Should the state "step on the brakes" of the waste power generation industry?

F: | Au:佚名 | DA:2023-12-06 | 404 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Operating income composition of domestic waste incineration power generation project

For domestic waste incineration power generation projects, garbage treatment service fee income and online power generation income are two important factors affecting the income. At the same time, the Ministry of Finance and the State Administration of Taxation "Preferential Policies on value-added Tax on Comprehensive Utilization products of some resources" (Finance and Taxation (2015) No. 78) are implemented. The comprehensive utilization of waste power generation resources implements the policy of VAT collection and refund, and labor services are taxed in accordance with the policy of 100% tax refund and 70% tax refund.

In terms of electricity price subsidies, with reference to the provisions of the "Notice of the National Development and Reform Commission on Improving the Price policy of waste incineration power Generation" (Price [2012]801) document, the amount of domestic waste processed into the factory is converted into online electricity for settlement, and the amount of domestic waste converted into online electricity is tentatively set at 280 KWH per ton. And implement the national unified benchmark price of waste power generation 0.65 yuan per KWH (including tax, the same below); The rest of the on-grid electricity shall be subject to the on-grid electricity price of similar local coal-fired generating units.

Factors affecting the withdrawal of central subsidies

In the past two years, a lot of policy documents have been issued on the decline of domestic waste incineration power generation to a smooth exit. The following are mainly analyzed from the two perspectives of enjoying the central subsidy time and sharing the central subsidy part.

According to the Supplementary Notice on matters related to "Several Opinions on Promoting the Healthy Development of Non-water Renewable Energy Power Generation" jointly issued by the Ministry of Finance, the National Development and Reform Commission and the Energy Bureau (Caijian [2020] 426) guidance document content "Annual utilization hours of about 6560 hours" and "Supplementary Notice" "full life cycle [annual utilization hours] 82,500 hours to enjoy The maximum period of national subsidy and national subsidy is 15 years ".

In fact, as early as 2006, the National Development and Reform Commission on the issuance of "Renewable Energy power generation Price and cost allocation Management Trial Measures" (development and reform price [2006] No. 7) in the "power generation project from the date of production, 15 years to enjoy subsidized electricity prices; After 15 years of operation, the subsidized electricity price will be abolished." The policy already provides for a 15-year national subsidy period, but 82500 utilization hours is a new requirement, equivalent to adding a cap to the project life cycle on the basis of the 15-year national subsidy period.

The "2021 biomass power generation project construction work Plan" (Development and Reform Energy [2021] No. 1190) requires the central subsidy part of non-competitive allocation projects to be shared by the central government, and the central subsidy part of competitive allocation projects to be competitive online.

In view of the current on-grid electricity price of domestic waste incineration power generation projects in various regions of the country, it is described as follows: >>

(1) The on-grid electricity price of the domestic waste incineration power generation project is composed of three parts: the benchmark price of coal-fired power generation, the provincial price subsidy and the central price subsidy. Due to the different benchmark price of coal-fired power generation in each region, the central price subsidy of each region is very different.

(2) The geographical distribution of coal resources in China is extremely unbalanced. China's coal resources are more in the north and less in the south, more in the west and less in the east, and the distribution of coal resources is very inconsistent with the distribution of consumption areas. In areas rich in coal resources, there are many coal-burning power generation projects, which leads to the low benchmark price of local coal-burning power generation. However, the benchmark price of coal-fired power generation is higher in economically developed regions with scarce coal resources. For example, the benchmark price of coal-fired power generation in Guangdong is the highest at 0.4530 yuan/KWH, while that in Ningxia is the lowest at 0.2595 yuan/KWH. Eastern Mongolia and western Mongolia, both in the Inner Mongolia Autonomous Region, are also different, and their benchmark electricity prices for coal-fired power generation are 0.3035 yuan/KWH and 0.2829 yuan/KWH, respectively.

(3) Due to the difference in the benchmark price of coal-fired power generation in each region, the central price subsidy for local solid waste incineration projects varies greatly. In the case of the other boundary lines of the project, for domestic waste incineration power generation projects in areas where the central electricity price subsidy accounts for 44.69% of the on-grid electricity price, the withdrawal of the central electricity price subsidy means that the domestic waste treatment service fee will increase by 81.34 yuan per ton.

Take a solid waste incineration project in Heilongjiang Province as an example

A solid waste incineration project in Heilongjiang Province invested 565.23 million yuan, designed to treat 1000 tons/day, equipped with two 500-ton incinerators and one 20MW turbo-generator unit; At the same time, supporting construction of flue gas purification system, waste water treatment system, fly ash treatment system and other supporting projects.

According to the "2021 biomass power generation project construction Work Plan" (Energy [2021] No. 1190) policy, if the non-competitive configuration project, according to the domestic waste treatment service fee :60 yuan/ton, annual operation days :333 days/year, franchise period: 30 years (construction period: 2 years), on-grid electricity price: The boundary conditions of coal benchmark electricity price 0.3740 yuan/KWH, provincial electricity price subsidy 0.1 yuan/KWH, central electricity price subsidy 0.1760 yuan/KWH (82500 hours of the whole life cycle can enjoy the central electricity price subsidy) are as follows:

According to the "2021 biomass power generation project construction Work Plan" (energy [2021] No. 1190) policy, if it is a competitive configuration project, according to the domestic waste treatment service fee :60 yuan/ton, annual operating days :333 days/year, franchise period: 30 years (construction period: 2 years), on-grid electricity price: The boundary conditions of coal benchmark electricity price 0.3740 yuan/KWH, provincial electricity price subsidy 0.1 yuan/KWH, central electricity price subsidy 0.1760 yuan/KWH (need to participate in bidding online part) are as follows:

"12th Five-Year", "13th Five-Year" ten years to encourage the development of solid waste incineration power generation projects and do not specify the specific scope and time of decline, the same scale and similar boundary conditions, many projects previously estimated than a solid waste incineration project in Heilongjiang Province non-competitive allocation class is more optimistic; Similarly, according to the "Work Plan for the construction of biomass power generation Projects in 2021" (Energy [2021] No. 1190), the economic difference between non-competitive configuration projects and competitive configuration projects is also very large. After the end of 2021, the competitive configuration projects that achieve the completion of all units and connect to the grid need to further adopt the multiple application of biomass energy. Reduce power generation costs and other means to improve the economy of the project.

conclusion

Since 2020, the state has started to put the brakes on the domestic waste incineration power generation industry. Compared with the Notice of the National Development and Reform Commission on Issuing the "Trial Measures for the Management of Renewable Energy Power Generation Price and Cost Allocation" (Development and Reform Price [2006] No. 7), The two documents of the National Development and Reform Commission, the Finance Bureau and the National Energy Administration on issuing the "Implementation Plan for Improving the Construction and Operation of biomass Power Generation Projects" (Development and Reform Energy (2020) No. 1421) and the "Work Plan for the construction of biomass power generation Projects in 2021" (Development and Reform Energy [2021] No. 1190) clearly stipulate that the central subsidies will be withdrawn year by year The time and plan mainly involve central subsidy funds, project storage, and the proportion of central subsidy shared by the central government.

In addition to the central subsidy time and central subsidies and other factors, the economy of domestic waste incineration project is also affected by the waste treatment service fee payment cycle, the benchmark price payment cycle of coal-fired power generation, the provincial price subsidy payment cycle, the central price subsidy payment cycle, etc. In particular, the central electricity price subsidy of non-competitive allocation projects needs to continue to queue and the bidding cycle of competitive allocation projects needs to be further clarified.


  • Atlas Copco Power Focus SL PF4002-G-HW Controller
  • Atlas Copco 8436 6770 00 ILT Base Station
  • Atlas Copco 1900520400 Air Compressor Control Panel
  • Atlas Copco 1900-0711-51 Display Keypad Unit
  • Atlas Copco 1900-0710-52 Communication Control Board
  • Atlas Copco 1900-0701-04 Control Interface Module
  • Atlas Copco 8092 1143 40 SRTT Transducer 180Nm
  • Atlas Copco MT Focus 6000 Controller with Pump and Screwdriver
  • Atlas Copco Elektronikon GraphicPlus Controller PPBE0622 PPBE0633
  • Atlas Copco PF3109-G-DN-HW Tensor 8-9 Power Focus Nutrunner Control
  • Atlas Copco Elektronikon P1900520440 Touch Controller
  • Atlas Copco Power Focus 8 Controller 8436280002
  • Atlas Copco 8436 1500 03 FlexCarrier 3-Slot Torque System Component
  • Atlas Copco Power Focus 6000 PF6000 Industrial Controller
  • Atlas Copco TC-4000-P-PB-ES Power Macs Controller
  • Atlas Copco 8433-0015-20 8433001520 Cable Assembly
  • Atlas Copco 49X10301AB Pressure Transducer Sensor
  • Atlas Copco 8436180002 Replacement Filter Element
  • Atlas Copco C4700A01V216 Compressor Control Module
  • Alcatel-Lucent 3HE01019AAAA01 High-Speed Interface Module
  • Alcatel-Lucent 111381 Power Distribution Module
  • Alcatel TN 2523 1:1 CDN III Module – MRPQAE3
  • Alcatel-Lucent 3he06151aaac01 8-Port Interface Module – IPUIBKB3AA
  • Alcatel-Lucent LNW46 DMX Metro OC12 Interface Module – 108694878
  • Alcatel-Lucent 41A12C FT-2000 Optical Transponder Unit – 108188053
  • Alcatel-Lucent 8DG02607AA POW100 DC-DC Converter Module
  • Alcatel-Lucent LambdaXtreme WWBQ21 40G Optical Transponder
  • Alcatel-Lucent TN1891 5ESS Protocol Handler PHV5 Commcode 108747064
  • Alcatel-Lucent 300-0303-900 T1D3PDL1AE Digital Matrix Card
  • Alcatel-Lucent G-821M-A Module
  • Alcatel Lucent MPT-GC Eth 1G+ARM TX 81-86GHz 3DB80005AAAAO1
  • Nokia 3KC48990AB 1830PSS 16FAN2 Fan Unit
  • Alcatel 3EC17041AA PSPC-G4 PCB CP011200552
  • Alcatel 300-0437-906 Rev F DEXCS DMC T1D1L0S Module
  • Alcatel-Lucent 3DW03697ABBA01 TFD64A Module
  • Alcatel-Lucent AWR12 S1-1 UN Interface T3PQAC3AAA
  • ALCATEL LUCENT 9500-MPR ODU RADIO MPT-HC V2 9558HC 3DB20914BAAA03 6GHZ
  • Alcatel-Lucent 9500-MPR ODU 300 11GHz Microwave Radio MPT 3DB23035AEAA01
  • Alcatel 2C7-1005-000 Teflon Bell Jar Holder Ring – 146111
  • Alcatel-Lucent BNJ118 S1:4 Circuit Board – Interface Module
  • Alcatel-Lucent 9500-MPR ODU 300 6GHz Microwave Radio MPT 3DB23215AFAA01
  • Alcatel 3EM04001AA Signal Processing Unit with Accessory Cards
  • Alcatel VAUCAL5KAB AA1418FE2BG 3FE67437AAD02 Interface Card
  • Alcatel-Lucent 1642 Edge Multiplexer N1217P YF – Access Node
  • Alcatel-Lucent 3HE07158BA 7750 SR-12 12-Port 10GIGE MultiCore IMM IPUCA741AA
  • Alcatel 101200429000 Power Divider 746-776 MHz with Heatsinks
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 6GHz 3DB23215ADAA01 High Power Radio
  • Alcatel-Lucent 9500-MPR MPT-HC 23GHz 2/2P ODU Radio 3DB20474BA
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 6GHz 3DB23215AAAA01 Low Power Radio
  • Alcatel 3BA52126ABAA OmniPCX 4400 Compact Cabinet
  • Alcatel-Lucent 3HE12300AA 7750 SR-1 Subrack with Licenses
  • Alcatel 300-1368-903 Rev C DEXCS SPA-1 T1PQAC1 Line Card
  • Alcatel-Lucent 408977981 WOWUAB6HAA 10G XPR OTU2 XPonder Card
  • Alcatel-Lucent-Nokia 3HE08423AARC01 7750 SR Control Processor Module IPUCBGZ1AA
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 6GHz 3DB23215ABAA01 Low Power Radio
  • Alcatel-Lucent CPU7-2 3BA23259ABJE 05 Control Processor Module
  • Alcatel WTM11AD 3DW03915DABA01 Optical Transponder Module
  • Alcatel-Lucent 1340FMPK Card Chip BA5IVY6BAA – Processor Module
  • Alcatel-Lucent 3HE06151ACAC01 Control Fabric Module
  • Alcatel-Lucent 9500-MPR 18GHz 1P-1 Protection ODU Radio 3DB20433BA AA04
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 18GHz Radio 3DB20433BAAA04
  • Alcatel-Lucent SM269 LMPQ04KAXX Circuit Pack – Interface Module
  • Alcatel OME25HP Filter Cartridge – 107494
  • Alcatel-Lucent ALU-BZ74 99BC-4 –48V Battery Cabinet
  • Alcatel-Lucent WWAA37 Optical Amplifier WMAPZNZAAB – CP Series
  • ALCATEL LUCENT 9500-MPR ODU RADIO MPT-HC V2 9558HC MPT-XP 3DB20476BAAA04 23GHZ
  • Alcatel Tyco Yukon ES760A Rectifier
  • Alcatel-Lucent 9500-MPR ODU 300 MPT 23GHz 3DB23045HMAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 11GHz 3DB20548ACAA01 Microwave Radio
  • Alcatel Lucent 3DH03173AKAA Module
  • Alcatel-Lucent 76-0300-02 CSM-V2 PCB
  • Alcatel 9400 UX ODU Module 3CC06729ABAA
  • Alcatel-Lucent 408981363 Jigsaw A Band Block 24/-48V KS24624L58
  • Alcatel 3BA53095 PCB Card
  • Alcatel 2C7-1005-000 Bell Jar Holder Ring Teflon PC7-1005-000
  • Alcatel-Lucent ES640 PWDQAGKUAA 5ESS 48V DC Alarm Control Unit
  • Alcatel-Lucent 9500-MPR ODU 300 23GHz Microwave Radio MPT 3DB23045HM
  • Alcatel-Lucent KFA720 WMOTCMVLAB Optical System Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 15GHz Microwave Radio 3DB20373BAAB04
  • Alcatel-Lucent AKM70 S1-7 SMUX1 Sub-Multiplexer – T3PQWAEAAH
  • Alcatel-Lucent 107486490 DDM-2000 SONET DS3 Circuit Pack – BBG4B
  • Alcatel-Lucent SBEVM BNJ82 1:12 Module – AV950-01168
  • Alcatel-Lucent 938A Optical Loss Set – Test & Measurement Kit
  • Alcatel-Lucent MS1025-25O16-ED Fiber Optic Unit – 48VDC
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 1/1P Microwave Radio 3DB20473BA AA04
  • Alcatel-Lucent bCEM-U Control Module – 3BK28676ABAC01
  • Alcatel ASI20 Detector Control Module
  • Alcatel Lucent 130B S-1 PWPQ08B Power Unit
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20441BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20824AAAA02 Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-MC 15GHz 3DB20822AAAB02 Microwave Radio
  • Alcatel-Lucent 3AL92111AA 1P10GSO Interface Module
  • Alcatel 8220 CTT 450 Turbo Pump Controller 127821
  • Alcatel-Lucent 3AL78823AAAE 02 Module
  • Alcatel-Lucent 90-0413-01 Universal Card
  • Alcatel-Lucent BRMA 10Base-T/100Base-TX Connecting Box 3BA56170ACAB010842
  • Woodward Micronet 5453-279 Rev E Chassis Rack for TMR Control
  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module