Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IS215VPROH1B VME PROTECTION ASSEMBLY
    ❤ Add to collection
  • GE IS215VPROH1B VME PROTECTION ASSEMBLY

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IS215VPROH1B VME PROTECTION ASSEMBLY

    • ¥21587.36
      ¥21587.25
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:6.380KG
    • Quantity:
    • (Inventory: 39)
Description

GE IS215VPROH1B VME PROTECTION ASSEMBLY


GE IS215VPROH1B VME PROTECTION ASSEMBLY

Part Number IS215VPROH1B Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series Mark VI Function Module Availability In StockThe IS215VPROH1B is a Turbine Protection Board designed for the Mark VI system. The Turbine Protection Board (VPRO) and its associated terminal boards (TPRO and TREG) provide an independent emergency overspeed protection system. 

The protection system consists of three redundant VPRO boards in a module separate from the turbine control system, which control the trip solenoids via TREG. VPRO also has an Ethernet connection for IONet communications with the control modules. FUNCTIONAL DESCRIPTION The VPRO board in Protection Module P performs the emergency trip function. Up to three trip solenoids can be connected between the TREG and TRPG terminal boards TREG supplies the positive side of the 125 V dc to the solenoids, while TRPG supplies the negative side. Either board has the ability to trip the turbine. VPRO offers emergency Overspeed protection as well as emergency stop functions. It is in charge of TREG's 12 relays, nine of which form three groups of three to control the three trip solenoids. VPROH1A has been replaced by the functionally equivalent VPROH1B. 

VPROH1A and VPROH1B support a second TREG board that is powered by VPRO connector J4. IS215VPROH1B Installation To install the VPRO board Turn off the VME I/O processor rack. Insert the VPRO board and use your hands to push the top and bottom levers in to seat the edge connectors. Tighten the captive screws on the front panel's top and bottom. Power up the VME rack and check the diagnostic lights at the top of the front panel Cable connections to the TPRO and TREG terminal boards are made at the VPRO front panel connectors J3, J4, J5, and J6. To secure the cables, these are latching connectors. J7 is a 125 V dc power connector. 

Refer to the section on diagnostics in this document for more information. You may need to update the VPRO firmware to the most recent version. IS215VPROH1B Operation The main purpose of the protection module is to protect the turbine from emergency overspeed (EOS) using three VPRO boards. VPRO also has backup synchronization check protection, three analog current inputs, and nine thermocouple inputs, which are primarily intended for gas turbine exhaust over-temperature protection. 

With three completely separate and independent VPRO boards named R8, S8, and T8, the protection module is always triple redundant (originally named X, Y, and Z). While the turbine is running, any of these boards can be powered down and replaced without jeopardizing the protection system. Each board has its own I/O interface, processor, power supply, and Ethernet communications to the controller (IONet). The communications allow the controller to send test commands to the protection module and monitor EOS system diagnostics in the controller and on the operator interface. The VPRO board, which serves as the system's heart, is where communications take place. The VPRO board has a VME interface for programming and testing in a VME rack; however, when plugged into the protection module, the backplane is neutralized, removing any continuity between the three independent sections. 

 Speed Control and Overspeed Protection Six passive, magnetic speed pickups are used to implement speed control and overspeed protection. The controllers monitor the first three, which use the median signal for speed control and primary overspeed protection. The second three are connected to the R8, S8, and T8 VPROs in the protection module separately. On the TPRO terminal board, nine passive magnetic speed pickups or active pulse rate transducers (TTL type) are provided, with three monitored by each of the R8, S8, and T8 VPROs. The application software has separate overspeed trip settings for the primary and emergency overspeed trip limits, and a second emergency overspeed trip limit must be programmed into the I/O configurator to confirm the EOS trip point. Interface To Trip Solenoids The trip system combines the controller's Primary Trip Interface with the protection module's EOS Trip Interface. 

To interface with the hydraulics, three separate, triple redundant trip solenoids (also known as Electrical Trip Devices - ETDs) are used. The TRPG and TREG terminal boards are linked by the ETDs. From the turbine control, a separately fused 125 V dc feeder is provided for each solenoid, which energizes in the run mode and de-energizes in the trip mode. Backup Synch Check Protection The Protection Module includes backup synch check protection. The generator and bus voltages are supplied by two single-phase potential transformers (PTs) with secondary outputs of 115 V rms. Between the PTs and the turbine control, the maximum cable length is 100 meters of 18 AWG twisted, shielded wire. Each PT is magnetically isolated, with a rated barrier of 1,500 V rms and a circuit load of less than 3 VA. Synchronization algorithms are based on phase lock loop techniques. At nominal voltage and 50/60 Hz, the phase error between the generator and bus voltages is less than +/-1 degree. 

The measured frequency is within 0.05% of the input frequency and supports a frequency range of 45 to 66 Hz. Diagnostics Three LEDs at the top of the VPRO front panel indicate status. The normal RUN condition is a flashing green, while the FAIL condition is a solid red. The third LED is STATUS, which is normally off but displays a steady orange if the board has a diagnostic alarm condition. VPRO performs diagnostic checks and generates faults in the following ways: Feedback from the trip relay driver and contacts Solenoid voltage and source of solenoid voltage Economizer relay driver and contact feedbacks Relay driver and coil K25A Contact feedback and servo clamp relay driver All analog inputs have high and low limits. 

If any of the above signals fails, a composite diagnostic alarm L3DIAG VPROR, S, or T is generated. Individual diagnostic signals can be latched and then reset with the RESET DIA signal if they become healthy. Features The Board protects against backup synch checks and detects speed differences. The thermocouple and analog inputs are both supported by the board. Two circuit boards are stacked one on top of the other in this module. The top board, an IS200VPRW, is inserted into standoffs and connects to the lower board by four screw connections. Integrated circuits, a transformer, multiple transistors, as well as resistors, capacitors, and diodes, are all present on the board. Carbon composite material is sometimes used to make resistors. There are various inductor coils on the board, as well as numerous connectors, including plugs. 

A heat sink can be found on the right front side. The module's bottom board has two backplanes. There are capacitors and resistors, as well as many integrated circuits, in it. Oscillating chips are included in this category. The top board's standoffs are set towards the board's margins. The module uses the TREG board to regulate trip solenoids. The controller's application software is used to start tests on these trip solenoids. These can also be tripped manually. A faceplate is included with the board. LED indicators, a power switch, cable connectors, and Ethernet connectors are all found on the faceplate. Screws attach this faceplate to the boards.

  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • ADLINK NuPRO-852 LGA775 Industrial Control Motherboard Maintenance Guide
  • ADLINK NuPRO-841 Industrial Motherboard Maintenance and Troubleshooting
  • ADLINK NuPRO-590 Series Socket7 Industrial Control Motherboard Maintenance Guide
  • Deployment and Troubleshooting of ADLINK MXE-5500 Series Industrial Control Computer
  • ADLINK MXE-200 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK cPCI-6770 Series CompactPCI Motherboard Maintenance Guide
  • ADLINK NuPRO-A301 Industrial Motherboard Troubleshooting Manual
  • ADLINK NuPRO-965 SHB Debugging and Maintenance Complete Manual
  • ADLINK NuPRO-935A Industrial Motherboard Debugging and Maintenance Guide
  • ADLINK NuPRO-865 Single Board Computer Hardware Troubleshooting Guide
  • ADLINK NuPRO-840 P4 Industrial SBC Architecture Maintenance
  • ADLINK NuPRO-770 Full length SBC Configuration and Maintenance
  • ADLINK NuPRO-595 Industrial Half length SBC Motherboard Configuration and Maintenance Guide
  • ADLINK cPCI-6840 Series Single Board Computer Installation, Configuration, and Maintenance Guide
  • Foxboro 43AP Pneumatic Controller Technical Specifications and Selection Guide
  • ADLINK cPCI-3720: 3U CompactPCI Low Power Pentium III CPU Module
  • ADLINK NuPRO-E47: PICMG 1.3 13th Generation Core Industrial SHB
  • ADLINK NuPRO-E43: PICMG 1.3 Core 7th Generation Industrial SHB
  • ADLINK NuPRO-780 PICMG Bus Core CPU Card
  • ADLINK cPCI-6965 6U CompactPCI Core Dual Core Single Board Computer
  • ADLINK USB/LPCI/LPCIe-3488A GPIB Interface Card Selection and Application Guide
  • Rittal SK 3241.700 Blue e+Cabinet Fan Filter Unit
  • ADLINK CPCI-8168 8-Axis Motion Control Card and HSL Network Integration Solution
  • ADLINK PCIe-PXIe-8638 High Speed PXIe Bus Expansion Scheme
  • ADLINK PCIe GIE7x Poe+Frame Grabber Hardware and Power Management Detailed Explanation
  • ADLINK PCIe-7396 Digital I/O Card Deployment Guide
  • ADLINK PCI-8164 Advanced Motion Control Card Deployment Guide
  • ADLINK PCI-8154 Motion Control Card Deployment Guide
  • ADLINK PCI-8134 Motion Control Card Deployment Guide
  • ADLINK NuPRO-E42 Industrial Control Motherboard Deployment Guide
  • ADLINK MXC-6600 Embedded Platform Deployment Guide
  • ADLINK MXC-6000 Industrial Control Computer Deployment and Optimization Guide
  • ADLINK MXC-2300 Embedded System Deployment Guide
  • ADLINK MCM-204 Edge DAQ Deployment Configuration Guide
  • ADLINK MCM-100/102 Deployment Calibration Guide
  • Deployment and Performance Optimization of ADLINK MXC-6400 Industrial Control Computer
  • Selection and Deployment of ADLINK Matrix Series Industrial Control Computers
  • российские промышленные новые машины.Наш отдел дебютировал в 2026 году в России Международная промышленная ярмарка INNOPROM
  • Deeply cultivating the Eurasian industrial market, linking new industrial opportunities between China and Russia
  • Deployment and troubleshooting of ADLINK GIE64+PoE acquisition card
  • Honeywell UMS Security System Troubleshooting Guide
  • Honeywell Expert Series C I/O Troubleshooting Guide
  • ADLINK EOS-1200 Vision System Deployment and Troubleshooting
  • ADLINK DLAP-5200 series AI engine deployment and optimization
  • ADLINK DLAP-4000 Deployment and BIOS Optimization
  • ADLINK Matrix MXC-2000 Deployment and Troubleshooting
  • ADLINK DAQe-2000 series acquisition card calibration and synchronization
  • ADLINK cPCI-6520 Core i7 Processor Blade Engineering Application Guide
  • ADLINK CM1-86DX3 PC/104 Embedded Single Board Computer Engineering Application Guide
  • Honeywell DC1000 Series PID Temperature Controller Engineering Application Guide
  • ALSTOM MiCOM C264 Substation Controller Engineering Application Guide
  • EMERSON AMS 2140 Practical Guide for On site Dynamic Balance and Vibration Analysis
  • ADLINK NuPRO-E320 motherboard deployment and tuning guide
  • ADLINK NuPRO-800 Dual PIII Industrial SBC Maintenance and Upgrade Guide
  • ADLINK NuPRO-598 SBC Maintenance Practical Guide
  • ADLINK MXC-6300 Fanless Embedded Industrial Control Computer Deployment Guide
  • ADLINK Express-BASE7 Carrier Board Quick Deployment and Debugging Guide
  • ADLINK DLAP-211 Edge AI Platform Selection and Deployment Guide
  • ADLINK 7230 Series Isolation DIO Card Selection and Engineering Application Guide
  • ADLINK cPCI-6965 SBC Embedded Installation and BIOS Tuning Guide
  • ADLINK 7200 Series High Speed DIO Card Practical Guide
  • ADLINK DLAP Series Edge AI Acceleration Platform Selection and Deployment Practical Guide
  • DEIF TCM-2 thyristor control module: Wind power cut in control engineering guide
  • DEIF MVR-200 Medium Voltage Relay: Installation and Wiring Engineering Guide
  • DEIF MDR-2 Differential Relay: Engineering Guide for Generator Differential Protection
  • DEIF Delomatic 3 AOM: Engineering Guide for Analog Output Modules
  • DEIF AGI 400 Graphic Interface: Ship and Industrial HMI Solution
  • DEIF BRW-1 Marine Instruments: Installation and Calibration Guide for Offshore Bridge Indicators
  • DEIF AGC 200 Controller: Quick Deployment and Configuration Guide for Generator Sets
  • DEIF AGC-2 Controller: The Ultimate Guide to Automatic Control and Protection of Generator Sets
  • ABB SPA-ZC400 Gateway: REM54x Access to IEC 61850 Ultimate Engineering Guide
  • ABB REM 543/545 Terminal
  • Modular Architecture Analysis of DEIF PPU 300 Ship Generator Controller
  • DEIF DM-4 Marine&Offshore Ship Power Management System
  • Detailed Explanation of DEIF Delomatic Generator Control System Architecture
  • DEIF AGC-4 Mk II Generator Controller Depth Configuration Guide
  • DEIF AGC-4 Generator Controller Configuration and Debugging Guide
  • DEIF PPM Power Management System Operation and Troubleshooting
  • Installation and wiring of DEIF Multi line 2
  • Practical configuration and maintenance of Beckwith M-6280 capacitor bank controller
  • Beckwith M-3311 Transformer Protection Relay Setting and Engineering Application
  • Beckwith M-3311A Transformer Protection Relay Configuration and Optimization Guide
  • Beckwith M-3310 Transformer Protection Relay Complete Guide
  • Beckwith M-0359 synchronous inspection relay
  • Beckwith M-0293A Voltage Regulating Controller Replacement and Debugging Guide
  • Complete Guide to DEIF GPU-3 Generator Protection Unit
  • Installation and I/O configuration of DEIF PPM-3 power management module
  • Beckwith M-3520 Interconnection Protection Relay
  • Beckwith M-3430 Generator Protection Relay
  • Beckwith M-2293B adapter panel replacement GE regulator guide
  • Selection and Networking of Beckwith M-2001C Digital Voltage Regulating Controller
  • Beckwith M-2001B Digital Voltage Regulating Controller
  • Beckwith M-0388/M-0389 Synchronous Inspection Relay Application Guide
  • Beckwith M-0193B Synchronizer Debugging and System Integration Guide
  • Beckwith M-0115A Parallel Balance Module Debugging Guide
  • Beckwith M-0067E On Load Voltage Regulating Controller Selection and Debugging Guide
  • Debugging and Fault Handling of Beckwith M-4272 Digital Busbar Conversion System
  • Beckwith M-3311A Transformer Protection Relay Debugging Guide
  • Beckwith M-3425A Generator Protection Relay Debugging Guide
  • Setting and troubleshooting of Basler BE1-27/59 voltage relay
  • Debugging and troubleshooting of Basler AVC63-12/AVC125-10 voltage regulator
  • Basler L301kc Line Array Camera Technology and Troubleshooting
  • Selection and Debugging of Basler CBS 212A Current Boosting System
  • Selection and commissioning of Basler BE3-25 synchronous inspection relay
  • Basler BE1-32R/32O/U Direction Power Relay Setting and Testing Guide
  • Basler PRS 250 Synchronous Relay Maintenance and Replacement Guide
  • Basler piA2400-17gc Industrial Camera Replacement and Optimization Guide
  • Basler BE1-11g Generator Protection System
  • Basler VR63-4C/UL Voltage Regulator
  • Basler BE1-DFPR feeder protection relay
  • Basler CBS 310/320 Current Boosting System
  • Basler UFOV 250A/260A protection module
  • Basler MVC104/MVC108/MVC232 manual voltage control device
  • Basler XR2002/XR2002F Regulator
  • Basler DECS-400 excitation system
  • Basler DGC-2020 Generator Set Controller: Integrated Control and Debugging Guide
  • Basler MVC-300 Manual Voltage Controller: Characteristics and Engineering Applications
  • Basler MVC Series Manual Voltage Controller: Application and Selection
  • Basler SSR Static Voltage Regulator: A Complete Guide to Debugging and Troubleshooting
  • Basler SR4A/SR8A Voltage Regulator: Detailed Debugging and Troubleshooting Explanation
  • Basler BE2000E Voltage Regulator: Replacement and Application Details
  • Basler DECS-2100 Excitation System: Modular Upgrade and Engineering Application
  • Basler BE1-851 Overcurrent Protection System: A Complete Guide to Professional Debugging and Troubleshooting
  • Basler APR 63-5 Voltage Regulator: Professional Debugging and Troubleshooting Guide for Industrial Generator Excitation Systems
  • Basler BE1-FLEX Protection System: A Complete Guide to Professional Installation, Configuration, and Troubleshooting
  • Debugging and Testing of Basler BE1-700 Relay
  • Basler BE1-87B busbar differential setting test
  • Basler BE1-40Q demagnetization relay setting test