Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Development situation and prospect of natural gas in China

F: | Au:佚名 | DA:2024-01-02 | 579 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:



China's supply and demand of natural gas continue to increase

Natural gas reserves are growing at their peak, and the proportion of unconventional resources is increasing. China's natural gas resources are 172 trillion cubic meters, the resource base is strong, but the proved degree is low, and the overall exploration is in the early and middle period. Since 2000, China's natural gas reserves have maintained peak growth, with an average annual increase of 732.8 billion cubic meters of proven natural gas reserves. By the end of 2021, China had submitted a total of 17.05 trillion cubic meters of proved reserves, of which conventional gas accounted for 53%, tight gas accounted for 32%, shale gas accounted for 11%, and coalbed gas accounted for 4%. The new proved reserves are large, but mainly low-grade reserves such as unconventional and deep deposits.

Natural gas production has increased rapidly, and Sulige has entered the ranks of the world's largest gas fields. Since 2000, China's natural gas development has entered a period of rapid development, with an average annual growth rate of about 10%, reaching more than 220 billion cubic meters in 2022. At present, it has built four natural gas production bases in Ordos, Tarim, Sichuan and Haihai. China's oil and gas output rose from 18.3 billion cubic meters in 2000 to 145.3 billion cubic meters in 2022, accounting for 66.05% of the country's natural gas output. At present, CNPC has built a 50 billion cubic meter super gas zone - Changqing gas zone and two more than 30 billion cubic meter atmospheric zones - Southwest, Tarim gas zone. In 2022, the output of Changqing Sulige gas field will reach 30.56 billion cubic meters, becoming the only super gas field in China with an annual output of more than 30 billion cubic meters, and entering the ranks of the world's top ten super large gas fields.

Natural gas consumption continued to flourish, and its dependence on foreign countries was effectively controlled. In 2018, China produced 160.1 billion cubic meters of natural gas, its apparent consumption was 280.3 billion cubic meters, and its dependence on foreign natural gas was 45.3 percent. In 2022, China's natural gas production is 220 billion cubic meters, the apparent consumption is 366.3 billion cubic meters, and the external dependence of natural gas is less than 41%. Four years, in the case of natural gas consumption increased by 86 billion cubic meters, foreign dependence decreased by more than 4%, mainly due to the rapid growth of domestic natural gas production in recent years. Over the past four years, the net increase of domestic natural gas was 60 billion cubic meters, and the decline in external dependence was beyond most experts' forecasts.

In the future, China's policy of increasing domestic storage and production will not change, vigorously develop the natural gas industry, take natural gas as a bridge to achieve green transformation, and promote the development of unconventional natural gas will become the main force for increasing storage and production.

The development of natural gas promotes the transformation of energy structure. Compared with the world level, the proportion of natural gas in primary energy consumption in China is low, but the particularity of energy structure determines that the proportion of natural gas consumption in China is not comparable with that of foreign countries. The proportion of natural gas in primary energy consumption increased from 4% in 2010 to 8.9% in 2021, more than doubling in 10 years, and absolute consumption increased from 95.8 billion cubic meters to 372.6 billion cubic meters, an increase of nearly four times.

Prospect of natural gas development in China

At present, China has formed different types of gas reservoir characteristic development technology, according to the "discovery of a class, research a class, mature supporting a class of ideas, development technology system gradually formed.

Exploration potential analysis

For conventional gas and tight gas, the remaining resources are mainly distributed in the six fields of lithostratigraphy, Marine carbonate rocks, foreland and complex structure-lithology, and the proved rate of each field is low, and the fields of lithostratigraphy, Marine carbonate rocks and foreland are at the peak of reserve growth. At present, the evaluation of the realistic scale of eight additional storage areas, the resource potential of 30 trillion cubic meters, with 8 trillion to 10 trillion cubic meters of proven potential. The cumulative discovery rate in 2021 is 20%, which is expected to increase to 40% in 2035 and more than 50% in 2060.

There are 3 total areas of shale gas, 3 new potential storage areas have been discovered, the resource potential is more than 35 trillion cubic meters, and the future has 8 trillion to 9 trillion cubic meters of proved geological reserves potential.

CBM is in the early stage of exploration, with large amount of remaining resources and unbalanced distribution. There are 2 actual additional storage areas and 3 potential additional storage areas, with proven geological reserves potential of 500 billion to 750 billion cubic meters in the future. Ordos deep coalbed methane will show a broad development prospect in the future.

Development potential analysis

Clarify the development orientation of the four types of gas reservoirs, and give precise policies to ensure the efficient development of the natural gas industry. Conventional gas is the "ballast stone" of stable production and emergency supply, is the basis of economic benefits, and needs to ensure steady development; Tight gas is the most realistic field to accelerate production, which can accelerate development and benefit development. Shale gas is an important field of production replacement, which emphasizes technical research and strives to achieve scale efficiency development. Deep coal bed gas is a new field of sustainable development, and it is implemented steadily and strives to break through the scale and efficiency.

Scenario 1: According to the economic recoverable reserves scale, storage and production ratio, stable production period, production and construction rhythm and other constraints, the use of SEC reserves of 2.03 trillion cubic meters and new economic recoverable reserves of 7.3 trillion cubic meters, is expected to reach the peak of 200 billion cubic meters in 2035, stable production until 2060.

Scenario 2: The use of SEC reserves of 2.03 trillion cubic meters and new economic recoverable reserves of 8.2 trillion cubic meters, considering the economic recoverable reserves replacement rate of more than 1 and storage and production ratio of more than 10 constraints, is expected to peak at 220 billion cubic meters in 2035, stable production until 2060. If a huge breakthrough is made in deep coalbed methane, China's oil production is expected to reach more than 240 billion cubic meters.

In the longer term, China's oil production will continue to account for 61% to 66% of the national production, according to the median 63% calculation, China's natural gas will peak in 2035 to 2040, the production scale of 317 billion to 380 billion cubic meters. Overall, peak production above 300 billion cubic meters is achievable.

Natural gas development pattern

In 2022, China will produce 220 billion cubic meters of natural gas and 84 billion cubic meters of unconventional gas, accounting for 38.2%. Natural gas business has achieved leapfrog development in recent years, and will continue to show a trend of "stable development of conventional gas and rapid development of unconventional gas" in the future. It is estimated that in 2035, China's natural gas output will be 317 billion to 380 billion cubic meters, and the output of unconventional gas will be 180 billion to 210 billion cubic meters.

To form China's first 100 billion cubic meters of natural gas super production base. In 2022, the output of Sulige gas field will reach 30.56 billion cubic meters, becoming the only super gas field with an annual output of more than 30 billion cubic meters in China and entering the ranks of the world's super large gas fields. The output of Changqing gas region will exceed 50 billion cubic meters in 2022. Ordos Basin will build China's first 100 billion cubic meters of natural gas super production base before 2030, and continue to maintain production growth.

Conventional and unconventional gas production accounts for half of the total. Conventional gas is the "ballast stone" of stable production. In 2035, the production will increase to 151.5 billion cubic meters, and maintain long-term stable production. Conventional gas fields have both stable gas supply and production regulation functions. Developed gas fields focus on the two main lines of controlling decline rate and improving recovery rate, and consolidate the stable production foundation through the measures of overall water control, reconstruction of well pattern and rolling edge expansion. New areas and new areas promote the overall construction with high quality by accelerating the evaluation and construction of new reserves.

Tight gas is the most realistic area for accelerating production. By 2035, the production will reach 80 billion cubic meters and maintain long-term stable production. The main development zone aims to improve oil recovery, and takes measures such as fine characterization of residual gas and interwell encryption. The new layer system of the new district aims to increase production, improve efficiency and reduce cost, and adopts the three-dimensional development mode of large well cluster, factory, multi-layer system and multi-well type to promote and apply new technology and accelerate the rhythm of construction and production.

Shale gas is an important area for production replacement. By 2035, the production will reach 40 billion cubic meters, and maintain long-term stable production. In Changning-Weiyuan and Zhaotong medium and deep shale gas fields, the development technology of multi-layer and multi-set well patterns has been studied and applied in order to improve oil recovery by three-dimensional development. With the goal of efficient development, deep shale gas in Luzhou and West Chongqing should upgrade the fracturing 2.0 technology with the core of "multi-cluster in the segment + large-displacement fracture creation + high-strength sand addition + temporary plugging and diversion". Meanwhile, it should strengthen evaluation, plan preparation and on-site organization guarantee, especially reduce development investment.

Deep CBM is a new area of sustainable development and will see tremendous development in the next 20 years, with an estimated production of more than 30 billion cubic meters. Judging from the current situation, the Ordos Basin will be the first to make a breakthrough. In the future, we will continue to expand the capacity construction of deep coal bed methane, strengthen technological research and reduce costs and increase efficiency, and promote the development of efficiency.


  • Sigmatek MDD111-1 DIAS Drive Axis Module
  • Sigmatek DKL042 05-024-042 Terminal Module
  • Sigmatek DM822 Control Module
  • Sigmatek CDM167 12-008-167-O Module
  • Sigmatek TAE151 Touch Display Unit
  • Sigmatek DCC041 SLIDES Module 05-700-041-D
  • Sigmatek AKM65M-ANC2GBB0 PM Servo Motor
  • Sigmatek ETT221 01-230-221 Operator Terminal
  • Sigmatek SLIDES DAM 124 Analog Module
  • Sigmatek AKM31C-ANCNGBB0 Servo Motor
  • Mannesmann Demag Sigmatek CP626 Central Unit
  • SIGMATEK 0332.554.03 Board 371071000154
  • SIGMATEK 12-250-021 Base Plate Back Panel CM5V020
  • SIGMATEK DM162 S-DIAS Digital Mix Module
  • DEMAG ERGOTECH 061 381 66 Sigmatek 9842.243.02 Circuit Board
  • SIGMATEK CP313-1 PLC Module
  • Sigmatek ETV0551-2 VARAN Touch Terminal
  • Sigmatek SDM 081 FS S-Dias Safety Module
  • DEMAG 05-250-023 Ergotech Motherboard with Sigmatek TMS012
  • Sigmatek CM5V020 12-250-023-K Wiring Base
  • Sigma Tek 5000B-37 Attitude Gyro Indicator
  • Sigmatek SDD120-2 DIAS Drive
  • Sigmatek CME221 Memory Module
  • Sigmatek DCP640 DIAS Central Unit
  • Sigmatek STO040 Safety Output Module
  • Sigmatek CET281 Control Panel
  • Sigmatek CIPC LX800 Demag NC5 CPU
  • Sigmatek DKL093 05-024-093 Terminal Module
  • Sigmatek AI088 20-009-088 Analog Input Module
  • Sigmatek CAI888 Analog Input Module
  • SIGMATEK CCA021 12-025-021 Analog Output Module
  • SIGMATEK 1104.579.05 Control Module
  • SIGMATEK SDI100 Digital Input Module
  • SIGMATEK C-IPC 256MB LX800 Compact Dias
  • SIGMATEK 9423.090.02 Control Module
  • SIGMATEK C-IPC 256 Power Supply 148498
  • SIGMATEK CAI025 Analog Input Module
  • SIGMATEK CTO166 Digital Output Module
  • SIGMATEK CP112 20-004-112 Processor Module
  • SIGMATEK CAI887 12-009-887 Safety Module
  • Sigma-Tek 4000B-31 Directional Gyro 1U262-002-42
  • Sigmatek C-IPC 256MB LX800 IPC Controller
  • Sigmatek C-IPC 01-450-031 Industrial PC LX800
  • Sigmatek C-IPC 256 Industrial PC Controller
  • Sigmatek CCP-531 PLC Processor Module
  • Sigmatek CDI163 Digital Input Module
  • Sigmatek ETV0501 VARAN Terminal 12-230-0501
  • Sigmatek CTMS020 C-DIAS Technology Module
  • Sigmatek CIV512 VARAN Switch Module
  • Sigmatek HU011 20-080-011 Interface Module
  • SIGMATEK SLIDES DAM 124 Module
  • SIGMATEK C-IPC 161 01-450-161L Industrial PC
  • SIGMATEK C-IPC 128MB VIA 733MHz 01-450-024-K
  • SIGMATEK 12-780-012 R8-IPC Geode LX800 Module
  • SIGMATEK CAM124 Analog Module
  • SIGMATEK S1 032-8AF61-R4 EZ Servo Motor
  • SIGMATEK CTO163 Digital Output Module
  • SIGMATEK CCP082 12-004-082 Processor Module
  • SIGMATEK CRCH081 C-DIAS Temperature Module
  • SIGMATEK PC322-K 01-310-322-K Industrial PC
  • SIGMATEK SDD310-2 Servo Drive
  • SIGMATEK AI084 Analog Input Module
  • SIGMATEK CRCH081 12-752-081 Temperature Module
  • Sigma-Tek 5000L-4 Attitude Gyro 1U284-001-3
  • SIGMATEK CM5V020 12-250-023-K Wiring Module
  • Sigma-Tek 4000H-6 Directional Gyro IU262-035-7
  • SIGMATEK Dias DCP160 05-004-160 Processor Module
  • SIGMATEK 0147.395.02 Control Module
  • SIGMATEK A1084 Control Module
  • SIGMATEK DI200 20-006-2000 Digital Input Module
  • Sigmatek DNC115 Encoder Module
  • Sigmatek DAM122 05-017-122 Analog Module
  • Sigmatek 9802.289.01 Control Board TA71 Display
  • Sigmatek TO127 20-007-127 Digital Output Module
  • Sigmatek DNC031 05-011-031 Digital Module
  • Sigmatek VI022 20-003-022 Interface Module
  • Sigmatek CAI085 Analog Input Module
  • Sigmatek CP111 S-DIAS CPU Module
  • Sigmatek CTMS030 Krauss Maffei Module
  • Sigmatek CAM123 Control Module
  • Sigmatek TAE732-P 01-240-732-P Touch Display Unit
  • Sigmatek MDM021 Digital Mixed Module
  • Sigmatek DCP642 DIAS Central Unit
  • Sigmatek CST022 12-014-022 C-DIAS Module
  • Sigmatek SRO021 20-893-021 Safety Relay Output
  • Krauss Maffei MC5 Control System Sigmatek
  • Sigmatek DC061 Module 18-24VDC 300mA
  • Herrmann EVT0855 Ultrasonic Welder Touch Panel
  • Sigmatek CIV521 Control Module 1.4A 2W
  • Sigmatek DDI61 05-006-161 Digital Input Module
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • Cessna S3326-1 Sigma Tek 5000B-67 Gyro 1U149-015-9
  • SIGMATEK PS101 Power Supply Module
  • SIGMATEK 0332.554.03 Control Module 371071000154
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • SIGMATEK CDM163 Control Module
  • SIGMATEK VSV046 16-023-046 Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • SIGMATEK CTS051 12-053-051 Control Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • Sigmatek CSDI161 12-891-161 Safety Input Module
  • Sigma Tek 4000C-1 Directional Gyro Indicator
  • Sigmatek ETV0501 12-230-0501 VARAN Terminal
  • Sigmatek DDM165 SLIDES Module
  • Sigmatek N100 20-011-100 Control Module
  • Sigmatek AKM54K-ANC2R-B0 PM Servo Motor
  • Sigmatek CTO166 Digital Output Module
  • Sigmatek CP212-K 20-004-212-K CPU Module
  • Sigmatek CDI161 Digital Input Module
  • Sigmatek DCC080 05-700-080-2 Control Module
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SRO022 Relay Output Module
  • SIGMATEK MDD 121 Drive Axis Module
  • SIGMATEK DSI021 SLIDES Siemens Interface
  • SIGMATEK DIAS DCP161 Module 05-004-161
  • Sigmatek ETT312 Built-in Touch Terminal
  • SIGMATEK DCP 643 DIAS Controller System
  • SIGMATEK CIO021 Multi I/O Module
  • SIGMATEK CTMS020 Control Module
  • Sigmatek CME 221 Memory Module
  • Sigmatek 0420.615.01 Control Board
  • Sigmatek CP111 20-004-111 CPU Module
  • Sigmatek 9405.065.03 Control Board
  • Sigmatek ETEK 01-450-032-K C-IPC 256MB Industrial PC
  • Sigmatek CTO163 12-007-163 Safety Output Module
  • Sigmatek TO081 20-007-081 Digital Output Module
  • Sigmatek SI021 20-022-021 Safety Input Module