the short term

It is necessary to construct distributed and miniaturized sewage treatment facilities. The organized towns were adapted to local conditions and adopted nearby

Centralized joint construction, city side takeover and other ways to build sewage treatment facilities, promote the "biological + ecological" sewage treatment technology.

Discharge standards for sewage treatment plants. Cities of Yangtze River Delta and Guangdong-Hong Kong-Macao Greater Bay Area, Beijing

Cities at prefecture level and above along the Tianjin-Hebei, Yangtze River main stream and South-to-North Water Diversion project, Yellow River basin

Provincial capital cities, separately planned cities can put forward stricter pollutants for urban sewage treatment plants

Emission control requirements. The treatment of wastewater in water environment sensitive areas has basically reached the Grade A discharge standard

Allowed. In other areas, emission standards are scientifically determined according to local conditions, and it is not appropriate to blindly raise standards. Close

Sewage plants in residential areas and environmentally sensitive areas should build deodorization facilities and ensure deodorization effect.

About the combined overflow sewage rapid purification facilities. Checking and repairing the district pipe network

Under the premise of reconstruction, the construction of rapid purification facilities for combined overflow sewage is implemented with high efficiency

Remove sedimentary particles and floating matter, effectively reduce the total amount of urban water pollutants, promote

Long-term maintenance of water environmental quality.

(3) Strengthen the construction of recycling facilities and promote the utilization of sewage resources

1. Construction tasks. Combined with existing sewage treatment facilities upgrading and capacity expansion, system

Planning urban sewage recycling facilities, reasonable determination of recycled water utilization direction, promote real

Now divided quality, sub-object water supply, excellent water use. Downstream of the key sewage outlet, the river into the lake

The mouth and branch flow into the main stream, and implement the regional recycled water recycling project according to local conditions. Lack of

The new urban area of the water city should plan the layout of the reclaimed water pipe network in advance and carry out the construction in an orderly manner. Ehoang

River basin prefecture-level and above cities as the focus, in the Beijing-Tianjin-Hebei, Yangtze River economic belt, the Yellow River flow

Construction sewage in the region, along the South-to-North Water Diversion Project, in the arid areas of northwest China and in the coastal areas lacking water

Demonstration cities for resource utilization, planning and construction of supporting infrastructure, and realizing the scale of reclaimed water

Utilization. Construction of resource and energy benchmark reclaimed water plant. Encourage the extraction of nitrogen and phosphorus from sewage

Matter. During the "14th Five-Year Plan" period, the capacity of new construction, reconstruction and expansion of recycled water production is not less than

15 million cubic meters per day.

2. Technical requirements. Priority should be given to converting standard discharge water into utilizable water in water-scarce areas

The water resources of the nearest natural water body. Promote the use of reclaimed water for construction in resource-based water shortage areas

While using industrial water and municipal water for miscellaneous purposes, encourage the use of reclaimed water for ecological replenishment of rivers, lakes and wetlands

Water. In areas where conditions exist, local water resources are utilized, water environment is improved, and water ecology is improved

Demand, according to local conditions through the construction of wetlands, deep purification projects and other measures to optimize the town

The effluent quality of sewage treatment plants will improve the resource utilization level of urban sewage. Propulsion industry

Production, landscaping, road cleaning, vehicle washing, building construction and other fields are given priority

Use reclaimed water. Encourage industrial parks to cooperate with municipal reclaimed water production and operation units to promote

Point to point water supply.


  • Alcatel WTM11AD 3DW03915DABA01 Optical Transponder Module
  • Alcatel-Lucent 1340FMPK Card Chip BA5IVY6BAA – Processor Module
  • Alcatel-Lucent 3HE06151ACAC01 Control Fabric Module
  • Alcatel-Lucent 9500-MPR 18GHz 1P-1 Protection ODU Radio 3DB20433BA AA04
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 18GHz Radio 3DB20433BAAA04
  • Alcatel-Lucent SM269 LMPQ04KAXX Circuit Pack – Interface Module
  • Alcatel OME25HP Filter Cartridge – 107494
  • Alcatel-Lucent ALU-BZ74 99BC-4 –48V Battery Cabinet
  • Alcatel-Lucent WWAA37 Optical Amplifier WMAPZNZAAB – CP Series
  • ALCATEL LUCENT 9500-MPR ODU RADIO MPT-HC V2 9558HC MPT-XP 3DB20476BAAA04 23GHZ
  • Alcatel Tyco Yukon ES760A Rectifier
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 23GHz 3DB23045HMAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 11GHz 3DB20548ACAA01 Microwave Radio
  • Alcatel Lucent 3DH03173AKAA Module
  • Alcatel-Lucent 76-0300-02 CSM-V2 PCB
  • Alcatel 9400 UX ODU Module 3CC06729ABAA
  • Alcatel-Lucent 408981363 Jigsaw A Band Block 24/-48V KS24624L58
  • Alcatel 3BA53095 PCB Card
  • Alcatel 2C7-1005-000 Bell Jar Holder Ring Teflon PC7-1005-000
  • Alcatel-Lucent ES640 PWDQAGKUAA 5ESS 48V DC Alarm Control Unit
  • Alcatel-Lucent 9500-MPR ODU 300 23GHz Microwave Radio MPT 3DB23045HM
  • Alcatel-Lucent KFA720 WMOTCMVLAB Optical System Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 15GHz Microwave Radio 3DB20373BAAB04
  • Alcatel-Lucent AKM70 S1-7 SMUX1 Sub-Multiplexer – T3PQWAEAAH
  • Alcatel-Lucent 107486490 DDM-2000 SONET DS3 Circuit Pack – BBG4B
  • Alcatel-Lucent SBEVM BNJ82 1:12 Module – AV950-01168
  • Alcatel-Lucent 938A Optical Loss Set – Test & Measurement Kit
  • Alcatel-Lucent MS1025-25O16-ED Fiber Optic Unit – 48VDC
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 1/1P Microwave Radio 3DB20473BA AA04
  • Alcatel-Lucent bCEM-U Control Module – 3BK28676ABAC01
  • Alcatel ASI20 Detector Control Module
  • Alcatel Lucent 130B S-1 PWPQ08B Power Unit
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20441BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20824AAAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20822AAAB02 Microwave Radio
  • Alcatel-Lucent 3AL92111AA 1P10GSO Interface Module
  • Alcatel 8220 CTT 450 Turbo Pump Controller 127821
  • Alcatel-Lucent 3AL78823AAAE 02 Module
  • Alcatel-Lucent 90-0413-01 Universal Card
  • Alcatel-Lucent BRMA 10Base-T/100Base-TX Connecting Box 3BA56170ACAB010842
  • Woodward Micronet 5453-279 Rev E Chassis Rack for TMR Control
  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module
  • Alcatel-Lucent MDEE DPB11 Part 109773580 – Digital Processing Board
  • Alcatel 3EH76027ADAD OmniPCX Enterprise Communication Server R500/30.4
  • Alcatel-Lucent 3EH73084AEJD Gateway Driver Board GD-3 – Communication Interface
  • Alcatel-Lucent 9500-MPR ODU Radio MPT-HC V2 3DB20476BAAB04 23 GHz Microwave Outdoor Unit
  • Alcatel-Lucent 9396 Digital 2U NodeB Indoor – UMTS Base Station
  • Alcatel-Lucent 3HE03607AA CFM-XP Control Fabric Module – Switch Fabric Controller
  • Alcatel-Lucent 8232 DECT Mobile Handset – Cordless Enterprise Phone
  • Alcatel-Lucent 244-2082-201 Sierra NAC V3.1 Slave Package – Network Access Control
  • Alcatel-Lucent 408154912 CPU Rear I/O Pack Card – Backplane Interface Module
  • Alcatel-Lucent 3AL82037ADAA SFP Module
  • Alcatel-Lucent OMQ 408645968 Optical Module
  • Alcatel-Lucent 9500 MPR 8-Slot Shelf 3DB18485AB
  • Alcatel-Lucent 408154904 CPU I/O Card
  • Alcatel-Annecy 5150 CP Turbo Vacuum Pump
  • Alcatel-Lucent 3EH73084AEJD08 Card
  • Alcatel-Lucent 3EH73050ABAB Interface Card
  • Alcatel-Lucent 3HE06151ABAA01 SFP Line Card
  • Alcatel-Lucent 8DG59242AD Power Filter
  • Alcatel-Lucent IMM48-1GB-TX 48-Port Module
  • Alcatel Lucent 3CM03285MQ02 Module
  • Alcatel 3HE07158BA 7750 SR-12 IMM-2PCA-FP3 Optical Transceiver
  • Alcatel-Lucent 9396 Digital 2U NodeB Outdoor with Indoor Mainframe and Alarm Module
  • Alcatel Lucent MPX-16/64-T-L3 MPX1664TL3 Multiplexer Module
  • Alcatel Lucent 3EH73052AB Power Supply Module
  • Alcatel Lucent ASM2-155FM-2W-4C ASM2155FM2W4C Switch Fabric Module
  • Alcatel Lucent 3AL00124ABAB Interface Card
  • Alcatel-Lucent 1AB429380001 Cable Assembly
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA53065AA
  • Alcatel-Lucent 9500-MPR 11GHz MPT-HC ODU Microwave Packet Radio 3DB20371ACAA01
  • Alcatel-Lucent RRH1900-4x45 Remote Radio Head
  • Alcatel-Lucent 3HE00028AA Ethernet Line Card
  • Alcatel-Lucent 3HE04939CE CWDM SFP Transceiver
  • Nokia Alcatel-Lucent 3FE66546AA Fan Module
  • Alcatel-Lucent SSP-6 Speech Signal Processor Board
  • Alcatel-Lucent 500-1113-212 Channel Bank Assembly
  • Alcatel-Lucent EZ32-2 Board 3BA23265ADKE 01
  • Alcatel-Lucent GSM-FM-2W-4C Filter Module
  • Alcatel-Lucent 3AL00378AF Interface Card
  • Alcatel-Lucent 3AL00124ABAC Interface Module
  • Alcatel-Lucent BJB1 PWPQALGAAG 48V Independent Microprocessor Board
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8506-4 with 13 Modules
  • Alcatel Lucent 3AL00424AA Interface Card
  • Alcatel Lucent 3BA73012AB Power Supply Module
  • Alcatel Lucent ESX-100C-32W ESX100C32W Power Supply Module
  • Alcatel Lucent GSX-K-FM-2W GSXKFM2W Fan Module
  • Alcatel 8DG59247AA Optical Protection Switch Card
  • Alcatel Lucent 91-E03100-B 91E03100B Interface Module
  • Alcatel Lucent FSX-FM-1W FSXFM1W Fan Module
  • Alcatel Lucent RRH2X40-07L-AT Remote Radio Head
  • Alcatel-Lucent 9500-MPR MSS-8 Shelf 3DB18485CA
  • Alcatel Annecy ACP20 Vacuum Pump CP20
  • Alcatel-Lucent 9500 MPR P32E1DS1 E1 PDH Card
  • Alcatel-Lucent J98726AL-2 D4OI210DAA Module
  • Alcatel 409113651 RRH700L1 700MHz Remote Radio Head
  • Alcatel io2 3ba23050 PCB Card
  • Alcatel-Lucent MDR-8000 MDR-8706-8 Digital Radio