Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Development situation and prospect of natural gas in China

来源: | 作者:佚名 | 发布时间 :2024-01-02 | 273 次浏览: | Share:



China's supply and demand of natural gas continue to increase

Natural gas reserves are growing at their peak, and the proportion of unconventional resources is increasing. China's natural gas resources are 172 trillion cubic meters, the resource base is strong, but the proved degree is low, and the overall exploration is in the early and middle period. Since 2000, China's natural gas reserves have maintained peak growth, with an average annual increase of 732.8 billion cubic meters of proven natural gas reserves. By the end of 2021, China had submitted a total of 17.05 trillion cubic meters of proved reserves, of which conventional gas accounted for 53%, tight gas accounted for 32%, shale gas accounted for 11%, and coalbed gas accounted for 4%. The new proved reserves are large, but mainly low-grade reserves such as unconventional and deep deposits.

Natural gas production has increased rapidly, and Sulige has entered the ranks of the world's largest gas fields. Since 2000, China's natural gas development has entered a period of rapid development, with an average annual growth rate of about 10%, reaching more than 220 billion cubic meters in 2022. At present, it has built four natural gas production bases in Ordos, Tarim, Sichuan and Haihai. China's oil and gas output rose from 18.3 billion cubic meters in 2000 to 145.3 billion cubic meters in 2022, accounting for 66.05% of the country's natural gas output. At present, CNPC has built a 50 billion cubic meter super gas zone - Changqing gas zone and two more than 30 billion cubic meter atmospheric zones - Southwest, Tarim gas zone. In 2022, the output of Changqing Sulige gas field will reach 30.56 billion cubic meters, becoming the only super gas field in China with an annual output of more than 30 billion cubic meters, and entering the ranks of the world's top ten super large gas fields.

Natural gas consumption continued to flourish, and its dependence on foreign countries was effectively controlled. In 2018, China produced 160.1 billion cubic meters of natural gas, its apparent consumption was 280.3 billion cubic meters, and its dependence on foreign natural gas was 45.3 percent. In 2022, China's natural gas production is 220 billion cubic meters, the apparent consumption is 366.3 billion cubic meters, and the external dependence of natural gas is less than 41%. Four years, in the case of natural gas consumption increased by 86 billion cubic meters, foreign dependence decreased by more than 4%, mainly due to the rapid growth of domestic natural gas production in recent years. Over the past four years, the net increase of domestic natural gas was 60 billion cubic meters, and the decline in external dependence was beyond most experts' forecasts.

In the future, China's policy of increasing domestic storage and production will not change, vigorously develop the natural gas industry, take natural gas as a bridge to achieve green transformation, and promote the development of unconventional natural gas will become the main force for increasing storage and production.

The development of natural gas promotes the transformation of energy structure. Compared with the world level, the proportion of natural gas in primary energy consumption in China is low, but the particularity of energy structure determines that the proportion of natural gas consumption in China is not comparable with that of foreign countries. The proportion of natural gas in primary energy consumption increased from 4% in 2010 to 8.9% in 2021, more than doubling in 10 years, and absolute consumption increased from 95.8 billion cubic meters to 372.6 billion cubic meters, an increase of nearly four times.

Prospect of natural gas development in China

At present, China has formed different types of gas reservoir characteristic development technology, according to the "discovery of a class, research a class, mature supporting a class of ideas, development technology system gradually formed.

Exploration potential analysis

For conventional gas and tight gas, the remaining resources are mainly distributed in the six fields of lithostratigraphy, Marine carbonate rocks, foreland and complex structure-lithology, and the proved rate of each field is low, and the fields of lithostratigraphy, Marine carbonate rocks and foreland are at the peak of reserve growth. At present, the evaluation of the realistic scale of eight additional storage areas, the resource potential of 30 trillion cubic meters, with 8 trillion to 10 trillion cubic meters of proven potential. The cumulative discovery rate in 2021 is 20%, which is expected to increase to 40% in 2035 and more than 50% in 2060.

There are 3 total areas of shale gas, 3 new potential storage areas have been discovered, the resource potential is more than 35 trillion cubic meters, and the future has 8 trillion to 9 trillion cubic meters of proved geological reserves potential.

CBM is in the early stage of exploration, with large amount of remaining resources and unbalanced distribution. There are 2 actual additional storage areas and 3 potential additional storage areas, with proven geological reserves potential of 500 billion to 750 billion cubic meters in the future. Ordos deep coalbed methane will show a broad development prospect in the future.

Development potential analysis

Clarify the development orientation of the four types of gas reservoirs, and give precise policies to ensure the efficient development of the natural gas industry. Conventional gas is the "ballast stone" of stable production and emergency supply, is the basis of economic benefits, and needs to ensure steady development; Tight gas is the most realistic field to accelerate production, which can accelerate development and benefit development. Shale gas is an important field of production replacement, which emphasizes technical research and strives to achieve scale efficiency development. Deep coal bed gas is a new field of sustainable development, and it is implemented steadily and strives to break through the scale and efficiency.

Scenario 1: According to the economic recoverable reserves scale, storage and production ratio, stable production period, production and construction rhythm and other constraints, the use of SEC reserves of 2.03 trillion cubic meters and new economic recoverable reserves of 7.3 trillion cubic meters, is expected to reach the peak of 200 billion cubic meters in 2035, stable production until 2060.

Scenario 2: The use of SEC reserves of 2.03 trillion cubic meters and new economic recoverable reserves of 8.2 trillion cubic meters, considering the economic recoverable reserves replacement rate of more than 1 and storage and production ratio of more than 10 constraints, is expected to peak at 220 billion cubic meters in 2035, stable production until 2060. If a huge breakthrough is made in deep coalbed methane, China's oil production is expected to reach more than 240 billion cubic meters.

In the longer term, China's oil production will continue to account for 61% to 66% of the national production, according to the median 63% calculation, China's natural gas will peak in 2035 to 2040, the production scale of 317 billion to 380 billion cubic meters. Overall, peak production above 300 billion cubic meters is achievable.

Natural gas development pattern

In 2022, China will produce 220 billion cubic meters of natural gas and 84 billion cubic meters of unconventional gas, accounting for 38.2%. Natural gas business has achieved leapfrog development in recent years, and will continue to show a trend of "stable development of conventional gas and rapid development of unconventional gas" in the future. It is estimated that in 2035, China's natural gas output will be 317 billion to 380 billion cubic meters, and the output of unconventional gas will be 180 billion to 210 billion cubic meters.

To form China's first 100 billion cubic meters of natural gas super production base. In 2022, the output of Sulige gas field will reach 30.56 billion cubic meters, becoming the only super gas field with an annual output of more than 30 billion cubic meters in China and entering the ranks of the world's super large gas fields. The output of Changqing gas region will exceed 50 billion cubic meters in 2022. Ordos Basin will build China's first 100 billion cubic meters of natural gas super production base before 2030, and continue to maintain production growth.

Conventional and unconventional gas production accounts for half of the total. Conventional gas is the "ballast stone" of stable production. In 2035, the production will increase to 151.5 billion cubic meters, and maintain long-term stable production. Conventional gas fields have both stable gas supply and production regulation functions. Developed gas fields focus on the two main lines of controlling decline rate and improving recovery rate, and consolidate the stable production foundation through the measures of overall water control, reconstruction of well pattern and rolling edge expansion. New areas and new areas promote the overall construction with high quality by accelerating the evaluation and construction of new reserves.

Tight gas is the most realistic area for accelerating production. By 2035, the production will reach 80 billion cubic meters and maintain long-term stable production. The main development zone aims to improve oil recovery, and takes measures such as fine characterization of residual gas and interwell encryption. The new layer system of the new district aims to increase production, improve efficiency and reduce cost, and adopts the three-dimensional development mode of large well cluster, factory, multi-layer system and multi-well type to promote and apply new technology and accelerate the rhythm of construction and production.

Shale gas is an important area for production replacement. By 2035, the production will reach 40 billion cubic meters, and maintain long-term stable production. In Changning-Weiyuan and Zhaotong medium and deep shale gas fields, the development technology of multi-layer and multi-set well patterns has been studied and applied in order to improve oil recovery by three-dimensional development. With the goal of efficient development, deep shale gas in Luzhou and West Chongqing should upgrade the fracturing 2.0 technology with the core of "multi-cluster in the segment + large-displacement fracture creation + high-strength sand addition + temporary plugging and diversion". Meanwhile, it should strengthen evaluation, plan preparation and on-site organization guarantee, especially reduce development investment.

Deep CBM is a new area of sustainable development and will see tremendous development in the next 20 years, with an estimated production of more than 30 billion cubic meters. Judging from the current situation, the Ordos Basin will be the first to make a breakthrough. In the future, we will continue to expand the capacity construction of deep coal bed methane, strengthen technological research and reduce costs and increase efficiency, and promote the development of efficiency.


  • ABB 3HAC5498-1 High-Performance Control Module
  • ABB 3HAC5518-1 Industrial Control Module
  • ABB 3HAC5497-1 Industrial Control Module
  • ABB 3HAC7344-1 Mains line filter unit
  • ABB 3HAC7681-1 Process Interface Module
  • ABB 3HAC6428-1/04 high-performance control module
  • ABB 3HAC6157-1 Floppy sign/supply cable
  • ABB 3HAC10847-1 Ethernet on front,Harness
  • ABB 3HAC5566-1 Industrial Communication Bus Cable
  • ABB 3HAC9710-1 Heat exchanger unit
  • ABB IMFECI2 Industrial Control Module
  • ABB IMDS014 Digital Slave Output Module
  • ABB INIT03 Control Module
  • ABB 3HAC031683-004 Cable Teach Pendant 30m
  • ABB HAC319AEV1 High-Performance Control Module
  • ABB UFC092BE01 Binary input module
  • ABB DAPC100 3ASC25H203 Industrial Control Board
  • ABB 57160001-KX DSDO 131 Digital Output Unit
  • ABB 3HAC4776-1/1 Industrial Control Module
  • ABB DSTF610 terminal
  • ABB YB560100-EA S3 Industrial Control Module
  • ABB XO16N1-B20 XO16N1-C3.0 High-Performance Industrial Control Module
  • ABB TU804-1 Programmable Logic Controller (PLC) Module
  • ABB TU515 I/O terminal unit
  • ABB TK516 Connection Cable with Contacts
  • ABB SPCJ4D34-AA Industrial Ethernet I/O System Module
  • ABB SPAD346C Integrated Differential Relay
  • ABB 1SAM101904R0003 SK-11 Signal contact 1NO+1NC
  • ABB SE96920414 YPK112A Communication Module
  • ABB SC610 3BSE001552R1 Submodule Carrier
  • ABB SC513 PLC Analog Input Module
  • ABB SAFT110 Advanced Safety Termination Module
  • ABB RVC6-5A Control Module
  • ABB RB520 Linear Motion Controller Module
  • ABB R1.SW2/3 Industrial Control Module
  • ABB PU517 Controller Automation System
  • ABB PS130/6-75-P Industrial Control Module
  • ABB 3BSE008062R1 PM633 Processor Module
  • ABB L110-24-1 Industrial Control Module
  • ABB IMDSO14 Digital Slave Output Module
  • ABB DSU10 Control Module
  • ABB DSQC627 3HAC020466-001 Advanced Power Supply Module
  • ABB DSQC354 Industrial I/O Module
  • ABB DSQC352 High Performance Input/Output Module
  • ABB 37911-4-0338125 Control Module
  • ABB DSPC172 CPU Module
  • ABB DSBB175 Industrial PLC Expansion Module
  • ABB CR-M4LS Industrial Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB BB510 (DC5256) Digital Control Module
  • ABB 61615-0-1200000 High-Precision Industrial Controller
  • ABB 3HNE 00313-1 TILLV.0317 Machine No. 64-25653
  • ABB 3HNA000512-001 Control Module
  • ABB 3HAC025466-001 Industrial Control Module
  • ABB 3HAB8101-8/08Y Industrial Control Module
  • ABB 3BHB003689 Multifunction Controller Module
  • ABB PXBHE65 206-00212 power module
  • ZUNKU 6203-2RS Deep Groove Ball Bearing
  • ZUNKU 6201-2RS Deep Groove Ball Bearing
  • ZYCOM IGLACS01281 Control Module
  • Zygo 8010-0105-02 ZMI-501 Displacement Measurement Interferometer
  • Zygo 1115-801-346 laser head cable
  • ZYGO HSSDC2 TO HSSDC2 CABLE 1115-800-055
  • ZYGO HSSDC TO HSSDC2 CABLE 1115-800-056
  • ZYGO ZMI 4104C Measurement Electronics Board
  • ZYGO ZMI-2002 8020-0211 Measurement Board
  • ZYGO 7702 8070-0102-35 Laser Head
  • ZYGO ZMI 7702 8070-0102-01X Laser Head
  • ZYGO ZMI-4004 4-Axis VME64x Measurement Board
  • ZYGO PC200 CS1115-801-346 Laser interferometer cable
  • ZYGO 8010-0105-01 ZMI Power Supply
  • ZYGO ZMI-2002 8020-0211-1-J Laser system measurement board card
  • ABB 35AE92 control card
  • ABB 200900-004 I/O Adapter PLC Board
  • Siemens 6ES7193-4CA40-0AA0 ET 200S Electronic Module
  • Siemens 6AV2124-2DC01-0AX0 Comfort Panel
  • Siemens 6ES7421-7DH00-0AB0 Digital Input Module
  • Siemens 6ES7350-2AH01-0AE0 Counter Module
  • Siemens 6ES7231-0HC22-0XA0 Analog Input Expansion Module
  • Siemens ET200SP 6ES7193-6PA00-0AA0 server module
  • Siemens 6ES7193-4JA00-0AA0 Terminal Module
  • Siemens 6AG1204-2BB10-4AA3 Ethernet Switch
  • SIEMENS 6GK1105-2AA10 SIMATIC NET series optical switching module (OSM ITP62)
  • Schneider Modicon Quantum 140CPU65260 Unity Processor
  • Schneider Modicon Quantum 140ACO02000 Analog Output Module
  • Schneider Modicon Quantum 140CPS11420 power module
  • Allen-Bradley 1747-CP3 SLC ™ Series of programming cables
  • Kollmorgen S33GNNA-RNNM-00 - Brushless Servo Motor
  • Kollmorgen 6sm56-s3000-g-s3-1325 - Servo Motor
  • Kollmorgen AKM52K-CCCN2-00 - Servo Motor
  • Kollmorgen PSR3-230/75-21-202 - Power Supply
  • Kollmorgen akm24d-anc2r-00 - Servo Motor
  • Kollmorgen AKM22E-ANCNR-00 - Servo Motor
  • Kollmorgen S60300-550 - Servo Drive
  • Kollmorgen B-204-B-21 - Servomotor
  • Kollmorgen AKM21E-BNBN1-00 - Servo Motor
  • Kollmorgen TT2953-1010-B - DC Servo Motor
  • Kollmorgen pa8500 - Servo Power Supply
  • Kollmorgen BDS4A-210J-0001-207C2 - Servo Drive
  • Kollmorgen TTRB1-4234-3064-AA - DC Servo Motor
  • Kollmorgen MH-827-A-43 - Servo Motor
  • Kollmorgen AKM24D-ACBNR-OO - Servo Motor
  • Kollmorgen 00-01207-002 - Servo Disk DC Motor
  • Kollmorgen AKM21C-ANBNAB-00 - Servo Motor
  • Kollmorgen PSR3-208/50-01-003 - Power Supply
  • Kollmorgen 6SM56-S3000 - Servo Motor
  • Kollmorgen DBL3H00130-B3M-000-S40 - Servo Motor
  • Kollmorgen 6SN37L-4000 - Servo Motor
  • Kollmorgen AKM65K-ACCNR-00 - Servo motor
  • Kollmorgen 6SM56-L3000-G - Servo Motor
  • Kollmorgen AKMH43H-CCCNRE5K - Servo Motor
  • Kollmorgen PSR4/52858300 - Power Supply
  • Kollmorgen KBM-79H03-E03 - Direct Drive Rotary Motor
  • Kollmorgen AKM33E-ANCNDA00 - Servo Motor
  • Kollmorgen U9M4/9FA4T/M23 - ServoDisc DC Motor
  • Kollmorgen AKM13C-ANCNR-00 - Servo Motor
  • Kollmorgen AKM43L-ACD2CA00 - Servo Motor
  • Kollmorgen AKM54K-CCCN2-00 - Servo Motor
  • Kollmorgen M-605-B-B1-B3 - Servo Motor
  • Kollmorgen AKD-P00606-NBAN-0000 - Rotary Drive
  • Kollmorgen 6SM-37M-6.000 - Servo Motor
  • Kollmorgen A.F.031.5 - Sercos Interface Board
  • Kollmorgen 918974 5054 - Servo PWM
  • Kollmorgen U12M4 - ServoDisc DC Motor
  • Kollmorgen AKD-B00606-NBAN-0000 - Servo Drive
  • Kollmorgen MV65WKS-CE310/22PB - Servo Drive
  • Kollmorgen 65WKS-CE310/22PB - Servo Drive
  • Kollmorgen EM10-27 - Module