"Fourteen Five"! Where will the biomass power generation industry go?

F: | Au:佚名 | DA:2024-01-04 | 857 Br: | 🔊 点击朗读正文 ❚❚ | Share:

What about the cost? For simplicity, assume that the annual operating cost (including consumables, spare parts, etc.) is 8 million yuan, the management cost is 8 million yuan, and the financial cost is estimated to be about 38 million yuan.

In this way, we can roughly calculate that the annual after-tax net profit of the first to 15 years of the operation period of the waste incineration power generation project is about 24 million yuan, from the 16th to the 28th year (assuming that the franchise period is 30 years, the construction period is 2 years), there is no longer a financial cost, and the annual after-tax net profit is about 52 million yuan.

According to the above calculation, without considering the cancellation of electricity price subsidies, it will take 16 years for waste incineration power generation enterprises to recover their investment, but if you consider the factors such as the production cycle, the cost of rising costs, and the cost of periodic large-scale maintenance, it is expected that it will take about 18 years to recover the investment.

For agricultural and forestry biomass power generation projects, the situation seems to be more severe, although the total investment of such projects will be lower, generally about two to three hundred million yuan, and the benchmark price is higher than the waste incineration power generation project, but agricultural and forestry biomass power generation projects need a huge amount of fuel costs, that is to say, not only there is no waste disposal fee in terms of income, In addition, the cost also increases a lot of fuel acquisition costs, especially in some regions, the fuel market competition is fierce, and the fuel cost is high.

At the same time, because agricultural and forestry biomass power generation projects generally use circulating fluidized bed technology, whether it is the effective use of hours or energy conversion rate, there is a certain gap compared with the use of grate technology waste incineration power generation projects, and the cost of inspection and maintenance will be much higher than the waste incineration power generation project. Taking the above factors into account, the cycle of investment recovery of agricultural and forestry biomass power generation projects is at least not shorter than that of waste incineration power generation projects, and even longer.

It should be emphasized that the above calculation does not take into account the elimination of the tariff subsidy in the 12th year. If this factor is taken into account, the recovery period will be extended by another two years, that is, 20 years. This means that only eight years are really "earning money", the annual after-tax net profit of 35 million yuan, the total return of 280 million yuan, the internal rate of return (IRR) of the whole investment of the project has plummeted from about 7% before the New Deal to about 4.9%. Although the above calculation is relatively simple, but enough to explain the problem, IRR4.9% means what, needless to say.

Where will the biomass power generation industry go?

The issuance of the "Supplementary Notice" may announce the end of the golden age of the biomass power generation industry. The New Deal has become a fact, so how will the biomass power generation industry go in the future, and how should enterprises respond? We may wish to make a forecast from the three levels of policy, industry and enterprise.

Policy level

The purpose of various policies introduced by the state is to regulate and guide the healthy development of the industry, and not to kill a certain industry with one stick. Therefore, we have reason to believe that the relevant departments will introduce supporting policies to make the industry glow with new vitality, and there are two aspects of policy worthy of everyone's expectation.

First, Article 4 clearly points out that "the price authorities will improve the price formation mechanism of waste incineration power generation in a timely manner according to the development needs of the industry and cost changes." On September 11, the National Development and Reform Commission, the Ministry of Finance and the National Energy Administration jointly issued the "Implementation Plan for Improving the construction and operation of biomass power generation projects" (Development and Reform Energy (2020) No. 1421) pointed out that the benchmark price of waste incineration power generation projects in 2020 continued to be determined as 0.65 yuan, which has been implemented for many years. The benchmark price of agricultural and forestry biomass power generation projects is still 0.75 yuan. We may be able to look forward to 0.65 yuan of waste incineration power generation project on-grid benchmark price can be increased in the future.

Second, the "Supplementary Notice" clearly points out that after the biomass power generation project has been connected to the grid for 15 years, regardless of whether the project has reached the full life cycle of subsidized electricity, it no longer enjoys the central financial subsidy funds, and the green certificate is issued to allow participation in the green certificate transaction. At the same time, article 4 also puts the "full implementation of green power certificate trading" in an important position.

  • Basler KR7FFX Static Regulator 840V
  • Basler EL200-7 Voltage Regulator 90-660VAC 7A
  • Basler PRP210-1 Reverse Power Relay 9056300102
  • Basler SSR 63-12 Static Regulator 600VAC
  • Basler 9289901106 Digital Board
  • Basler DECS100 Voltage Regulator DECS100A01
  • Basler Electric CEM-2020 Contact Expansion Module
  • Basler Electric BE3-25-1 C1 N4 Synchronizing Check Relay
  • Basler Electric ACA2000-50GM GigE Camera 2MP 50fps
  • Basler Electric ACA2240-20GMSYM GigE Camera Sony IMX264
  • Basler BE1-50G Ground Overcurrent Relay
  • Basler PRS250 Veri-Sync Relay
  • Basler MOC2199 Output Module
  • Basler UFOV 260A Underfrequency Overvoltage Module
  • Basler BE-15482-001 Control Module
  • Basler LSP4-7 Protective Relay
  • Basler SCP 250-G-60 VAR Power Factor Controller
  • Basler BE146N Negative Sequence Overcurrent Relay
  • Basler APR63-5 Automatic Voltage Regulator
  • Basler 9507900107 SR8A Retrofit Voltage Regulator
  • Basler BE1-320 Directional Power Relay
  • Basler KR7F Voltage Regulator 9116200100
  • Basler UFOV 260A Overvoltage Protective Module
  • Basler AEC63-7 Analog Excitation Controller
  • Basler 9992D90G01 Control Module
  • Basler 6966D22G01 Control Board
  • Basler 6965D40G01 Control Board
  • Basler BE1-50/51M-104 Overcurrent Relay
  • Basler BE1-BPR Programmable Breaker Relay
  • BASLER Electric SSR 125-9 1256 00 102 Static Voltage Regulator
  • Basler Electric MVC 112 Manual Voltage Control
  • Basler Electric 9321000102 Control Module
  • Basler Electric RA-70-MDCT7 Rectifier Assembly
  • Basler Electric ACA1300-60GM GigE Camera
  • Basler Electric 6427C85G01 Interface Board
  • Basler Electric 6965D05G01 Control Board
  • Basler Electric ACA2500-14UC Current Transducer
  • Basler Electric 9170206111 Protective Relay
  • Basler Electric BE1-11-G6D1M1J1P0E000 Protection Relay
  • Basler Electric BE1-50/51B-107 Overcurrent Relay
  • Basler 9121000106 Voltage Controller
  • Basler B3E-E1P-A0N0F Solid State Protective Relay
  • Basler 9121000106 Manual Voltage Control
  • Basler PRP320 Motor Pull-out Relay
  • Basler SSE-N 250-9KW Shunt Exciter Regulator
  • Basler BE1-50-51B-107 Overcurrent Relay
  • BASLER ELECTRIC MVC 108 MANUAL VOLTAGE CONTROL MODULE 9 0370 00 102
  • Basler BE1-59N-A7E-D1J-D0N0F Ground Overvoltage Relay
  • Basler BE1-46N-G1E-B8P-B0N0F Negative Sequence Overcurrent Relay
  • Basler BE1-951 Overcurrent Protection System
  • Basler Electric MOC2199 Motor Operated Potentiometer
  • Basler Electric BE1-60 Voltage Balance Solid State Relay B1FA1C1M1F
  • Basler Electric BE1-67N Directional Overcurrent Relay
  • Basler Electric PIA2400-17GM Interface Module
  • Basler Electric V6RAB Rectifier Module
  • Basler Electric BE1-32R Reverse Power Relay B2E E1R A0N1F
  • Basler Electric IFM-150 Firing Circuit Chassis 120V AC
  • Basler Electric IFM-102 Firing Circuit Chassis 120V AC
  • Basler Electric 9170206111 NSNP Control Module
  • Basler Electric SSR 63-12 Static Voltage Regulator
  • Basler UFOV 260A Overvoltage Protective Module
  • Basler SCA1300-32GM CCD Camera Lens Enclosure
  • Basler BA1-27 Under Voltage Relay
  • Basler 149D866G06 Control Board
  • Basler 9072300130 Power Supply Module
  • Basler CBS 305 Current Boost System
  • Basler BE1-60 Voltage Balance Relay
  • Basler Electric CBS 212 Current Boost System Sensing 120/240VAC 50/60Hz 10VA
  • Basler MVC-300 Manual Voltage Control Unit
  • Basler SSR125-12 Static Voltage Regulator 918500102
  • Basler SR32A2B05B3E Static Voltage Regulator
  • Basler Electric BE1-59N Ground Fault Overvoltage Relay
  • Basler Electric 9110000113 Excitation Module
  • Basler Electric 90-72300-114 Control Accessory
  • Basler Electric PRS-250 Protection Relay System
  • Basler Electric BE1-50/51M-109 Overcurrent Relay
  • Basler Electric SR4A1B10B3E Static Voltage Regulator
  • Basler Electric CBS 212 Current Boost System
  • Basler Electric SR32A2B05B3E Static Voltage Regulator
  • Basler Electric MOC2207 Motor Operated Potentiometer
  • Basler Electric SR4A1B05A3E Static Voltage Regulator
  • Basler Electric BE1-32R Power Relay B2EE1PA0N1F
  • Basler BEI-81 Underfrequency Relay
  • Basler CBS 212A Current Boost System
  • Basler SSR 63-12 Static Voltage Regulator
  • Basler DGC-2020 Digital Genset Controller
  • Basler BE1-32 Reverse Power Relay
  • Basler BE1-50/51B-207 Overcurrent Relay
  • Basler BE1-951 Overcurrent Protection System
  • Basler 9073800-103 Power Supply
  • Basler SCA1300-32FC CCD Camera
  • Basler 9073800-103 Power Supply
  • Basler SCA1300-32FC CCD Camera
  • Basler L304KC Protective Relay
  • Basler BE3-25-1S1N4 Time Overcurrent Relay
  • Basler 9032300113 Excitation Support System
  • Basler BE1-59N Ground Overvoltage Relay
  • Basler MVC-300 Manual Voltage Control Unit
  • Basler MOC2102 Potentiometer
  • Basler BE1-87G Generator Differential Relay
  • Basler Electric DECS-200 Digital Excitation Control System
  • Basler Electric DECS 125-15-B2C5 Digital Excitation System
  • Basler Electric PLA2400-12GM Power Supply
  • Basler Electric BE1-50/51B-235 Overcurrent Relay
  • Basler Electric BE1-27/59 Undervoltage Overvoltage Relay
  • Basler Electric CEM-2020 Contact Expansion Module
  • Basler Electric BE1-32R Solid State Power Relay
  • Basler Electric BE1-700 Digital Generator Management Relay
  • Basler Electric BE1-59N Ground Fault Overvoltage Relay
  • Basler Electric BE10493002 Protection Module
  • Basler Electric BEI-79A1AA5CA3M1F Digital Annunciator
  • Basler Electric SSR 32-12 Static Voltage Regulator
  • Basler Electric BE1-CDS240 Current Differential System
  • Basler Electric BE1-67 Directional Overcurrent Relay
  • Basler Electric 9121000106 DECS-100 Voltage Controller
  • Basler Electric BEI-871 Interface Module
  • Basler Electric 8650C72 Exciter Control Module
  • Basler Electric RDP-110-S1 Generator Annunciator
  • Basler Electric BE1-32O/U Directional Power Relay
  • Basler Electric BE2000E AVR Voltage Regulator
  • BASLER ELECTRIC BE1-50F2EA1PA0N0F Instantaneous Overcurrent Relay
  • BASLER ELECTRIC BE1-81T1EE1WA0N1F Underfrequency Relay
  • Basler BE1-67 Directional Overcurrent Relay
  • Basler BE1-25/79TR Reclosing Relay
  • Basler CEM-2020 Contact Expansion Module
  • Basler BE1-11 Overcurrent Protection Relay
  • Basler BE1-GPS Generator Protective Relay
  • BASLER ELECTRIC MVC-300 MANUAL VOLTAGE CONTROL UNIT 9121000106