Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • Reliance 419437-D Automax PC Interface Board
    ❤ Add to collection
  • Reliance 419437-D Automax PC Interface Board

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    Reliance 419437-D Automax PC Interface Board

    • ¥22500.00
      ¥24520.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:2.500KG
    • Quantity:
    • (Inventory: 33)
Description

Reliance 419437-D Automax PC Interface Board


Reliance 419437-D Automax PC Interface Board

OVERVIEW

The 419437-D is an Automax PC Interface Board manufactured by Reliance Electric. The 419437-D has three microprocessors. Two of these microprocessors are labeled XILINX XC3042A TM -7, PCB4C, A30006A, BK19510, and the third microprocessor is labeled NEC U.S.A. D70208L-8, V40 ©NEC 84, 9436HV A36. The 419437-D has thirteen other integrated circuits. The card has a small encapsulated transformer. There are eight yellow suppressor style capacitors around the outside edges of the circuit board. The 419437-D has over thirty small surface mounted resistors (SMD). There are also ceramic surface mounted capacitors. The circuit board has a red box in the bottom right corner that has six white switches. The 419437-D has two crystal oscillators on the left side of the card. The bottom of the card has an extra nub that has thirty-one individual gold colored lines. These gold colored lines are called traces and are used to allow the 419437-D to communicate with other systems one it is installed. The 419437-D does have a front panel, that features two large round metal components. 

Product Overview

Model No.: 419437-D

Brand:Reliance Electric

Type:Automax PC Interface Board

Product Features and Uses

Interface Function: The interface board, as a part of Automax system, is mainly used to connect the computer (PC) with the automation system to achieve data transmission and control.

Application areas: Widely used in industrial automation, such as production line control, equipment monitoring and other scenarios to improve production efficiency and equipment management.


Instructions and warnings related to the operation of the product:

The following specifications must be strictly observed:

 The technical specifications and typical applications of the product system must be strictly observed.

 PERSONNEL TRAINING: Only trained personnel may install, operate, maintain or repair the product system. These personnel must be instructed on the

These personnel must be instructed and briefed on the conditions in the hazardous area.

 Unauthorised modifications: No modifications or structural changes may be made to the product system.

 Maintenance Responsibility: It must be ensured that the product system is only used under appropriate conditions and in a condition that is fully fit for purpose.

 Working environment: The user must fulfil the specified environmental conditions:

Safety regulations

The following safety regulations must be fully observed when (maintenance) work is carried out on the product system:

1 Disconnect completely.

2 Secure to prevent reconnection.

3 Confirm that the installation has been completed.

4 Perform grounding and short-circuiting.

Application Areas

Electric power plants: monitoring and controlling generators, steam turbines, governors and other equipment to ensure the stable operation of the power generation system.

Power transformer and distribution: used in substations and distribution stations to monitor and control transformers, circuit breakers, voltage regulators and other equipment.

Power grid control: applied in monitoring, scheduling and control of power systems to ensure the stability and reliability of power networks.

Industrial process control: in manufacturing and chemical plants for automating and monitoring production processes.

Energy Management System: supports the monitoring, analysis and optimisation of energy systems to improve energy efficiency.

Power Generation Scheduling: Coordinates and optimises the operation of power generation plants to meet electricity demand.

Smart Grid: in smart grids to support the digitisation and intelligence of power grids.



  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting
  • KUKA KR AGILUS-3 ultra maintenance troubleshooting
  • KUKA KR 300 R2700-2 C-F maintenance troubleshooting
  • KUKA KR 20 R1820-2 E Maintenance Troubleshooting and Replacement Practice
  • KUKA AGILUS-3 troubleshooting
  • KUKA KR AGILUS-2 maintenance troubleshooting
  • KUKA KR 1000 titan PA troubleshooting
  • KUKA KR 700 PA maintenance troubleshooting
  • KUKA KR18 R1450-3 PP Operation and Maintenance Essentials
  • KUKA KR12 SCARA Operations Essentials
  • KUKA KR4 R600 Operation and Maintenance Essentials
  • KUKA KR 3 AGILUS Operation and Maintenance Safety Essentials
  • KUKA LBR iiwa CR Cleanroom Troubleshooting and Maintenance
  • Troubleshooting and Maintenance of KUKA KR AGILUS sixx
  • KUKA KR60 SCARA CS Maintenance Guide
  • KUKA KR 23 SCARA-2 Robot Installation and Maintenance Detailed Explanation
  • KUKA KR 20 SCARA CS Robot Selection and Maintenance Guide
  • KUKA KR 15 DELTA-2 Robot Installation and Maintenance
  • KUKA KR 13 SCARA-2 CS Detailed Explanation
  • KUKA KR 3 D1200 Robot Operation and Maintenance
  • KUKA KR 3 D1200 HM Robot Operation and Maintenance Guide
  • KUKA LBR Med Medical Robot Integration Guide
  • KUKA iiwa Robot Safety Operation and Maintenance
  • KUKA LBR iiwa CR Operations and Troubleshooting
  • Lauer PCS Series Operation Console Configuration Guide
  • Installation and Maintenance Guide for KUKA LBR iisy Series Collaborative Robots
  • KUKA LBR iisy 3 R760 Collaborative Robot Debugging Guide
  • KUKA LBR iico Robot Installation and Debugging Technical Guide
  • Lauer Starline LCA 300/320/325 Text Display Application Guide
  • Lauer PCS 950 Operation Console Application Guide
  • Lauer EPC series industrial computer configuration
  • Bonfiglioli Precision Planetary Gearbox Selection and Application Guide
  • Installation and heat dissipation of Bonfiglioli Vectron cold plate frequency converter
  • Bonfiglioli Vectron EM-RES-02 Expansion Module Installation and Configuration Guide
  • Bonfiglioli Vectron EM-RES-01 Expansion Module Rotary Transformer Interface Configuration Guide
  • Bonfiglioli Vectron EM-IO-04 module KTY temperature measurement and digital port configuration
  • Bonfiglioli Vectron EM-IO-03 Expansion Module Dual Analog Output and PTC Configuration
  • Installation of Bonfiglioli Vectron EM-IO-02 Expansion Module and PTC Temperature Monitoring Configuration
  • Bonfiglioli Vectron EM-IO-01 Expansion Module Installation and System Bus Configuration Guide
  • Bonfiglioli F series gearbox spare parts identification and replacement guide
  • Installation, maintenance, and troubleshooting of Bonfiglioli HF series reducers for hoisting applications
  • Bonfiglioli 300 series reducer installation, maintenance, and troubleshooting guide
  • Selection and integration guide for Bonfiglioli R3 series planetary gearboxes in primary crushing equipment
  • Bonfiglioli C-series ATEX gearbox selection and explosion-proof application guide
  • Bonfiglioli Vectron EM-ENC-05 Full Function Expansion Module Integration Guide
  • Bonfiglioli Vectron EM-ENC-04 Multi functional Expansion Module Complete Configuration Guide
  • Bonfiglioli Vectron EM-ENC-03 Second Encoder Interface and System Bus Expansion Guide
  • Bonfiglioli Vectron EM-ENC-02 Expansion Module Integration and Encoder Interface Guide
  • Bonfiglioli Vectron CM-CAN CANopen Communication Configuration and DS402 Control Guide
  • Bonfiglioli Vectron EM-SYS System Bus Networking and Virtual Link Configuration Guide
  • Bonfiglioli Vectron CM-PDP Profibus DP Configuration and Debugging Guide
  • Bonfiglioli Vectron CM-232/485 Modbus Communication Configuration Guide
  • Bonfiglioli BMS series servo reduction motor selection and integration guide
  • Bonfiglioli ACTION 210/410 Inverter Debugging and Fault Diagnosis Complete Guide
  • Honeywell Enhanced Micro TDC 3000X System Redundancy Architecture and Maintenance Guide
  • Selection and Configuration of Bonfiglioli Active Series Inverter
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli HDP/HDO Series Heavy duty Gearboxes
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli 300/300M Series Gearboxes
  • Bonfiglioli 300M planetary gearbox selection and thermal verification guide
  • Bonfiglioli 3/H series heavy-duty gearbox selection and verification guide
  • Bonfiglioli KRG/KCG/KSD Hydraulic Coupling Selection and Integration Guide
  • Bonfiglioli BTD/BCR Servo Motor System Integration and Interface Configuration Guide
  • Bonfiglioli BTD/BCR Synchronous Servo Motor Selection and Interface Configuration Guide
  • Bonfiglioli VF-W series ATEX explosion-proof reducer selection guide
  • Bonfiglioli EM-ENC-03 Expansion Module Configuration and System Bus Integration Guide
  • Bonfiglioli EVOX CP Explosion proof Reducer: Quick Guide for Installation and Maintenance
  • Bonfiglioli C/A/F/S Reducer ATEX Installation and Maintenance Practice Guide
  • Bonfiglioli BXN/MXN Motor Installation and Brake Maintenance Complete Guide
  • Bonfiglioli VF-W IE2/IE3 Worm Gear Reducer: Energy Efficiency Selection and Application Practice Guide
  • Bonfiglioli VF-W Explosion proof Worm Gear Reducer: ATEX Selection and Installation Complete Guide
  • Selection and Calculation of Bonfiglioli RAN Right Angle Gearbox