Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

"14th Five-Year Plan" urban sewage treatment and resource utilization Development planning

来源: | 作者:佚名 | 发布时间 :2023-11-22 | 559 次浏览: | Share:

I. Planning basis and situation outlook

Sewage collection, treatment and resource utilization facilities are the core of urban environmental infrastructure

Composition is an important starting point for in-depth fighting against pollution prevention and control, and for improving urban people

Living in the environment, promoting the modernization of urban governance system and governance capacity, and accelerating the construction of ecological civilization

Promoting high-quality development plays an important role.

Conscientiously implement the decisions and arrangements of the Party Central Committee and The State Council, and constantly increase urban sewage treatment facilities

Construction and operation management, sewage collection and treatment capacity level significantly improved, completed

"13th Five-Year Plan" national urban sewage treatment and recycling facilities construction planning "objectives. with

We should also be clearly aware that the development of urban sewage collection and treatment in our country is unbalanced and inadequate

Problems, weaknesses are still prominent. In particular, the construction and transformation of sewage pipe networks are lagging and dirty

The utilization level of water resources is low, the harmless disposal of sludge is not standardized, and the facilities are sustainable

There is still a gap between China's weak capacity and high-quality development.

The 14th Five-Year Plan period was the first century of our endeavor to build a moderately prosperous society in all respects

After fighting the goal, take advantage of the momentum to start a new phase of building a modern socialist country in an all-round way

The first five years of marching toward the second centenary goal is to enter a new stage of development

An important period to promote high-quality development. "Fourteenth Five-Year Plan" period, we should build high quality

Urban sewage treatment system as the theme, from the incremental construction of the main system to improve the quality and efficiency

Pay equal attention to structural adjustment and optimization, improve the stock, do the best increment, and systematically promote the urban sewage department

Management facilities of high quality construction and operation and maintenance, effectively improve the quality of urban water ecological environment,

We will continue to enhance people's sense of happiness, fulfillment and security.

Second, general requirements

(1) Guiding ideology

The spirit of the Fourth and Fifth Plenary Sessions of the CPC Central Committee should be based on the new development stage, implement the new development concept, and build

The new development pattern, adhere to the system concept, to improve the quality of the water ecological environment as the goal, to

Improve the efficiency of urban sewage collection and treatment, and focus on the strength and weakness of facilities

Hand, overall planning, focus on key points, problem-oriented, classified policies, and accelerate the formation of the layout

Reasonable, coordinated, safe, efficient, energy-saving and low-carbon urban sewage collection and treatment

The new pattern of source utilization, to achieve high-quality development of sewage treatment, sustainable development, meet

The people's growing need for a beautiful ecological environment.

(2) Basic principles

Planning leads, optimize the layout. Strengthen planning guidance and guidance, scientific determination of facilities

Scale and layout, promote river basin linkage, regional coordination, urban and rural overall planning, and achieve supply and demand

Constitutive phase equilibrium. We will make coordinated efforts to promote sewage treatment, improve black and odorous water bodies, and control waterlogging.

Make up the short board, improve the efficiency. We will speed up the collection, treatment and recycling of urban sewage

Utilization and sludge disposal facilities short board, promote the full coverage of urban sewage network, upgrade facilities

Processing power. Promote the integration of plant and network, equal emphasis on mud and water, construction and management, and improve operation management

To achieve stable and reliable operation of facilities and improve the overall efficiency of facilities.

Adopt policies according to local conditions. Combine the local water resources endowment and water environment carrying capacity

Capacity, development needs and economic and technical level and other factors, scientific establishment of facility capacity targets.

Choose economical, energy-saving and low-carbon process routes, and build sewage treatment facilities in different areas

Grant.

Government led, market operation. Give play to the decisive role of the market in allocating resources

So that the government can play its role. Clarify the main body of responsibility, strengthen the standard constraints, and strictly supervise the examination

Core. Improve the price mechanism, increase financial input, attract private capital, and form sustainable development

The construction and operation mode.

(3) Main objectives

-- By 2025, the direct discharge and collection of domestic sewage in urban built-up areas will be basically eliminated

Treatment facilities blank areas, the national urban domestic sewage centralized collection rate strive to reach 70%

Up; City and county sewage treatment capacity basically meet the needs of economic and social development, county

Sewage treatment rate reached 95% or above; The treatment of sewage in water environment sensitive areas has basically reached 1

Class A emission standard; The utilization rate of recycled water in water-scarce cities at the prefecture level and above has reached 25 percent

Above, the Beijing-Tianjin-Hebei region reached more than 35%, and the middle and lower reaches of the Yellow River basin were short at prefecture level and above

Water city strives to reach 30%; City and county sludge harmless, resource utilization level

Further improvement, urban sludge harmless disposal rate reached more than 90%; Yangtze river economy

Belt, the Yellow River basin, the Beijing-Tianjin-Hebei area of the town sewage collection and treatment capacity, sludge harmless

The level of chemical disposal has been significantly improved.

-- By 2035, the urban domestic sewage collection network will be basically covered and urban pollution will be eliminated

Full coverage of water treatment capacity, comprehensive realization of harmless sludge disposal, sewage sludge resources

The utilization level has been significantly improved, and urban sewage has been treated safely and efficiently, and the green is shared by all

Color, ecology, safe urban water ecological environment.

Third, promote the construction of facilities

(1) Make up the short board of the urban sewage network and improve the collection efficiency

1. Construction tasks. New centralized sewage treatment facilities will be built in the area

Sewage collection network to ensure effective collection of sewage. We will speed up the construction of villages and old cities in cities

Domestic sewage collection pipes in districts, towns, urban and rural fringe areas and resettlement areas for poverty alleviation in inhospitable areas

Network to fill the blank area of sewage collection network. New residential communities should be planned and constructed simultaneously

Sewage collection pipe network, promote the construction of branch pipe network and outbound pipe connection. Carry out old and broken

Diagnosis and repair of sewage pipe network and rain-sewage combined system pipe network that damage and easily cause waterlogging

Update, step by step to promote the pipe network misconnection, mixed connection and leakage transformation, improve the efficiency of sewage collection. big

We will implement the renovation and renewal of sewage pipe networks in cities and counties along the main stream of the Yangtze River at the prefecture level and above

Cities have basically solved the problem of mixing and misconnecting municipal sewage networks, and basically eliminated domestic sewage

Row. Diversion of rain and pollution shall be carried out in light of local conditions, and measures shall be taken if conditions are not available for the time being

Reduce the overflow pollution in rainy season. During the "14th Five-Year Plan" period, new and reformed sewage collection pipe network8

Ten thousand kilometers.

2. Technical requirements.

About sewage network checks. Comprehensive investigation of sewage pipe networks, rain and sewage combined pipe networks

Facility functions and operating conditions, misconnection, misconnection, misconnection and user access, etc., to find out the pollution

The bottom of the water pipe network, clarify the problem of sewage collection facilities. Based on geographic information system, etc

Periodic inspection and evaluation system. Urban people's governments organize residential communities, enterprises and institutions

The ownership units, property management units and their competent departments (units) carry out internal pollution

Water pipe network investigation, and carry out remediation.

Construction and renovation of sewage pipe network. New sewage collection pipe, except in arid areas

The network should adopt a split system. The shunt drainage system periodically carries out misconnection and mixed leakage

It is easy to inspect and transform the urban waterlogging pipe network and promote the diagnosis of pipe network diseases

And repair, strengthen the sewage collection network external water infiltration flow, backfilling investigation and treatment. steady

We will move forward with the diversion of rain and pollution, and give priority to the implementation of source drainage in residential communities, enterprises and public institutions

Renovation of water pipe network. We will prudently carry out rain and pollution diversion in old urban areas in arid and semi-arid areas

One size does not fit all.

On the treatment of direct discharge of domestic sewage. To carry out direct discharge of domestic sewage source tracing treatment in dry weather

Reason. The capacity of the subsequent sewerage system needs to be considered before terminal interception measures are taken

And the treatment capacity of downstream wastewater treatment plants. Construction dewatering and foundation pit drainage to ensure standards

Discharge, avoid water discharge into the sewage collection system, crowding out the sewage collection and treatment space, increase

Increase energy consumption.

About the systematic renovation of the area. Biochemical oxygen demand (BOD) of inlet water from municipal sewage treatment plant

If the concentration of (BOD) is less than 100 mg/L, the system should be investigated around the service area pipe network

The causes of low intake concentration, scientific determination of water quality improvement objectives, the development and implementation of "a plant

The "One policy" systematic treatment plan steadily improves the efficiency of sewage collection and treatment facilities.

On pollution control of combined flow control. The combined drainage area adopts the source according to local conditions

Reconstruction, overflow port reconstruction, interception well reconstruction, damage repair, pipe replacement, additional adjustment

Engineering measures such as storage facilities and diversion transformation of rain and pollution can reduce the overflow pollution of the combined pipe network in rainy season

Improve rainwater discharge capacity and reduce the risk of urban waterlogging.

About pipe network construction quality control. Strengthen the whole process of pipe network construction quality control, pipe

The material should be durable and applicable, the pipeline foundation should be supported, the pipeline interface should be tight, and the trench backfill should be

Tightness, tightness check should be standardized. Speed up the elimination of brick Wells, promote concrete cast-in-place or

Finished product inspection Wells, promoting ductile iron pipe, socket rubber ring interface reinforced concrete pipe, etc

Pipes.

(2) Strengthen the weak points of urban sewage treatment facilities and improve treatment capacity

1. Construction tasks. Cities and counties where existing sewage treatment capacity cannot meet demand,

We will speed up efforts to fill gaps in processing capacity. The new urban area should promote sewage collection synchronously with urban development

Construction of collective processing facilities. The construction scale of sewage treatment facilities in large and medium-sized cities can be appropriately exceeded

Before. Beijing-tianjin-hebei, Yangtze River Delta, Guangdong-Hong Kong-Macao Greater Bay Area, along the South-to-North Water Diversion Project, the Yangtze River

Economic belt cities and counties, cities along the main stream of the Yellow River to achieve centralized treatment of domestic sewage

Full force coverage. Overall planning, orderly construction, and steady promotion of municipal sewage treatment facilities

Construction, appropriate reserve space for development, centralized if appropriate, scattered if appropriate. Speed up

We will improve sewage collection and treatment capacity in key towns along the Yangtze River Economic Belt. Yangtze River basin and south

In local areas, classified measures should be taken to reduce the overflow pollution of the combined pipe network, and the combined system should be promoted according to local conditions

Construction of rapid purification facilities for overflow sewage. During the "14th Five-Year Plan" period, the sewage treatment capacity was added

20 million cubic meters per day.

2. Technical requirements.

About the layout of sewage treatment facilities. Take full account of urban population size, nature and land

Management conditions, spatial layout and industrial development, as well as sewage collection network construction and sewage resources

Source utilization needs, reasonable planning of urban sewage treatment plant layout, scale and service pattern

Wring. Densely populated areas with large sewage discharge should be mainly treated in a centralized manner

Areas with few mouths, relatively dispersed, and difficult to cover by centralized treatment facilities in the short term

It is necessary to construct distributed and miniaturized sewage treatment facilities. The organized towns were adapted to local conditions and adopted nearby

Centralized joint construction, city side takeover and other ways to build sewage treatment facilities, promote the "biological + ecological" sewage treatment technology.

Discharge standards for sewage treatment plants. Cities of Yangtze River Delta and Guangdong-Hong Kong-Macao Greater Bay Area, Beijing

Cities at prefecture level and above along the Tianjin-Hebei, Yangtze River main stream and South-to-North Water Diversion project, Yellow River basin

Provincial capital cities, separately planned cities can put forward stricter pollutants for urban sewage treatment plants

Emission control requirements. The treatment of wastewater in water environment sensitive areas has basically reached the Grade A discharge standard

Allowed. In other areas, emission standards are scientifically determined according to local conditions, and it is not appropriate to blindly raise standards. Close

Sewage plants in residential areas and environmentally sensitive areas should build deodorization facilities and ensure deodorization effect.

About the combined overflow sewage rapid purification facilities. Checking and repairing the district pipe network

Under the premise of reconstruction, the construction of rapid purification facilities for combined overflow sewage is implemented with high efficiency

Remove sedimentary particles and floating matter, effectively reduce the total amount of urban water pollutants, promote

Long-term maintenance of water environmental quality.

(3) Strengthen the construction of recycling facilities and promote the utilization of sewage resources

1. Construction tasks. Combined with existing sewage treatment facilities upgrading and capacity expansion, system

Planning urban sewage recycling facilities, reasonable determination of recycled water utilization direction, promote real

Now divided quality, sub-object water supply, excellent water use. Downstream of the key sewage outlet, the river into the lake

The mouth and branch flow into the main stream, and implement the regional recycled water recycling project according to local conditions. Lack of

The new urban area of the water city should plan the layout of the reclaimed water pipe network in advance and carry out the construction in an orderly manner. Ehoang

River basin prefecture-level and above cities as the focus, in the Beijing-Tianjin-Hebei, Yangtze River economic belt, the Yellow River flow

Construction sewage in the region, along the South-to-North Water Diversion Project, in the arid areas of northwest China and in the coastal areas lacking water

Demonstration cities for resource utilization, planning and construction of supporting infrastructure, and realizing the scale of reclaimed water

Utilization. Construction of resource and energy benchmark reclaimed water plant. Encourage the extraction of nitrogen and phosphorus from sewage

Matter. During the "14th Five-Year Plan" period, the capacity of new construction, reconstruction and expansion of recycled water production is not less than

15 million cubic meters per day.

2. Technical requirements. Priority should be given to converting standard discharge water into utilizable water in water-scarce areas

The water resources of the nearest natural water body. Promote the use of reclaimed water for construction in resource-based water shortage areas

While using industrial water and municipal water for miscellaneous purposes, encourage the use of reclaimed water for ecological replenishment of rivers, lakes and wetlands

Water. In areas where conditions exist, local water resources are utilized, water environment is improved, and water ecology is improved

Demand, according to local conditions through the construction of wetlands, deep purification projects and other measures to optimize the town

The effluent quality of sewage treatment plants will improve the resource utilization level of urban sewage. Propulsion industry

Production, landscaping, road cleaning, vehicle washing, building construction and other fields are given priority

Use reclaimed water. Encourage industrial parks to cooperate with municipal reclaimed water production and operation units to promote

Point to point water supply.


  • Metso A413177 Digital Interface Control Module
  • METSO A413222 8-Channel Isolated Temperature Input Module
  • Metso A413313 Interface Control Module
  • METSO D100532 Control System Module
  • METSO A413310 8-Channel Digital Output Module
  • METSO A413659 Automation Control Module
  • Metso D100314 Process Control Interface Module
  • METSO A413665 8-Channel Analog Output Module
  • METSO A413654 Automation Control Module
  • Metso A413325 Interface Control Module
  • METSO A413110 8-Channel Analog Input Module
  • METSO A413144 Automation Control Module
  • Metso A413160 Digital Interface Control Module
  • METSO A413152 8-Channel Digital Input Module
  • METSO A413240A Automation Control Module
  • METSO A413146 Digital Interface Control Module
  • METSO A413150 Multi-Role Industrial Automation Module
  • METSO A413125 Automation Control / I/O Module
  • Metso A413111 Interface Control Module
  • METSO A413140 Automation Control Module
  • METSO 020A0082 Pneumatic Control Valve Component
  • METSO 02VA0093 Automation Control Module
  • METSO 02VA0153 Actuator Control Module
  • METSO 02VA0190 Automation Control Module
  • Metso 02VA0193 Pneumatic Control Valve Component
  • METSO 02VA0175 Valve Actuator Module
  • METSO D100308 Industrial Control Module
  • MOOG QAIO2/2-AV D137-001-011 Analog Input/Output Module
  • MOOG D136-002-002 Servo Drive or Control Module
  • MOOG D136-002-005 Servo Drive Control Module
  • MOOG D136E001-001 Servo Control Card Module
  • MOOG M128-010-A001B Servo Control Module Variant
  • MOOG G123-825-001 Servo Control Module
  • MOOG D136-001-008a Servo Control Card Module
  • MOOG M128-010 Servo Control Module
  • MOOG T161-902A-00-B4-2-2A Servo-Proportional Control Module
  • MOTOROLA 21255-1 Electronic Component Module
  • MOTOROLA 12967-1 / 13000C Component Assembly
  • MOTOROLA 01-W3914B Industrial Control Module
  • Motorola MVME2604-4351 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME162-513A VMEbus Embedded Computer Board
  • MOTOROLA MPC2004 Embedded PowerPC Processor
  • Motorola MVME6100 VMEbus Single Board Computer
  • MOTOROLA MVME162PA-344E VMEbus Embedded Computer Board
  • MOTOROLA RSG2PMC RSG2PMCF-NK2 PMC Expansion Module
  • Motorola APM-420A Analog Power Monitoring Module
  • MOTOROLA 0188679 0190530 Component Pair
  • Motorola 188987-008R 188987-008R001 Power Control Module
  • MOTOROLA DB1-1 DB1-FALCON Control Interface Module
  • MOTOROLA AET-3047 Antenna Module
  • Motorola MVME2604761 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME761-001 VMEbus Single Board Computer
  • MOTOROLA 84-W8865B01B Electronic System Module
  • Motorola MVIP301 Digital Telephony Interface Module
  • MOTOROLA 84-W8973B01A Industrial Control Module
  • MOTOROLA MVME2431 VMEbus Embedded Computer Board
  • MOTOROLA MVME172PA-652SE VMEbus Single Board Computer
  • Motorola MVME162-223 VMEbus Single Board Computer
  • MOTOROLA BOARD 466023 Electronic Circuit Board
  • Motorola MVME333-2 6-Channel Serial Communication Controller
  • MOTOROLA 01-W3324F Industrial Control Module
  • MOTOROLA MVME335 VMEbus Embedded Computer Board
  • Motorola MVME147SRF VMEbus Single Board Computer
  • MOTOROLA MVME705B VMEbus Single Board Computer
  • MOTOROLA MVME712A/AM VMEbus Embedded Computer Board
  • MOTOROLA MVME715P VMEbus Single Board Computer
  • Motorola MVME172-533 VMEbus Single Board Computer
  • Motorola TMCP700 W33378F Control Processor Module
  • MOTOROLA MVME188A VMEbus Embedded Computer Board
  • Motorola MVME712/M VME Transition Module
  • Motorola 30-W2960B01A Industrial Processor Control Module
  • MOTOROLA FAB 0340-1049 Electronic Module
  • Motorola MVME162-210 VME Single Board Computer
  • Motorola MVME300 VMEbus GPIB IEEE-488 Interface Controller
  • MOTOROLA CPCI-6020TM CompactPCI Processor Board
  • Motorola MVME162-522A VMEbus Single Board Computer
  • MOTOROLA MVME162-512A VMEbus Single Board Computer
  • MOTOROLA MVME162-522A 01-W3960B/61C VMEbus Single Board Computer
  • MOTOROLA MVME162-220 VMEbus Embedded Computer Board
  • Motorola MVME162-13 VMEbus Single Board Computer
  • MOTOROLA MVME162-10 VMEbus Single Board Computer
  • RELIANCE 57C330C AutoMax Network Interface Module
  • RELIANCE 6MDBN-012102 Drive System Module
  • RELIANCE 0-60067-1 Industrial Drive Control Module
  • Reliance Electric 0-60067-A AutoMax Communication Module
  • RELIANCE S0-60065 System Control Module
  • RELIANCE S-D4006-F Industrial Drive Control Module
  • Reliance Electric S-D4011-E Shark I/O Analog Input Module
  • RELIANCE S-D4009-D Drive Control Module
  • RELIANCE S-D4043 Drive Control Module
  • Reliance DSA-MTR60D Digital Servo Motor Interface Module
  • RELIANCE 0-60063-2 Industrial Drive Control Module
  • RELIANCE S-D4041 Industrial Control Module
  • Reliance Electric SR3000 2SR40700 Power Module
  • RELIANCE VZ7000 UVZ701E Variable Frequency Drive Module
  • RELIANCE VZ3000G UVZC3455G Drive System Module
  • Reliance Electric S-D4039 Remote I/O Head Module
  • RELIANCE 0-57210-31 Industrial Drive Control Module
  • RELIANCE 0-56942-1-CA Control System Module
  • Reliance Electric 0-57100 AutoMax Power Supply Module
  • RELIANCE 0-54341-21 Industrial Control Module
  • RELIANCE 0-52712 800756-21B Drive Interface Board
  • KEBA PS242 - Power Supply Module
  • KEBA BL460A - Bus Coupling Module
  • KEBA K2-400 OF457/A Operating Panel
  • KEBA T200-M0A-Z20S7 Panel PC
  • KEBA K2-700 AMT9535 Touch Screen Panel
  • KEBA T20e-r00-Am0-C Handheld Terminal
  • KEBA OP350-LD/J-600 Operating Panel
  • KEBA 3HAC028357-001 DSQC 679 IRC5 Teach Pendant
  • KEBA E-32-KIGIN Digital Input Card
  • KEBA FP005 Front Panel
  • KEBA BT081 2064A-0 Module
  • KEBA FP-005-LC / FP-004-LC Front Panel
  • KEBA SI232 Serial Interface
  • KEBA T70-M00-AA0-LE KeTop Teach Pendant
  • KEBA KEMRO-BUS-8 Bus Module
  • KEBA IT-10095 Interface Terminal
  • KEBA RFG-150AWT Power Supply Unit
  • KEBA C55-200-BU0-W Control Unit
  • KEBA Tt100-MV1 Temperature Module
  • KEBA E-HSI-RS232 D1714C / D1714B Interface Module
  • KEBA E-HSI-CL D1713D Interface Module
  • KEBA D1321F-1 Input Module
  • KEBA E-32-D Digital Input Card
  • KEBA C5 DM570 Digital Module
  • KEBA XE020 71088 Module
  • KEBA E-16-DIGOUT Digital Output Card