Thinking of China's green mine construction planning in the new era

F: | Au:佚名 | DA:2023-12-21 | 939 Br: | 🔊 点击朗读正文 ❚❚ | Share:

In 2017, the former Ministry of Land and Resources, together with the Ministry of Finance and other six ministries and commissions issued the "Implementation Opinions on Accelerating the construction of green mines" (Land Regulations [2017] No. 4, hereinafter referred to as "No. 4 Document"), marking the transformation of China's green mine construction from the "pilot exploration" stage to the "comprehensive promotion" stage, and the green mine has become the general consensus of the whole society on the future development of the mining industry. It has become an inevitable requirement and prerequisite for the high-quality development of mining industry.

In the face of the new situation, new stage and new requirements, whether to prepare a plan for enterprises to create green mines, and how to prepare a "useful" plan in combination with their own development needs have become a problem faced by many enterprises. This paper analyzes and discusses how to position, necessity, purpose, method and effective implementation of green mine construction planning, in order to further improve the theory and method system of green mine construction planning and provide guidance for enterprises to carry out green mine construction practice.

First, the necessity analysis of preparing green mine construction plan

From 2011 to 2014, China carried out four batches of 661 state-level green mine construction pilot work. Green mine construction and development plan is one of the "essential elements" for mining enterprises to apply for national pilot units, which is not only an action program for enterprises to carry out green mine creation, but also an important basis for the government to evaluate, examine and accept pilot enterprises. Simply put, green mine construction planning in the pilot stage has requirements.

In 2017, with the release of Document No. 4, the overall work organization promotion and management system have also been adjusted accordingly. Under the new situation, the green mine adopts a directory management model, that is, the process of national, provincial, city and county level joint creation → business owner construction → self-construction and self-evaluation → third-party evaluation → standard storage → social supervision. Specifically, in the comprehensive promotion stage, in accordance with the national reform requirements of streamlining administration and delegating power and reducing administrative approval items, the national level has not made uniform requirements for the preparation of green mine construction planning. Planning will not be regarded as a "warehousing" requirement, enterprises only need to submit a self-evaluation report, and then the government will entrust a third-party organization to conduct an evaluation in the way of purchasing services, and the evaluation can be included in the directory management (Figure 1).

Therefore, in the face of new situations and new requirements, whether enterprises prepare green mine construction plans can be determined according to the management needs of different regions and the needs of enterprises themselves. Due to management needs, the competent departments of natural resources in some regions clearly require the mining enterprises established in the region to prepare green mine construction plans. If the competent department of the local government does not make specific requirements, the enterprise can decide whether to prepare a plan according to its own basic situation and needs.

Specifically, some enterprises with relatively solid preliminary basic work can directly prepare the green mine construction self-assessment report in accordance with the requirements, and submit third-party assessment and storage applications to the government. Some enterprises with a relatively weak foundation can consider the preparation of green mine construction plans, and can also consider the preparation of green mine construction implementation plans. The difference between planning and program is that, from the perspective of content, planning is more overall, from the macro and overall grasp, both strategic level and tactical level; The implementation plan pays more attention to concrete, micro, relanding and operability. In terms of time scale, the planning can be combined with short and long term goals, 2-5 years, and long-term goals can be 5-10 years; The implementation plan is usually one to two years.

For new mines, "green" should be taken as one of the main considerations in the design review and project acceptance, so that "green" runs through the whole life cycle and radiates the whole value chain. "Green" should be fully reflected in the mineral resources development and utilization plan, mine geological environment protection and restoration and management plan, land reclamation plan, mining area environmental impact assessment, water and soil conservation plan, and achieve the full connection and integration of the five plans. For example, it is more meaningful to formulate the green mine construction plan at the beginning of construction, ensure green development from the source of mine planning, design and construction, and guide the whole process of green mine construction.

Second, the internal needs of enterprises to prepare green mine construction planning

Under the new situation, the green mine construction plan (program) is not only for "warehousing" and "listing" to facilitate government review, supervision and guidance management, but also the "action program" and "actual combat manual" for mining enterprises to carry out green mine construction, and is a key link and important guarantee to promote the development of mining enterprises along the road of green mining. From the recent research and local practice, many mining enterprises have realized that green mine construction is an inevitable choice for enterprises to fulfill their responsibilities, seek their own sustainable development, and actively adapt to the requirements of national ecological civilization and high-quality economic development, and there is a strong internal demand for green mine construction planning (or program).

2.1 Mining enterprises do not know enough about the concept and construction standards of green mines

Some mining enterprises think that green mines are green mines, to wear a green clothes to the mine, is to plant grass and fill pits, is a face project; Some enterprises regard green mines as a shield to deal with environmental protection inspections, and think that energy conservation and emission reduction can be done well. Everyone's understanding of the connotation of green mine construction is not in place, so as to cover all. From the perspective of specific construction requirements, green mine construction has developed from the nine basic conditions required in the pilot stage and the relatively qualitative and rough construction requirements of Document 4 to the sub-industry standard combining qualitative requirements and quantitative indicators, and the next step is more detailed evaluation index system, realizing the transformation of green mine construction from administrative promotion to standard guidance. However, some enterprises have insufficient knowledge and understanding of industry standards and how to meet them.

2.2 For the creation and declaration of green mines, mining enterprises do not know where to start

Green mine construction is a systematic project with strong professionalism and technology, which requires both macro-level policy grasp and micro-level technical support, including concepts and methods, engineering technology, norms and standards, system management and other levels. For most enterprises, especially small and medium-sized enterprises, affected by the limitations of information, profession, technology and talent, they can not rely on their own strength to complete. For the current advanced green process technology and equipment is not mastered, how to treat and use tailings and waste rock, how to treat slope, what measures to take to meet the industry standard is not very clear, the need for third-party institutions to participate in helping enterprises to improve awareness, sort out problems, system design, scientific planning. In view of the above problems, the green mine construction planning required by enterprises should have the following characteristics.

1) Operability of planning. Green mine construction planning should not only be "virtual", but also "pragmatic", in order to improve operability and landing, it must be supported by a number of projects or projects to truly help enterprises solve the outstanding problems faced by key links such as green mining, comprehensive utilization of resources, energy conservation and emission reduction, mining geological environment governance and restoration, and digital mine construction, so as to achieve green mine construction standards. It lays a foundation for the preparation of the enterprise self-evaluation report, successfully passes the third-party evaluation, and then "meets the standards for warehousing".

2) Strategic development of planning. According to the requirements of ecological civilization strategy, the ultimate goal of green mine construction is to promote the ecological mining industry. Yu Runcang, academician of the Chinese Academy of Engineering, once proposed that the construction of green mines should focus on the construction of ecological mining projects. The planning should adhere to industrial integration as the key direction of green mine construction, and promote the green transformation and upgrading of mining enterprises from a more long-term perspective. Especially for some large mines, the mining cycle is as long as several decades or even 100 years, it is necessary to plan in advance from the perspective of the entire production system and subsequent industrial development, innovate development approaches from the perspective of environmental reconstruction and industrial regeneration, and promote the integrated development of mining and the primary industry, the secondary industry and the tertiary industry. For example, Masteel Group, through the pilot exploration and planning implementation, starts the tailings aerated concrete block/gray sand brick project in terms of resource utilization, and builds a new model of "dual drive" with full utilization of associated resources and solid waste resources; In terms of industrial integration, based on the main mining industry, we will build a regional green ecological economic system with diversified development of comprehensive utilization industry, production technology service industry, modern agriculture, and characteristic industrial, mining and tourism, and create a new engine for green development.

Third, the preparation of green mine construction planning methods and suggestions

 The planner should have correct epistemology, values and methodology.

In terms of epistemology, it is necessary to change or even subvert the existing cognition of the production, operation and development law of the "mine", and use the "living body" to abstract and understand the mine. The "living body" of the mine has digestive, respiratory, circulation, nervous and other systems, and has the ability of learning, feedback, immunity, adaptation, repair and regeneration. If the green mine is compared to a person, it is to be a civilized person and a modern person, to have face (the mining environment is clean and reasonable layout), to have a good organ function, to achieve less input, more output, less emissions), and to have a brain (high IQ and EQ, digital mines and mines are harmonious).

In terms of values, it is necessary to guide the ideal goal of "symbiosis, co-prosperity, sharing, mutual benefit and co-governance" in the new era of ecological civilization, change the concept of "mineral resources" as a single tool value, establish the concept of "living body" of mines, and actively fulfill corporate social responsibilities. To promote the economic, ecological, environmental and social benefits of resource development and maximize the comprehensive benefits.

In terms of methodology, this paper puts forward the following suggestions from the two aspects of working method and planning concept.

3.1 Working method -- goal oriented + problem oriented

1) Find gaps against industry standards. At the end of June 2018, the Ministry of Natural Resources issued the green mine construction specifications for nine major industries in the form of Announcement No. 18, which is a milestone event in the development process of China's green mining industry, marking the transformation of China's green mine construction from "administrative promotion" to "standard guidance", and strengthening the self-discipline of the mining industry and accelerating the formation of a new pattern of green mine construction. It is of great significance to deepen the construction of ecological civilization in the mining industry and improve the ability of mining management. Green mine construction industry standards from mining environment (mine capacity and mine appearance, mining greening), resource development and utilization mode (green development, ecological environmental protection and restoration), comprehensive utilization of resources (co-associated resource utilization, solid waste utilization, mineral processing wastewater utilization), energy saving and emission reduction (energy saving and consumption reduction, pollutant discharge), scientific and technological innovation and digital mine, enterprise management and corporate image (Enterprise culture, enterprise management, enterprise integrity, enterprise harmony) put forward specific requirements, clear a series of qualitative and quantitative index requirements, green construction should be compared with industry standards for systematic analysis, shortcomings, strengths and weaknesses, at the same time can choose domestic and foreign benchmarking enterprises field research, learn from experience, expand ideas, learning methods. On the basis of benchmarking, planning should be problem-oriented, focus on the core links, determine priorities, and improve the pertinence and effectiveness of planning.

2) Overall planning and positioning. The green mine construction plan shall implement the national economic and social development plan, the overall plan of mineral resources and the green mining development plan of the region, take the enterprise construction and development plan or strategy as the guidance, and connect with the existing micro-level planning or program design of mine environmental protection and management, mining land reclamation and so on. Among them, the planning of different mines belonging to the same mining enterprise should fully reflect the characteristics; Different enterprises, but the same type of mines in the same area, have great similarities and can draw lessons from each other.

3) Use planning as a platform to gather force. Green mine construction is a systematic project, green mine construction planning involves a wide range of professional fields, many categories, large span, long chain, what kind of organization to choose is also a problem faced by many mining enterprises. More and more scientific research institutions or social organizations participate in the construction of green mines, but no matter what kind of institutions to prepare green mine construction planning, it is necessary to open the door to prepare planning, through planning to build a platform for communication and information sharing, one is to invite relevant experts to "pulse consultation", Such as mine design, mine restoration, digital mine construction and other technical experts, as well as familiar with local policy standards and requirements of management experts; The second is to encourage enterprise employees to offer suggestions, the most familiar with the problems of the enterprise is the mining enterprise employees, especially the relevant technical management personnel, to open the way, brainstorm.

3.2 Planning concept - Upper antenna + lower ground gas

The idea is the precursor of action. Green mine construction planning concept should not only connect the antenna, but also the ground gas.  Fully embodies "local adaptation, professional technology, economic feasibility, circular system and advanced consciousness".

3.2.1 Local conditions

Different regions, different scales, different production stages (new mines, production mines), different industries, different mining methods, facing different outstanding problems in green mine construction, environmental impact, capital requirements, technical means that should be taken are different. Therefore, in order to make a good plan, we must establish the concept of difference, according to the principle of adapting to local conditions and adapting to the time, one mine and one policy, according to the standard, and carry out targeted planning.

1) Different mining methods: The stripping project of open-pit mine has a large scope, and the construction focuses on solving the problems such as land destruction caused by the pressure of mining pit and external dump, geological disasters induced by the instability of open-pit slope, mining greening, dust suppression and so on. Underground mining mines are faced with problems such as ground collapse, ground cracks and destruction of underground aquifers. The planning focuses on filling mining, water retention mining or integration of mining, selection and charging.

2) Different regions: the terrain, geomorphology, climate and biological conditions around the mine are different, and the difficulty and application of technical modes are different in the mine environmental construction and geological environment restoration; In the warm and moist climate area of south China, the environmental restoration is less difficult, and the focus is on the protection and restoration of biological communities. The western and northern regions are more difficult. For example, Jinhui Mining in Qinghai Province is located in an ecologically fragile region on the plateau, exploring the cultivation of highland barley and other plants on the pulp of the dry beach of the tailings pond, and Dongming Mining in Hulunbuir is located in the east Arctic cold region, selecting and domesticating 26 kinds of seedlings suitable for growth in the cold region.

3) Different scales: Large mines have obvious advantages in team, technology, capital and management, while small mines are at a disadvantage. Large and medium-sized mines should pay attention to comprehensive construction of green mines, not only pay attention to overall resource benefits and environmental benefits, but also pay attention to scientific and technological innovation, personnel training, system construction and other capacity building as well as related ecological industry development, while small mines should focus on environmental restoration standards. Combine their own characteristics to solve specific problems.

4) Different stages: New mines are "incremental planning" mode, equivalent to painting on a blank sheet of paper, to pay attention to systematic and forward-looking; Production mines need to adopt the "stock planning" model, the core is to optimize and upgrade the existing production technology and equipment, economic model.

3.2.1 Local conditions

Different regions, different scales, different production stages (new mines, production mines), different industries, different mining methods, facing different outstanding problems in green mine construction, environmental impact, capital requirements, technical means that should be taken are different. Therefore, in order to make a good plan, we must establish the concept of difference, according to the principle of adapting to local conditions and adapting to the time, one mine and one policy, according to the standard, and carry out targeted planning.

1) Different mining methods: The stripping project of open-pit mine has a large scope, and the construction focuses on solving the problems such as land destruction caused by the pressure of mining pit and external dump, geological disasters induced by the instability of open-pit slope, mining greening, dust suppression and so on. Underground mining mines are faced with problems such as ground collapse, ground cracks and destruction of underground aquifers. The planning focuses on filling mining, water retention mining or integration of mining, selection and charging.

2) Different regions: the terrain, geomorphology, climate and biological conditions around the mine are different, and the difficulty and application of technical modes are different in the mine environmental construction and geological environment restoration; In the warm and moist climate area of south China, the environmental restoration is less difficult, and the focus is on the protection and restoration of biological communities. The western and northern regions are more difficult. For example, Jinhui Mining in Qinghai Province is located in an ecologically fragile region on the plateau, exploring the cultivation of highland barley and other plants on the pulp of the dry beach of the tailings pond, and Dongming Mining in Hulunbuir is located in the east Arctic cold region, selecting and domesticating 26 kinds of seedlings suitable for growth in the cold region.

3) Different scales: Large mines have obvious advantages in team, technology, capital and management, while small mines are at a disadvantage. Large and medium-sized mines should pay attention to comprehensive construction of green mines, not only pay attention to overall resource benefits and environmental benefits, but also pay attention to scientific and technological innovation, personnel training, system construction and other capacity building as well as related ecological industry development, while small mines should focus on environmental restoration standards. Combine their own characteristics to solve specific problems.

4) Different stages: New mines are "incremental planning" mode, equivalent to painting on a blank sheet of paper, to pay attention to systematic and forward-looking; Production mines need to adopt the "stock planning" model, the core is to optimize and upgrade the existing production technology and equipment, economic model.

3.2.2 Professional and technical

Green mine construction reflects the professional and technical requirements of many fields and disciplines, and has cross-border and integration. It is necessary to fully realize the important role of scientific and technological innovation driving in the construction of green mines.  It is necessary to fully realize that green mining and green mining are not only the application of high and new technology, but also the "source" of green new technology. The green mine construction industry standard puts forward specific qualitative and quantitative requirements for technological innovation from the aspects of innovation system construction, personnel training, key technology research and development, scientific research capital investment, and scientific and technological achievements transformation. In the preparation of the plan, it is necessary to attract relevant professional and technical experts to participate in the preparation of the plan, and more importantly, it is necessary to put forward effective and feasible concrete measures from the aspects of releasing the momentum of scientific and technological innovation and giving play to the drive of scientific and technological innovation.

3.2.3 Economic feasibility

Green mine construction should be considered from the economic dimension. From the green mine construction experience, the production mine after green upgrading and transformation, its total industrial output value and comprehensive utilization output value will be greatly increased, green mine construction is a short-term investment, long-term benefit. For example, Qinghai Duran Jinhui Mining Company, 90% of the annual profits from green mine construction, with their own practical actions to prove to all sectors of society: the development of green mining, the construction of green mines not only do not suffer losses, but also considerable profits. But in the short term, the construction of "green mine" needs to invest a certain amount of funds. At present, the mining industry situation is depressed, mining enterprises have a certain survival pressure, we must scientifically evaluate the reasonable cost of "green mine" construction, find a meeting point, not only to ensure the survival of enterprises but also to promote the transformation of green development of enterprises.

In the planning, the first is to carry out input-output analysis and overall budget for the projects and projects to be carried out, and make overall arrangements in time series according to the priorities; Second, for some small mines or old mines, research and introduction of "advanced applicable technology" that ADAPTS to the economic conditions and development stage of the mine, and promote the transformation and upgrading of process technology and equipment, rather than unbearable "luxury technology"; Third, while clarifying the development direction of comprehensive utilization of resources and circular economy, fully study the market, and consider improving resource and environmental benefits at the same time, there must be a certain economic benefit output as the premise. For example, Chengde vanadium titanium magnetite tailings have stable performance and high strength, which can meet the performance requirements of concrete aggregates, and can provide sufficient and lasting resource guarantee for Beijing green sand and gravel. In some mines with the same resource conditions, but the location conditions and market demand conditions are not very superior, the tailings sand making project is not economically feasible to a certain extent.

3.2.4 Circulatory system

The construction of green mine is a systematic project, and the construction of green mine is to build the circular economy of mine. The construction of green mine should change the mining enterprises from a single mining mode to a diversified, comprehensive resource development and utilization industry chain development mode. First, it is necessary to establish the concept of circular economy, considering the strengthening of green mining, comprehensive utilization of resources, mining geological environment management +, coupling between multiple production systems or links, so that material and energy multi-level utilization, waste resources and products, waste heat and waste gas energy, forming a multi-level closed-circuit cycle without waste and pollution-free industrial system; Second, it is necessary to establish the concept of comprehensive regulation of "mountains, rivers, forests, fields, lakes and grasses", change the previous narrow concept of land reclamation in mining areas, and through the process of "geomorphic remodeling, soil reconstruction, vegetation reconstruction, landscape reproduction, biodiversity reorganization and protection" from the perspective of "mountains, rivers, forests, fields, lakes and grasses" life community. To realize the "overall protection, systematic restoration and comprehensive management" of the ecological environment in the mining area and the surrounding area.

3.2.5 Advanced consciousness

As a planner, it is necessary to be forward-looking and innovative in thinking, and make suggestions for the development of mines from a more macro vision and a longer time scale. For example, for new mines, based on the circular economy model from the source, develop technical routes and measures to control interference and damage, strengthen the comprehensive utilization of resources and waste resources, and strive to achieve "no waste" mining without building tailings ponds, no waste rock yards, and no substandard wastewater discharged. For example, the Dawudian graphite mine in Inner Mongolia, in accordance with the concept of green development, in the mine design stage, based on the advantage of "one mine and three resources", to create a green mine of the whole industrial chain, in addition to the development and utilization of main mineral graphite resources, the development of new materials such as high-purity graphite and graphene industries, but also make full use of surrounding rock to develop stone industries such as microcrystalline building materials. Development of assembly building materials industry by using tailings to make foamed ceramics. For open-pit mines that are about to be closed, industrial implantation can be considered while doing a good job in the restoration and management of the mine geological environment. If there are many ways to use abandoned mines at present, + agriculture, cultivation or animal husbandry or aquaculture; + Ecological industries to form reservoirs or wetlands; + Tourism and entertainment, forming mine park, mine hotel; + Social services or other emerging industries, the formation of landfill or photovoltaic power generation, according to the mine's own conditions, regional natural environmental conditions, traffic conditions, distance from the city, local cultural environment, etc., combined with the actual planning to give directional suggestions.

Fourth, formulate green mine construction planning safeguard measures

1) Strengthen organizational, financial and technical support. Qualified mines should set up a special green mine construction leading group and office, coordinate the relevant work, improve the green mine management system, responsibility system, clear the schedule of planning and implementation, road map, responsible person. The construction of green mines will be included in the production cost budget of enterprises, and actively expand funding channels, strive for green credit and other support, and ensure that the project and project funds are raised and used in place. Strengthen cooperation with universities and research institutes to provide technical support and guarantee for the construction of green mines.

2) Strengthen deployment assessment and follow-up evaluation. Combine the green mine construction planning and implementation with the overall deployment of mine development and production and operation, improve and improve the planning implementation organization and management system, build a driving system with green performance as the core, combine the planning objectives with the annual objectives of mine production assessment and management, and consolidate layer by layer. We will strengthen follow-up and evaluation of the implementation of the plan and correct problems in a timely manner.

3) Strengthen publicity training and local guidance. Thought is the forerunner of action, and concept is the key to success or failure. Enterprises should strengthen the promotion and guidance of green mine concept and policy, improve every employee's awareness of ecological civilization and green development concept, let everyone know what is green mine, and take the initiative to participate in green mine construction, local governments and competent departments should also strengthen work guidance, and summarize the best practice of green mine construction that can be promoted and replicated.


  • Woodward Micronet 5453-279 Rev E Chassis Rack for TMR Control
  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module
  • Alcatel-Lucent MDEE DPB11 Part 109773580 – Digital Processing Board
  • Alcatel 3EH76027ADAD OmniPCX Enterprise Communication Server R500/30.4
  • Alcatel-Lucent 3EH73084AEJD Gateway Driver Board GD-3 – Communication Interface
  • Alcatel-Lucent 9500-MPR ODU Radio MPT-HC V2 3DB20476BAAB04 23 GHz Microwave Outdoor Unit
  • Alcatel-Lucent 9396 Digital 2U NodeB Indoor – UMTS Base Station
  • Alcatel-Lucent 3HE03607AA CFM-XP Control Fabric Module – Switch Fabric Controller
  • Alcatel-Lucent 8232 DECT Mobile Handset – Cordless Enterprise Phone
  • Alcatel-Lucent 244-2082-201 Sierra NAC V3.1 Slave Package – Network Access Control
  • Alcatel-Lucent 408154912 CPU Rear I/O Pack Card – Backplane Interface Module
  • Alcatel-Lucent 3AL82037ADAA SFP Module
  • Alcatel-Lucent OMQ 408645968 Optical Module
  • Alcatel-Lucent 9500 MPR 8-Slot Shelf 3DB18485AB
  • Alcatel-Lucent 408154904 CPU I/O Card
  • Alcatel-Annecy 5150 CP Turbo Vacuum Pump
  • Alcatel-Lucent 3EH73084AEJD08 Card
  • Alcatel-Lucent 3EH73050ABAB Interface Card
  • Alcatel-Lucent 3HE06151ABAA01 SFP Line Card
  • Alcatel-Lucent 8DG59242AD Power Filter
  • Alcatel-Lucent IMM48-1GB-TX 48-Port Module
  • Alcatel Lucent 3CM03285MQ02 Module
  • Alcatel 3HE07158BA 7750 SR-12 IMM-2PCA-FP3 Optical Transceiver
  • Alcatel-Lucent 9396 Digital 2U NodeB Outdoor with Indoor Mainframe and Alarm Module
  • Alcatel Lucent MPX-16/64-T-L3 MPX1664TL3 Multiplexer Module
  • Alcatel Lucent 3EH73052AB Power Supply Module
  • Alcatel Lucent ASM2-155FM-2W-4C ASM2155FM2W4C Switch Fabric Module
  • Alcatel Lucent 3AL00124ABAB Interface Card
  • Alcatel-Lucent 1AB429380001 Cable Assembly
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA53065AA
  • Alcatel-Lucent 9500-MPR 11GHz MPT-HC ODU Microwave Packet Radio 3DB20371ACAA01
  • Alcatel-Lucent RRH1900-4x45 Remote Radio Head
  • Alcatel-Lucent 3HE00028AA Ethernet Line Card
  • Alcatel-Lucent 3HE04939CE CWDM SFP Transceiver
  • Nokia Alcatel-Lucent 3FE66546AA Fan Module
  • Alcatel-Lucent SSP-6 Speech Signal Processor Board
  • Alcatel-Lucent 500-1113-212 Channel Bank Assembly
  • Alcatel-Lucent EZ32-2 Board 3BA23265ADKE 01
  • Alcatel-Lucent GSM-FM-2W-4C Filter Module
  • Alcatel-Lucent 3AL00378AF Interface Card
  • Alcatel-Lucent 3AL00124ABAC Interface Module
  • Alcatel-Lucent BJB1 PWPQALGAAG 48V Independent Microprocessor Board
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8506-4 with 13 Modules
  • Alcatel Lucent 3AL00424AA Interface Card
  • Alcatel Lucent 3BA73012AB Power Supply Module
  • Alcatel Lucent ESX-100C-32W ESX100C32W Power Supply Module
  • Alcatel Lucent GSX-K-FM-2W GSXKFM2W Fan Module
  • Alcatel 8DG59247AA Optical Protection Switch Card
  • Alcatel Lucent 91-E03100-B 91E03100B Interface Module
  • Alcatel Lucent FSX-FM-1W FSXFM1W Fan Module
  • Alcatel Lucent RRH2X40-07L-AT Remote Radio Head
  • Alcatel-Lucent 9500-MPR MSS-8 Shelf 3DB18485CA
  • Alcatel Annecy ACP20 Vacuum Pump CP20
  • Alcatel-Lucent 9500 MPR P32E1DS1 E1 PDH Card
  • Alcatel-Lucent J98726AL-2 D4OI210DAA Module
  • Alcatel 409113651 RRH700L1 700MHz Remote Radio Head
  • Alcatel io2 3ba23050 PCB Card
  • Alcatel-Lucent MDR-8000 MDR-8706-8 Digital Radio
  • Alcatel-Lucent ACT2300M Turbo Pump Controller AF042134A
  • Alcatel-Lucent OmniPCX Office Medium PowerCPU PRA-TI
  • Alcatel-Lucent 9500 MPR 23GHz ODU 3DB23045HDAA01
  • Alcatel-Lucent 9500 MPR ODU Outdoor Unit 300 11GHz TX Low HP 3DB23035AAAA01
  • Alcatel-Lucent ECNT-C 3FE25676 BA AK 06 Termination Card
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8606-45 with 13 Modules
  • Alcatel-Lucent 849144415 KS-24829L1 Remote Radio Head v1.4
  • Alcatel CFF 450 Turbo Pump Controller 137171
  • Alcatel-Lucent ACS108 109579896 004 Access Controller
  • Alcatel-Lucent OS6850-48 Network Switch with PS-126W-AC Power Supply
  • Alcatel Lucent DFP-CM-14B/2T Filter DCMA Base Station
  • Alcatel Lucent ESX-K100C32W4 ESXK100C32W4 Power Supply Module
  • Alcatel Lucent 91-E03100-A 91E03100A Interface Module
  • Alcatel-Lucent STGR-LIM-A2P-72-HBI ADSL2+ High Bandwidth Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20547BBAA02
  • Alcatel Lucent Enterprise 4049-4059 MMK Keyboard Console Kit
  • Alcatel-Lucent RRH4X40-1900 Remote Radio Head
  • Alcatel Lucent OS6450-P48 Switch
  • Alcatel Lucent 625617-000-001 Cable Assembly
  • Alcatel Lucent 108320 Module
  • Alcatel Lucent TN801B Board
  • Alcatel-Lucent RRH2X50-800 LTE Remote Radio Head
  • Alcatel Lucent CPU8 Board 3BA23258AB OmniPCX 4400
  • Alcatel-Lucent 3EM22617AAAE 9500 MPT-HL Microwave Radio Transceiver
  • Alcatel-Lucent CPU7-2 3BA23259AAAD 7750 SR Control Processor Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20371BCAA01
  • Alcatel-Lucent Enterprise 4059 MMK Keyboard + Phone PAC Kit
  • Alcatel-Lucent Nokia 3HE10329AA 7750 SR Series Router Module
  • Alcatel-Lucent 7705 SAR-W IP MPLS Service Aggregation Router 3HE07349AA
  • Alcatel-Lucent-Nokia 3HE08429AARC01 7750 SR SFM5-7 Switching Module
  • Alcatel-Lucent 3HE00272DB 7750 SR-7 DC Chassis with PEM3+EFT
  • Alcatel-Lucent ACT 1300M/1600M HT Turbo Pump Controller
  • Alcatel Lucent IMM48-1GB-TX 3HE03625AAG01 48-Port 7750 SR-12 Interface Module
  • Alcatel-Lucent AP-500 Wireless Access Point
  • Alcatel-Lucent ATP-150 Power Supply
  • Alcatel-Lucent 622-8603-012 Optical Transceiver
  • Alcatel-Lucent 270-0038-010 10.5 VDC Power Supply
  • Nokia 9500-MPR Microwave Radio Module XPIC-RPS/3DB20116BCAA01
  • Alcatel-Lucent 3DB19017AB EAS Access Switch v2
  • Alcatel-Lucent 3AL81072AA Matrix Enhanced Unit - Cross-Connect Module