(3) Strengthen the construction of recycling facilities and promote the utilization of sewage resources
Construction task. Combined with existing sewage treatment facilities upgrading and capacity expansion, system Planning urban sewage recycling facilities, reasonable determination of recycled water utilization direction, promote real Now divided quality, sub-object water supply, excellent water use. Downstream of the key sewage outlet, the river into the lake The mouth and branch flow into the main stream, and implement the regional recycled water recycling project according to local conditions. Lack of
The new urban area of the water city should plan the layout of the reclaimed water pipe network in advance and carry out the construction in an orderly manner. Ehoang
River basin prefecture-level and above cities as the focus, in the Beijing-Tianjin-Hebei, Yangtze River economic belt, the Yellow River flow Construction sewage in the region, along the South-to-North Water Diversion Project, in the arid areas of northwest China and in the coastal areas lacking water Demonstration cities for resource utilization, planning and construction of supporting infrastructure, and realizing the scale of reclaimed water Utilization. Construction of resource and energy benchmark reclaimed water plant. Encourage the extraction of nitrogen and phosphorus from sewage Matter. During the "14th Five-Year Plan" period, the capacity of new construction, reconstruction and expansion of recycled water production is not less than 15 million cubic meters per day
email:1583694102@qq.com
wang@kongjiangauto.com