Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IS210TREGH4B Turbine Emergency Trip Terminal Board
    ❤ Add to collection
  • GE IS210TREGH4B Turbine Emergency Trip Terminal Board

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IS210TREGH4B Turbine Emergency Trip Terminal Board

    • ¥11587.25
      ¥12587.02
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:3.850KG
    • Quantity:
    • (Inventory: 69)
Description

GE IS210TREGH4B Turbine Emergency Trip Terminal Board


GE IS210TREGH4B Turbine Emergency Trip Terminal Board

Part Number IS210TREGH4B Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series Mark VI/VIe Function Module Availability In StockIS210TREGH4B is an emergency trip terminal board assembly developed by General Electrics. It is a part of Mark VI control system. The TREG system plays a critical role in ensuring the safety and functionality of various emergency functions within a larger system. Specifically, it serves as the power source for three emergency trip solenoids, all of which are under the precise control of the I/O controller. 

 Features Responsible for supplying power to the three emergency trip solenoids. These solenoids are crucial for triggering essential safety measures in response to specific conditions or events. It is designed to accommodate up to three trip solenoids, and these solenoids are connected between the TREG and TRPG terminal boards. Each solenoid is strategically positioned to respond to distinct emergency scenarios. Provides the positive side of the direct current (DC) power to the connected solenoids. This positive power supply is essential for energizing and activating the solenoids when required. It is designed to accommodate up to three trip solenoids, and these solenoids are connected between the TREG and TRPG terminal boards. 

Each solenoid is strategically To complete the circuit and ensure proper functionality, the TRPG terminal boards come into play by providing the negative side of the DC power. This complementary power source from TRPG is essential for enabling the solenoids to perform their emergency trip functions effectively. It is designed to accommodate up to three trip solenoids, and these solenoids are connected between the TREG and TRPG terminal boards. Each solenoid is strategically The I/O controller takes on a central role in the operation of this system. It is responsible for overseeing and managing several critical functions: Emergency Overspeed Protection: The I/O controller monitors the speed of the system and can engage emergency overspeed protection measures to prevent dangerous acceleration. Emergency Stop Functions: In case of any critical issues or emergencies, the I/O controller can initiate emergency stop functions to halt the system immediately. 

Relay Control: TREG hosts a set of 12 relays, and the I/O controller is in charge of controlling these relays. Nine of these relays are organized into three groups of three. These relay groups work in a voting system, where the inputs are assessed collectively, ensuring redundancy and reliability. This mechanism allows for effective control of the three trip solenoids, enhancing safety and response capabilities. Operation The operation of the TREG system is highly streamlined and reliant on the precise control provided by the I/O controller. This control scheme ensures the safety and functionality of the entire system, with minimal external connections to the control modules. I/O Controller Dominance: The I/O controller serves as the central brain of the system, exercising complete authority over its functions. It orchestrates and coordinates all actions and responses, making it a crucial component for the system's overall performance and safety. Control Module Connections: TREG maintains a minimalist approach when it comes to external connections. 

The only two connections it has to the control modules are as follows: J2 Power Cable: This cable is responsible for supplying power. It acts as the lifeline that ensures TREG remains operational and ready to respond to emergency situations. This power connection is fundamental to keeping the system active and prepared for action. Trip Solenoid Connections: The primary means through which TREG interacts with the wider system is through the trip solenoids. 

These solenoids are crucial for initiating emergency shutdowns or other critical actions when necessary. The control signals from the I/O controller are transmitted through these solenoids, enabling precise and rapid responses to emergency conditions. Simplex System Functionality: In simplex systems, an additional cable, known as the third cable, comes into play. This cable carries a trip signal from J1 to the TSVO terminal board. This trip signal is particularly important because it facilitates a servo valve clamp function when the turbine undergoes a trip event. This feature is critical for ensuring that the turbine is safely brought to a stop or controlled state during emergency scenarios. 

In essence, TREG's operation is characterized by its reliance on the I/O controller for control and coordination. Its connections are kept minimal and purpose-driven, with power supply through the J2 cable and communication via the trip solenoids. In simplex systems, the introduction of the third cable adds an extra layer of safety by enabling precise control of the servo valve during turbine trip events. This careful design and control strategy make TREG an integral component in maintaining the safety and reliability of the larger system it is a part of. Attributes Trip interlock isolation: Optical isolation to 1500 V on all inputs Trip interlock filter: Hardware filter, 4 ms Trip interlock ac voltage rejection: 60 V rms Solenoid response time: Solenoid L/R time constant is 0.1 second Solenoid Trip Tests Solenoid Trip Tests involve the utilization of application software within the controller to execute tests on trip solenoids. 

These tests can be conducted online, enabling the individual tripping of each solenoid sequentially. This can be achieved either through the PTR (Protection, Trip, and Release) relays from the controller or via the ETR (Emergency Trip Relay) relays from the protection module. For confirmation of solenoid operation, a contact from each solenoid circuit is connected back as a contact input, providing a positive indication that the solenoid has indeed tripped. Furthermore, the system incorporates primary and emergency offline overspeed tests. These tests serve the purpose of validating genuine trip occurrences by simulating overspeed conditions through software. This verification process ensures the reliability and functionality of the solenoids in response to critical operational parameters, bolstering the overall safety and efficiency of the system.

SPECIFICATIONS:

Part Number: IS210TREGH4B
Manufacturer: General Electric
Series: Mark VI
Product Type: Turbine Emergency Trip Terminal Board
Number of Channels: 24
Number of inputs: 12
Number of trip solenoids: 3
Number of outputs: 125 V dc
Technology: Surface Mount
Suppression: MOV across the solenoid
Trip interlock isolation: Optical isolation to 1500 V
Dimensions: 17.8 cm wide x 33.02 cm
Operating Temperature: 30 to 65°C
Repair: 3-7 Day
Availability: In Stock
Country of Origin: United States
Manual: GEH-6421I


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Modular Architecture Analysis of DEIF PPU 300 Ship Generator Controller
  • DEIF DM-4 Marine&Offshore Ship Power Management System
  • Detailed Explanation of DEIF Delomatic Generator Control System Architecture
  • DEIF AGC-4 Mk II Generator Controller Depth Configuration Guide
  • DEIF AGC-4 Generator Controller Configuration and Debugging Guide
  • DEIF PPM Power Management System Operation and Troubleshooting
  • Installation and wiring of DEIF Multi line 2
  • Practical configuration and maintenance of Beckwith M-6280 capacitor bank controller
  • Beckwith M-3311 Transformer Protection Relay Setting and Engineering Application
  • Beckwith M-3311A Transformer Protection Relay Configuration and Optimization Guide
  • Beckwith M-3310 Transformer Protection Relay Complete Guide
  • Beckwith M-0359 synchronous inspection relay
  • Beckwith M-0293A Voltage Regulating Controller Replacement and Debugging Guide
  • Complete Guide to DEIF GPU-3 Generator Protection Unit
  • Installation and I/O configuration of DEIF PPM-3 power management module
  • Beckwith M-3520 Interconnection Protection Relay
  • Beckwith M-3430 Generator Protection Relay
  • Beckwith M-2293B adapter panel replacement GE regulator guide
  • Selection and Networking of Beckwith M-2001C Digital Voltage Regulating Controller
  • Beckwith M-2001B Digital Voltage Regulating Controller
  • Beckwith M-0388/M-0389 Synchronous Inspection Relay Application Guide
  • Beckwith M-0193B Synchronizer Debugging and System Integration Guide
  • Beckwith M-0115A Parallel Balance Module Debugging Guide
  • Beckwith M-0067E On Load Voltage Regulating Controller Selection and Debugging Guide
  • Debugging and Fault Handling of Beckwith M-4272 Digital Busbar Conversion System
  • Beckwith M-3311A Transformer Protection Relay Debugging Guide
  • Beckwith M-3425A Generator Protection Relay Debugging Guide
  • Setting and troubleshooting of Basler BE1-27/59 voltage relay
  • Debugging and troubleshooting of Basler AVC63-12/AVC125-10 voltage regulator
  • Basler L301kc Line Array Camera Technology and Troubleshooting
  • Selection and Debugging of Basler CBS 212A Current Boosting System
  • Selection and commissioning of Basler BE3-25 synchronous inspection relay
  • Basler BE1-32R/32O/U Direction Power Relay Setting and Testing Guide
  • Basler PRS 250 Synchronous Relay Maintenance and Replacement Guide
  • Basler piA2400-17gc Industrial Camera Replacement and Optimization Guide
  • Basler BE1-11g Generator Protection System
  • Basler VR63-4C/UL Voltage Regulator
  • Basler BE1-DFPR feeder protection relay
  • Basler CBS 310/320 Current Boosting System
  • Basler UFOV 250A/260A protection module
  • Basler MVC104/MVC108/MVC232 manual voltage control device
  • Basler XR2002/XR2002F Regulator
  • Basler DECS-400 excitation system
  • Basler DGC-2020 Generator Set Controller: Integrated Control and Debugging Guide
  • Basler MVC-300 Manual Voltage Controller: Characteristics and Engineering Applications
  • Basler MVC Series Manual Voltage Controller: Application and Selection
  • Basler SSR Static Voltage Regulator: A Complete Guide to Debugging and Troubleshooting
  • Basler SR4A/SR8A Voltage Regulator: Detailed Debugging and Troubleshooting Explanation
  • Basler BE2000E Voltage Regulator: Replacement and Application Details
  • Basler DECS-2100 Excitation System: Modular Upgrade and Engineering Application
  • Basler BE1-851 Overcurrent Protection System: A Complete Guide to Professional Debugging and Troubleshooting
  • Basler APR 63-5 Voltage Regulator: Professional Debugging and Troubleshooting Guide for Industrial Generator Excitation Systems
  • Basler BE1-FLEX Protection System: A Complete Guide to Professional Installation, Configuration, and Troubleshooting
  • Debugging and Testing of Basler BE1-700 Relay
  • Basler BE1-87B busbar differential setting test
  • Basler BE1-40Q demagnetization relay setting test
  • Basler BE1-60 Voltage Balance Relay Setting Test
  • Basler BE1-47N Relay Field Setting and Testing Guide
  • Basler BE1-81O/U Frequency Relay: On site Debugging and Protection Configuration Guide
  • Basler BE1-11f Feedline Protection System Debugging and Troubleshooting Guide
  • Basler DECS-250 Excitation System: Installation, Configuration, and Troubleshooting Practice Guide
  • Basler DECS-100 Digital Excitation System Debugging Guide
  • Application Guide for Basler BE1-BPR Circuit Breaker Protection Relay
  • Basler BE1-50/51B-255 Replacement CO Relay Guide
  • Basler BE1-25 synchronous inspection relay principle and testing
  • Basler BE1-51 Time Overcurrent Relay Debugging Guide
  • Practical Guide to Basler DECS-300 Digital Excitation System
  • Mitsubishi FX Series PLC Data Communication Practical Manual
  • Selection of Hirschmann cSCALE S6/C8 Mobile Safety Controller
  • Hirschmann OZD Profi G12D repeater explosion-proof installation configuration
  • Hirschmann OCTOPUS OS20/24 Switch Installation Power Supply
  • Hirschmann RS20/30/40 Switch Selection and PoE Deployment
  • Hirschmann EAGLE One Firewall Installation and Configuration Guide
  • Hirschmann MACH102 Switch Installation and Power Supply Guide
  • Hirschmann MICE MS20/MS30 Installation and DIP Configuration
  • Hirschmann BOBCAT BRS Switch Installation and Power Supply Guide
  • Hirschmann RSB20 Switch Deployment and Redundant Configuration
  • Hirschmann RS20 Basic Switch Installation and Debugging Guide
  • BECKHOFF EP20xx/EP28xx Output Module Installation and Debugging Guide
  • BECKHOFF EL5102 Encoder Terminal Debugging and Troubleshooting
  • BECKHOFF CU8803 Launch Box Installation and Explosion proof Guide
  • BECKHOFF CU20xx/CU22xx Switch Installation and Troubleshooting
  • BECKHOFF AMP8000 Servo Drive Installation and Debugging Manual
  • BECKHOFF EL2911 Safety Feed Terminal Debugging Guide
  • BECKHOFF EL600x/EL602x Serial Port Module Debugging Manual
  • BECKHOFF CP6700 Panel PC Installation and Maintenance Manual
  • BECKHOFF CP70xx panel maintenance and troubleshooting
  • BECKHOFF CP29xx Panel Installation and Troubleshooting
  • Beckhoff C6650-0060 Industrial Control Computer Hardware Architecture and RAID Data Security
  • Beckhoff BK1120/BK1250 EtherCAT Coupling Debugging and KL Terminal Parameterization Complete Guide
  • Beckhoff CX20x0 Embedded Controller Hardware Maintenance and Troubleshooting Complete Manual
  • Beckhoff CP77xx Panel PC Hardware Maintenance and Troubleshooting Complete Guide
  • Beckhoff EL41xx Analog Output Terminal Deep Analysis: Parameter Configuration, Fault Diagnosis, and Firmware Compatibility Guide
  • Beckhoff C63xx industrial computer power supply and shutdown configuration
  • Beckhoff C6920 Industrial Control Computer Selection and Expansion Guide
  • Beckhoff CU8800 USB extender diagnostic guide
  • Beckhoff AX2000 Shutdown Braking and Debugging
  • Beckhoff AX8000 servo installation fuse selection
  • Beckhoff CP27xx Multi finger Touch PC Maintenance
  • Beckhoff CP69xx long-distance transmission and installation
  • Beckhoff CP60xx remote deployment and maintenance
  • Beckhoff CP72xx Installation and Maintenance Complete Manual
  • Beckhoff CP78xx Installation and Troubleshooting Guide
  • Beckhoff CP39xx Control Panel
  • Beckhoff CX8110 Embedded PC
  • Beckhoff CX50x0 series DIN rail embedded industrial PC
  • Beckhoff CP62xx panel PC
  • BECKHOFF C6030 Industrial Control Computer
  • UniOP ePAD32B/ePAD33B/ePAD33BT Industrial HMI
  • UniOP ePAD05/06 Human Computer Interface
  • UniOP ePAD03/04 Human Computer Interface
  • UniOP BKDR-46-0045 Human Machine Interface
  • UniOP BKDR-16 human-machine interface
  • Beckwith M-3425A Relay Guide
  • Basler DECS-200-2L excitation system
  • Basler DECS-250 Excitation System Debugging Guide
  • HA-800A Servo Drive Debugging Guide
  • JUMO dTRANS p35 Manual
  • KEBA XE020 RFID Module Manual
  • Honeywell SmartLine Transmitter Complete Guide
  • Eaton CROUSE-HINDS Series MA30 Lightning Protection Filter Installation Guide
  • BECKHOFF EL31xx Series 16 Bit EtherCAT Analog Input Terminal Manual
  • BECKHOFF AX5000 Servo Drive Maintenance Guide
  • BECKHOFF EL30xx Analog Input Diagnostic Guide
  • BECKHOFF EL70x7 Stepper Terminal Maintenance Guide
  • BECKHOFF CX52x0 Industrial Control Computer Maintenance Guide
  • BECKHOFF CX9000/CX9010 Hardware Maintenance Guide
  • BECKHOFF AM8xxx Motor Guide