Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Infrastructure safeguards

F: | Au:佚名 | DA:2023-12-05 | 292 Br: | 🔊 点击朗读正文 ❚❚ | Share:

During the "14th Five-Year Plan" period, infrastructure construction plays a more important role in expanding effective investment and maintaining stable and healthy economic development, and it is necessary to continuously increase reform, innovation and guarantee efforts, coordinate all parties to form synergy, ensure the realization of planning tasks and planning objectives, and improve the support and guarantee for urban operation and development.

1. Strengthening overall planning and coordination

Strengthen planning control, pay attention to the coordination of construction and management, and create a full-life cycle development model of all aspects of infrastructure planning, construction and management.

We will strengthen planning and coordination. We will strengthen the guiding and constrainting role of territorial spatial planning in various special plans, improve the mechanism for coordinating plans, avoid overlapping and conflicting plans, and promote the integration of multiple plans at all levels and of all types of plans. We will strengthen the coordination of planning and construction projects, establish and improve the joint reserve mechanism for projects, promote coordinated implementation of related projects, and improve the efficiency of planning and construction.

We will improve construction management. Improve the top-level design, reasonably integrate and divide the municipal facilities construction management responsibilities undertaken by relevant departments, avoid duplication of construction, and make up for management gaps. Strengthen the linkage of departments, optimize the coordination and information sharing mechanism between departments, coordinate the major issues in the preliminary work of the project and the construction management process, and ensure the integrity and continuity of the implementation of major infrastructure projects in the city.

Improve the level of lifecycle control. Coordinate the early and late stages, strengthen the scientific control of operating costs, service prices, operation and maintenance issues in the design stage, and ensure the long-term stable operation of infrastructure. Improve the participation channels of facility management departments and operation service units, combine operation management needs, optimize facility design schemes, improve technical indicators and quality standards, and promote the extension of management forward. Improve the joint acceptance mechanism, standardize acceptance standards and procedures, and ensure the proper transfer of facilities and standard operation.

2. Strengthening reform and innovation

We should properly handle the relationship between public welfare and operational infrastructure, clarify the direction of reform in key areas and key links, scientifically design innovative development paths and models, and promote sustainable development of infrastructure.

We will further improve the pricing mechanism. We will adhere to the market-oriented direction and improve the mechanism for dynamic adjustment of tolls and prices in rail transit, surface public transportation, and expressways. We will accelerate the improvement of the mechanism whereby prices are mainly determined by the market, stimulate market vitality, and increase the efficiency of resource allocation. For infrastructure with public welfare characteristics and natural monopoly operation characteristics, we will establish and improve a government pricing mechanism that scientifically reflects costs, attaches equal importance to incentives and constraints, takes into account social affordability, and adjusts flexibly and dynamically, so as to promote high-quality development of the industry.

We will continue to promote innovation in investment and financing models. We will establish a diversified and multi-channel investment guarantee system and increase the capacity of capital supply. Gradually open the subway station shuttle bus, microcirculation bus, air source market, P+R parking lot and other business subject bidding, forming a multi-subject competition pattern, and constantly improve the service level of the industry. We will improve risk sharing and compensation mechanisms, and improve restraint and incentive policies. We will implement integrated development of hubs, terminals and stations, develop expressways and parking lots using the PPP model, strengthen the pilot promotion of infrastructure real estate investment trusts (REITs), and attract private capital through multiple channels. We will play the role of a financing platform in accordance with the law and regulations, and enhance our financing capacity without violating regulations on borrowing.

3. Strengthening project implementation

We will continue to determine and implement projects based on plans, accelerate the construction of major projects, and ensure the realization of planned goals and tasks.

Implementation of major projects to drive. To study and establish the city's major infrastructure project reserve, arrange special funds to support the preliminary work, strengthen the evaluation of the maturity of construction projects, determine the city's major infrastructure formal projects, preparatory projects and reserve projects according to the maturity of the project, plan and start the preliminary work in advance, and achieve a virtuous cycle mechanism of reserve demonstration and construction.

Categorize and implement precise policies. We will strengthen the coordination and scheduling of reserve projects, speed up the preliminary work, and promote eligible projects to start construction as soon as possible. We will ensure the reasonable funding needs of projects under construction as a whole, promote the smooth implementation of projects under construction, and ensure their early completion and effectiveness. For major reserve projects, projects that meet the conditions and effectively stimulate the economy, serve the people's livelihood, and promote integrated development will be encouraged and supported, optimize the development environment, increase promotion efforts, and accelerate the pace of early work.

4. Strengthening standardized management

We will strengthen the monitoring and evaluation of planning, improve the system for monitoring and evaluating the implementation of planning, strengthen financial constraints, expand public participation, and ensure that planning is scientific.

Strengthen cost performance management. Accurately calculate the project cost, strengthen the management of the projects included in the planning, improve the quality of the preliminary work of the project, establish a scientific and complete cost budget management system with standardized implementation, strengthen the project cost budget and strengthen the budget implementation. Improve the cost performance management mechanism, enhance performance awareness and performance concept, and realize the whole-process performance management of pre-planning, in-process control and post-evaluation. Improve the scientific and refined level of cost performance management, reasonably control the scale and pace of construction, and ensure that the construction timing and construction standards are compatible with development needs and financing capacity.

We will strengthen supervision and assessment. In the implementation of the plan, the assessment and supervision shall be strengthened, mid-term evaluation shall be conducted on the implementation of the planning objectives, key tasks and policies and measures, efficiency analysis shall be emphasized, and a scientific and reasonable planning evaluation mechanism shall be established to ensure the effective implementation of the plan.

Promote broad public participation. We will translate the enthusiasm of open-door planning and public participation into joint efforts to implement the plan, give full play to the role of the main body of society, strengthen government guidance and support, focus on high-quality development and public concern, and insist on steady progress in echelons. Carry out extensive planning publicity, give full play to the enthusiasm, initiative and creativity of all sectors of society, let more citizens participate in the implementation and supervision of the planning, and form a lively situation of collective wisdom, joint construction and sharing.


  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series