Functional module capability
Fast I/O Fast I/O Processing
Real time Ethernet and PROFIBUS Real time Ethernet and PROFIBUS Communication Expansion
Programmable limit switch
Cross communication across controllers
Sercos III SERCOS III Fiber Real time Bus
This modular expansion strategy enables L25 to be smoothly upgraded from a simple centralized controller to the hub of a complex motion system - for example, to achieve collaboration between multiple L25's through the Cross communication module, or to support cam positioning requirements in high-speed printing and packaging machinery through the Programmable limit switch.
Order information and model decoding
6.1 Controller body
Type code description order number
CML25.1-PN-400-NN-NNC1-NW IndraControl L25,RT Ethernet + PROFIBUS, Configurable fieldbus interface R911172155
CML25.1-3N-400-NN-NNC1-NW IndraControl L25,Sercos III R911171363
Interpretation of Model Field: CML25.1 refers to the product line and version; PN=Real time Ethernet+PROFIBUS combination, 3N=Sercos III; 400 is the performance level; NNC1/NW is the firmware and delivery status suffix. When selecting, it is necessary to decide based on the fieldbus ecosystem: PN type is selected for existing PROFIBUS/PROFINET networks, and 3N type is selected for SERCOS fiber optic drive ecosystems.
6.2 Accessories
Type code description order number
R-IB IL SCN-PWR IN-PWR power connector R911171765
R-IB IL Field 2 Identification Field (Narrow) R911289341
R-IB IL Field 8 Identification Field (Width) R911289342
System selection suggestions and application scenarios
Typical scenarios suitable for L25 include:
Single machine motion control: equipped with IndraDrive drive (Sercos III 3N type) to build a compact multi axis machine;
Centralized control cabinet solution: Covering all I/O requirements of medium-sized equipment with an expansion limit of 63 Inline modules;
Distributed topology: Utilizing the dual role capabilities of PROFINET/EtherNet/IP, L25 is integrated as a slave into the higher-level factory network;
Machine upgrade and renovation: Replace the old PLC+motion control dual hardware solution, integrate logic with an L25+IndraLogic XLC/IndraMotion MLC software stack, and reduce spare parts and training costs;
Visual extension: Combined with IndraControl VCP series operation terminals or standard visualization components, achieve a complete machine HMI solution.
Selection checklist: ① Fieldbus type and role (master/slave); ② Is the number of I/O points within the budget of 256 channels/64 bytes; ③ Is the total power consumption of each Inline segment less than 8 A? ④ Is CFL function module (such as fast I/O or programmable limit) required; ⑤ Whether the temperature inside the cabinet meets+5...+55 ° C.
Maintenance and shutdown precautions
Based on the diagnostic design in the specification table, daily maintenance should focus on:
Temperature monitoring alarm: Clean the heat dissipation surface in a timely manner, verify the ambient temperature and convection inside the cabinet;
Powerfail record: Check the power supply quality (ripple within ± 5%, voltage 19-30 V DC);
Watchdog trigger: mostly due to program dead loop or firmware exception, requiring a read back of diagnostic logs;
Retention data: The recipe/counter data stored in the 256 kB Remanent area should be fully migrated when replacing the controller;
Aging management: According to the manufacturer's instructions, the product undergoes natural wear and aging processes - the document clearly states that the data is only a product description and does not exempt the user from the obligation of self judgment and verification.
