Allen-Bradley 1747-CP3 SLC ™ Series of programming cables
Product basic information
Product positioning: Belonging to Allen Bradley ® SLC ™ The programming cable series is specifically designed for RS232 9-pin DSHELL to RS232 9-pin DSHELL conversion, with a length of 3 meters. It is specifically designed for 5/03 and 5/04 controllers and is suitable for Compact PLC Systems. It belongs to the Modular Programmable Controllers category under Automation Systems.
Product image description: The provided images in the document are representative, and the actual product may vary due to different configuration choices.
Related support and matching: There are various alternative power supplies, chassis, communication modules, I/O cards, and accessories to choose from; Provide EtherNet I/P adapter (model 1747-AENTR), which can convert existing systems into distributed I/O; Flexible options for analog and digital I/O cards, which can be used to modify and expand system functionality; Continuous support from NHP and Rockwell Automation, including lifecycle management strategies, can be obtained simultaneously.
Product Technical Specifications
Working temperature: minimum 0 ° C, maximum 60 ° C.
Storage temperature: minimum -40 ° C, maximum 85 ° C.
Relative humidity: up to 95% RH.
Installation precautions
First, the importance of industrial equipment installation
In modern industrial production, various equipment and machines are widely used in various fields, such as manufacturing, energy industry, chemical industry and so on. The installation of industrial equipment is directly related to production efficiency and product quality. Proper installation and commissioning of good equipment can ensure the stable operation of the production line, improve production efficiency and product quality, reduce maintenance costs, and ensure the safety of employees.
Second, the steps of industrial equipment installation
1. Preparation: Before the installation of industrial equipment, it is necessary to carry out adequate preparation work. This includes the tools and equipment required for installation, cleaning and preparation of the installation site, and making installation plans and schedules.
2. Determine the installation position: Determine the installation position of the equipment according to the requirements of the equipment and the layout of the production line. When determining the location, the weight and size of the equipment need to be considered, as well as the coordination of the equipment with the surrounding environment.
3. Install the device: Assemble and install the device according to the installation instructions. Ensure that the device is securely and accurately connected, while protecting the appearance and internal components of the device.
4. Connect power supplies and pipelines: For devices that require power supplies and power supplies, properly connect power supplies and pipelines. The connection of power supply and pipeline should comply with safety standards to avoid hazards such as electric shock and leakage.
5. Commissioning the device: After the installation is complete, you need to commission the device to ensure that the device can run properly. It includes checking the functions and performance of the equipment, adjusting the parameters and Settings of the equipment, and carrying out the necessary tests and inspections.
6. Training operators: After the installation of the equipment, it is necessary to train the operators to understand the operation methods and precautions of the equipment, and improve the operation skills and safety awareness of the employees.
Third, industrial equipment installation precautions
1. Safety first: When installing industrial equipment, safety is the most important consideration. You must operate in strict accordance with safety regulations and wear necessary protective equipment to ensure the safety of the workplace.
2. Strictly follow the equipment instructions: Industrial equipment usually comes with detailed installation instructions, you must carefully read and understand the contents of the instructions, and install the operation in accordance with the requirements of the instructions.
3. Pay attention to the assembly sequence: When installing the device, follow the correct assembly sequence to ensure that all components of the device are assembled correctly to avoid equipment failures or safety accidents caused by incorrect assembly sequence.
Email:wang@kongjiangauto.com