Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IS200EXAMG1A INSPECTION MARK VI CARD
    ❤ Add to collection
  • GE IS200EXAMG1A INSPECTION MARK VI CARD

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IS200EXAMG1A INSPECTION MARK VI CARD

    • ¥22500.00
      ¥24520.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:4.900KG
    • Quantity:
    • (Inventory: 36)
Description

GE IS200EXAMG1A INSPECTION MARK VI CARD


GE IS200EXAMG1A INSPECTION MARK VI CARD

Part Number IS200EXAMG1A Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series EX 2100e Function Module Availability In StockIS200EXAMG1A is an Exciter Attenuation Module developed by GE under the Mark VI series. The ground detection system for the EX2100 Excitation Control is provided by the Exciter Attenuation Module IS200EXAM (EXAM) in conjunction with the Exciter Ground Detector Module IS200EGDM (EGDM). The EXAM is housed in the auxiliary cabinet's High Voltage Interface (HVI) module. 

It attenuates the field bus and the EGDM by sensing high voltage from the bridge and scaling it to a usable level. The Exciter Power Backplane IS200EPBP connects the EXAM and EGDM(s) (EPBP). The EXAM and the EPBP are linked by a single 9-pin cable. The EGDMs connect to the EPBP via a 96-pin connector, P2. For simplex and triple modular redundant (TMR) applications, only one EXAM is required, and the interconnection is the same. IS200EXAMG1A Functional Description In some EX2100 models, the EXAM board interfaces with the exciter/regulator options board (EROC) rather than the EGDM board. EROC and EGDM have the same ground detector functionality. The Digital Signal Processor Control Board provides computational power for the EX2100 ground detector (DSPX). The EXAM board is also used in the PGDM standalone simplex ground detector product. 

The PGDM employs interface boards BGTB and BFGD, as well as a processor board BPPB. These boards perform similarly to the EX2100-based boards. The bus voltage is distributed across the attenuation resistors (RA1 - RA4) and sense resistors when the field ground test is enabled (Rx, Ry, Rz). The test has a time limit of 10 seconds. When an alternating current bus is dead short to the ground, the entire bus voltage is present across a single section of the attenuation resistors. A fault is generated in the event of a dead short, and the exciter is shut down within 10 seconds. The EGDM controls the activation of the field ground test and master selection. The EGDM is in charge of a relay on the EXAM. The relay has a 24 V dc coil with diode suppression and operates on less than 20 mA. The relay is de-energized in its default state and feeds back to the M1 section in the TMR control, or to the only control in a simple application. 

An activated relay will feed back to the TMR control's M2 section. Application Data There are no test points, fuses, or LED indicators on the EXAM module. Two plug connectors, two stab-on connectors, a ground connection terminal, and three adjustable jumpers are included in the module: Connector J2 is a 9-pin D connector for the test signal, relay control, and leakage current. Connector J1 is a three-pin locking connector for the cable to the field flashing relay auxiliary contact. Stab-on connectors E1 and E2 connect the field bus voltages to the attenuator module. Terminal TB1 connects the EXAM board shield ground to the chassis ground in the cabinet. IS200EXAMG1A Board Replacement To replace the EXAM module in an EX2100, follow the procedure: Ensure that the exciter has been deactivated. 

(For complete de-energizing procedures, refer to the EX2100 Installation and Startup Guide, GEH-6631, and follow all local lock-out/tag-out practices.) Open the auxiliary cabinet door and, using high-voltage equipment, test any electrical circuits before touching them to ensure that power is turned off. Disconnect all cables from the EXAM board with care as follows: To facilitate reconnection, ensure that all cables are labeled with the correct connector name (as marked on the board). 

Unplug the two stab-on connectors, J1 and J2, as well as the wire to TB1. Carefully remove the board from the Glastic bracket by unseating it from the mounting pins. Verify that the jumpers JP1 JP3 on the new EXAM module are correctly set, as they were on the original board. Firmly secure the replacement board to the plastic bracket. Reconnect and tighten the cables that were disconnected in step 3. Close the door to the auxiliary cabinet.

OTHER INFORMATION

• Available with either the 1.1 GHz, 1.6 GHz or 1.8 GHz  Pentium® M processor  

• 1.4 GHz Pentium M processor coming soon  

• Up to 2 Mbyte of advanced L2 cache  

• Up to 1.5 Gbyte DDR SDRAM  

• Up to 2 Gbyte bootable CompactFlash on secondary IDE (see  ordering options)  

• Internal SVGA and DVI controller  

• Serial ATA support through P2 rear I/O  

• 400 MHz system bus via Intel® 855GME chipset  

• Ethernet controller supporting 10BaseT and 100BaseTX  through the front panel  

• Gigabit Ethernet controller supporting 10BaseT, 100BaseTX  and 1000BaseT interface with optional VITA 31.1 support  

• Four asynchronous 16550 compatible serial ports  

• Four Universal Serial Bus (USB) Rev. 2.0 connections, two on  the front panel and two rear I/O  

• PMC expansion site (PCI-X, 66 MHz)  

• 32 Kbyte of nonvolatile SRAM  

• Operating system support for Windows® XP, Windows 2000,  VxWorks®, QNX® , LynxOS® and Linux


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • SIGMATEK TAE1941 Display Unit Replacement and Troubleshooting
  • SIGMATEK TAE151 Replacement and Troubleshooting
  • SIGMATEK AKM Servo Motor Replacement and Troubleshooting Guide
  • SIGMATEK S-DIAS Control System Replacement and Upgrade Guide
  • SIGMATEK ETT Series HMI Replacement and Selection Guide
  • SIGMATEK DIAS Drive 310-23 servo amplifier
  • SIGMATEK CCP 521 C-DIAS processor module
  • Megmeet L6 electric drive troubleshooting
  • Sysmex XN-1000/2000 Technical Guide
  • Sysmex XN-L blood analyzer maintenance and troubleshooting
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting
  • KUKA KR AGILUS-3 ultra maintenance troubleshooting
  • KUKA KR 300 R2700-2 C-F maintenance troubleshooting
  • KUKA KR 20 R1820-2 E Maintenance Troubleshooting and Replacement Practice
  • KUKA AGILUS-3 troubleshooting
  • KUKA KR AGILUS-2 maintenance troubleshooting
  • KUKA KR 1000 titan PA troubleshooting
  • KUKA KR 700 PA maintenance troubleshooting
  • KUKA KR18 R1450-3 PP Operation and Maintenance Essentials
  • KUKA KR12 SCARA Operations Essentials
  • KUKA KR4 R600 Operation and Maintenance Essentials
  • KUKA KR 3 AGILUS Operation and Maintenance Safety Essentials
  • KUKA LBR iiwa CR Cleanroom Troubleshooting and Maintenance
  • Troubleshooting and Maintenance of KUKA KR AGILUS sixx
  • KUKA KR60 SCARA CS Maintenance Guide
  • KUKA KR 23 SCARA-2 Robot Installation and Maintenance Detailed Explanation
  • KUKA KR 20 SCARA CS Robot Selection and Maintenance Guide
  • KUKA KR 15 DELTA-2 Robot Installation and Maintenance
  • KUKA KR 13 SCARA-2 CS Detailed Explanation
  • KUKA KR 3 D1200 Robot Operation and Maintenance
  • KUKA KR 3 D1200 HM Robot Operation and Maintenance Guide
  • KUKA LBR Med Medical Robot Integration Guide
  • KUKA iiwa Robot Safety Operation and Maintenance
  • KUKA LBR iiwa CR Operations and Troubleshooting
  • Lauer PCS Series Operation Console Configuration Guide
  • Installation and Maintenance Guide for KUKA LBR iisy Series Collaborative Robots
  • KUKA LBR iisy 3 R760 Collaborative Robot Debugging Guide
  • KUKA LBR iico Robot Installation and Debugging Technical Guide
  • Lauer Starline LCA 300/320/325 Text Display Application Guide
  • Lauer PCS 950 Operation Console Application Guide
  • Lauer EPC series industrial computer configuration
  • Bonfiglioli Precision Planetary Gearbox Selection and Application Guide
  • Installation and heat dissipation of Bonfiglioli Vectron cold plate frequency converter
  • Bonfiglioli Vectron EM-RES-02 Expansion Module Installation and Configuration Guide
  • Bonfiglioli Vectron EM-RES-01 Expansion Module Rotary Transformer Interface Configuration Guide
  • Bonfiglioli Vectron EM-IO-04 module KTY temperature measurement and digital port configuration
  • Bonfiglioli Vectron EM-IO-03 Expansion Module Dual Analog Output and PTC Configuration
  • Installation of Bonfiglioli Vectron EM-IO-02 Expansion Module and PTC Temperature Monitoring Configuration
  • Bonfiglioli Vectron EM-IO-01 Expansion Module Installation and System Bus Configuration Guide
  • Bonfiglioli F series gearbox spare parts identification and replacement guide
  • Installation, maintenance, and troubleshooting of Bonfiglioli HF series reducers for hoisting applications
  • Bonfiglioli 300 series reducer installation, maintenance, and troubleshooting guide
  • Selection and integration guide for Bonfiglioli R3 series planetary gearboxes in primary crushing equipment
  • Bonfiglioli C-series ATEX gearbox selection and explosion-proof application guide
  • Bonfiglioli Vectron EM-ENC-05 Full Function Expansion Module Integration Guide
  • Bonfiglioli Vectron EM-ENC-04 Multi functional Expansion Module Complete Configuration Guide
  • Bonfiglioli Vectron EM-ENC-03 Second Encoder Interface and System Bus Expansion Guide
  • Bonfiglioli Vectron EM-ENC-02 Expansion Module Integration and Encoder Interface Guide
  • Bonfiglioli Vectron CM-CAN CANopen Communication Configuration and DS402 Control Guide
  • Bonfiglioli Vectron EM-SYS System Bus Networking and Virtual Link Configuration Guide
  • Bonfiglioli Vectron CM-PDP Profibus DP Configuration and Debugging Guide
  • Bonfiglioli Vectron CM-232/485 Modbus Communication Configuration Guide
  • Bonfiglioli BMS series servo reduction motor selection and integration guide
  • Bonfiglioli ACTION 210/410 Inverter Debugging and Fault Diagnosis Complete Guide
  • Honeywell Enhanced Micro TDC 3000X System Redundancy Architecture and Maintenance Guide
  • Selection and Configuration of Bonfiglioli Active Series Inverter
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli HDP/HDO Series Heavy duty Gearboxes
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli 300/300M Series Gearboxes
  • Bonfiglioli 300M planetary gearbox selection and thermal verification guide
  • Bonfiglioli 3/H series heavy-duty gearbox selection and verification guide
  • Bonfiglioli KRG/KCG/KSD Hydraulic Coupling Selection and Integration Guide