Remarkable progress has been made in water pollution control. Completed the second three-year action plan for sewage treatment, and launched the implementation of the third three-year action plan for sewage treatment. The construction of sewage collection and treatment facilities was accelerated, 26 new reclaimed water plants were built in the city, and eight sewage treatment plants were upgraded and renovated. In urban areas, sewage collection and treatment were basically realized, and pollution control in rural areas was carried out in an orderly manner. The sludge has basically achieved harmless treatment; We will accelerate efforts to improve the water environment, make the utilization of recycled water an advanced level in the country, eliminate all inferior V water bodies on national examination sections, and carry out comprehensive treatment and landscape enhancement projects for key rivers such as the Qinghe, Bahe, and Tonghui rivers, so as to improve the water environment of river channels and achieve initial recovery of river channels.
The means of smart governance have been upgraded. China's first transportation and green travel integrated service platform (MaaS) was put into operation, the construction of information management platforms for urban environment construction, underground pipelines, and environmental health was completed, and government services realized online "one-network", and intelligent management began to show results.
We carried out intensive and refined governance. The garbage management system has been further improved, and the newly revised Regulations on the Management of domestic waste in Beijing have been promulgated and implemented, the construction coverage rate of garbage classification demonstration areas has reached 99%, the recycling rate of domestic garbage has reached 35%, a total of 1,500 garbage classification demonstration villages have been created, and the domestic garbage of 99% of the administrative villages in the city has been effectively treated, and a new situation of garbage classification has basically formed. The environmental improvement of backstreets and alleys has achieved remarkable results, and the three-year action to improve the environmental improvement of backstreets and alleys in the core area has been successfully concluded, and 3,500 backstreets and alleys have been completed, and the urban appearance has been improved from the details. The renovation of overhead lines into the ground has continued, and more than 1,400 kilometers of overhead lines and nearly 31,000 poles of various types have been renovated, making urban public Spaces cleaner and more orderly. Major progress was made in building beautiful rural areas, and 3,254 villages were completed to improve the living environment, and the living environment in rural areas continued to improve.
4. More solid security in key areas
The infrastructure in the core area has been continuously upgraded. The second phase of Metro Line 8 was put into operation, and existing stations such as Xuanwumen Station and Andingmen Station completed capacity expansion and renovation. Speed up the construction of microcirculation roads, increase financial support, simplify approval procedures, build the south section of Beixinhua Street, Dixingju Road, Xixinglong Street and other roads, and ease traffic congestion in Qianmen, Tiantan and other areas. We will take a number of measures at the same time to increase urban greenery, promote the construction of tree-lined streets, and complete the renovation and upgrading of Ping An Avenue and other streets. Make full use of the dredding space to build small and micro green Spaces, complete the construction of Jiaowei Hutong, Dongfu Shouli, Jingyun Garden and other pocket parks and small and micro green Spaces, continue to promote green around the people, and meet the needs of citizens for green ecological space.
The main framework of urban sub-central infrastructure has basically taken shape. The east extension of Metro Line 7 and the south extension of Batong Line were opened to traffic; the urban sub-center Line of suburban railway was officially opened to traffic; and the second phase of Guangqu Road and the Binfu Road were opened to traffic, making internal and external transportation more convenient. Thirteen substations have been built, and the power supply capacity has increased by more than 30 percent. The Tongzhou Water Plant under the South-to-North Water Diversion Project has been put into operation. The urban sewage treatment rate has reached 99 percent, the use of high-quality energy has reached 100 percent, and the harmless treatment rate of household waste has reached 100 percent. The ecological quality has been greatly improved, all 53 sections of black and odorous water bodies have been treated, and the water quality of all national examination sections has reached the standard. A total of 251,000 mu of green construction has been implemented, and the coverage rate of the 500-meter service radius of the park green space has reached 91.2%.
Infrastructure development in the southern region has accelerated. The comprehensive transportation system continued to improve. The fourth phase of Metro Line 8 and the northern extension of the Fangshan Line were opened to traffic; the construction of the southern section of Liucun Road and the first and second phases of Tongjiu Road was accelerated; and a number of multi-level bus stations such as Guogongzhuang and Ertong Factory were completed. Strengthen the supply of resources and energy, realize the Fengtai Station, Liangxiang University Town and other 220 kV power transmission and transformation projects put into operation, complete the construction of water supply facilities such as Huangcun Water plant and Liangxiang Water plant, and complete the Beijing Gas Tianjin Nangang LNG emergency reserve project (Chengnan Terminal Station). Green and ecological space continued to expand, Qinglonghu Forest Park (Phase II) and Nanhaizi Park (Phase II) were completed and opened, construction of Nanyuan Forest Wetland Park was accelerated, and comprehensive improvement and ecological restoration projects for Yongding River and Machao River were carried out in an orderly manner.