Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:
  • GE IS200VTURG1B Turbine Specific Primary Trip Board
    ❤ Add to collection
  • GE IS200VTURG1B Turbine Specific Primary Trip Board

    110V-380V
    5W-130W
    1A-30A
    1 year
    30
    United States, France, Japan, Viet Nam, Australia, Russia, Germany, Italy, Arabia

    GE IS200VTURG1B Turbine Specific Primary Trip Board

    • ¥18445.46
      ¥19554.26
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:1.500KG
    • Quantity:
    • (Inventory: 45)
Description

GE IS200VTURG1B Turbine Specific Primary Trip Board


GE IS200VTURG1B Turbine Specific Primary Trip Board

Part Number IS200VTURG1B Manufacturer General Electric Country of Manufacture As Per GE Manufacturing Policy Series Mark VI/VIe Function Module Availability In StockIS200VTURG1B is a turbine specific primary trip board developed by GE. It is a part of Mark VI control system. It employs four passive pulse rate devices to accurately measure the speed of the turbine. These measurements are transmitted to the controller, which utilizes this data to generate the primary overspeed trip signal. 

This overspeed trip mechanism acts as a crucial safety feature, ensuring that the turbine does not exceed safe operational speeds, thereby preventing potential damage or catastrophic failure. FEATURES Generator Synchronization and Breaker Closure: Additionally, it facilitates the automatic synchronization of the generator.Once synchronization is achieved, it coordinates the closure of the main breaker, allowing the generated power to be efficiently transmitted through the electrical system. Monitoring Shaft Voltage and Current: Equipped to monitor the induced voltage and current on the turbine shaft. This monitoring capability is vital for detecting any irregularities or abnormalities in the turbine's operation, enabling timely intervention to prevent damage or malfunction. Flame Detection: In gas turbine applications, oversees the operation of eight Geiger Mueller flame detectors. 

These detectors, connected to the TRPG, are supplied with 335 V DC and 0.5 mA from an external source. The function of these detectors is to detect the presence or absence of flames within the turbine, providing critical information for maintaining safe combustion processes. Overspeed Trip Control: Controlling the primary overspeed trip relays on the TRPG terminal board. It generates the trip signal based on the turbine speed measurements and other relevant parameters. This trip signal is then transmitted to the TRPG, initiating the activation of emergency solenoids to trigger the turbine overspeed trip. 

Notably, it can receive overspeed trip signals from both itself and VPRO, providing redundancy and enhancing system reliability. Interface with Electrical Trip Devices (ETD): Within the TRPG, nine magnetic relays interface with three trip solenoids, collectively known as Electrical Trip Devices (ETD). These relays, nine in total for Triple Modular Redundancy (TMR) systems and three for simplex systems, serve to ensure the reliable operation of the trip mechanisms. By coordinating with VTUR and other components, the ETDs play a crucial role in swiftly and effectively executing turbine shutdown procedures in response to critical events like overspeed conditions. 

INSTALLATION Power Down the VME Processor Rack:Prior to installation, it's crucial to power down the VME processor rack to prevent any electrical interference or potential damage to the components. This step involves safely shutting down any associated systems and disconnecting power sources to the VME rack to ensure a secure installation environment. Slide in the Board: With the VME processor rack powered down, the next step is to carefully slide the board into the designated slot within the rack. Precision is key during this process to align the board correctly with the slot and ensure a proper fit. Once the board is positioned correctly, apply gentle pressure to push the top and bottom levers in with your hands. 

This action secures the edge connectors of the board firmly in place within the slot, establishing electrical connectivity with the rack and other components. Secure with Captive Screws:After seating the board in the slot, the final step is to secure it in position by tightening the captive screws located at the top and bottom of the front panel.Captive screws are designed to remain attached to the panel even when loosened, simplifying the installation process and reducing the risk of misplaced hardware. Tightening these screws ensures that the board remains securely fastened within the rack, minimizing the potential for displacement or instability during operation. 

 FAST OVERSPEED TRIP PR_Single: This algorithm utilizes redundant VTUR packs, distributing the workload across two separate boards. Each redundant PR (Pulse Rate) transducer is assigned to one board, ensuring redundancy and enhancing reliability. PR_Single is the preferred algorithm for LM (Land and Marine) gas turbines, offering a robust overspeed protection mechanism tailored to the specific requirements of these turbines. PR_Max: In contrast to PR_Single, PR_Max utilizes a single VTUR pack connected to two redundant PR transducers. This configuration allows for broken shaft detection and deceleration protection while mitigating the risk of nuisance trips in the event of transducer failure. PR_Max offers a balanced approach, combining effective overspeed protection with enhanced fault tolerance, thereby ensuring the uninterrupted operation of the turbine under diverse operating conditions.

SPECIFICATIONS

Part No.: IS200VTURG1B
Manufacturer: General Electric
Country of Manufacture: United States of America (USA)
MPU pulse rate range 2 Hz to 20 kHz
MPU pulse rate accuracy 0.05 percent
MPU input circuit sensitivity 27 mV pk
Flame detectors: 8 per VTUR
Temperature rating: 0 to 60 oC
Product Type: turbine specific primary trip board
Availability: In Stock
Series: Mark VI


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information
  • SIGMATEK TAE1941 Display Unit Replacement and Troubleshooting
  • SIGMATEK TAE151 Replacement and Troubleshooting
  • SIGMATEK AKM Servo Motor Replacement and Troubleshooting Guide
  • SIGMATEK S-DIAS Control System Replacement and Upgrade Guide
  • SIGMATEK ETT Series HMI Replacement and Selection Guide
  • SIGMATEK DIAS Drive 310-23 servo amplifier
  • SIGMATEK CCP 521 C-DIAS processor module
  • Megmeet L6 electric drive troubleshooting
  • Sysmex XN-1000/2000 Technical Guide
  • Sysmex XN-L blood analyzer maintenance and troubleshooting
  • Troubleshooting and Maintenance of Sysmex XN-9000
  • LTI Motion ServoOne PROFIBUS/PROFINET Troubleshooting and Replacement
  • Micro Innovation MICRO GF1 Touch Screen Troubleshooting and Replacement
  • Troubleshooting and Replacement of Micro Innovation WINbloc Distributed I/O System
  • MICRO PANEL GS-2 Troubleshooting and Debugging
  • LTi Synchronous Motor LST/LSH Replacement Selection Guide
  • Fault diagnosis of LTi CDE/CDB3000
  • Maintenance and troubleshooting of ENOTEC SILOTEC 8000 silo analyzer
  • ENOTEC ENSITU 7000 Oxygen Analyzer
  • ENOTEC COMTEC 6000 ATEX GasEx Analyzer Maintenance, Calibration, and Troubleshooting Guide
  • ENOTEC Analyzer Family Selection Guide
  • ENOTEC OXITEC 500E Oxygen Analyzer
  • KUKA KR CS Box-2 Compact Controller for Four Axis SCARA Robot
  • KUKA KR C5 slim-2 Robot Controller
  • KUKA KR C5 micro KSS troubleshooting
  • KUKA KR C5 micro debugging and troubleshooting
  • KUKA KR C5 Controller Assembly and Troubleshooting
  • KUKA KR C5 Cabinet Assembly and Troubleshooting
  • KUKA KR C4 Smallsize-2 Debugging Guide
  • KUKA KR C4 Midsize Assembly Guide
  • ENOTEC OXITEC 5000 Oxygen Analyzer Maintenance Guide
  • KUKA KR C4 extended assembly and debugging
  • KUKA KR C4 compact assembly and debugging
  • KUKA Sunrise Cabinet Med Medical Collaborative Robot Special Control Cabinet
  • KUKA Sunrise Cabinet Next Generation Small Control Cabinet
  • KUKA KR C4 Smallsize-2 family's smallest control cabinet
  • KUKA KR C4 Midsize Fault Diagnosis
  • KUKA KR C4 extended is a high-power multi axis control cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Control Cabinet
  • Troubleshooting and Maintenance of KUKA KR C4 Compact Control Cabinet
  • KUKA KR15 DELTA-2 V2 Robot Installation and Debugging
  • KUKA TITAN-2 Ultra Assembly and Maintenance Guide
  • KUKA KR SCARA-2 CS Assembly, Debugging, and Operation Guide
  • Troubleshooting KUKA SCARA X
  • Troubleshooting of KUKA KR FORTEC-2 ultra
  • Troubleshooting of KUKA KR FORTEC-2
  • Troubleshooting KUKA KR 1000 Titan
  • Troubleshooting of KUKA KR 600 FORTEC
  • KUKA KR 500 MT FORTEC Maintenance and Inspection
  • KUKA KR 360 FORTEC Inspection and Maintenance Guide
  • Troubleshooting KUKA Sunrise Cabinet Med
  • KUKA KR SCARA HO Assembly and Maintenance
  • KUKA QUANTEC-2 PA maintenance troubleshooting
  • KUKA QUANTEC-2 K/P Maintenance Troubleshooting Guide
  • KUKA QUANTEC-2 HO Maintenance Guide
  • KUKA KR QUANTEC-2 HC Maintenance and Rescue Guide
  • KUKA KR QUANTEC-2 Maintenance Troubleshooting Guide
  • KUKA KR QUANTEC PA series heavy-duty palletizing robot
  • KUKA KR IONTEC-2 Debugging and Maintenance Guide
  • KUKA KR IONTEC ultra series six axis heavy-duty industrial robot
  • KUKA KR IONTEC HO Maintenance Troubleshooting Guide
  • KUKA KR CYBERTECH-3 HW maintenance troubleshooting
  • KUKA KR CYBERTECH-3 maintenance troubleshooting
  • KUKA KR8 R2100-2 arc HW maintenance troubleshooting
  • KUKA KR CYBERTECH nano-2 maintenance troubleshooting
  • KUKA KR 20 R1810 HO maintenance troubleshooting
  • KUKA CYBERTECH maintenance troubleshooting
  • KUKA KR CYBERTECH CR maintenance troubleshooting
  • KUKA KR AGILUS-3 ultra maintenance troubleshooting
  • KUKA KR 300 R2700-2 C-F maintenance troubleshooting
  • KUKA KR 20 R1820-2 E Maintenance Troubleshooting and Replacement Practice
  • KUKA AGILUS-3 troubleshooting
  • KUKA KR AGILUS-2 maintenance troubleshooting
  • KUKA KR 1000 titan PA troubleshooting
  • KUKA KR 700 PA maintenance troubleshooting
  • KUKA KR18 R1450-3 PP Operation and Maintenance Essentials
  • KUKA KR12 SCARA Operations Essentials
  • KUKA KR4 R600 Operation and Maintenance Essentials
  • KUKA KR 3 AGILUS Operation and Maintenance Safety Essentials
  • KUKA LBR iiwa CR Cleanroom Troubleshooting and Maintenance
  • Troubleshooting and Maintenance of KUKA KR AGILUS sixx
  • KUKA KR60 SCARA CS Maintenance Guide
  • KUKA KR 23 SCARA-2 Robot Installation and Maintenance Detailed Explanation
  • KUKA KR 20 SCARA CS Robot Selection and Maintenance Guide
  • KUKA KR 15 DELTA-2 Robot Installation and Maintenance
  • KUKA KR 13 SCARA-2 CS Detailed Explanation
  • KUKA KR 3 D1200 Robot Operation and Maintenance
  • KUKA KR 3 D1200 HM Robot Operation and Maintenance Guide
  • KUKA LBR Med Medical Robot Integration Guide
  • KUKA iiwa Robot Safety Operation and Maintenance
  • KUKA LBR iiwa CR Operations and Troubleshooting
  • Lauer PCS Series Operation Console Configuration Guide
  • Installation and Maintenance Guide for KUKA LBR iisy Series Collaborative Robots
  • KUKA LBR iisy 3 R760 Collaborative Robot Debugging Guide
  • KUKA LBR iico Robot Installation and Debugging Technical Guide
  • Lauer Starline LCA 300/320/325 Text Display Application Guide
  • Lauer PCS 950 Operation Console Application Guide
  • Lauer EPC series industrial computer configuration
  • Bonfiglioli Precision Planetary Gearbox Selection and Application Guide
  • Installation and heat dissipation of Bonfiglioli Vectron cold plate frequency converter
  • Bonfiglioli Vectron EM-RES-02 Expansion Module Installation and Configuration Guide
  • Bonfiglioli Vectron EM-RES-01 Expansion Module Rotary Transformer Interface Configuration Guide
  • Bonfiglioli Vectron EM-IO-04 module KTY temperature measurement and digital port configuration
  • Bonfiglioli Vectron EM-IO-03 Expansion Module Dual Analog Output and PTC Configuration
  • Installation of Bonfiglioli Vectron EM-IO-02 Expansion Module and PTC Temperature Monitoring Configuration
  • Bonfiglioli Vectron EM-IO-01 Expansion Module Installation and System Bus Configuration Guide
  • Bonfiglioli F series gearbox spare parts identification and replacement guide
  • Installation, maintenance, and troubleshooting of Bonfiglioli HF series reducers for hoisting applications
  • Bonfiglioli 300 series reducer installation, maintenance, and troubleshooting guide
  • Selection and integration guide for Bonfiglioli R3 series planetary gearboxes in primary crushing equipment
  • Bonfiglioli C-series ATEX gearbox selection and explosion-proof application guide
  • Bonfiglioli Vectron EM-ENC-05 Full Function Expansion Module Integration Guide
  • Bonfiglioli Vectron EM-ENC-04 Multi functional Expansion Module Complete Configuration Guide
  • Bonfiglioli Vectron EM-ENC-03 Second Encoder Interface and System Bus Expansion Guide
  • Bonfiglioli Vectron EM-ENC-02 Expansion Module Integration and Encoder Interface Guide
  • Bonfiglioli Vectron CM-CAN CANopen Communication Configuration and DS402 Control Guide
  • Bonfiglioli Vectron EM-SYS System Bus Networking and Virtual Link Configuration Guide
  • Bonfiglioli Vectron CM-PDP Profibus DP Configuration and Debugging Guide
  • Bonfiglioli Vectron CM-232/485 Modbus Communication Configuration Guide
  • Bonfiglioli BMS series servo reduction motor selection and integration guide
  • Bonfiglioli ACTION 210/410 Inverter Debugging and Fault Diagnosis Complete Guide
  • Honeywell Enhanced Micro TDC 3000X System Redundancy Architecture and Maintenance Guide
  • Selection and Configuration of Bonfiglioli Active Series Inverter
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli HDP/HDO Series Heavy duty Gearboxes
  • Installation, Maintenance, and Troubleshooting Guide for Bonfiglioli 300/300M Series Gearboxes
  • Bonfiglioli 300M planetary gearbox selection and thermal verification guide
  • Bonfiglioli 3/H series heavy-duty gearbox selection and verification guide
  • Bonfiglioli KRG/KCG/KSD Hydraulic Coupling Selection and Integration Guide