Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE DS200RTBAG2A Relay Terminal Board
    ❤ Add to collection
  • GE DS200RTBAG2A Relay Terminal Board

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE DS200RTBAG2A Relay Terminal Board

    • ¥22000.00
      ¥24520.00
      ¥22000.00
      ¥22000.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:2.500KG
    • Quantity:
    • (Inventory: 33)
Description

GE DS200RTBAG2A Relay Terminal Board


GE DS200RTBAG2A Relay Terminal Board

Part Number DS200RTBAG2A Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series Mark V Function Module Availability In StockDS200RTBAG2A is a relay terminal board developed by GE under Mark V series. The Relay Terminal Board (RTBA) for the DS200 is an optional board that is also known as a relay card. The RTBA offers ten relays, three of which have four form C contacts rated at 5 A, and seven of which have two form C contacts rated at 10 A. These relays can be operated remotely by the user or directly from the LTB board's relays. 

Depending on the group number of the board, there are three coil voltages for the RTBA relays. The coil voltages that are accessible include 115 V ac, 50/60 Hz, 24 V do, and 110 v de (RTBAG1, RTBAG2) (RTBAG3). The RTBA board has jumpers of the Berg type. DS200RTBAG2A Relays An external voltage source placed on the terminal board between KnA (n = 2026) and KCM or an internal control voltage source supplied by plug RPL from LTB may be used to activate each RTBA relay. (Take note that JP8 and JP9 provide extra alternatives for K20-K22.) Seven relays on the RTBA board each have two form C connections. The contact connection is indicated by the nomenclature for the terminal board points. 

The terminal board point K2O NO, for instance, stands for normally open (NO), as opposed to normally closed (NC) or common. K stands for the relay, 20 for which of the seven relays (2026), 7 for which of the two forms C contacts, and NO for ordinarily open (K) (CM). Board Connections The board is connected to the LTBA board using a 16-pin connector (RPL) and a 2-pin connector (OPTPL). Usage of specific RPL connector signals is selectable from jumper. Two stab connectors, CPH (control power hot, positive) and CPN (control power negative), are provided to supply control power to certain pluggable circuits. 

A jumper controls the use of these stab connectors. The RTBA board includes pluggable circuits as well as relays K27 and K29 access via connectors C1PL C5PL and Y9PL Y37PL. A jumper can be used to select the control power source for these pluggable circuits. Through the RTBA board terminals 1 52, I/O can be connected between the RTBA board relays K20 K26 and external signals. A jumper is used to select the power source for these relays. Application Data - Configurable Hardware A JP nomenclature identifies Berg-type (manually movable) hardware jumpers on the RTBA board, and they must be set appropriately for the application. Most jumper options have already been pre-programmed. On the data sheets that are included with each controller (in the drive/exciter door pocket), these factory preset positions are listed. DS200RTBAG2A Features This card can be used with a wide range of GE exciters and drivers in their cabinets. 

When utilizing this RTBA board, you can control both remote and LAN I/O terminals. The ten relays on the board are divided into two categories: DPDT and 4PDT. On the board, there are seven DPDT type relays, each with two Form C contacts. A 10A charge is registered on each relay contact. Each relay also contains a 110 VDC coil. Each DPDT relay is located between K20 and K26 on the circuit board. The final three slots on the board are reserved for 4PDT relay types. Within each relay, there are four contacts of this type. These types of contacts have a 1A charge. A 110 VDC coil is also included in each relay. A 130 VAC metal oxide varistor protects all onboard relays (MOV). Relays can be simply removed and replaced as needed. 

 DS200RTBAG2A Board Replacement Turn off the drive and wait several minutes for all of the capacitors to discharge. Before touching any electrical circuits, make sure the power is turned off. To access the board, open the cabinet door on the drive (The RTBA board is usually found beneath the drive's board rack.) Remove all cables from the RTBA board with care. Remove the four screws with washers that secure the RTBA board to the four standoffs. Place all configurable items on the replacement (new) board in the same position as those on the replaced board (old board). Place the new board on the four standoffs using the four screws and washers that were removed in step 4. Reconnect all cables that were disconnected in step 3, making sure that each connector is properly seated at both ends. Reconnect all individual wires that were disconnected in step 3, making sure that each wire is securely fastened in the terminal.

Instructions and warnings related to the operation of the product:

The following specifications must be strictly observed:

 The technical specifications and typical applications of the product system must be strictly observed.

 PERSONNEL TRAINING: Only trained personnel may install, operate, maintain or repair the product system. These personnel must be instructed on the

These personnel must be instructed and briefed on the conditions in the hazardous area.

 Unauthorised modifications: No modifications or structural changes may be made to the product system.

 Maintenance Responsibility: It must be ensured that the product system is used only under appropriate conditions and in a condition fully suitable for use.

 Working environment: The user must fulfil the specified environmental conditions:

Safety regulations

The following safety regulations must be fully observed when (maintenance) work is carried out on the product system:

1 Disconnect completely.

2 Secure to prevent reconnection.

3 Confirm that the installation has been completed.

4 Perform grounding and short-circuiting.


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • ABB ACH550 Inverter Maintenance
  • IDEC MicroSmart FC6A Replacement Guide
  • Gefran GILOGIK II Distributed I/O System
  • GE VersaMax Nano/Micro Replacement Guide
  • Nastyaer GIV50-11 limit switch
  • Rockwell Trusted TMR Processor
  • TIANMA NL8060BC21-11KG Industrial LCD
  • CapXon UJ series aluminum electrolytic capacitors
  • FLVOTEK MV10H DC/DC power supply
  • SIEMENS QBE3000/3100 differential pressure
  • Huichuan H3U series PLC high-performance motion control selection and troubleshooting guide
  • Phoenix Contact ILC 1X1 Field Troubleshooting and Engineering Application Guide
  • Allen Bradley Lifeline 4 Cable Switch Field Installation and Troubleshooting Complete Guide
  • Gardner DELCOS 3100 Controller Field Troubleshooting and Maintenance Guide
  • Mitsubishi GOT2000 Utility Troubleshooting and System Maintenance Complete Guide
  • Ohmite EBW Current Sensing
  • Mitsubishi A1S61PN Power Module: Complete Guide to On site Troubleshooting and System Maintenance
  • Complete Guide to On site Maintenance and Troubleshooting of Honeywell TN3801 Electro Motive Liquid Level
  • ABB PSTX/PSR Soft Starter Field Troubleshooting and Maintenance Guide
  • GE Hydran 201Ti Troubleshooting Practice
  • ABB NextMove ESB-2 Debugging and Replacement
  • CAREL PGD Handheld Operator Configuration Replacement
  • Clinical Guidelines for Hiossen EK Implant System
  • Eaton 9PX UPS maintenance and replacement
  • Airlec RYP Precision Pressure Reducing Valve Selection and Maintenance
  • Schneider Modicon M258 Selection and Upgrade
  • KEYENCE XG-8000/7000 adds new features
  • Alfa Laval EPC 50 Upgrades EPC 70 Separators
  • Nidec Unidrive M700 Troubleshooting
  • Mitsubishi A171SCPU Maintenance and Troubleshooting
  • YASKAWA DX200 Feature Pack Complete Guide
  • CKD AxTools servo debugging software (EboDEX)
  • IUSA Copper Tube System Installation and Troubleshooting Guide
  • TAIYO LX Series Generator Common Troubleshooting and Maintenance Guide
  • Automation Direct DL06 PLC Common Troubleshooting and Maintenance Guide
  • Kepco BOP Bipolar Power Supply Troubleshooting and Maintenance Guide
  • Pilz PNOZmulti Safety Controller Troubleshooting and Maintenance Guide
  • HMS Airbus X-gateway troubleshooting
  • Nidec Unidrive SP troubleshooting
  • GE SPEEDTRONIC Mark VI troubleshooting
  • LK-TECH MGv2 Servo Motor System Complete Guide
  • Zebra EPL2 Complete Guide
  • Gold Whistle Servo Drive Complete Guide
  • MITSUBISHI ELECTRIC FR-D700 Inverter Complete Guide
  • Edwards EST-3 Life Safety System
  • ABB ACS380 Inverter Complete Guide
  • MITSUBISHI ELECTRIC MELSEC iQ-R/Q/L Complete Guide
  • Rockwell Automation CompactLogix 5380/5480 Complete Guide
  • CODESYS Control Win SL Soft PLC
  • ABB AC 800M Complete Guide
  • Honeywell 7800 Troubleshooting Guide
  • Troubleshooting of Rockwell AutoMax DPS
  • SNO 4062K/SNO 4062KM Safety Relay On site Troubleshooting and Selection Replacement Guide
  • World Encoders iPHD Series Handheld Operation Box Field Troubleshooting and Replacement Selection Guide
  • Troubleshooting of Copes Vulcan bypass valve
  • Complete Guide for On site Maintenance and Troubleshooting of ZF ClearCommand 9000 Series Ship Propulsion Control System
  • Troubleshooting of Pro face GP Series
  • TI C2000 CLA Software Development Guide
  • Honeywell ControlEdge HC900 Controller Troubleshooting Manual
  • Metso DNA system troubleshooting
  • ABB Millmate Rolling Force Measurement and Control System On site Troubleshooting and Maintenance Guide
  • On site Troubleshooting and Parameter Recovery Guide for Reliance Electric GV3000/SE Vector Inverter
  • EUCHNER Handheld Operating Unit and Electronic Handwheel Field Troubleshooting Guide
  • Microchip dsPIC30F High Performance 16 Bit Digital Signal Controller Field Application and Troubleshooting Guide
  • GE Fanuc VersaMax I/O and Control System Field Maintenance and Troubleshooting Guide
  • Milacron Elektron 400/500/600 Full Electric Injection Molding Machine On site Maintenance and Troubleshooting Complete Guide
  • PRECILEC RE.0444N Guide for On site Maintenance and Replacement of DC Speed Generator
  • Complete Guide to Field Application and Troubleshooting of Mitsubishi GT15-RS2/4 Serial Communication Unit
  • Keyence GS interlock switch
  • GE AT868 AquaTrans Ultrasonic Flow Meter Field Maintenance and Troubleshooting Guide
  • MITSUBISHI ELECTRIC GOT1000 Modbus Connection
  • Allen Bradley Guardmaster Security Practice
  • Delta AH500 PLC system operation and maintenance
  • Pilz PNOZmulti system extension
  • Pilz PNOZ XV3P safety relay
  • Pilz PZE 9 safety relay
  • SCHNEIDER TSX Premium System Operation and Maintenance
  • KONGSBERG HiPAP System Operation and Maintenance Guide
  • KONGSBERG Seatex MRU 5 practical combat
  • KONGSBERG BWMS system operation and maintenance
  • WCU Ship Control Unit Manual
  • Albatross NMEA2000 Integration
  • KONGSBERG PI50 Fishing Troubleshooting Guide
  • Kongsberg C-series cutting machine troubleshooting guide
  • KONGSBERG RCU500 Controller Manual
  • AutroSafe Fire Operation Manual
  • EAU-321 Multi Protocol Serial Port Card
  • MTL4850 Gateway Integration Manual
  • MITSUBISHI ELECTRIC FR-A500 frequency converter
  • Laumas TLM8 weighing transmitter
  • Anybus X-gateway Configuration Manual
  • OMRON NJ/NX OPC UA Configuration Guide
  • OMRON NX series system unit power configuration and troubleshooting
  • FANUC 16i/18i/21i hardware connection and troubleshooting
  • PILZ PNOZmulti Safety Controller Maintenance Guide
  • MITSUBISHI ELECTRIC MELSEC A-series PLC Hardware Maintenance and Troubleshooting
  • Installation and troubleshooting of Renishaw PHC10-3 PLUS controller
  • Constellation HA Series Vacuum Transmission System Selection Guide
  • PILZ PNOZ m B0 configurable safety control system basic unit
  • BANNER BES58-6 series incremental encoder selection and troubleshooting guide
  • Classic PLC Maintenance: Practical Memory and I/O Configuration
  • Eaton LZM Circuit Breaker Selection and Engineering Guide
  • Pilz PSWZ X1P static monitoring
  • Keyence CV-3000 Visual System Selection
  • Pro face GP2000 Maintenance Guide
  • Siemens S120 frequency converter maintenance and configuration
  • Allen Bradley InterBus Module Configuration Guide
  • MX321 AVR Voltage Regulator Guide
  • GE MM2 Motor Manager Complete Guide
  • SIEMENS C500 microcontroller architecture and instruction set
  • HORIBA SEC-Z500X Mass Flow Controller
  • QUBE Servo 2 Teaching Experiment Platform
  • Schneider TSX17 serial communication upgrade and replacement
  • GE DC Drives (BCH series) upgrade and replacement of old DC drives
  • Honeywell X-DCS3000 Digital Integrated System Manager
  • OMRON Z500 high-precision contour measurement system
  • Siemens SIMATIC S5-90U/S5-95U Compact PLC
  • KEB F5 Elevator Driver Complete Guide
  • TOSHIBA VF-S15 Inverter Complete Guide
  • Complete Guide to SV-iG5A Inverter
  • Allen Bradley Guard PLC Safety System Practical Guide
  • Omron C1000H/C2000H PLC Practical Guide
  • Omron F160-2 Visual Expert Guide
  • Bonner Q45U Ultrasonic Sensor in Practical Use
  • Schneider C60H-DC Protector Practical Manual
  • Omron CPM2B Board PLC Practical Guide
  • Omron C500 PLC Installation and Maintenance Guide
  • Mitsubishi FXo/FXon PLC Hardware Practice