Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

"14th Five-Year Plan" urban sewage treatment and resource utilization Development planning

来源: | 作者:佚名 | 发布时间 :2023-11-22 | 395 次浏览: | Share:

I. Planning basis and situation outlook

Sewage collection, treatment and resource utilization facilities are the core of urban environmental infrastructure

Composition is an important starting point for in-depth fighting against pollution prevention and control, and for improving urban people

Living in the environment, promoting the modernization of urban governance system and governance capacity, and accelerating the construction of ecological civilization

Promoting high-quality development plays an important role.

Conscientiously implement the decisions and arrangements of the Party Central Committee and The State Council, and constantly increase urban sewage treatment facilities

Construction and operation management, sewage collection and treatment capacity level significantly improved, completed

"13th Five-Year Plan" national urban sewage treatment and recycling facilities construction planning "objectives. with

We should also be clearly aware that the development of urban sewage collection and treatment in our country is unbalanced and inadequate

Problems, weaknesses are still prominent. In particular, the construction and transformation of sewage pipe networks are lagging and dirty

The utilization level of water resources is low, the harmless disposal of sludge is not standardized, and the facilities are sustainable

There is still a gap between China's weak capacity and high-quality development.

The 14th Five-Year Plan period was the first century of our endeavor to build a moderately prosperous society in all respects

After fighting the goal, take advantage of the momentum to start a new phase of building a modern socialist country in an all-round way

The first five years of marching toward the second centenary goal is to enter a new stage of development

An important period to promote high-quality development. "Fourteenth Five-Year Plan" period, we should build high quality

Urban sewage treatment system as the theme, from the incremental construction of the main system to improve the quality and efficiency

Pay equal attention to structural adjustment and optimization, improve the stock, do the best increment, and systematically promote the urban sewage department

Management facilities of high quality construction and operation and maintenance, effectively improve the quality of urban water ecological environment,

We will continue to enhance people's sense of happiness, fulfillment and security.

Second, general requirements

(1) Guiding ideology

The spirit of the Fourth and Fifth Plenary Sessions of the CPC Central Committee should be based on the new development stage, implement the new development concept, and build

The new development pattern, adhere to the system concept, to improve the quality of the water ecological environment as the goal, to

Improve the efficiency of urban sewage collection and treatment, and focus on the strength and weakness of facilities

Hand, overall planning, focus on key points, problem-oriented, classified policies, and accelerate the formation of the layout

Reasonable, coordinated, safe, efficient, energy-saving and low-carbon urban sewage collection and treatment

The new pattern of source utilization, to achieve high-quality development of sewage treatment, sustainable development, meet

The people's growing need for a beautiful ecological environment.

(2) Basic principles

Planning leads, optimize the layout. Strengthen planning guidance and guidance, scientific determination of facilities

Scale and layout, promote river basin linkage, regional coordination, urban and rural overall planning, and achieve supply and demand

Constitutive phase equilibrium. We will make coordinated efforts to promote sewage treatment, improve black and odorous water bodies, and control waterlogging.

Make up the short board, improve the efficiency. We will speed up the collection, treatment and recycling of urban sewage

Utilization and sludge disposal facilities short board, promote the full coverage of urban sewage network, upgrade facilities

Processing power. Promote the integration of plant and network, equal emphasis on mud and water, construction and management, and improve operation management

To achieve stable and reliable operation of facilities and improve the overall efficiency of facilities.

Adopt policies according to local conditions. Combine the local water resources endowment and water environment carrying capacity

Capacity, development needs and economic and technical level and other factors, scientific establishment of facility capacity targets.

Choose economical, energy-saving and low-carbon process routes, and build sewage treatment facilities in different areas

Grant.

Government led, market operation. Give play to the decisive role of the market in allocating resources

So that the government can play its role. Clarify the main body of responsibility, strengthen the standard constraints, and strictly supervise the examination

Core. Improve the price mechanism, increase financial input, attract private capital, and form sustainable development

The construction and operation mode.

(3) Main objectives

-- By 2025, the direct discharge and collection of domestic sewage in urban built-up areas will be basically eliminated

Treatment facilities blank areas, the national urban domestic sewage centralized collection rate strive to reach 70%

Up; City and county sewage treatment capacity basically meet the needs of economic and social development, county

Sewage treatment rate reached 95% or above; The treatment of sewage in water environment sensitive areas has basically reached 1

Class A emission standard; The utilization rate of recycled water in water-scarce cities at the prefecture level and above has reached 25 percent

Above, the Beijing-Tianjin-Hebei region reached more than 35%, and the middle and lower reaches of the Yellow River basin were short at prefecture level and above

Water city strives to reach 30%; City and county sludge harmless, resource utilization level

Further improvement, urban sludge harmless disposal rate reached more than 90%; Yangtze river economy

Belt, the Yellow River basin, the Beijing-Tianjin-Hebei area of the town sewage collection and treatment capacity, sludge harmless

The level of chemical disposal has been significantly improved.

-- By 2035, the urban domestic sewage collection network will be basically covered and urban pollution will be eliminated

Full coverage of water treatment capacity, comprehensive realization of harmless sludge disposal, sewage sludge resources

The utilization level has been significantly improved, and urban sewage has been treated safely and efficiently, and the green is shared by all

Color, ecology, safe urban water ecological environment.

Third, promote the construction of facilities

(1) Make up the short board of the urban sewage network and improve the collection efficiency

1. Construction tasks. New centralized sewage treatment facilities will be built in the area

Sewage collection network to ensure effective collection of sewage. We will speed up the construction of villages and old cities in cities

Domestic sewage collection pipes in districts, towns, urban and rural fringe areas and resettlement areas for poverty alleviation in inhospitable areas

Network to fill the blank area of sewage collection network. New residential communities should be planned and constructed simultaneously

Sewage collection pipe network, promote the construction of branch pipe network and outbound pipe connection. Carry out old and broken

Diagnosis and repair of sewage pipe network and rain-sewage combined system pipe network that damage and easily cause waterlogging

Update, step by step to promote the pipe network misconnection, mixed connection and leakage transformation, improve the efficiency of sewage collection. big

We will implement the renovation and renewal of sewage pipe networks in cities and counties along the main stream of the Yangtze River at the prefecture level and above

Cities have basically solved the problem of mixing and misconnecting municipal sewage networks, and basically eliminated domestic sewage

Row. Diversion of rain and pollution shall be carried out in light of local conditions, and measures shall be taken if conditions are not available for the time being

Reduce the overflow pollution in rainy season. During the "14th Five-Year Plan" period, new and reformed sewage collection pipe network8

Ten thousand kilometers.

2. Technical requirements.

About sewage network checks. Comprehensive investigation of sewage pipe networks, rain and sewage combined pipe networks

Facility functions and operating conditions, misconnection, misconnection, misconnection and user access, etc., to find out the pollution

The bottom of the water pipe network, clarify the problem of sewage collection facilities. Based on geographic information system, etc

Periodic inspection and evaluation system. Urban people's governments organize residential communities, enterprises and institutions

The ownership units, property management units and their competent departments (units) carry out internal pollution

Water pipe network investigation, and carry out remediation.

Construction and renovation of sewage pipe network. New sewage collection pipe, except in arid areas

The network should adopt a split system. The shunt drainage system periodically carries out misconnection and mixed leakage

It is easy to inspect and transform the urban waterlogging pipe network and promote the diagnosis of pipe network diseases

And repair, strengthen the sewage collection network external water infiltration flow, backfilling investigation and treatment. steady

We will move forward with the diversion of rain and pollution, and give priority to the implementation of source drainage in residential communities, enterprises and public institutions

Renovation of water pipe network. We will prudently carry out rain and pollution diversion in old urban areas in arid and semi-arid areas

One size does not fit all.

On the treatment of direct discharge of domestic sewage. To carry out direct discharge of domestic sewage source tracing treatment in dry weather

Reason. The capacity of the subsequent sewerage system needs to be considered before terminal interception measures are taken

And the treatment capacity of downstream wastewater treatment plants. Construction dewatering and foundation pit drainage to ensure standards

Discharge, avoid water discharge into the sewage collection system, crowding out the sewage collection and treatment space, increase

Increase energy consumption.

About the systematic renovation of the area. Biochemical oxygen demand (BOD) of inlet water from municipal sewage treatment plant

If the concentration of (BOD) is less than 100 mg/L, the system should be investigated around the service area pipe network

The causes of low intake concentration, scientific determination of water quality improvement objectives, the development and implementation of "a plant

The "One policy" systematic treatment plan steadily improves the efficiency of sewage collection and treatment facilities.

On pollution control of combined flow control. The combined drainage area adopts the source according to local conditions

Reconstruction, overflow port reconstruction, interception well reconstruction, damage repair, pipe replacement, additional adjustment

Engineering measures such as storage facilities and diversion transformation of rain and pollution can reduce the overflow pollution of the combined pipe network in rainy season

Improve rainwater discharge capacity and reduce the risk of urban waterlogging.

About pipe network construction quality control. Strengthen the whole process of pipe network construction quality control, pipe

The material should be durable and applicable, the pipeline foundation should be supported, the pipeline interface should be tight, and the trench backfill should be

Tightness, tightness check should be standardized. Speed up the elimination of brick Wells, promote concrete cast-in-place or

Finished product inspection Wells, promoting ductile iron pipe, socket rubber ring interface reinforced concrete pipe, etc

Pipes.

(2) Strengthen the weak points of urban sewage treatment facilities and improve treatment capacity

1. Construction tasks. Cities and counties where existing sewage treatment capacity cannot meet demand,

We will speed up efforts to fill gaps in processing capacity. The new urban area should promote sewage collection synchronously with urban development

Construction of collective processing facilities. The construction scale of sewage treatment facilities in large and medium-sized cities can be appropriately exceeded

Before. Beijing-tianjin-hebei, Yangtze River Delta, Guangdong-Hong Kong-Macao Greater Bay Area, along the South-to-North Water Diversion Project, the Yangtze River

Economic belt cities and counties, cities along the main stream of the Yellow River to achieve centralized treatment of domestic sewage

Full force coverage. Overall planning, orderly construction, and steady promotion of municipal sewage treatment facilities

Construction, appropriate reserve space for development, centralized if appropriate, scattered if appropriate. Speed up

We will improve sewage collection and treatment capacity in key towns along the Yangtze River Economic Belt. Yangtze River basin and south

In local areas, classified measures should be taken to reduce the overflow pollution of the combined pipe network, and the combined system should be promoted according to local conditions

Construction of rapid purification facilities for overflow sewage. During the "14th Five-Year Plan" period, the sewage treatment capacity was added

20 million cubic meters per day.

2. Technical requirements.

About the layout of sewage treatment facilities. Take full account of urban population size, nature and land

Management conditions, spatial layout and industrial development, as well as sewage collection network construction and sewage resources

Source utilization needs, reasonable planning of urban sewage treatment plant layout, scale and service pattern

Wring. Densely populated areas with large sewage discharge should be mainly treated in a centralized manner

Areas with few mouths, relatively dispersed, and difficult to cover by centralized treatment facilities in the short term

It is necessary to construct distributed and miniaturized sewage treatment facilities. The organized towns were adapted to local conditions and adopted nearby

Centralized joint construction, city side takeover and other ways to build sewage treatment facilities, promote the "biological + ecological" sewage treatment technology.

Discharge standards for sewage treatment plants. Cities of Yangtze River Delta and Guangdong-Hong Kong-Macao Greater Bay Area, Beijing

Cities at prefecture level and above along the Tianjin-Hebei, Yangtze River main stream and South-to-North Water Diversion project, Yellow River basin

Provincial capital cities, separately planned cities can put forward stricter pollutants for urban sewage treatment plants

Emission control requirements. The treatment of wastewater in water environment sensitive areas has basically reached the Grade A discharge standard

Allowed. In other areas, emission standards are scientifically determined according to local conditions, and it is not appropriate to blindly raise standards. Close

Sewage plants in residential areas and environmentally sensitive areas should build deodorization facilities and ensure deodorization effect.

About the combined overflow sewage rapid purification facilities. Checking and repairing the district pipe network

Under the premise of reconstruction, the construction of rapid purification facilities for combined overflow sewage is implemented with high efficiency

Remove sedimentary particles and floating matter, effectively reduce the total amount of urban water pollutants, promote

Long-term maintenance of water environmental quality.

(3) Strengthen the construction of recycling facilities and promote the utilization of sewage resources

1. Construction tasks. Combined with existing sewage treatment facilities upgrading and capacity expansion, system

Planning urban sewage recycling facilities, reasonable determination of recycled water utilization direction, promote real

Now divided quality, sub-object water supply, excellent water use. Downstream of the key sewage outlet, the river into the lake

The mouth and branch flow into the main stream, and implement the regional recycled water recycling project according to local conditions. Lack of

The new urban area of the water city should plan the layout of the reclaimed water pipe network in advance and carry out the construction in an orderly manner. Ehoang

River basin prefecture-level and above cities as the focus, in the Beijing-Tianjin-Hebei, Yangtze River economic belt, the Yellow River flow

Construction sewage in the region, along the South-to-North Water Diversion Project, in the arid areas of northwest China and in the coastal areas lacking water

Demonstration cities for resource utilization, planning and construction of supporting infrastructure, and realizing the scale of reclaimed water

Utilization. Construction of resource and energy benchmark reclaimed water plant. Encourage the extraction of nitrogen and phosphorus from sewage

Matter. During the "14th Five-Year Plan" period, the capacity of new construction, reconstruction and expansion of recycled water production is not less than

15 million cubic meters per day.

2. Technical requirements. Priority should be given to converting standard discharge water into utilizable water in water-scarce areas

The water resources of the nearest natural water body. Promote the use of reclaimed water for construction in resource-based water shortage areas

While using industrial water and municipal water for miscellaneous purposes, encourage the use of reclaimed water for ecological replenishment of rivers, lakes and wetlands

Water. In areas where conditions exist, local water resources are utilized, water environment is improved, and water ecology is improved

Demand, according to local conditions through the construction of wetlands, deep purification projects and other measures to optimize the town

The effluent quality of sewage treatment plants will improve the resource utilization level of urban sewage. Propulsion industry

Production, landscaping, road cleaning, vehicle washing, building construction and other fields are given priority

Use reclaimed water. Encourage industrial parks to cooperate with municipal reclaimed water production and operation units to promote

Point to point water supply.


  • ABB HIEE300927R0101 UBC717AE101 High Voltage Inverter Board
  • ABB UFC721AE101 3BHB002916R0101 PC Board
  • ABB 5SHY4045L0003 3BHB021400 3BHE019719R0101 GVC736BE101 Diode and grid drive circuits
  • ABB 3BHE019719R0101 GVC736BE101 IGCT Module
  • ABB REM620A_F NAMBBABA33E5BNN1XF Protective Relay
  • ABB PPD113B03-26-100110 3BHE023584R2634 Power Distribution Module
  • ABB MB810 Module Mounting locations
  • ABB 3BHL000986P7000 LXN1604-6 POWER SUPPLY
  • ABB VBX01BA I/O Control Module
  • ABB AI03 AI module, 8-CH, 2-3-4 Wire RTDs
  • ABB 1TGE120010R1300 Industrial Control Module
  • ABB 216BM61b HESG448267R1021 Advanced Process Control Module
  • ABB BDD110 HNLP205879R1 Digital I/O Module
  • ABB IEMPU02 Power Supply Module
  • ABB G3FE HENF452697R1 High performance control module
  • ABB G3FD HENF452692R1 High-Performance Industrial Control Module
  • ABB B5EC HENF105077R1 Electronic Motor Protection Relay
  • ABB G3EFa HENF450295R2 Industrial Automation Module
  • ABB B5EEd HENF105082R4 Electronic Motor Protection Relay
  • ABB O3EId HENF452777R3 Digital Output Module
  • ABB NWX511a-2/R HESG112548R12 Industrial Automation Module
  • ABB E3ES Power communication module
  • ABB O3EX HENF315845R2 Industrial Control Module
  • ABB O3EHa HENF315087R2 Digital Output Module
  • ABB E3ED High-Performance Industrial Controller
  • ABB O3EGb HENF315118R2 Digital Output Module
  • ABB O3ED Digital Input Module
  • ABB O3ES HENF445789R1 Digital Input Module
  • ABB G3ESa HENF318736R1 control module
  • ABB 8025-235 Industrial Control Module
  • ABB 216NG61A HESG441633R1 HESG216875/K main control board
  • ABB SCYC51020 58052582G programmable Logic Controller
  • ABB RED670 Line differential protection
  • ABB PP825A 3BSE042240R3 Touch Screen Panel
  • ABB SCYC51020 58052582/G pulse trigger board
  • ALSTOM COP232.2 VME A32/D32.029.232 446 Controller Unit
  • ABB AO2000 LS25 Laser analyzers
  • ABB LM80 Laser level transmitter
  • ABB PM803F 3BDH000530R1 Base Unit 16 MB
  • ABB SD822 3BSC610038R1 Power Supply Device
  • ABB PCD235B1101 3BHE032025R1101 Industrial Control Module
  • ABB AZ20/112112221112E/STD Control Module
  • ABB UAD142A01 3BHE012551R0001 Industrial Control Module
  • ABB 5SHY35L4503 3BHB004693R0001 3BHB004692R0002 5SXE01-0127 main control board
  • ABB FET3251C0P184C0H2 High-Performance Power Module
  • ABB CAI04 Ability ™ Symphony ® Plus Hardware Selector
  • ABB R474A11XE HAFAABAAABE1BCA1XE output hybrid module
  • ABB REF542PLUS 1VCR007346 Compact Digital Bay Control
  • ABB REF542PLUS 1VCF752000 Feeder Terminal Panel
  • ABB PPD113B03-26-100100 3BHE023584R2625 output hybrid module
  • ABB 3BHE022293R0101 PCD232A Communication Interface Unit
  • ABB CI857K01 3BSE018144R1 Module Controller
  • ABB 3ASC25H216A DATX132 Industrial Controller
  • ABB LWN2660-6 High-Voltage Industrial Controller
  • ABB 1MRK00008-KB Control Module
  • ABB SC540 3BSE006096R1 Submodule Carrier
  • ABB REF615C_C HCFFAEAGANB2BAN1XC feeder protection and measurement and control device
  • ABB S-073N 3BHB009884R0021 multi-function servo driver
  • ABB SK827005 SK827100-AS 480V 60HZ coil
  • GE 029.381208 module
  • ABB REF615E_E HBFHAEAGNCA1BNN1XE Module
  • ABB TP830 3BSE018114R1 Baseplate Module
  • ABB TK803V018 3BSC950130R1 Cable Assembly
  • ABB DSRF197 3BSE019297R1 Controller Module
  • ABB DSAO120A 3BSE018293R1 Advanced Analog Output Board
  • ABB DSDP170 57160001-ADF Pulse Counting Module
  • ABB DSBC176 3BSE019216R1 Bus Extender Board
  • ABB DSDO115A 3BSE018298R1 Digital Output Module
  • ABB PM865K01 3BSE031151R1 Processor Unit HI
  • ABB 5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101 auxiliary DC power supply unit
  • ABB TP853 3BSE018126R1 Power Supply Module
  • ABB REM545AG228AAAA High Precision Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB REM615C_D HCMJAEADAND2BNN1CD Motor protection and control
  • ABB TP857 3BSE030192R1 DCS System
  • ABB PP865A 3BSE042236R2 Touch Panel
  • ABB SCYC51020 58052582H Industrial Automation Control Module
  • ABB SCYC51090 58053899E Control Module
  • ABB CB801 3BSE042245R1 Profibus DP Slave Expansion Module
  • ABB 5SHY4045L0001 3BHB018162R0001 IGCT Module
  • ABB 5SHY6545L0001 AC10272001R0101 5SXE10-0181 High-Power IGCT Module
  • ABB RMU811 Module Termination Unit
  • ABB TVOC-2-240 1SFA664001R1001 Industrial Control Module
  • ABB LDSTA-01 63940143B Input/Output (I/O) Module
  • ABB GJR5252300R3101 07AC91H Analog Input/Output Module
  • ABB GJR5252300R3101 07AC91F Industrial Control Module
  • ABB TB711F 3BDH000365R0001 Industrial Control Module
  • ABB TU715F 3BDH000378R0001 I/O Terminal Unit (ITU)
  • ABB DC732F 3BDH000375R0001 Industrial Controller
  • ABB TTH300 Head-mount temperature transmitter
  • ABB UNS3670A-Z V2 HIEE205011R0002 Industrial Automation Module
  • ABB RC527 3BSE008154R1 Redundant System Control Module
  • ABB 5SHY5055L0002 3BHE019719R0101 GVC736BE101 Industrial Control Module
  • ABB PM866 3BSE050200R1 AC800M series PLC core controller
  • ABB UFC718AE01 HIEE300936R0001 Main Circuit Interface Board
  • ABB DSAI130A 3BSE018292R1 Industrial I/O Module Controller
  • ABB 07KT98 GJR5253100R0278 Advanced Controller Module
  • ABB PFTL101B-5.0kN 3BSE004191R1 Power Conversion Module
  • ABB 5SHX1445H0002 3BHL000387P0101 IGCT Module
  • ABB 3HNM07686-1 3HNM07485-1/07 Controller Module
  • ABB DSCS131 57310001-LM DS Communication Board
  • ABB DSBC172 57310001-KD BUS REPEATER
  • ABB DSRF180A 57310255-AV Digital Remote I/O Module
  • ABB DSTC175 57310001-KN Precision Control Module
  • ABB DSSB140 48980001-P Battery Unit Industrial Control Module
  • ABB UAC389AE02 HIEE300888R0002 PCB Board
  • ABB PFTL101B 20KN 3BSE004203R1 DCS Module
  • ABB UFC718AE101 HIEE300936R0101 PCB Circuit Board
  • ABB UNS2880b-P,V2 3BHE014967R0002 Control Board
  • ABB UNS0887A-P 3BHE008128R0001 Communication Module
  • ABB UNS2882A-P,V1 3BHE003855R0001 EGC Board
  • ABB UNS2882A 3BHE003855R0001 Interface Board
  • ABB UNS4881b,V4 3BHE009949R0004 Controller
  • ABB 216EA62 1MRB150083R1/F 1MRB178066R1/F 216EA62 Redundant system modules
  • ABB 216DB61 HESG324063R100/J Controller Module
  • ABB PFSK142 3BSE006505R1 Control board
  • ABB DSAI133A 3BSE018290R1 Analog Input Module
  • ABB PFTL201C-10KN 3BSE007913R0010 Load Cells
  • ABB CI858-1 3BSE018137R1 Industrial Module
  • ABB 5SHY35L4520 5SXE10-0181 AC10272001R0101 Controller
  • ABB TU847 3BSE022462R1 Module Termination Unit
  • ABB 6231BP10910 PLC Analog Output Module
  • ABB 07BR61R1 GJV3074376R1 Distributed I / O Coupler
  • ABB DI93A HESG440355R3 Digital Input Module
  • ABB IC660BBA104 6231BP10910 Industrial Control Module
  • ABB TP858 3BSE018138R1 Module Controller
  • ABB PFEA111-65 3BSE050090R65 Tension Electronics Module
  • ABB DSMB-02C 3AFE64666606 Power Supply Board