Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Beijing's major infrastructure development plan during the 14th Five-Year Plan period

来源: | 作者:佚名 | 发布时间 :2023-12-05 | 515 次浏览: | Share:

The ability to secure water resources has been continuously enhanced. The Tongzhou Branch line of the South-to-North Water Diversion Project was completed, and the Daxing Branch Line was completed, with a total water transfer volume of more than 6 billion cubic meters. Four water plants, including the tenth water plant and Tongzhou Water Plant, have been completed and put into operation, and about 1,300 kilometers of water supply network have been built and renovated. The city's water supply capacity has reached 9.2 million cubic meters/day, and the safety factor of urban water supply has reached 1.2 to 1.3. All 16 districts of the city have been built into water-saving zones, and the water consumption per unit of regional GDP has dropped by about 15%, and the water-saving target has been fully achieved. The protection of drinking water sources has been strengthened, and the Miyun Reservoir, Huairou Reservoir and Jingmi Aqueduct have been fully closed. The improvement of small river basins has been continuously promoted, and 401 ecological clean small river basins have been built in the city, and the construction rate of ecological clean small river basins in mountainous areas has reached 67%. New progress has been made in comprehensively improving river courses. The Yongding River and the North Canal have been comprehensively improved and ecological restoration has been carried out. The Yongding River in Beijing is now fully open to water for the first time in 25 years. Continuous monitoring and evaluation of water ecological health has been carried out, and a network of water ecological monitoring stations has been initially established in rivers, reservoirs and lakes, and the city's water ecological health has continued to improve.

The level of landscaping continued to improve. The ecological and environmental quality of urban areas has been continuously improved, and 3,773 hectares of urban green space has been added, 190 urban leisure parks, 460 small and micro green Spaces and pocket parks have been built, 52 urban forests have been built, and 597 kilometers of healthy greenways have been built. The coverage of the 500-meter service radius of park green Spaces has reached 86.8%. The ecological capacity of the plain area has been further expanded, and a new round of afforestation and afforestation project of one million mu has been launched. 590,000 mu of large-scale forest has been added, and the forest area of the plain area has reached 2.45 million mu, and the forest coverage rate of the city has reached 44.4%. Two "green necklaces" have basically been formed in the Green Zone, with 102 parks of various types in the first Green zone and 40 country parks in the second Green zone. Green barriers in mountainous areas have been strengthened, key national projects such as the control of sandstorms between Beijing and Tianjin have been continued, and 219,000 mu of planted forest has been completed and 325,000 mu of low-efficiency forest has been transformed, with a forest coverage rate of 60 percent in mountainous areas. 24,200 mu of rural landscaping has been completed, and 30 forest towns and 250 green villages in the capital have been created. Steady progress has been made in the protection, restoration and development of wetlands. 11,000 hectares of wetlands have been restored, and six wetland nature reserves, 12 wetland parks and 10 wetland nature protection communities have been established, significantly increasing biodiversity.

The energy security system has been improved. We continued to adjust and improve the energy mix, increasing the proportion of high-quality energy to 98.6 percent, and reducing energy consumption per unit of GDP by about 24 percent over 2015. The power supply capacity of urban and rural areas has continued to improve, and four gas thermal power centers have been built and put into operation, achieving clean local power production, and the city's power supply reliability rate has reached 99.995%. The gas supply guarantee capacity has been continuously enhanced, and the Beijing section of the "one trunk and three branches" project of the Shan-Beijing fourth Line has been completed, and 2 gas gate stations, 4 high pressure A regulator stations and 12 high pressure B regulator stations have been built. All 16 districts are connected to piped natural gas, and the gas pipeline network in Pingyuan has been "connected to towns". The scale of clean heating continues to expand, complete the renovation of clean energy such as Beichen heating plant and Baoneng heating plant and the transformation of emergency heat sources such as Guohua Power Plant, fully implement the replacement of municipal coal-fired boilers and rural loose coal clean energy, and basically achieve clean heating in urban areas of the city.

3. The capacity of urban governance has been continuously enhanced

Comprehensive transport management was implemented in an orderly manner. Hierarchical control of 943 blocked points, to create 24 central urban congestion demonstration areas, the full implementation of road parking reform, the city above the branch road roadside parking all realize electronic charging, "parking, parking fees, parking penalties" concept deeply rooted in the people, traffic congestion has been alleviated to a certain extent.

  • Metso A413177 Digital Interface Control Module
  • METSO A413222 8-Channel Isolated Temperature Input Module
  • Metso A413313 Interface Control Module
  • METSO D100532 Control System Module
  • METSO A413310 8-Channel Digital Output Module
  • METSO A413659 Automation Control Module
  • Metso D100314 Process Control Interface Module
  • METSO A413665 8-Channel Analog Output Module
  • METSO A413654 Automation Control Module
  • Metso A413325 Interface Control Module
  • METSO A413110 8-Channel Analog Input Module
  • METSO A413144 Automation Control Module
  • Metso A413160 Digital Interface Control Module
  • METSO A413152 8-Channel Digital Input Module
  • METSO A413240A Automation Control Module
  • METSO A413146 Digital Interface Control Module
  • METSO A413150 Multi-Role Industrial Automation Module
  • METSO A413125 Automation Control / I/O Module
  • Metso A413111 Interface Control Module
  • METSO A413140 Automation Control Module
  • METSO 020A0082 Pneumatic Control Valve Component
  • METSO 02VA0093 Automation Control Module
  • METSO 02VA0153 Actuator Control Module
  • METSO 02VA0190 Automation Control Module
  • Metso 02VA0193 Pneumatic Control Valve Component
  • METSO 02VA0175 Valve Actuator Module
  • METSO D100308 Industrial Control Module
  • MOOG QAIO2/2-AV D137-001-011 Analog Input/Output Module
  • MOOG D136-002-002 Servo Drive or Control Module
  • MOOG D136-002-005 Servo Drive Control Module
  • MOOG D136E001-001 Servo Control Card Module
  • MOOG M128-010-A001B Servo Control Module Variant
  • MOOG G123-825-001 Servo Control Module
  • MOOG D136-001-008a Servo Control Card Module
  • MOOG M128-010 Servo Control Module
  • MOOG T161-902A-00-B4-2-2A Servo-Proportional Control Module
  • MOTOROLA 21255-1 Electronic Component Module
  • MOTOROLA 12967-1 / 13000C Component Assembly
  • MOTOROLA 01-W3914B Industrial Control Module
  • Motorola MVME2604-4351 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME162-513A VMEbus Embedded Computer Board
  • MOTOROLA MPC2004 Embedded PowerPC Processor
  • Motorola MVME6100 VMEbus Single Board Computer
  • MOTOROLA MVME162PA-344E VMEbus Embedded Computer Board
  • MOTOROLA RSG2PMC RSG2PMCF-NK2 PMC Expansion Module
  • Motorola APM-420A Analog Power Monitoring Module
  • MOTOROLA 0188679 0190530 Component Pair
  • Motorola 188987-008R 188987-008R001 Power Control Module
  • MOTOROLA DB1-1 DB1-FALCON Control Interface Module
  • MOTOROLA AET-3047 Antenna Module
  • Motorola MVME2604761 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME761-001 VMEbus Single Board Computer
  • MOTOROLA 84-W8865B01B Electronic System Module
  • Motorola MVIP301 Digital Telephony Interface Module
  • MOTOROLA 84-W8973B01A Industrial Control Module
  • MOTOROLA MVME2431 VMEbus Embedded Computer Board
  • MOTOROLA MVME172PA-652SE VMEbus Single Board Computer
  • Motorola MVME162-223 VMEbus Single Board Computer
  • MOTOROLA BOARD 466023 Electronic Circuit Board
  • Motorola MVME333-2 6-Channel Serial Communication Controller
  • MOTOROLA 01-W3324F Industrial Control Module
  • MOTOROLA MVME335 VMEbus Embedded Computer Board
  • Motorola MVME147SRF VMEbus Single Board Computer
  • MOTOROLA MVME705B VMEbus Single Board Computer
  • MOTOROLA MVME712A/AM VMEbus Embedded Computer Board
  • MOTOROLA MVME715P VMEbus Single Board Computer
  • Motorola MVME172-533 VMEbus Single Board Computer
  • Motorola TMCP700 W33378F Control Processor Module
  • MOTOROLA MVME188A VMEbus Embedded Computer Board
  • Motorola MVME712/M VME Transition Module
  • Motorola 30-W2960B01A Industrial Processor Control Module
  • MOTOROLA FAB 0340-1049 Electronic Module
  • Motorola MVME162-210 VME Single Board Computer
  • Motorola MVME300 VMEbus GPIB IEEE-488 Interface Controller
  • MOTOROLA CPCI-6020TM CompactPCI Processor Board
  • Motorola MVME162-522A VMEbus Single Board Computer
  • MOTOROLA MVME162-512A VMEbus Single Board Computer
  • MOTOROLA MVME162-522A 01-W3960B/61C VMEbus Single Board Computer
  • MOTOROLA MVME162-220 VMEbus Embedded Computer Board
  • Motorola MVME162-13 VMEbus Single Board Computer
  • MOTOROLA MVME162-10 VMEbus Single Board Computer
  • RELIANCE 57C330C AutoMax Network Interface Module
  • RELIANCE 6MDBN-012102 Drive System Module
  • RELIANCE 0-60067-1 Industrial Drive Control Module
  • Reliance Electric 0-60067-A AutoMax Communication Module
  • RELIANCE S0-60065 System Control Module
  • RELIANCE S-D4006-F Industrial Drive Control Module
  • Reliance Electric S-D4011-E Shark I/O Analog Input Module
  • RELIANCE S-D4009-D Drive Control Module
  • RELIANCE S-D4043 Drive Control Module
  • Reliance DSA-MTR60D Digital Servo Motor Interface Module
  • RELIANCE 0-60063-2 Industrial Drive Control Module
  • RELIANCE S-D4041 Industrial Control Module
  • Reliance Electric SR3000 2SR40700 Power Module
  • RELIANCE VZ7000 UVZ701E Variable Frequency Drive Module
  • RELIANCE VZ3000G UVZC3455G Drive System Module
  • Reliance Electric S-D4039 Remote I/O Head Module
  • RELIANCE 0-57210-31 Industrial Drive Control Module
  • RELIANCE 0-56942-1-CA Control System Module
  • Reliance Electric 0-57100 AutoMax Power Supply Module
  • RELIANCE 0-54341-21 Industrial Control Module
  • RELIANCE 0-52712 800756-21B Drive Interface Board
  • KEBA PS242 - Power Supply Module
  • KEBA BL460A - Bus Coupling Module
  • KEBA K2-400 OF457/A Operating Panel
  • KEBA T200-M0A-Z20S7 Panel PC
  • KEBA K2-700 AMT9535 Touch Screen Panel
  • KEBA T20e-r00-Am0-C Handheld Terminal
  • KEBA OP350-LD/J-600 Operating Panel
  • KEBA 3HAC028357-001 DSQC 679 IRC5 Teach Pendant
  • KEBA E-32-KIGIN Digital Input Card
  • KEBA FP005 Front Panel
  • KEBA BT081 2064A-0 Module
  • KEBA FP-005-LC / FP-004-LC Front Panel
  • KEBA SI232 Serial Interface
  • KEBA T70-M00-AA0-LE KeTop Teach Pendant
  • KEBA KEMRO-BUS-8 Bus Module
  • KEBA IT-10095 Interface Terminal
  • KEBA RFG-150AWT Power Supply Unit
  • KEBA C55-200-BU0-W Control Unit
  • KEBA Tt100-MV1 Temperature Module
  • KEBA E-HSI-RS232 D1714C / D1714B Interface Module
  • KEBA E-HSI-CL D1713D Interface Module
  • KEBA D1321F-1 Input Module
  • KEBA E-32-D Digital Input Card
  • KEBA C5 DM570 Digital Module
  • KEBA XE020 71088 Module
  • KEBA E-16-DIGOUT Digital Output Card