Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

"14th Five-Year Plan" urban sewage treatment and resource utilization Development planning

来源: | 作者:佚名 | 发布时间 :2023-11-22 | 239 次浏览: | Share:

I. Planning basis and situation outlook

Sewage collection, treatment and resource utilization facilities are the core of urban environmental infrastructure

Composition is an important starting point for in-depth fighting against pollution prevention and control, and for improving urban people

Living in the environment, promoting the modernization of urban governance system and governance capacity, and accelerating the construction of ecological civilization

Promoting high-quality development plays an important role.

Conscientiously implement the decisions and arrangements of the Party Central Committee and The State Council, and constantly increase urban sewage treatment facilities

Construction and operation management, sewage collection and treatment capacity level significantly improved, completed

"13th Five-Year Plan" national urban sewage treatment and recycling facilities construction planning "objectives. with

We should also be clearly aware that the development of urban sewage collection and treatment in our country is unbalanced and inadequate

Problems, weaknesses are still prominent. In particular, the construction and transformation of sewage pipe networks are lagging and dirty

The utilization level of water resources is low, the harmless disposal of sludge is not standardized, and the facilities are sustainable

There is still a gap between China's weak capacity and high-quality development.

The 14th Five-Year Plan period was the first century of our endeavor to build a moderately prosperous society in all respects

After fighting the goal, take advantage of the momentum to start a new phase of building a modern socialist country in an all-round way

The first five years of marching toward the second centenary goal is to enter a new stage of development

An important period to promote high-quality development. "Fourteenth Five-Year Plan" period, we should build high quality

Urban sewage treatment system as the theme, from the incremental construction of the main system to improve the quality and efficiency

Pay equal attention to structural adjustment and optimization, improve the stock, do the best increment, and systematically promote the urban sewage department

Management facilities of high quality construction and operation and maintenance, effectively improve the quality of urban water ecological environment,

We will continue to enhance people's sense of happiness, fulfillment and security.

Second, general requirements

(1) Guiding ideology

The spirit of the Fourth and Fifth Plenary Sessions of the CPC Central Committee should be based on the new development stage, implement the new development concept, and build

The new development pattern, adhere to the system concept, to improve the quality of the water ecological environment as the goal, to

Improve the efficiency of urban sewage collection and treatment, and focus on the strength and weakness of facilities

Hand, overall planning, focus on key points, problem-oriented, classified policies, and accelerate the formation of the layout

Reasonable, coordinated, safe, efficient, energy-saving and low-carbon urban sewage collection and treatment

The new pattern of source utilization, to achieve high-quality development of sewage treatment, sustainable development, meet

The people's growing need for a beautiful ecological environment.

(2) Basic principles

Planning leads, optimize the layout. Strengthen planning guidance and guidance, scientific determination of facilities

Scale and layout, promote river basin linkage, regional coordination, urban and rural overall planning, and achieve supply and demand

Constitutive phase equilibrium. We will make coordinated efforts to promote sewage treatment, improve black and odorous water bodies, and control waterlogging.

Make up the short board, improve the efficiency. We will speed up the collection, treatment and recycling of urban sewage

Utilization and sludge disposal facilities short board, promote the full coverage of urban sewage network, upgrade facilities

Processing power. Promote the integration of plant and network, equal emphasis on mud and water, construction and management, and improve operation management

To achieve stable and reliable operation of facilities and improve the overall efficiency of facilities.

Adopt policies according to local conditions. Combine the local water resources endowment and water environment carrying capacity

Capacity, development needs and economic and technical level and other factors, scientific establishment of facility capacity targets.

Choose economical, energy-saving and low-carbon process routes, and build sewage treatment facilities in different areas

Grant.

Government led, market operation. Give play to the decisive role of the market in allocating resources

So that the government can play its role. Clarify the main body of responsibility, strengthen the standard constraints, and strictly supervise the examination

Core. Improve the price mechanism, increase financial input, attract private capital, and form sustainable development

The construction and operation mode.

(3) Main objectives

-- By 2025, the direct discharge and collection of domestic sewage in urban built-up areas will be basically eliminated

Treatment facilities blank areas, the national urban domestic sewage centralized collection rate strive to reach 70%

Up; City and county sewage treatment capacity basically meet the needs of economic and social development, county

Sewage treatment rate reached 95% or above; The treatment of sewage in water environment sensitive areas has basically reached 1

Class A emission standard; The utilization rate of recycled water in water-scarce cities at the prefecture level and above has reached 25 percent

Above, the Beijing-Tianjin-Hebei region reached more than 35%, and the middle and lower reaches of the Yellow River basin were short at prefecture level and above

Water city strives to reach 30%; City and county sludge harmless, resource utilization level

Further improvement, urban sludge harmless disposal rate reached more than 90%; Yangtze river economy

Belt, the Yellow River basin, the Beijing-Tianjin-Hebei area of the town sewage collection and treatment capacity, sludge harmless

The level of chemical disposal has been significantly improved.

-- By 2035, the urban domestic sewage collection network will be basically covered and urban pollution will be eliminated

Full coverage of water treatment capacity, comprehensive realization of harmless sludge disposal, sewage sludge resources

The utilization level has been significantly improved, and urban sewage has been treated safely and efficiently, and the green is shared by all

Color, ecology, safe urban water ecological environment.

Third, promote the construction of facilities

(1) Make up the short board of the urban sewage network and improve the collection efficiency

1. Construction tasks. New centralized sewage treatment facilities will be built in the area

Sewage collection network to ensure effective collection of sewage. We will speed up the construction of villages and old cities in cities

Domestic sewage collection pipes in districts, towns, urban and rural fringe areas and resettlement areas for poverty alleviation in inhospitable areas

Network to fill the blank area of sewage collection network. New residential communities should be planned and constructed simultaneously

Sewage collection pipe network, promote the construction of branch pipe network and outbound pipe connection. Carry out old and broken

Diagnosis and repair of sewage pipe network and rain-sewage combined system pipe network that damage and easily cause waterlogging

Update, step by step to promote the pipe network misconnection, mixed connection and leakage transformation, improve the efficiency of sewage collection. big

We will implement the renovation and renewal of sewage pipe networks in cities and counties along the main stream of the Yangtze River at the prefecture level and above

Cities have basically solved the problem of mixing and misconnecting municipal sewage networks, and basically eliminated domestic sewage

Row. Diversion of rain and pollution shall be carried out in light of local conditions, and measures shall be taken if conditions are not available for the time being

Reduce the overflow pollution in rainy season. During the "14th Five-Year Plan" period, new and reformed sewage collection pipe network8

Ten thousand kilometers.

2. Technical requirements.

About sewage network checks. Comprehensive investigation of sewage pipe networks, rain and sewage combined pipe networks

Facility functions and operating conditions, misconnection, misconnection, misconnection and user access, etc., to find out the pollution

The bottom of the water pipe network, clarify the problem of sewage collection facilities. Based on geographic information system, etc

Periodic inspection and evaluation system. Urban people's governments organize residential communities, enterprises and institutions

The ownership units, property management units and their competent departments (units) carry out internal pollution

Water pipe network investigation, and carry out remediation.

Construction and renovation of sewage pipe network. New sewage collection pipe, except in arid areas

The network should adopt a split system. The shunt drainage system periodically carries out misconnection and mixed leakage

It is easy to inspect and transform the urban waterlogging pipe network and promote the diagnosis of pipe network diseases

And repair, strengthen the sewage collection network external water infiltration flow, backfilling investigation and treatment. steady

We will move forward with the diversion of rain and pollution, and give priority to the implementation of source drainage in residential communities, enterprises and public institutions

Renovation of water pipe network. We will prudently carry out rain and pollution diversion in old urban areas in arid and semi-arid areas

One size does not fit all.

On the treatment of direct discharge of domestic sewage. To carry out direct discharge of domestic sewage source tracing treatment in dry weather

Reason. The capacity of the subsequent sewerage system needs to be considered before terminal interception measures are taken

And the treatment capacity of downstream wastewater treatment plants. Construction dewatering and foundation pit drainage to ensure standards

Discharge, avoid water discharge into the sewage collection system, crowding out the sewage collection and treatment space, increase

Increase energy consumption.

About the systematic renovation of the area. Biochemical oxygen demand (BOD) of inlet water from municipal sewage treatment plant

If the concentration of (BOD) is less than 100 mg/L, the system should be investigated around the service area pipe network

The causes of low intake concentration, scientific determination of water quality improvement objectives, the development and implementation of "a plant

The "One policy" systematic treatment plan steadily improves the efficiency of sewage collection and treatment facilities.

On pollution control of combined flow control. The combined drainage area adopts the source according to local conditions

Reconstruction, overflow port reconstruction, interception well reconstruction, damage repair, pipe replacement, additional adjustment

Engineering measures such as storage facilities and diversion transformation of rain and pollution can reduce the overflow pollution of the combined pipe network in rainy season

Improve rainwater discharge capacity and reduce the risk of urban waterlogging.

About pipe network construction quality control. Strengthen the whole process of pipe network construction quality control, pipe

The material should be durable and applicable, the pipeline foundation should be supported, the pipeline interface should be tight, and the trench backfill should be

Tightness, tightness check should be standardized. Speed up the elimination of brick Wells, promote concrete cast-in-place or

Finished product inspection Wells, promoting ductile iron pipe, socket rubber ring interface reinforced concrete pipe, etc

Pipes.

(2) Strengthen the weak points of urban sewage treatment facilities and improve treatment capacity

1. Construction tasks. Cities and counties where existing sewage treatment capacity cannot meet demand,

We will speed up efforts to fill gaps in processing capacity. The new urban area should promote sewage collection synchronously with urban development

Construction of collective processing facilities. The construction scale of sewage treatment facilities in large and medium-sized cities can be appropriately exceeded

Before. Beijing-tianjin-hebei, Yangtze River Delta, Guangdong-Hong Kong-Macao Greater Bay Area, along the South-to-North Water Diversion Project, the Yangtze River

Economic belt cities and counties, cities along the main stream of the Yellow River to achieve centralized treatment of domestic sewage

Full force coverage. Overall planning, orderly construction, and steady promotion of municipal sewage treatment facilities

Construction, appropriate reserve space for development, centralized if appropriate, scattered if appropriate. Speed up

We will improve sewage collection and treatment capacity in key towns along the Yangtze River Economic Belt. Yangtze River basin and south

In local areas, classified measures should be taken to reduce the overflow pollution of the combined pipe network, and the combined system should be promoted according to local conditions

Construction of rapid purification facilities for overflow sewage. During the "14th Five-Year Plan" period, the sewage treatment capacity was added

20 million cubic meters per day.

2. Technical requirements.

About the layout of sewage treatment facilities. Take full account of urban population size, nature and land

Management conditions, spatial layout and industrial development, as well as sewage collection network construction and sewage resources

Source utilization needs, reasonable planning of urban sewage treatment plant layout, scale and service pattern

Wring. Densely populated areas with large sewage discharge should be mainly treated in a centralized manner

Areas with few mouths, relatively dispersed, and difficult to cover by centralized treatment facilities in the short term

It is necessary to construct distributed and miniaturized sewage treatment facilities. The organized towns were adapted to local conditions and adopted nearby

Centralized joint construction, city side takeover and other ways to build sewage treatment facilities, promote the "biological + ecological" sewage treatment technology.

Discharge standards for sewage treatment plants. Cities of Yangtze River Delta and Guangdong-Hong Kong-Macao Greater Bay Area, Beijing

Cities at prefecture level and above along the Tianjin-Hebei, Yangtze River main stream and South-to-North Water Diversion project, Yellow River basin

Provincial capital cities, separately planned cities can put forward stricter pollutants for urban sewage treatment plants

Emission control requirements. The treatment of wastewater in water environment sensitive areas has basically reached the Grade A discharge standard

Allowed. In other areas, emission standards are scientifically determined according to local conditions, and it is not appropriate to blindly raise standards. Close

Sewage plants in residential areas and environmentally sensitive areas should build deodorization facilities and ensure deodorization effect.

About the combined overflow sewage rapid purification facilities. Checking and repairing the district pipe network

Under the premise of reconstruction, the construction of rapid purification facilities for combined overflow sewage is implemented with high efficiency

Remove sedimentary particles and floating matter, effectively reduce the total amount of urban water pollutants, promote

Long-term maintenance of water environmental quality.

(3) Strengthen the construction of recycling facilities and promote the utilization of sewage resources

1. Construction tasks. Combined with existing sewage treatment facilities upgrading and capacity expansion, system

Planning urban sewage recycling facilities, reasonable determination of recycled water utilization direction, promote real

Now divided quality, sub-object water supply, excellent water use. Downstream of the key sewage outlet, the river into the lake

The mouth and branch flow into the main stream, and implement the regional recycled water recycling project according to local conditions. Lack of

The new urban area of the water city should plan the layout of the reclaimed water pipe network in advance and carry out the construction in an orderly manner. Ehoang

River basin prefecture-level and above cities as the focus, in the Beijing-Tianjin-Hebei, Yangtze River economic belt, the Yellow River flow

Construction sewage in the region, along the South-to-North Water Diversion Project, in the arid areas of northwest China and in the coastal areas lacking water

Demonstration cities for resource utilization, planning and construction of supporting infrastructure, and realizing the scale of reclaimed water

Utilization. Construction of resource and energy benchmark reclaimed water plant. Encourage the extraction of nitrogen and phosphorus from sewage

Matter. During the "14th Five-Year Plan" period, the capacity of new construction, reconstruction and expansion of recycled water production is not less than

15 million cubic meters per day.

2. Technical requirements. Priority should be given to converting standard discharge water into utilizable water in water-scarce areas

The water resources of the nearest natural water body. Promote the use of reclaimed water for construction in resource-based water shortage areas

While using industrial water and municipal water for miscellaneous purposes, encourage the use of reclaimed water for ecological replenishment of rivers, lakes and wetlands

Water. In areas where conditions exist, local water resources are utilized, water environment is improved, and water ecology is improved

Demand, according to local conditions through the construction of wetlands, deep purification projects and other measures to optimize the town

The effluent quality of sewage treatment plants will improve the resource utilization level of urban sewage. Propulsion industry

Production, landscaping, road cleaning, vehicle washing, building construction and other fields are given priority

Use reclaimed water. Encourage industrial parks to cooperate with municipal reclaimed water production and operation units to promote

Point to point water supply.


  • Honeywell MP-SERIES - Datamax Nova4 TT - Label Printer - Thermal Transfer
  • Honeywell RT10W - "- 25.6cm (10.1in) - 1920 x 1200 Pixels - 128GB - 8GB"
  • Honeywell XFL823A - / XFL823A (USED TESTED CLEANED)
  • Honeywell YSTR12D-21A-1F0DDCBA40/Y/K-1C,LC,LP,SM-B77P - NSNP
  • Honeywell DPSU11130044 - Dc Regulated Power Supply 24Vdc 20Amp
  • Honeywell 51304362-150 - NEW LOW LEVEL ANALOG MUX MC-PLAM02
  • Honeywell DMU - AFIS 400-045500-0211 Removed Working
  • Honeywell 900C70S-0360-00 - 1PC 100% test SHIP EXPRESS 90days Warranty #P1827E YL
  • Honeywell RM7800L1087 - Burner Control Module with display
  • Honeywell XFL823A - 24V NSMP
  • Honeywell 10024/I/F - COMMUNICATION CARD NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell TK-PRR021 - REDUNDANCY MODULE 51309288-475 NEW IN BOX
  • Honeywell DR45AT-1100-00-001-0-00000E-0 - Chart Recorder
  • Honeywell Q7750A2003 - New in box Area controller FAST SHIP#XR
  • Honeywell C7012A1152 - 1PC New UV Flame Detector Expedited Shipping
  • Honeywell NXS0500A1009 - NSX SERIES VARIABLE FREQUENCY DRIVE 50HP 380-500V 3-PHASE
  • Honeywell SM200 - Servo Drive 4006719-906 w/ June 2023 Inspected 8130
  • Honeywell PX45A - Ethernet Rewinder+ Label Taken Sense TT 203dpi
  • Honeywell 2MLR-AC22 - " 2mlr-dbsf,2mlf-dc4s,2mlf-rd4a Rack"
  • Honeywell 9806710 - NEW SEALED MEASUREX SSEC SCP CONTROL MODULE NIB 2007
  • Honeywell RM7800L1087 - 1PCS Combustion Controller Brand new fedex or DHL
  • Honeywell DR45AT-1100-44-000-0-3AN000-0 - CHART RECORDER * NEW IN BOX *
  • Honeywell 80360206-001 - USED YAMATAKE CLI BOARD
  • Honeywell TSENALMOX-05682 - "Target, LC5Al 1Sl .5CU, 1.95X11.279X14.495"", 140838"
  • Honeywell EX-DGM506 - Pressure switch for flammable gases / #Z A00A 0232
  • Honeywell CC-PDOB01 - 24VDC F/W G NUPI
  • Honeywell TK-PRS021 - REV E CONTROL PROCESSOR NEW
  • Honeywell 0190-20139/D - Target TSENALMOX-08287 Enraf 2075252-D2 PCB XPU1+ Display Assembly 2558 584-1 4N5TI Sputtering Coating Disc
  • Honeywell SPS5713 - 51199930-100 TDI Power Transistor Devices Main Rack
  • Honeywell MIDAS-I-N2O - ", Gas Detector Via DHL or FedEx"
  • Honeywell TK-PPD011 - NEW 1PCS 51309241-175 51309241-175
  • Honeywell BC7000L1018 - CB70 120V NSMP
  • Honeywell 10006/2/1 - / 1000621 (NEW NO BOX)
  • Honeywell TK-FTEB01 - "FTE connection module , 51309512-175 Via DHL or FedEx"
  • Honeywell 858211-1 - BODY VALVE P/N NE COND # 11429 (2)
  • Honeywell XNX-UTAI-RNNNN - Honeywell
  • Honeywell VR434VA5009-1000 - Servo gas combination valve Brand New Fast shipping
  • Honeywell SPXCDALMFX - plc new FREE EXPEDITED SHIPPING /
  • Honeywell 7000605-902 - Flight Director Mode OH 7-08-2016
  • Honeywell QPP-0001 - NEW
  • Honeywell Q7055C1009/U - Network Adapter
  • Honeywell 51309152-175 - / 51309152175 (NEW IN BOX)
  • Honeywell DR45AT-1111-00-000-0-RA0P00-0 - NEW - Truline DR4500 Chart Recorder ????
  • Honeywell TK-PRS021 - REV N CONTROL PROCESSOR NEW
  • Honeywell 053567-02 - / 05356702 (USED TESTED CLEANED)
  • Honeywell QPP-0002 - Quad Processor Module / 5 Vdc / max. 1.2A / 24Vdc / max.25mA
  • Honeywell ML7999A2001 - NEW Universal Parallel-Positioning Direct Coupled Actuator
  • Honeywell J-MHM10 - PROCESS CONTROLLER
  • Honeywell 51401583-200 - NEW NETWORK INTERFACE CARD 51401583200
  • Honeywell 098067-01 - "USED MEASUREX PC BOARD QSCP W/ F/O I/F TYPE II, 05410100"
  • Honeywell 620-0073 - PROCESSOR MODULE ETHERNET LOOP * NEW NO BOX *
  • Honeywell TK-PRR021 - MEASUREX 51309288-375 REDUNDANCY MODULE NEW
  • Honeywell W7704D-1016 - / W7704D1016 (USED TESTED CLEANED)
  • Honeywell 51305390-400 - NEW PC BOARD W/51305392-100
  • Honeywell YSTA740-E1(G)C1A-1-A-AD0-11-S-B-(1)1A0-F1-0000/PTMVIS-4-AM - "500PSI"
  • Honeywell XF522-A - / XF522A (NEW NO BOX)
  • Honeywell CC-PCNT01 - Module
  • Honeywell TK-PRS021 - 1PC New reduntancy module Via DHL or FedEX
  • Honeywell FS24X-9 - 1PCS Flame Detector FS24X-911-22-1
  • Honeywell LG80A12 - Pressure Ratio Transmitter Overhauled FFA Paperwork Included
  • Honeywell MC-TAMR03 - 51309218-125 DCS card brand new Shipping DHL or FedEX
  • Honeywell ML7999A2001 - Universal Parallel Positioning Direct Coupling Actuator Zy
  • Honeywell 8631800 - Measurex Pbs Detector
  • Honeywell FF-SYB30064M2R - / FFSYB30064M2R (USED TESTED CLEANED)
  • Honeywell TC-IXL062 - module brand new Fast Shipping
  • Honeywell FC-PSU-UNI2450U - Power Supply Module Via FEDEX/DHL
  • Honeywell TC-CCR014 - REDUNDANT NET INTERFACE NEWORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell DMX-A-6212 - DATAMAX O'NEIL PRINT ENGINE (143789 - )
  • Honeywell DR45AT-1000-00-101-0-100000-0 - NSMP
  • Honeywell PX65A00000000200 - PX65A. Ethernet. TT 203 DPI.
  • Honeywell CM4-P - MDA Scientific Analytics Pyrolyzing Gas Monitor
  • Honeywell A06B-0246-B000 - 1PCS NEW fedex or DHL
  • Honeywell 90113 - SPUTTERING TARGET 5N5 Al1Si.5Cu 12.555X11.625X1.600IN
  • Honeywell D15S-80A - Pressure regulator / #Z A00A 8701
  • Honeywell 085621-03 - "USED MEASUREX PC BOARD GP63, 08562103"
  • Honeywell LCNP4M - Spacer 51403776-100 Spacer Board Rev:D Fw: J Card
  • Honeywell YSTR130-/S/10-2/H1F/E - 24VDC UNMP
  • Honeywell DR45AT-1100-00-001-0-600000-0 - NSNP
  • Honeywell 30731832-002 - / 30731832002 (USED TESTED CLEANED)
  • Honeywell TK-IAH161 - NEW REDUNDANT NET INTERFACE IN BOX FREE SHIPPING#XR
  • Honeywell CT40 - 50pcs LCD Touch Digitizer+Front Housing For Dolphin (FSTM2)
  • Honeywell AC-EYV174-2 - VCU with AC-EYV175-A VDU Graphic controller
  • Honeywell XNX-UTAI-RNNNN - 1 PCS New DHL
  • Honeywell PX45A - "12 Points/mm (300dpi), Disp. (Color), RTC, Ethernet, Multi-IF"
  • Honeywell RT10A - "- 25.6cm (10.1"") - 1920 x 1200 Pixels - 32GB - 4GB"
  • Honeywell CC-PAOH01 - * NEW NO BOX *
  • Honeywell PM45C - ", Short Door, 12 Points/mm (300dpi), Peeler, LTU, Disp., USB, USB"
  • Honeywell 10024/I/F - / 10024IF (USED TESTED CLEANED)
  • Honeywell STG770-A1GC1A-1-A-ADC-11S-A-00A0-00-0000 - NSMP
  • Honeywell C7012E1112 - One Explosion-proof Detector New Expedited Shipping
  • Honeywell TC-IXL06 - Brand new in box Input Module TC-IXL06 TC-IXL06 DHL Express
  • Honeywell X-NPMS(H) - Network Paging Console Fire Equipment
  • Honeywell CC-PUIO31 - 51454220-176 Universal I/O Module New Via Fedex/DHL/UPS
  • Honeywell SPXCDALMFX - plc New One Year Warranty#
  • Honeywell MC-TAMT04 - 51305890-175 DCS card brand new Shipping DHL or FedEX
  • Honeywell 51401551-800 - / 51401551800 (USED TESTED CLEANED)
  • Honeywell 32007458-003 - Printed Circuit Board
  • Honeywell 620-3632 - 620-36 IPC PLC PROCESSOR W/ KEY ACCESS4000 620-0041 621-0021R
  • Honeywell 51198651-100 - power supply new
  • Honeywell 8694500 - USED CONTROL PROCESSOR REV. D
  • Honeywell CC-PAIM01 - * NEW NO BOX *
  • Honeywell 51304362-150 - LOW LEVEL ANALOG CARD NEW NO BOX
  • Honeywell RI206S - Remote Controller 4026206-972 w/ October 2019 Overhauled 8130
  • Honeywell 200-01717-0000 - "LATERAL AXIS BP (HONEYWELL) P/N OHC, OUTRIGHT # 12565"
  • Honeywell RCZ851K - Communication Unit 7510700-615 Removed Working
  • Honeywell DR45AT-1100-00-011-A-00000E-0 - 120/240VAC NSMP
  • Honeywell TK-PRS021 - REV M CONTROL PROCESSOR NEW
  • Honeywell 51400903-100 - / 51400903100 (USED TESTED CLEANED)
  • Honeywell 4409SMM - / 4409SMM (USED TESTED CLEANED)
  • Honeywell C7012F1052 - 2022-2023 New Fast Shipping with 1 Year Warranty
  • Honeywell TK-PRS021 - module
  • Honeywell DR45AT-1100-40-001-0-10N000-0 - UNMP
  • Honeywell 51304362-150 - NSMP
  • Honeywell TSVCTADBX-09073 - "TARGET TANTALUM 39.5, 137061"
  • Honeywell 3244759-3 - MAIN FUEL CONTROL UNIT P/N
  • Honeywell 4042181-1002 - "TARGET 1.95X11.279X14.495"", 59.5 {LC5}AL/1SI/.5CU, 112062"
  • Honeywell C7012E1112 - 1PC C7012E 1112 Burner Detector New In Box Expedited Ship
  • Honeywell XF824-A - / XF824A (USED TESTED CLEANED)
  • Honeywell C7012E1112 - 1PC New In Box Flame Detector FAST SHIP
  • Honeywell TC-PRS021 - DCS C200 /PL3
  • Honeywell TK-PRS021 - Brand New reduntancy module 1 year warranty
  • Honeywell MC-TAMR03 - 51309218-175 Low Level Analog Module
  • Honeywell TSENALMOX-05682 - "Target, LC5Al 1Sl .5CU, 1.95X11.279X14.495"", 140839"
  • Honeywell QPP-0002 - Safety Manager Processor
  • Honeywell 30735863-502 - SWITCH
  • Honeywell TK-CCR014 - REDUNDANT NET INTERFACE NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell 51403165-400 - new 51403165400/
  • Honeywell 318-049-001 - "100 Batteries(Japan Liion2Ah14.8Wh)INTERMEC/ PR2,PR3 P/N.:."