Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IS210TREGH4B Turbine Emergency Trip Terminal Board
    ❤ Add to collection
  • GE IS210TREGH4B Turbine Emergency Trip Terminal Board

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IS210TREGH4B Turbine Emergency Trip Terminal Board

    • ¥11587.25
      ¥12587.02
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:3.850KG
    • Quantity:
    • (Inventory: 69)
Description

GE IS210TREGH4B Turbine Emergency Trip Terminal Board


GE IS210TREGH4B Turbine Emergency Trip Terminal Board

Part Number IS210TREGH4B Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series Mark VI/VIe Function Module Availability In StockIS210TREGH4B is an emergency trip terminal board assembly developed by General Electrics. It is a part of Mark VI control system. The TREG system plays a critical role in ensuring the safety and functionality of various emergency functions within a larger system. Specifically, it serves as the power source for three emergency trip solenoids, all of which are under the precise control of the I/O controller. 

 Features Responsible for supplying power to the three emergency trip solenoids. These solenoids are crucial for triggering essential safety measures in response to specific conditions or events. It is designed to accommodate up to three trip solenoids, and these solenoids are connected between the TREG and TRPG terminal boards. Each solenoid is strategically positioned to respond to distinct emergency scenarios. Provides the positive side of the direct current (DC) power to the connected solenoids. This positive power supply is essential for energizing and activating the solenoids when required. It is designed to accommodate up to three trip solenoids, and these solenoids are connected between the TREG and TRPG terminal boards. 

Each solenoid is strategically To complete the circuit and ensure proper functionality, the TRPG terminal boards come into play by providing the negative side of the DC power. This complementary power source from TRPG is essential for enabling the solenoids to perform their emergency trip functions effectively. It is designed to accommodate up to three trip solenoids, and these solenoids are connected between the TREG and TRPG terminal boards. Each solenoid is strategically The I/O controller takes on a central role in the operation of this system. It is responsible for overseeing and managing several critical functions: Emergency Overspeed Protection: The I/O controller monitors the speed of the system and can engage emergency overspeed protection measures to prevent dangerous acceleration. Emergency Stop Functions: In case of any critical issues or emergencies, the I/O controller can initiate emergency stop functions to halt the system immediately. 

Relay Control: TREG hosts a set of 12 relays, and the I/O controller is in charge of controlling these relays. Nine of these relays are organized into three groups of three. These relay groups work in a voting system, where the inputs are assessed collectively, ensuring redundancy and reliability. This mechanism allows for effective control of the three trip solenoids, enhancing safety and response capabilities. Operation The operation of the TREG system is highly streamlined and reliant on the precise control provided by the I/O controller. This control scheme ensures the safety and functionality of the entire system, with minimal external connections to the control modules. I/O Controller Dominance: The I/O controller serves as the central brain of the system, exercising complete authority over its functions. It orchestrates and coordinates all actions and responses, making it a crucial component for the system's overall performance and safety. Control Module Connections: TREG maintains a minimalist approach when it comes to external connections. 

The only two connections it has to the control modules are as follows: J2 Power Cable: This cable is responsible for supplying power. It acts as the lifeline that ensures TREG remains operational and ready to respond to emergency situations. This power connection is fundamental to keeping the system active and prepared for action. Trip Solenoid Connections: The primary means through which TREG interacts with the wider system is through the trip solenoids. 

These solenoids are crucial for initiating emergency shutdowns or other critical actions when necessary. The control signals from the I/O controller are transmitted through these solenoids, enabling precise and rapid responses to emergency conditions. Simplex System Functionality: In simplex systems, an additional cable, known as the third cable, comes into play. This cable carries a trip signal from J1 to the TSVO terminal board. This trip signal is particularly important because it facilitates a servo valve clamp function when the turbine undergoes a trip event. This feature is critical for ensuring that the turbine is safely brought to a stop or controlled state during emergency scenarios. 

In essence, TREG's operation is characterized by its reliance on the I/O controller for control and coordination. Its connections are kept minimal and purpose-driven, with power supply through the J2 cable and communication via the trip solenoids. In simplex systems, the introduction of the third cable adds an extra layer of safety by enabling precise control of the servo valve during turbine trip events. This careful design and control strategy make TREG an integral component in maintaining the safety and reliability of the larger system it is a part of. Attributes Trip interlock isolation: Optical isolation to 1500 V on all inputs Trip interlock filter: Hardware filter, 4 ms Trip interlock ac voltage rejection: 60 V rms Solenoid response time: Solenoid L/R time constant is 0.1 second Solenoid Trip Tests Solenoid Trip Tests involve the utilization of application software within the controller to execute tests on trip solenoids. 

These tests can be conducted online, enabling the individual tripping of each solenoid sequentially. This can be achieved either through the PTR (Protection, Trip, and Release) relays from the controller or via the ETR (Emergency Trip Relay) relays from the protection module. For confirmation of solenoid operation, a contact from each solenoid circuit is connected back as a contact input, providing a positive indication that the solenoid has indeed tripped. Furthermore, the system incorporates primary and emergency offline overspeed tests. These tests serve the purpose of validating genuine trip occurrences by simulating overspeed conditions through software. This verification process ensures the reliability and functionality of the solenoids in response to critical operational parameters, bolstering the overall safety and efficiency of the system.

SPECIFICATIONS:

Part Number: IS210TREGH4B
Manufacturer: General Electric
Series: Mark VI
Product Type: Turbine Emergency Trip Terminal Board
Number of Channels: 24
Number of inputs: 12
Number of trip solenoids: 3
Number of outputs: 125 V dc
Technology: Surface Mount
Suppression: MOV across the solenoid
Trip interlock isolation: Optical isolation to 1500 V
Dimensions: 17.8 cm wide x 33.02 cm
Operating Temperature: 30 to 65°C
Repair: 3-7 Day
Availability: In Stock
Country of Origin: United States
Manual: GEH-6421I


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • SIGMATEK TAE1941 Display Unit Replacement and Troubleshooting
  • SIGMATEK TAE151 Replacement and Troubleshooting
  • SIGMATEK AKM Servo Motor Replacement and Troubleshooting Guide
  • SIGMATEK S-DIAS Control System Replacement and Upgrade Guide
  • SIGMATEK ETT Series HMI Replacement and Selection Guide
  • SIGMATEK DIAS Drive 310-23 servo amplifier
  • SIGMATEK CCP 521 C-DIAS processor module
  • Megmeet L6 electric drive troubleshooting
  • Sysmex XN-1000/2000 Technical Guide
  • Sysmex XN-L blood analyzer maintenance and troubleshooting
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting
  • KUKA KR AGILUS-3 ultra maintenance troubleshooting
  • KUKA KR 300 R2700-2 C-F maintenance troubleshooting
  • KUKA KR 20 R1820-2 E Maintenance Troubleshooting and Replacement Practice
  • KUKA AGILUS-3 troubleshooting
  • KUKA KR AGILUS-2 maintenance troubleshooting
  • KUKA KR 1000 titan PA troubleshooting
  • KUKA KR 700 PA maintenance troubleshooting
  • KUKA KR18 R1450-3 PP Operation and Maintenance Essentials
  • KUKA KR12 SCARA Operations Essentials
  • KUKA KR4 R600 Operation and Maintenance Essentials
  • KUKA KR 3 AGILUS Operation and Maintenance Safety Essentials
  • KUKA LBR iiwa CR Cleanroom Troubleshooting and Maintenance
  • Troubleshooting and Maintenance of KUKA KR AGILUS sixx
  • KUKA KR60 SCARA CS Maintenance Guide
  • KUKA KR 23 SCARA-2 Robot Installation and Maintenance Detailed Explanation
  • KUKA KR 20 SCARA CS Robot Selection and Maintenance Guide
  • KUKA KR 15 DELTA-2 Robot Installation and Maintenance
  • KUKA KR 13 SCARA-2 CS Detailed Explanation
  • KUKA KR 3 D1200 Robot Operation and Maintenance
  • KUKA KR 3 D1200 HM Robot Operation and Maintenance Guide
  • KUKA LBR Med Medical Robot Integration Guide
  • KUKA iiwa Robot Safety Operation and Maintenance
  • KUKA LBR iiwa CR Operations and Troubleshooting
  • Lauer PCS Series Operation Console Configuration Guide
  • Installation and Maintenance Guide for KUKA LBR iisy Series Collaborative Robots
  • KUKA LBR iisy 3 R760 Collaborative Robot Debugging Guide
  • KUKA LBR iico Robot Installation and Debugging Technical Guide
  • Lauer Starline LCA 300/320/325 Text Display Application Guide
  • Lauer PCS 950 Operation Console Application Guide
  • Lauer EPC series industrial computer configuration
  • Bonfiglioli Precision Planetary Gearbox Selection and Application Guide
  • Installation and heat dissipation of Bonfiglioli Vectron cold plate frequency converter
  • Bonfiglioli Vectron EM-RES-02 Expansion Module Installation and Configuration Guide
  • Bonfiglioli Vectron EM-RES-01 Expansion Module Rotary Transformer Interface Configuration Guide
  • Bonfiglioli Vectron EM-IO-04 module KTY temperature measurement and digital port configuration
  • Bonfiglioli Vectron EM-IO-03 Expansion Module Dual Analog Output and PTC Configuration
  • Installation of Bonfiglioli Vectron EM-IO-02 Expansion Module and PTC Temperature Monitoring Configuration
  • Bonfiglioli Vectron EM-IO-01 Expansion Module Installation and System Bus Configuration Guide
  • Bonfiglioli F series gearbox spare parts identification and replacement guide
  • Installation, maintenance, and troubleshooting of Bonfiglioli HF series reducers for hoisting applications
  • Bonfiglioli 300 series reducer installation, maintenance, and troubleshooting guide
  • Selection and integration guide for Bonfiglioli R3 series planetary gearboxes in primary crushing equipment
  • Bonfiglioli C-series ATEX gearbox selection and explosion-proof application guide
  • Bonfiglioli Vectron EM-ENC-05 Full Function Expansion Module Integration Guide
  • Bonfiglioli Vectron EM-ENC-04 Multi functional Expansion Module Complete Configuration Guide
  • Bonfiglioli Vectron EM-ENC-03 Second Encoder Interface and System Bus Expansion Guide
  • Bonfiglioli Vectron EM-ENC-02 Expansion Module Integration and Encoder Interface Guide
  • Bonfiglioli Vectron CM-CAN CANopen Communication Configuration and DS402 Control Guide
  • Bonfiglioli Vectron EM-SYS System Bus Networking and Virtual Link Configuration Guide
  • Bonfiglioli Vectron CM-PDP Profibus DP Configuration and Debugging Guide
  • Bonfiglioli Vectron CM-232/485 Modbus Communication Configuration Guide
  • Bonfiglioli BMS series servo reduction motor selection and integration guide
  • Bonfiglioli ACTION 210/410 Inverter Debugging and Fault Diagnosis Complete Guide
  • Honeywell Enhanced Micro TDC 3000X System Redundancy Architecture and Maintenance Guide
  • Selection and Configuration of Bonfiglioli Active Series Inverter
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli HDP/HDO Series Heavy duty Gearboxes
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli 300/300M Series Gearboxes
  • Bonfiglioli 300M planetary gearbox selection and thermal verification guide
  • Bonfiglioli 3/H series heavy-duty gearbox selection and verification guide
  • Bonfiglioli KRG/KCG/KSD Hydraulic Coupling Selection and Integration Guide