Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Should the state "step on the brakes" of the waste power generation industry?

来源: | 作者:佚名 | 发布时间 :2023-12-06 | 272 次浏览: | Share:

Operating income composition of domestic waste incineration power generation project

For domestic waste incineration power generation projects, garbage treatment service fee income and online power generation income are two important factors affecting the income. At the same time, the Ministry of Finance and the State Administration of Taxation "Preferential Policies on value-added Tax on Comprehensive Utilization products of some resources" (Finance and Taxation (2015) No. 78) are implemented. The comprehensive utilization of waste power generation resources implements the policy of VAT collection and refund, and labor services are taxed in accordance with the policy of 100% tax refund and 70% tax refund.

In terms of electricity price subsidies, with reference to the provisions of the "Notice of the National Development and Reform Commission on Improving the Price policy of waste incineration power Generation" (Price [2012]801) document, the amount of domestic waste processed into the factory is converted into online electricity for settlement, and the amount of domestic waste converted into online electricity is tentatively set at 280 KWH per ton. And implement the national unified benchmark price of waste power generation 0.65 yuan per KWH (including tax, the same below); The rest of the on-grid electricity shall be subject to the on-grid electricity price of similar local coal-fired generating units.

Factors affecting the withdrawal of central subsidies

In the past two years, a lot of policy documents have been issued on the decline of domestic waste incineration power generation to a smooth exit. The following are mainly analyzed from the two perspectives of enjoying the central subsidy time and sharing the central subsidy part.

According to the Supplementary Notice on matters related to "Several Opinions on Promoting the Healthy Development of Non-water Renewable Energy Power Generation" jointly issued by the Ministry of Finance, the National Development and Reform Commission and the Energy Bureau (Caijian [2020] 426) guidance document content "Annual utilization hours of about 6560 hours" and "Supplementary Notice" "full life cycle [annual utilization hours] 82,500 hours to enjoy The maximum period of national subsidy and national subsidy is 15 years ".

In fact, as early as 2006, the National Development and Reform Commission on the issuance of "Renewable Energy power generation Price and cost allocation Management Trial Measures" (development and reform price [2006] No. 7) in the "power generation project from the date of production, 15 years to enjoy subsidized electricity prices; After 15 years of operation, the subsidized electricity price will be abolished." The policy already provides for a 15-year national subsidy period, but 82500 utilization hours is a new requirement, equivalent to adding a cap to the project life cycle on the basis of the 15-year national subsidy period.

The "2021 biomass power generation project construction work Plan" (Development and Reform Energy [2021] No. 1190) requires the central subsidy part of non-competitive allocation projects to be shared by the central government, and the central subsidy part of competitive allocation projects to be competitive online.

In view of the current on-grid electricity price of domestic waste incineration power generation projects in various regions of the country, it is described as follows: >>

(1) The on-grid electricity price of the domestic waste incineration power generation project is composed of three parts: the benchmark price of coal-fired power generation, the provincial price subsidy and the central price subsidy. Due to the different benchmark price of coal-fired power generation in each region, the central price subsidy of each region is very different.

(2) The geographical distribution of coal resources in China is extremely unbalanced. China's coal resources are more in the north and less in the south, more in the west and less in the east, and the distribution of coal resources is very inconsistent with the distribution of consumption areas. In areas rich in coal resources, there are many coal-burning power generation projects, which leads to the low benchmark price of local coal-burning power generation. However, the benchmark price of coal-fired power generation is higher in economically developed regions with scarce coal resources. For example, the benchmark price of coal-fired power generation in Guangdong is the highest at 0.4530 yuan/KWH, while that in Ningxia is the lowest at 0.2595 yuan/KWH. Eastern Mongolia and western Mongolia, both in the Inner Mongolia Autonomous Region, are also different, and their benchmark electricity prices for coal-fired power generation are 0.3035 yuan/KWH and 0.2829 yuan/KWH, respectively.

(3) Due to the difference in the benchmark price of coal-fired power generation in each region, the central price subsidy for local solid waste incineration projects varies greatly. In the case of the other boundary lines of the project, for domestic waste incineration power generation projects in areas where the central electricity price subsidy accounts for 44.69% of the on-grid electricity price, the withdrawal of the central electricity price subsidy means that the domestic waste treatment service fee will increase by 81.34 yuan per ton.

Take a solid waste incineration project in Heilongjiang Province as an example

A solid waste incineration project in Heilongjiang Province invested 565.23 million yuan, designed to treat 1000 tons/day, equipped with two 500-ton incinerators and one 20MW turbo-generator unit; At the same time, supporting construction of flue gas purification system, waste water treatment system, fly ash treatment system and other supporting projects.

According to the "2021 biomass power generation project construction Work Plan" (Energy [2021] No. 1190) policy, if the non-competitive configuration project, according to the domestic waste treatment service fee :60 yuan/ton, annual operation days :333 days/year, franchise period: 30 years (construction period: 2 years), on-grid electricity price: The boundary conditions of coal benchmark electricity price 0.3740 yuan/KWH, provincial electricity price subsidy 0.1 yuan/KWH, central electricity price subsidy 0.1760 yuan/KWH (82500 hours of the whole life cycle can enjoy the central electricity price subsidy) are as follows:

According to the "2021 biomass power generation project construction Work Plan" (energy [2021] No. 1190) policy, if it is a competitive configuration project, according to the domestic waste treatment service fee :60 yuan/ton, annual operating days :333 days/year, franchise period: 30 years (construction period: 2 years), on-grid electricity price: The boundary conditions of coal benchmark electricity price 0.3740 yuan/KWH, provincial electricity price subsidy 0.1 yuan/KWH, central electricity price subsidy 0.1760 yuan/KWH (need to participate in bidding online part) are as follows:

"12th Five-Year", "13th Five-Year" ten years to encourage the development of solid waste incineration power generation projects and do not specify the specific scope and time of decline, the same scale and similar boundary conditions, many projects previously estimated than a solid waste incineration project in Heilongjiang Province non-competitive allocation class is more optimistic; Similarly, according to the "Work Plan for the construction of biomass power generation Projects in 2021" (Energy [2021] No. 1190), the economic difference between non-competitive configuration projects and competitive configuration projects is also very large. After the end of 2021, the competitive configuration projects that achieve the completion of all units and connect to the grid need to further adopt the multiple application of biomass energy. Reduce power generation costs and other means to improve the economy of the project.

conclusion

Since 2020, the state has started to put the brakes on the domestic waste incineration power generation industry. Compared with the Notice of the National Development and Reform Commission on Issuing the "Trial Measures for the Management of Renewable Energy Power Generation Price and Cost Allocation" (Development and Reform Price [2006] No. 7), The two documents of the National Development and Reform Commission, the Finance Bureau and the National Energy Administration on issuing the "Implementation Plan for Improving the Construction and Operation of biomass Power Generation Projects" (Development and Reform Energy (2020) No. 1421) and the "Work Plan for the construction of biomass power generation Projects in 2021" (Development and Reform Energy [2021] No. 1190) clearly stipulate that the central subsidies will be withdrawn year by year The time and plan mainly involve central subsidy funds, project storage, and the proportion of central subsidy shared by the central government.

In addition to the central subsidy time and central subsidies and other factors, the economy of domestic waste incineration project is also affected by the waste treatment service fee payment cycle, the benchmark price payment cycle of coal-fired power generation, the provincial price subsidy payment cycle, the central price subsidy payment cycle, etc. In particular, the central electricity price subsidy of non-competitive allocation projects needs to continue to queue and the bidding cycle of competitive allocation projects needs to be further clarified.


  • Metso A413177 Digital Interface Control Module
  • METSO A413222 8-Channel Isolated Temperature Input Module
  • Metso A413313 Interface Control Module
  • METSO D100532 Control System Module
  • METSO A413310 8-Channel Digital Output Module
  • METSO A413659 Automation Control Module
  • Metso D100314 Process Control Interface Module
  • METSO A413665 8-Channel Analog Output Module
  • METSO A413654 Automation Control Module
  • Metso A413325 Interface Control Module
  • METSO A413110 8-Channel Analog Input Module
  • METSO A413144 Automation Control Module
  • Metso A413160 Digital Interface Control Module
  • METSO A413152 8-Channel Digital Input Module
  • METSO A413240A Automation Control Module
  • METSO A413146 Digital Interface Control Module
  • METSO A413150 Multi-Role Industrial Automation Module
  • METSO A413125 Automation Control / I/O Module
  • Metso A413111 Interface Control Module
  • METSO A413140 Automation Control Module
  • METSO 020A0082 Pneumatic Control Valve Component
  • METSO 02VA0093 Automation Control Module
  • METSO 02VA0153 Actuator Control Module
  • METSO 02VA0190 Automation Control Module
  • Metso 02VA0193 Pneumatic Control Valve Component
  • METSO 02VA0175 Valve Actuator Module
  • METSO D100308 Industrial Control Module
  • MOOG QAIO2/2-AV D137-001-011 Analog Input/Output Module
  • MOOG D136-002-002 Servo Drive or Control Module
  • MOOG D136-002-005 Servo Drive Control Module
  • MOOG D136E001-001 Servo Control Card Module
  • MOOG M128-010-A001B Servo Control Module Variant
  • MOOG G123-825-001 Servo Control Module
  • MOOG D136-001-008a Servo Control Card Module
  • MOOG M128-010 Servo Control Module
  • MOOG T161-902A-00-B4-2-2A Servo-Proportional Control Module
  • MOTOROLA 21255-1 Electronic Component Module
  • MOTOROLA 12967-1 / 13000C Component Assembly
  • MOTOROLA 01-W3914B Industrial Control Module
  • Motorola MVME2604-4351 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME162-513A VMEbus Embedded Computer Board
  • MOTOROLA MPC2004 Embedded PowerPC Processor
  • Motorola MVME6100 VMEbus Single Board Computer
  • MOTOROLA MVME162PA-344E VMEbus Embedded Computer Board
  • MOTOROLA RSG2PMC RSG2PMCF-NK2 PMC Expansion Module
  • Motorola APM-420A Analog Power Monitoring Module
  • MOTOROLA 0188679 0190530 Component Pair
  • Motorola 188987-008R 188987-008R001 Power Control Module
  • MOTOROLA DB1-1 DB1-FALCON Control Interface Module
  • MOTOROLA AET-3047 Antenna Module
  • Motorola MVME2604761 PowerPC VMEbus Single Board Computer
  • MOTOROLA MVME761-001 VMEbus Single Board Computer
  • MOTOROLA 84-W8865B01B Electronic System Module
  • Motorola MVIP301 Digital Telephony Interface Module
  • MOTOROLA 84-W8973B01A Industrial Control Module
  • MOTOROLA MVME2431 VMEbus Embedded Computer Board
  • MOTOROLA MVME172PA-652SE VMEbus Single Board Computer
  • Motorola MVME162-223 VMEbus Single Board Computer
  • MOTOROLA BOARD 466023 Electronic Circuit Board
  • Motorola MVME333-2 6-Channel Serial Communication Controller
  • MOTOROLA 01-W3324F Industrial Control Module
  • MOTOROLA MVME335 VMEbus Embedded Computer Board
  • Motorola MVME147SRF VMEbus Single Board Computer
  • MOTOROLA MVME705B VMEbus Single Board Computer
  • MOTOROLA MVME712A/AM VMEbus Embedded Computer Board
  • MOTOROLA MVME715P VMEbus Single Board Computer
  • Motorola MVME172-533 VMEbus Single Board Computer
  • Motorola TMCP700 W33378F Control Processor Module
  • MOTOROLA MVME188A VMEbus Embedded Computer Board
  • Motorola MVME712/M VME Transition Module
  • Motorola 30-W2960B01A Industrial Processor Control Module
  • MOTOROLA FAB 0340-1049 Electronic Module
  • Motorola MVME162-210 VME Single Board Computer
  • Motorola MVME300 VMEbus GPIB IEEE-488 Interface Controller
  • MOTOROLA CPCI-6020TM CompactPCI Processor Board
  • Motorola MVME162-522A VMEbus Single Board Computer
  • MOTOROLA MVME162-512A VMEbus Single Board Computer
  • MOTOROLA MVME162-522A 01-W3960B/61C VMEbus Single Board Computer
  • MOTOROLA MVME162-220 VMEbus Embedded Computer Board
  • Motorola MVME162-13 VMEbus Single Board Computer
  • MOTOROLA MVME162-10 VMEbus Single Board Computer
  • RELIANCE 57C330C AutoMax Network Interface Module
  • RELIANCE 6MDBN-012102 Drive System Module
  • RELIANCE 0-60067-1 Industrial Drive Control Module
  • Reliance Electric 0-60067-A AutoMax Communication Module
  • RELIANCE S0-60065 System Control Module
  • RELIANCE S-D4006-F Industrial Drive Control Module
  • Reliance Electric S-D4011-E Shark I/O Analog Input Module
  • RELIANCE S-D4009-D Drive Control Module
  • RELIANCE S-D4043 Drive Control Module
  • Reliance DSA-MTR60D Digital Servo Motor Interface Module
  • RELIANCE 0-60063-2 Industrial Drive Control Module
  • RELIANCE S-D4041 Industrial Control Module
  • Reliance Electric SR3000 2SR40700 Power Module
  • RELIANCE VZ7000 UVZ701E Variable Frequency Drive Module
  • RELIANCE VZ3000G UVZC3455G Drive System Module
  • Reliance Electric S-D4039 Remote I/O Head Module
  • RELIANCE 0-57210-31 Industrial Drive Control Module
  • RELIANCE 0-56942-1-CA Control System Module
  • Reliance Electric 0-57100 AutoMax Power Supply Module
  • RELIANCE 0-54341-21 Industrial Control Module
  • RELIANCE 0-52712 800756-21B Drive Interface Board
  • KEBA PS242 - Power Supply Module
  • KEBA BL460A - Bus Coupling Module
  • KEBA K2-400 OF457/A Operating Panel
  • KEBA T200-M0A-Z20S7 Panel PC
  • KEBA K2-700 AMT9535 Touch Screen Panel
  • KEBA T20e-r00-Am0-C Handheld Terminal
  • KEBA OP350-LD/J-600 Operating Panel
  • KEBA 3HAC028357-001 DSQC 679 IRC5 Teach Pendant
  • KEBA E-32-KIGIN Digital Input Card
  • KEBA FP005 Front Panel
  • KEBA BT081 2064A-0 Module
  • KEBA FP-005-LC / FP-004-LC Front Panel
  • KEBA SI232 Serial Interface
  • KEBA T70-M00-AA0-LE KeTop Teach Pendant
  • KEBA KEMRO-BUS-8 Bus Module
  • KEBA IT-10095 Interface Terminal
  • KEBA RFG-150AWT Power Supply Unit
  • KEBA C55-200-BU0-W Control Unit
  • KEBA Tt100-MV1 Temperature Module
  • KEBA E-HSI-RS232 D1714C / D1714B Interface Module
  • KEBA E-HSI-CL D1713D Interface Module
  • KEBA D1321F-1 Input Module
  • KEBA E-32-D Digital Input Card
  • KEBA C5 DM570 Digital Module
  • KEBA XE020 71088 Module
  • KEBA E-16-DIGOUT Digital Output Card