Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IC660EPM100J Power Monitoring and Control Module
    ❤ Add to collection
  • GE IC660EPM100J Power Monitoring and Control Module

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IC660EPM100J is a high-precision and highly integrated power monitoring and control module for industrial power systems, belonging to the core expansion component of GE Fanuc Series 90-30/70 PLC system. This module is designed specifically for real-time monitoring of power parameters, energy consumption statistical analysis, and precise control requirements. It can collect key parameters such as voltage, current, power, frequency, etc. of AC/DC power systems in milliseconds, and has logic control, fault protection, and data upload functions, providing core support for the safe operation, energy efficiency optimization, and intelligent management of industrial power systems.

    • ¥8563.00
      ¥8845.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:2.180KG
    • Quantity:
    • (Inventory: 99999)
Description

GE IC660EPM100J is a high-precision and highly integrated power monitoring and control module for industrial power systems, belonging to the core expansion component of GE Fanuc Series 90-30/70 PLC system. This module is designed specifically for real-time monitoring of power parameters, energy consumption statistical analysis, and precise control requirements. It can collect key parameters such as voltage, current, power, frequency, etc. of AC/DC power systems in milliseconds, and has logic control, fault protection, and data upload functions, providing core support for the safe operation, energy efficiency optimization, and intelligent management of industrial power systems.




GE IC660EPM100J Power Monitoring and Control Module

Product Overview

GE IC660EPM100J is a high-precision and highly integrated power monitoring and control module for industrial power systems, belonging to the core expansion component of GE Fanuc Series 90-30/70 PLC system. This module is designed specifically for real-time monitoring of power parameters, energy consumption statistical analysis, and precise control requirements. It can collect key parameters such as voltage, current, power, frequency, etc. of AC/DC power systems in milliseconds, and has logic control, fault protection, and data upload functions, providing core support for the safe operation, energy efficiency optimization, and intelligent management of industrial power systems.

As an industrial grade power management equipment, IC660EPM100J is widely used in industrial plant power distribution systems, data center UPS power supply systems, new energy generation grid connected equipment, rail transit power supply networks and other scenarios due to its strong anti-interference ability and environmental adaptability. It is a key equipment for achieving closed-loop management of power systems through "monitoring analysis control protection".


Core technical characteristics

1. High precision multi parameter monitoring, comprehensive and reliable data collection

The module adopts a 24 bit high-precision AD conversion chip and supports various power system wiring methods such as 3-phase 4-wire and 3-phase 3-wire. It can simultaneously collect more than 20 power parameters, including voltage (AC 0-690V), current (AC 0-5A/DC 0-10A), active power, reactive power, apparent power, power factor, frequency (45-65Hz), and energy accumulation. The voltage measurement accuracy reaches ± 0.2% FS, and the current measurement accuracy reaches ± 0.3% FS, ensuring the accuracy and reliability of data acquisition. The module is equipped with a built-in data filtering algorithm, which can effectively suppress electromagnetic interference in industrial sites and avoid measurement errors caused by factors such as harmonics and surges.

2. Integrate control and protection functions to achieve closed-loop management

IC660EPM100J integrates dual functions of power monitoring and logic control, supporting threshold setting through PLC main controller or local programming. When abnormal situations such as voltage overvoltage/undervoltage, current overcurrent, power overload are detected, relay output can be triggered within 10ms to achieve control actions such as load shedding and circuit protection, avoiding fault expansion. The module is equipped with 4 programmable digital output interfaces, which can directly drive actuators such as contactors and circuit breakers. It also supports seamless linkage with GE PLC systems, enabling rapid deployment of complex power control logic.

3. Flexible communication and data management, adapted to intelligent requirements

The module supports multiple industrial communication protocols, including Modbus RTU, EtherNet/IP, PROFINET, etc. It can upload real-time power data, device status, and fault information to SCADA systems, energy management platforms (EMS), or cloud monitoring platforms through RS-485 or Ethernet interfaces. It supports timed data upload, on-demand testing, and breakpoint continuation functions. Built in 16MB local storage unit, capable of caching historical data and fault logs for over 1 year, facilitating later data analysis, fault tracing, and energy consumption statistics report generation.

4. Industrial grade reliability design, suitable for harsh environments

The module is encapsulated in a full metal shell, with good electromagnetic shielding performance and anti-interference level up to IEC 61000-4-2/3/4 standard, which can resist static electricity, pulse group and surge interference in industrial sites. The working environment has a wide temperature range of -20 ℃~70 ℃ and a humidity adaptation range of 5%~95% (without condensation), supporting stable operation in high dust and high vibration industrial scenarios. The average time between failures (MTBF) exceeds 200000 hours.

5. Convenient configuration and maintenance, reducing usage costs

The module supports parameter configuration, logic programming, and firmware upgrades through specialized configuration software such as GE Proficy Machine Edition. The graphical user interface is intuitive and easy to understand, and deployment can be completed without professional knowledge of power programming. The module comes with LED status indicator lights, which can display power, communication, measurement, and fault status in real time. It also supports remote diagnosis function. Maintenance personnel can remotely troubleshoot equipment faults through the monitoring platform, reducing on-site maintenance workload.


Key technical parameters

Product Model

IC660EPM100J

Compatible Systems

AC 3-phase 4-wire/3-phase 3-wire/DC system

Voltage measurement range

AC 0-690V; DC 0-1000V

Current measurement range

AC 0-5A (direct input)/0-1000A (with transformer); DC 0-10A

measurement accuracy

Voltage ± 0.2% FS; Current ± 0.3% FS; Power ± 0.5% FS

Frequency measurement range

45-65Hz, Accuracy ± 0.01Hz

input power

DC 24V (± 10%) or AC 110/220V (± 15%)

power consumption

≤15W

communication interface

1 RS-485, 1 Ethernet (RJ45)

Supported Protocols

Modbus RTU、EtherNet/IP、PROFINET

digital output

4-channel relay output (AC 250V/5A, DC 30V/10A)

storage capacity

16MB local data storage

working environment

Temperature: -20 ℃~70 ℃; Humidity: 5%~95% (no condensation)

Protection level

IP20 (panel)

MTBF

≥ 200000 hours

Dimensions (length x width x height)

140mm×80mm×120mm


Installation and maintenance precautions

1. Installation specifications

-The module should be installed in a well ventilated location away from heat sources and strong electromagnetic interference sources (such as frequency converters and high-power motors), avoiding direct sunlight;

-Before wiring, it is necessary to confirm the system voltage level and module compatibility. The current input circuit must not be open circuited, and the voltage input circuit must not be short circuited. The wiring terminals must be securely fastened to prevent poor contact;

-When using a 3-phase system wiring, it is necessary to strictly distinguish the phases of A, B, and C phases to ensure the correct wiring sequence and avoid phase errors that may cause abnormal measurement data;

-Communication lines should use shielded twisted pair cables, with the shielding layer grounded at one end. Ethernet lines should be kept away from strong electrical cables to avoid signal interference;

-After installation, insulation testing is required to ensure that the insulation resistance between the module and the ground is greater than 50M Ω to avoid the risk of leakage.

2. Daily maintenance

-It is recommended to conduct a visual inspection of the module every 6 months, clean the dust at the terminal block and heat dissipation holes to ensure good heat dissipation;

-Regularly verify the consistency between measurement data and actual power parameters through the monitoring platform, and calibrate in a timely manner if any deviation occurs;

-Check the stability of the communication link every month to see if there are any issues such as data loss or communication interruption, and promptly troubleshoot any faults in the line or protocol configuration;

-When a module malfunctions, it is necessary to first cut off the input power and communication lines before conducting maintenance. When replacing the module, it is necessary to ensure that the firmware version of the new module matches the system;

-Regularly backup module configuration parameters and historical data to avoid data loss caused by module failures.

  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • Selection and Calculation of Bonfiglioli RAN Right Angle Gearbox
  • Bonfiglioli Industrial Transmission System Selection Guide
  • Bonfiglioli EVOX Gearmotor Selection and Configuration Guide
  • Bonfiglioli CAFS Reducer Selection and Application Guide
  • Bonfiglioli C-A-F gearbox selection and maintenance
  • Bonfiglioli C Series ATEX Explosion proof Reducer Selection
  • Bonfiglioli BN-BE-BX Series Motor Selection Guide
  • Bonfiglioli BMD Servo Motor Selection and Configuration Guide
  • Selection of Bonfiglioli A-series servo reducer
  • Bonfiglioli AS Series Reducer Installation and Maintenance Guide
  • Bonfiglioli Active 401/201 Inverter Selection and Application Guide
  • Bonfiglioli EM-IO-04 Expansion Module Configuration Guide
  • Bonfiglioli EM-ENC-02 Expansion Module Engineering Configuration Guide
  • Bonfiglioli A-series gearbox selection and maintenance
  • Bonfiglioli Transmission and Automation Product Selection Reference
  • Bonfiglioli RAN series bevel gearbox selection and maintenance guide
  • Bonfiglioli ACTION 401/201 Inverter Engineering Integration Guide
  • Alcatel Lucent Stellar AP1301 Deployment and Performance Optimization
  • Alcatel Lucent ALE Wireless Handheld System Selection and Deployment Guide
  • In depth analysis of Alcatel Lucent MDR-8000 microwave system engineering technology
  • Alcatel 1660SM Multi Service Node Operations and Troubleshooting
  • Alcatel Lucent OmniSwitch 6850 Stacking and Security Configuration Guide
  • Alcatel Lucent 7750 SR Router High Availability Deployment and Troubleshooting
  • Alcatel 1600 Series SDH Equipment Operation and Maintenance Guide
  • Alcatel Lucent 9500 MPR Microwave Platform Deployment and Troubleshooting
  • Alcatel Lucent 7450 ESS High Availability Deployment and Operations Guide
  • Alcatel OmniPCX 4400 REFLEXES Phone Configuration Troubleshooting
  • Alcatel Lucent OmniSwitch 6850E Stacking Operations and Troubleshooting
  • Alcatel Lucent OmniSwitch 6450 Stacking and Troubleshooting Guide
  • Lucent Stinger DSLAM High Availability Deployment and Fault Recovery Complete Guide
  • Alcatel Lucent 1660SM Optical Transmission System Architecture and Business Bearer
  • ALCATEL-LUCENT 9500 MPR Microwave Packet Wireless System Performance
  • Atlas Copco MT Focus 6000 Controller Safety Specification and Electrical Grounding
  • Atlas Copco Power MACS 4000 Automated Tightening System Performance
  • Design and Protection of Constant Torque Application for Atlas Copco Neos Inverter
  • Atlas Copco Power Focus 8 Family Selection Configuration and Virtual Station Function Complete Explanation
  • Atlas Copco Power Focus 4000 Controller Safety Deployment and Electrical Grounding Specification
  • Atlas Copco Power Focus 3000 Controller Installation, Debugging, and Troubleshooting Guide
  • Atlas Copco Tensor S Tightening Tool Troubleshooting Guide
  • Application and maintenance of Atlas Copco SRTT-B torque sensor
  • Atlas Copco ACTA 4000 Torque Analyzer Operation and Calibration Guide
  • Atlas Copco Tensor STB Wireless Tightening Tool Deployment Guide
  • Atlas Copco Power Focus 4000 Configuration and Troubleshooting Manual
  • Atlas Copco Power Focus 6000 and Tensor STR System
  • Energy efficiency and selection of Atlas Copco ZR/ZT oil-free screw compressor
  • Atlas Copco PowerMACS 4000 Tightening Control System
  • Atlas Copco Elektronikon MK5 Controller Operation Guide
  • Atlas Copco Tensor ES and PF600 Tightening System
  • ADLINK STC2-AL/KL Industrial Control Tablet BIOS and Drivers
  • ADLINK STC-15W04 industrial tablet computer
  • ADLINK SP2-EHL Fanless Tablet Selection and Configuration Guide
  • ADLINK PXIS-2719A Chassis Deployment Monitoring Guide
  • ADLINK PXIe-9908 SMU Deployment and Configuration Guide
  • ADLINK PXIe-9852 High Speed Digitizer Configuration Guide
  • ADLINK PXIe-9848 High Speed Digitizer Configuration Guide
  • ADLINK PXIe-9834 High Speed Digitizer Configuration Guide
  • ADLINK PXIe-9529H Dynamic Signal Acquisition Configuration Guide
  • ADLINK PXIe-3988 Xeon Deployment Optimization Guide
  • ADLINK PXIe-3987/3977/3937 Deployment and Debugging
  • ADLINK PXIe-3987 Installation and Configuration Programming Guide
  • ADLINK-PXIe-3988-3987-3977-3937-TL Controller Deployment and Maintenance Guide
  • ADLINK PXI-2020/2022 Synchronous Acquisition Card Configuration and Synchronization Guide
  • ADLINK DAQ/PXI-2000 series synchronous acquisition card configuration and triggering
  • ADLINK PXES-2788 series chassis deployment and maintenance
  • ADLINK PXES-2785 18 Slot Gen3 Chassis Deployment and Maintenance Guide
  • ADLINK PXES-2780 18 Slot PXIe Chassis Deployment Configuration
  • ADLINK PXES-2596 Gen3 Chassis Installation and Maintenance Guide
  • ADLINK PXES-2590 Chassis Deployment and System Management
  • ADLINK PXES-2314T Chassis Deployment and Troubleshooting Guide
  • ADLINK PXES-2301 Chassis Installation Monitoring and Troubleshooting
  • ADLINK PCIe-U300 Series USB3 Vision Acquisition Card Deployment Guide
  • ADLINK PCIe PXIe-8565 Expansion Kit Remote Control and Compatibility
  • Installation and troubleshooting of ADLINK PCIe GIE74V four channel PoE acquisition card
  • ADLINK PCIe GIE7x Poe+Acquisition Card Configuration and Triggering Troubleshooting
  • Advanced triggering and multi card synchronization of ADLINK PCIe-CPL64V image acquisition card
  • ADLINK PCIe-CPL64 Image Acquisition Card Hardware Trigger and Encoder Application
  • Application and troubleshooting of ADLINK PCIe-8560/PXI-8565 expansion kit
  • ADLINK PCIe 8332/PCIe 8334/PCIe 8338 EtherCAT Motion Controller Multi axis Synchronous Control
  • ADLINK PCIe-7432 32 channel isolated I/O card interrupt and driver
  • ADLINK PCIe-7256 Industrial I/O Card Interruption and Relay
  • ADLINK PCIe-833x EtherCAT Motion Controller Debugging and Maintenance
  • ADLINK PCIe-10GPoE 10GigE Visual Acquisition Card Practical Use
  • ADLINK PCI-8254/8258 Motion Controller Debugging and Maintenance
  • Application and Maintenance of ADLINK PCI-8158 Multi axis Motion Control Card
  • ADLINK PCI-8134A Maintenance and Troubleshooting Guide
  • ADLINK PCI-7250 Series Relay Output Card Configuration and Protection Circuit Guide
  • ADLINK PCI-6308 Series Isolated Analog Output Card Configuration and Programming
  • ADLINK PanKonix Series HMI Panel Selection and Deployment Guide
  • ADLINK NuDAM-6100 Series I/O Module Deployment and Protocol Optimization
  • Deployment and Calibration of ADLINK NuDAM-6000 Data Acquisition Module
  • ADLINK NEON-2000-Ono Intelligent Camera Deployment and Trigger Optimization
  • ADLINK NuDAM-65xx Communication Module Networking and Configuration Guide
  • ADLINK NuDAM-60xx Series Digital I/O Module Deployment and Watchdog Optimization
  • ADLINK MXE-5300 Fanless Industrial Control Computer Deployment and Troubleshooting Manual
  • ADLINK MXE-310 edge computing Platform Hardware Installation and BIOS Tuning
  • ADLINK MXE-230 series Alder Lake platform industrial computer deployment and maintenance manual
  • ADLINK MXE-210 Compact Fanless Industrial Control Computer Hardware Deployment and Debugging Guide
  • ADLINK MXC-3300/3340 Embedded Industrial Control Computer Hardware Integration and Debugging Manual
  • ADLINK MXA-312M Edge AI Platform Hardware Integration and Debugging Guide
  • ADLINK MXA-200 IoT Gateway Hardware Installation and Linux System Debugging Complete Guide
  • ADLINK MVP-6200 Industrial Control Computer: PCIe Gen4 and PCI Hybrid Expansion
  • ADLINK MVP-6100 Industrial Control Computer: PCI/PCIe Expansion and Robust Design
  • ADLINK MVP-5200 Industrial Control Computer: High Performance Multi Display and TSN Network
  • ADLINK MVP-5100 Fanless Industrial Control Computer Deployment and Development Guide
  • ADLINK MVP-3100 and MVP-3120 Embedded Systems
  • ADLINK MNET-J3/S23/MIA/DA2/SAN Single Axis Module Installation and Wiring Guide
  • ADLINK MNET-4XMO/C Motion Module Installation and Debugging Guide
  • ADLINK MCM-216/218 Edge DAQ Deployment Configuration Guide
  • ADLINK LPCIe-8124-C Encoder Card Trigger Configuration Guide
  • ADLINK IM/OM Series Industrial Display Installation and Debugging Guide
  • ADLINK GW-01 Industrial IoT Gateway Configuration and Debugging Guide
  • EURESYS Grablink Collection Card Selection and Trigger Configuration Guide
  • ADLINK Express HL Module Selection and Heat Dissipation Configuration Guide
  • ADLINK EOS-2000 Visual System Installation and Troubleshooting
  • ADLINK EOS-1200 Installation, Configuration, and Troubleshooting
  • Application and Configuration of ADLINK ECS-8582-4S Extension System
  • ADLINK DIN-814P-A4 Panasonic servo adapter board configuration
  • ADLINK DIN-814M-J3A Mitsubishi servo adapter board configuration
  • ADLINK DIN-814-GP Universal Adapter Board Configuration
  • Application and Configuration of ADLINK DIN-812M Adapter Board
  • Application and Configuration of ADLINK DIN-814Y Adapter Board
  • ADLINK DAQ/DAQE/PXI-250x waveform generation complete guide
  • ADLINK DAQ/DAQE/PXI-220x acquisition card fully configured
  • Application and Configuration of ADLINK cPCI-9116 Data Acquisition Card
  • ADLINK cPCI/PCI-8554/R: A Complete Guide from Architecture to Application
  • ADLINK cPCI-7432/7433/7434 isolated I/O card
  • ADLINK cPCI-3544/3534/3538 Serial Cardcard Configuration Practice
  • ADLINK cPCI-3534/3538/3544 Multi Serial Port Card Configuration Complete Solution