Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Safeguards for sewage treatment

来源: | 作者:佚名 | 发布时间 :2023-11-22 | 202 次浏览: | Share:

Crack the difficulties of sludge disposal and achieve harmless promotion of resources

1. Construction tasks. Sludge disposal facilities should be included in local sewage treatment facilities construction regulations

Row. The existing sludge disposal capacity can not meet the needs of cities and counties, to speed up to make up

Gap, town and county sludge disposal should be considered as a whole. Eastern region city, east and west

Large and medium-sized cities in the Ministry and cities with conditions in other areas will speed up the reduction of sludge filling

Buried scale, and actively promote the utilization of sludge resources. During the "14th Five-Year Plan" period, new sludge (including

Water rate of 80% wet sludge) harmless disposal facility scale is not less than 20,000 tons/day.

2. Technical requirements.

Harmless disposal of sludge. New sewage treatment plants must have clear sludge sites

Set the path. Encourage the use of thermal hydrolysis, anaerobic digestion, aerobic fermentation, drying and other methods

Carry out harmless treatment. Encourage the use of sludge and kitchen, kitchen waste jointly treatment facilities

To improve the comprehensive disposal level of urban organic waste. Develop a collaborative sludge disposal system

When constructing, the operation and process of existing local sludge disposal facilities should be fully considered

Use case.

Sanitary landfill disposal of sludge. Limit the sludge that has not been dehydrated to meet the standards

Landfill landfill. If collaborative disposal is adopted, sanitary landfill can be used as collaborative disposal

Emergency measures in case of facility failure or maintenance.

About sludge resource utilization. In the realization of sludge stabilization, harmless disposal premise

Next, steadily promote the utilization of resources. After the harmless treatment of sludge meets the relevant standards, it can

It is used for land improvement, afforestation of wasteland, nursery care, landscaping and agricultural utilization. drum

Encourage the recovery and utilization of sludge energy resources, and promote the use of large and medium-sized cities with scarce land resources

"Biomass utilization + incineration", "drying + land use" and other models. Promote the incineration of sludge ash

Utilization of slag building materials.

Fourth, strengthen operation and maintenance

1. Improve assessment and incentive mechanisms

The objective tasks of centralized collection of municipal domestic sewage and utilization of recycled water are included in the local phase

Close planning, implementation of the main body of responsibility, strengthen supervision and assessment. Build to reduce performance by pollutants

In the oriented assessment system, when the government and the enterprise sign the project agreement, the sewage should be treated

The core indexes are the concentration of pollutants, the reduction amount of pollutants and the harmless disposal rate of sludge

The standard is included in the scope of assessment, and the linkage assessment of project construction and operation effect is carried out. Put into operation

As an important indicator, strength and level are included in the selection criteria of project construction and operation enterprises.

(2) Promoting professional operation and maintenance

The urban people's government shall be the master of the management and maintenance of urban drainage and sewage treatment facilities

To promote the confirmation and transfer of ownership of non-owner municipal management sections or facilities. Establish locally based,

A stable professional team of personnel, the establishment of a normal construction management mechanism, in strict accordance with the phase

Implement operation and maintenance of standard quota. Promote and implement the integration of water supply and drainage, "factory - network - river.

"(Lake)" integrated professional operation and maintenance to ensure the systemization of sewage collection and treatment facilities

And integrity. Encourage residential communities to entrust the maintenance of internal pipe networks to municipal drainage networks

The operation and maintenance unit shall implement and establish a cost guarantee mechanism shared by the government and residents. strengthen

Personnel training, improve the level of professional skills, to ensure the safe and stable operation of facilities. Extension area

Construction and operation of projects with different profit levels in the domain. Central enterprises are encouraged to fulfill social obligations

Responsibility, give play to the advantages of professional large-scale construction and operation.

3. Promoting the development of information systems

With local people's governments as the main body of implementation, urban sewage treatment facilities shall be established according to law

Management information system and regular update, or rely on the existing platform to improve the relevant functions, to achieve city

Town sewage facilities information, ledger management. Promote drainage households, trunk branch pipe networks, pumps

Intelligent linkage and dynamic update of water data of stations, sewage treatment plants, rivers and lakes are carried out regularly

State monitoring and evaluation to ensure stable operation of facilities.

V. Safeguard measures

1. Strengthening accountability

In accordance with the requirements of provincial deployment and city and county responsibility, the system plans the "14th Five-Year Plan" urban sewage

Construction and operation of treatment and resource utilization facilities. All provinces (autonomous regions and municipalities) make adjustments to their local conditions

Set the target of centralized collection rate of domestic sewage in each city, in principle, should reach more than 70% or ratio

It will increase by more than 5 percentage points in 2020. Provincial-level development and reform departments work together on urban drainage

The competent authorities formulated and introduced the local "14th Five-Year Plan" urban sewage treatment and resource utilization development regulations

Define the scale of construction in the region, key tasks and government safeguard measures. City and county responsibility

Main responsibility, do project planning and reserve, make rolling project list and annual schedule

Plan, clear the construction timing, promote the project construction in an orderly manner, and avoid "rushing forward". Urban pollution

Land for rapid purification facilities for water treatment and combined overflow pollution should be included in the land use year

Plan. Establish and improve the joint examination and approval system for construction and renovation projects of urban sewage treatment facilities

Optimize the approval process, improve the approval efficiency, and ensure that the construction is on time and quality.

2. Expand investment and financing channels

Local people's governments at all levels shall establish diversified mechanisms for ensuring the investment of financial funds

To arrange construction funds in the medium-term financial planning and annual plan. Special projects for local governments

Bonds support the construction of qualified urban sewage treatment and resource utilization facilities. centre

The budget funds shall be appropriate for the construction of urban sewage treatment and sewage resource utilization facilities

Supported. We will standardize and promote the public-private partnership (PPP) model in an orderly manner to guide society

Capital actively participates in construction and operation. Encourage enterprises to adopt green bonds and asset securitization

Means to expand financing channels according to law and regulations. Encourage financial institutions in the risk control, business

Provide medium - and long-term credit support on the premise of sustainability. Actively promote the infrastructure sector no

Pilot movable property investment trust. Explore project income rights, franchise rights and other pledge financing

A guarantee.

3. Improving the fee, price and tax mechanism

All places should cover the normal operation of sewage treatment facilities and the cost of sludge disposal

The principle of profit, reasonable development of sewage treatment fee standards, and according to local water pollution prevention

Treatment objectives require that the cost of upgrading sewage discharge standards and sludge disposal be reasonably increased

Factor dynamic adjustment. The provinces (municipalities) of the Yangtze River Economic Belt shall follow the "On Improving the Yangtze River Economy"

With the sewage treatment charging mechanism related policy guidance "requirements to ensure that the policy is implemented

Matter. Strengthen the management of users of self-provided water sources, implement meter metering, and ensure sewage treatment

All fees should be collected. Before the sewage treatment fee standards are adjusted, they shall be given according to regulations

Subsidies to ensure the normal operation and maintenance of urban sewage collection and treatment facilities. Encourage the establishment of operational services

The service fee is linked to the concentration of influent pollutants and the reduction amount of pollutants in the sewage treatment plant, and is paid according to the efficiency

Fee mechanism. Encourage the determination of sewage treatment service fee water through market-based methods such as bidding

Yes. Let the government set the price of recycled water, and let the recycled water supply enterprises and users follow the principle of high quality

Price principle independent negotiation pricing. For providing public ecological environment service function of rivers and lakes

The use of reclaimed water for ecological replenishment and landscape environment water is encouraged to use government purchased clothing

To promote the utilization of sewage resources. All localities should implement environmental protection and water resources in accordance with the law

Preferential tax policies on conservation and sewage resource utilization.

4. Strengthen oversight and management

Implement the concept of "water saving means pollution control", and carry out national water-saving actions. Scientific revision

Local water pollutant discharge standards, put forward differentiated pollutant discharge requirements and control measures

Grant. Strictly implement the Regulations on Urban Drainage and Sewage Treatment and the Sewage Discharge Permit Management

Strengthen sewage treatment standards discharge supervision and supervision and inspection. Strengthen the urban "small scattered" along the street shops and other regulation and management, construction precipitation, foundation pit drainage should be in accordance with the law

Let go. Regulate drainage management in industrial enterprises and industrial parks, local people's governments at all levels and industrial parks

The district management agency shall investigate the situation of industrial wastewater entering municipal sewage collection facilities,

Organize and conduct an assessment, after which it is determined that the pollutants cannot be effectively disposed of by the municipal sewage treatment plant

If it may affect the stability of the effluent from the sewage treatment plant to reach the standard, it shall be withdrawn within a time limit. Reinforcing tube

Material quality market supervision, strict production quality, with shoddy pipe production and sales gathered

As the focus, crack down on fake and inferior products. Strict project supervision, completion acceptance and removal

Pay, strictly the quality of the project, serious accountability. Improve the information disclosure system, perfect

Public participation mechanism to play a role in social supervision.


  • Honeywell MP-SERIES - Datamax Nova4 TT - Label Printer - Thermal Transfer
  • Honeywell RT10W - "- 25.6cm (10.1in) - 1920 x 1200 Pixels - 128GB - 8GB"
  • Honeywell XFL823A - / XFL823A (USED TESTED CLEANED)
  • Honeywell YSTR12D-21A-1F0DDCBA40/Y/K-1C,LC,LP,SM-B77P - NSNP
  • Honeywell DPSU11130044 - Dc Regulated Power Supply 24Vdc 20Amp
  • Honeywell 51304362-150 - NEW LOW LEVEL ANALOG MUX MC-PLAM02
  • Honeywell DMU - AFIS 400-045500-0211 Removed Working
  • Honeywell 900C70S-0360-00 - 1PC 100% test SHIP EXPRESS 90days Warranty #P1827E YL
  • Honeywell RM7800L1087 - Burner Control Module with display
  • Honeywell XFL823A - 24V NSMP
  • Honeywell 10024/I/F - COMMUNICATION CARD NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell TK-PRR021 - REDUNDANCY MODULE 51309288-475 NEW IN BOX
  • Honeywell DR45AT-1100-00-001-0-00000E-0 - Chart Recorder
  • Honeywell Q7750A2003 - New in box Area controller FAST SHIP#XR
  • Honeywell C7012A1152 - 1PC New UV Flame Detector Expedited Shipping
  • Honeywell NXS0500A1009 - NSX SERIES VARIABLE FREQUENCY DRIVE 50HP 380-500V 3-PHASE
  • Honeywell SM200 - Servo Drive 4006719-906 w/ June 2023 Inspected 8130
  • Honeywell PX45A - Ethernet Rewinder+ Label Taken Sense TT 203dpi
  • Honeywell 2MLR-AC22 - " 2mlr-dbsf,2mlf-dc4s,2mlf-rd4a Rack"
  • Honeywell 9806710 - NEW SEALED MEASUREX SSEC SCP CONTROL MODULE NIB 2007
  • Honeywell RM7800L1087 - 1PCS Combustion Controller Brand new fedex or DHL
  • Honeywell DR45AT-1100-44-000-0-3AN000-0 - CHART RECORDER * NEW IN BOX *
  • Honeywell 80360206-001 - USED YAMATAKE CLI BOARD
  • Honeywell TSENALMOX-05682 - "Target, LC5Al 1Sl .5CU, 1.95X11.279X14.495"", 140838"
  • Honeywell EX-DGM506 - Pressure switch for flammable gases / #Z A00A 0232
  • Honeywell CC-PDOB01 - 24VDC F/W G NUPI
  • Honeywell TK-PRS021 - REV E CONTROL PROCESSOR NEW
  • Honeywell 0190-20139/D - Target TSENALMOX-08287 Enraf 2075252-D2 PCB XPU1+ Display Assembly 2558 584-1 4N5TI Sputtering Coating Disc
  • Honeywell SPS5713 - 51199930-100 TDI Power Transistor Devices Main Rack
  • Honeywell MIDAS-I-N2O - ", Gas Detector Via DHL or FedEx"
  • Honeywell TK-PPD011 - NEW 1PCS 51309241-175 51309241-175
  • Honeywell BC7000L1018 - CB70 120V NSMP
  • Honeywell 10006/2/1 - / 1000621 (NEW NO BOX)
  • Honeywell TK-FTEB01 - "FTE connection module , 51309512-175 Via DHL or FedEx"
  • Honeywell 858211-1 - BODY VALVE P/N NE COND # 11429 (2)
  • Honeywell XNX-UTAI-RNNNN - Honeywell
  • Honeywell VR434VA5009-1000 - Servo gas combination valve Brand New Fast shipping
  • Honeywell SPXCDALMFX - plc new FREE EXPEDITED SHIPPING /
  • Honeywell 7000605-902 - Flight Director Mode OH 7-08-2016
  • Honeywell QPP-0001 - NEW
  • Honeywell Q7055C1009/U - Network Adapter
  • Honeywell 51309152-175 - / 51309152175 (NEW IN BOX)
  • Honeywell DR45AT-1111-00-000-0-RA0P00-0 - NEW - Truline DR4500 Chart Recorder ????
  • Honeywell TK-PRS021 - REV N CONTROL PROCESSOR NEW
  • Honeywell 053567-02 - / 05356702 (USED TESTED CLEANED)
  • Honeywell QPP-0002 - Quad Processor Module / 5 Vdc / max. 1.2A / 24Vdc / max.25mA
  • Honeywell ML7999A2001 - NEW Universal Parallel-Positioning Direct Coupled Actuator
  • Honeywell J-MHM10 - PROCESS CONTROLLER
  • Honeywell 51401583-200 - NEW NETWORK INTERFACE CARD 51401583200
  • Honeywell 098067-01 - "USED MEASUREX PC BOARD QSCP W/ F/O I/F TYPE II, 05410100"
  • Honeywell 620-0073 - PROCESSOR MODULE ETHERNET LOOP * NEW NO BOX *
  • Honeywell TK-PRR021 - MEASUREX 51309288-375 REDUNDANCY MODULE NEW
  • Honeywell W7704D-1016 - / W7704D1016 (USED TESTED CLEANED)
  • Honeywell 51305390-400 - NEW PC BOARD W/51305392-100
  • Honeywell YSTA740-E1(G)C1A-1-A-AD0-11-S-B-(1)1A0-F1-0000/PTMVIS-4-AM - "500PSI"
  • Honeywell XF522-A - / XF522A (NEW NO BOX)
  • Honeywell CC-PCNT01 - Module
  • Honeywell TK-PRS021 - 1PC New reduntancy module Via DHL or FedEX
  • Honeywell FS24X-9 - 1PCS Flame Detector FS24X-911-22-1
  • Honeywell LG80A12 - Pressure Ratio Transmitter Overhauled FFA Paperwork Included
  • Honeywell MC-TAMR03 - 51309218-125 DCS card brand new Shipping DHL or FedEX
  • Honeywell ML7999A2001 - Universal Parallel Positioning Direct Coupling Actuator Zy
  • Honeywell 8631800 - Measurex Pbs Detector
  • Honeywell FF-SYB30064M2R - / FFSYB30064M2R (USED TESTED CLEANED)
  • Honeywell TC-IXL062 - module brand new Fast Shipping
  • Honeywell FC-PSU-UNI2450U - Power Supply Module Via FEDEX/DHL
  • Honeywell TC-CCR014 - REDUNDANT NET INTERFACE NEWORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell DMX-A-6212 - DATAMAX O'NEIL PRINT ENGINE (143789 - )
  • Honeywell DR45AT-1000-00-101-0-100000-0 - NSMP
  • Honeywell PX65A00000000200 - PX65A. Ethernet. TT 203 DPI.
  • Honeywell CM4-P - MDA Scientific Analytics Pyrolyzing Gas Monitor
  • Honeywell A06B-0246-B000 - 1PCS NEW fedex or DHL
  • Honeywell 90113 - SPUTTERING TARGET 5N5 Al1Si.5Cu 12.555X11.625X1.600IN
  • Honeywell D15S-80A - Pressure regulator / #Z A00A 8701
  • Honeywell 085621-03 - "USED MEASUREX PC BOARD GP63, 08562103"
  • Honeywell LCNP4M - Spacer 51403776-100 Spacer Board Rev:D Fw: J Card
  • Honeywell YSTR130-/S/10-2/H1F/E - 24VDC UNMP
  • Honeywell DR45AT-1100-00-001-0-600000-0 - NSNP
  • Honeywell 30731832-002 - / 30731832002 (USED TESTED CLEANED)
  • Honeywell TK-IAH161 - NEW REDUNDANT NET INTERFACE IN BOX FREE SHIPPING#XR
  • Honeywell CT40 - 50pcs LCD Touch Digitizer+Front Housing For Dolphin (FSTM2)
  • Honeywell AC-EYV174-2 - VCU with AC-EYV175-A VDU Graphic controller
  • Honeywell XNX-UTAI-RNNNN - 1 PCS New DHL
  • Honeywell PX45A - "12 Points/mm (300dpi), Disp. (Color), RTC, Ethernet, Multi-IF"
  • Honeywell RT10A - "- 25.6cm (10.1"") - 1920 x 1200 Pixels - 32GB - 4GB"
  • Honeywell CC-PAOH01 - * NEW NO BOX *
  • Honeywell PM45C - ", Short Door, 12 Points/mm (300dpi), Peeler, LTU, Disp., USB, USB"
  • Honeywell 10024/I/F - / 10024IF (USED TESTED CLEANED)
  • Honeywell STG770-A1GC1A-1-A-ADC-11S-A-00A0-00-0000 - NSMP
  • Honeywell C7012E1112 - One Explosion-proof Detector New Expedited Shipping
  • Honeywell TC-IXL06 - Brand new in box Input Module TC-IXL06 TC-IXL06 DHL Express
  • Honeywell X-NPMS(H) - Network Paging Console Fire Equipment
  • Honeywell CC-PUIO31 - 51454220-176 Universal I/O Module New Via Fedex/DHL/UPS
  • Honeywell SPXCDALMFX - plc New One Year Warranty#
  • Honeywell MC-TAMT04 - 51305890-175 DCS card brand new Shipping DHL or FedEX
  • Honeywell 51401551-800 - / 51401551800 (USED TESTED CLEANED)
  • Honeywell 32007458-003 - Printed Circuit Board
  • Honeywell 620-3632 - 620-36 IPC PLC PROCESSOR W/ KEY ACCESS4000 620-0041 621-0021R
  • Honeywell 51198651-100 - power supply new
  • Honeywell 8694500 - USED CONTROL PROCESSOR REV. D
  • Honeywell CC-PAIM01 - * NEW NO BOX *
  • Honeywell 51304362-150 - LOW LEVEL ANALOG CARD NEW NO BOX
  • Honeywell RI206S - Remote Controller 4026206-972 w/ October 2019 Overhauled 8130
  • Honeywell 200-01717-0000 - "LATERAL AXIS BP (HONEYWELL) P/N OHC, OUTRIGHT # 12565"
  • Honeywell RCZ851K - Communication Unit 7510700-615 Removed Working
  • Honeywell DR45AT-1100-00-011-A-00000E-0 - 120/240VAC NSMP
  • Honeywell TK-PRS021 - REV M CONTROL PROCESSOR NEW
  • Honeywell 51400903-100 - / 51400903100 (USED TESTED CLEANED)
  • Honeywell 4409SMM - / 4409SMM (USED TESTED CLEANED)
  • Honeywell C7012F1052 - 2022-2023 New Fast Shipping with 1 Year Warranty
  • Honeywell TK-PRS021 - module
  • Honeywell DR45AT-1100-40-001-0-10N000-0 - UNMP
  • Honeywell 51304362-150 - NSMP
  • Honeywell TSVCTADBX-09073 - "TARGET TANTALUM 39.5, 137061"
  • Honeywell 3244759-3 - MAIN FUEL CONTROL UNIT P/N
  • Honeywell 4042181-1002 - "TARGET 1.95X11.279X14.495"", 59.5 {LC5}AL/1SI/.5CU, 112062"
  • Honeywell C7012E1112 - 1PC C7012E 1112 Burner Detector New In Box Expedited Ship
  • Honeywell XF824-A - / XF824A (USED TESTED CLEANED)
  • Honeywell C7012E1112 - 1PC New In Box Flame Detector FAST SHIP
  • Honeywell TC-PRS021 - DCS C200 /PL3
  • Honeywell TK-PRS021 - Brand New reduntancy module 1 year warranty
  • Honeywell MC-TAMR03 - 51309218-175 Low Level Analog Module
  • Honeywell TSENALMOX-05682 - "Target, LC5Al 1Sl .5CU, 1.95X11.279X14.495"", 140839"
  • Honeywell QPP-0002 - Safety Manager Processor
  • Honeywell 30735863-502 - SWITCH
  • Honeywell TK-CCR014 - REDUNDANT NET INTERFACE NEW ORIGINAL FREE EXPEDITED SHIPPING/
  • Honeywell 51403165-400 - new 51403165400/
  • Honeywell 318-049-001 - "100 Batteries(Japan Liion2Ah14.8Wh)INTERMEC/ PR2,PR3 P/N.:."