Product positioning and application objects
VT-VRPA2 is an analog Euro card format proportional valve amplifier (component series 1X) launched by Bosch Rexroth, designed specifically for 4/3 proportional directional valves with live feedback, compatible with two valve types:
4WRE 6... -2X (order code 02nd digit=1);
4WRE 10... -2X (order code 02=2).
The complete ordering code structure is * * VT-VRPA2 – 1X/V0/T1 or T5/* *: V0 is the standard version; Option T1 represents a single ramp time, while T5 represents five sets of ramp times (with switchable measurement points). In terms of attachments, an open card clamp VT 3002-1-2X/48F is required (see data sheet 29928).
List of core features:
Differential input (± 10 V)+four sets of callable command value inputs (± 10 V)+current input (4... 20 mA);
Internal command value signal inversion is achieved through 24V input or jumper;
Select the ramp time through quadrant recognition (24V input) or ramp time call (24V input of T5);
Characteristic curve correction: The step level and maximum value can be independently adjusted in both positive and negative directions;
Enable input and "ready" output signals;
The power supply is equipped with a DC/DC converter and does not raise the zero point, and has reverse polarity protection for the power supply.
Detailed explanation of functional links (refer to block diagram 1-20 modules)
Power supply unit [1]: Built in current limiting power supply unit, providing power to all positive and negative power sources inside the card. The DC/DC converter outputs multiple isolated voltages of+15 V/+7.5 V/+5 V/M0/-5 V/-7.5 V/-15 V, which are stabilized by a 100 µ F capacitor.
Instruction value synthesis path: Internal instruction value=differential input [2] signal+current input [3] signal+call signal [4]+zero offset [5] (zero potentiometer "Zw") sum (summation [6]). Corresponding relationship of standard values:
Standard value current input differential input command value measurement socket flow direction
−100 % 4 mA −10 V −10 V P→B, A→T
0 % 12 mA 0 V 0 V —
100 % 20 mA 10 V 10 V P→A, B→T
0 % < 1 mA¹ 0 V 0 V —
When the current input is not connected or the command value cable is disconnected, the internal command value is 0%. There is no switching mechanism between current and voltage inputs, and both sets of inputs are permanently available simultaneously.
Command value call [4]: Four sets of signals from w1 to w4 can be called, and the external command value voltage can be directly defined by the+10 V/-10 V regulated output, or introduced through an external potentiometer - when directly connected to the regulated source, the command value is set by the internal potentiometers w1 to w4; The internal potentiometer is only used as an attenuator/limiter when using an external potentiometer. Only one call is allowed at a time; If multiple actions are taken simultaneously, "1" has the lowest priority and "4" has the highest priority. The activated call is indicated by the yellow LED on the front panel.
Instruction value inversion [7]: The internal instruction value synthesized from the input signal, call, and zero offset can be inverted through an external signal or jumper J1, and the front panel LED ("-1") indicates the inversion state.
Enable function [8]: Enable the signal to turn on the power output stage and send the internal command value to the ramp generator, indicated by the LED on the front panel. After enabling, the internal command value changes according to the set ramp time - the controlled valve will not suddenly open.
Slope generator [9]: limits the rate of rise of the control output; The downstream step function and amplitude attenuator do not prolong or shorten the ramp time. When jumper J2 is closed, the ramp time is set to the minimum value (<2 ms, i.e. the ramp is closed). External slope time setting: The internal setting value can be extended through an external potentiometer, and the setting value can be verified through a measuring socket; Automatically revert back to the internal default value when the cable is disconnected.
Slope time setting and measurement conversion table:
Measure socket value Ut/V (T1 uses "t", T5 uses "v") 5 3 2 1 0.5 0.3 0.2 0.1 0.05 0.03 0.02
Current slope time t/ms (± 20%) 20 33 50 100 200 333 500 1000 2000 3333 5000
After closing jumper J3, the ramp time on the upper table can be increased tenfold.
Characteristic curve generator [11]: adjustable step level and maximum value are set for positive and negative signals according to hydraulic requirements; The actual characteristic curve at the zero crossing point is linear rather than step like. The amplitude limiter [12] limits the internal command value to approximately ± 110% of the nominal range. The oscillator [14] generates control signals for the inductive position sensor (± 5 VSS/output, 10 mA, 5.6 kHz ± 10%); The demodulator [15] extracts the actual value of the valve core position (100% ≙ 10 V) from the position sensor signal; Position controller [17] optimized according to valve type; The power output stage [18] generates a clock modulated proportional valve solenoid current (approximately 5 kHz clock, 0... 2.5 A), with a current limit of 2.5-2.8 A per output. The output is protected against short circuits, and the output stage is powered off in the event of an internal fault or failure to enable. Fault identification [19] monitors position sensor cable breakage, primary short circuit, and output stage overcurrent.

Interface differences between T1 and T5 options
T1 (single ramp): Reserved "internal command value" and "reserved" signal pins, the measurement signal includes the actual value x, command value w, and ramp time t.
T5 (Five Slope+Measurement Point Switching): Added module 10 slope time selection logic (Ramp call ups 1 to 4, 4-quadrant operation 4Q) and module 20 measurement point switching switch; Upgrade the measuring socket to a switchable "v" socket, and read 16 internal measuring points through the panel measuring point selection switch (0-F positions):
Signal gear measurement signal v
Internal command value 0 ± 100% ≙ ± 10 V
Instruction value call 1-4 1-4 ± 100% ≙ ± 10 V
Zero offset "Zw" 5 ± 30% ≙ ± 3 V
Command value synthesis signal 6 ± 100% ≙ ± 10 V
Slope output signal 7 ± 100% ≙ ± 10 V
Zero offset "Zx" 8 ± 30% ≙ ± 10 V
Gear 9 not connected -
Slope time t1 – t5/current t A – E/F 10 mV... 10 V (according to the voltage time conversion table on page 3)
T5 front panel LED adds an additional 4Q (four quadrant operation) and T (reserved); Jumper J4 (step function) defaults to On at the factory (opposite to T1's Off), while the rest of J1/J2/J3 have the same factory settings.
Quick Overview of Technical Data
Project specifications
Working voltage UB 24 VDC+40% -20% (upper limit 35 V/lower limit 18 V)
Power consumption/current<24 VA/<2 A
Delay in fuse 2A, replaceable
Command value 1-4 0... ± 10 V, Re>100 k Ω (with M0 as reference)
Command value 5 (differential) 0... ± 10 V, Re>50 k Ω
Command value 6 (current) 4... 20 mA, load RB=100 Ω
External slope time 0...+10 V, Re=10 k Ω (internal lifting to+15 V)
Digital input threshold 8.5 V... UB → ON; 0... 6.5 V → OFF (Re>100 k Ω)
Set range Zw zero ± 30%; W1-w4 instruction values 0... 110%; Slope t1- t5 20 ms... 5 s (switchable to 0.2... 50 s); Step S ± 0... 50%; Amplitude G ± 0... 110% (corresponding to a step of 0%)
Output command value ± 10 V ± 2%/2 mA; actual value ± 2.5 V ± 2%/2 mA; measurement signal (option 5) ± 10 V ± 2%; Ready>16 V/50 mA (<1 V in case of fault, Ri=10 k Ω); Voltage stabilization ± 10 V ± 2%/25 mA short circuit protection
Connect a 48 pin multi-point plug, DIN 41612 F-type; Euro card 100 × 160 mm, DIN 41494
Temperature operation 0... 50 ° C; storage -25...+85 ° C; net weight 0.17 kg
EMC、 Climate and mechanical load environment simulation testing information can be found in data table 30119-U; project planning and maintenance extension information can be found in document 30119-B.
Panel elements and jumper configuration (debugging core)
Front panel elements (T1/T5 universal):
LED: smiley face=ready (green); Lock shape=Enable (yellow); -1 "=External inversion; T5 also has "4Q" and "T";
Measuring sockets: x (actual value), w (command value), t (ramp time, T1)/v (T5 switchable measuring point), ⊥ (measuring zero point);
Panel potentiometers: Zw (zero calibration), w1-w4 (command values 1-4), t (ramp time); T5 is from t1 to t5);
Adjustable potentiometers on the card: Gw+/Gw − (positive/negative command value amplitude attenuator), S+/S − (positive/negative direction step level), Zx/Gx (board zero point and amplitude).
Jumper function matrix (●=factory settings; solid=closed; hollow=open):
Jumper function status A status B
J1 reverse phase (closed) not reverse phase ● (open)
J2 slope function Off On ●
J3 slope time range 0.2... 50 s (closed) 0.02... 5 s ● (open)
J4 step function T1: Off ●/T5: On ● Another gear
J5 and J6 are reserved (no function), and J7 is reserved for special functions. Once the sealed potentiometer is adjusted, the warranty becomes invalid - it is important to distinguish between panel adjustable potentiometers and factory seals during debugging.
Suggestions for Engineering Debugging Process
Wiring verification: Check the 48 pin DIN 41612 F-type plug according to the diagram; Confirm that the internal command value is 0% when the current input is not connected (to avoid misjudging valve zero drift);
Power supply verification: 24 VDC within the range of 18-35 V, check the 2A fuse and reverse polarity protection; The green "ready" LED lights up;
Zero point calibration: adjust the potentiometer Zw to zero within ± 30% range; T5 can directly read Zw/Zx offset for auxiliary calibration by measuring the switch position 5/8 at the measuring point;
Command value calibration: Check P → A/P → B and signal polarity according to the flow chart; If necessary, close J1 or connect an external inverted signal;
Slope setting: Verify the current slope time by comparing the voltage of the t/v socket with the conversion table; Close J3 to enter the range of 0.2... 50 seconds when slow start stop is required; The automatic rollback of internal default values in disconnected scenarios is a key design for reliability;
Characteristic curve correction: Set the S+/S - step level (0... 50%) and Gw+/Gw - amplitude (0... 110%) according to the hydraulic system requirements to eliminate valve zero dead zone and bilateral asymmetry;
Enable joint debugging: Verify the activation of the enable LED and power output stage, and confirm that the valve opens slowly according to the ramp time;
Fault channel verification: Simulate position sensor cable breakage/short circuit, confirm fault identification [19], power off the output stage, and drop the ready output to<1 V.
Key points for maintenance and troubleshooting
Ready output diagnostic value:>16 V/50 mA indicates normal,<1 V (Ri=10 k Ω) indicates internal fault - can be directly connected to PLC for status monitoring;
Common abnormal positioning: valve not operating → check the enable circuit and the 24V lower limit of 18V; one-way drift → recheck the symmetry between Zw/S ±/G ± and the characteristic curve; Response mutation → Check if J2 is closed incorrectly (slope closed); Oscillation → Check the position sensor cable shielding and Gx amplitude;
Measurement point system utilization: T5 users can fully reproduce the internal signal chain (call → synthesis → slope → output) without disconnecting the wires through 16 level measurement point switches, significantly reducing troubleshooting time;
Environmental adaptability: Applications beyond the operating parameter range must consult the manufacturer; Cards belong to products with natural wear and aging, and it is recommended to include long-term inventory cards in periodic power on verification.