"Fourteen Five"! Where will the biomass power generation industry go?

F: | Au:佚名 | DA:2024-01-04 | 816 Br: | 🔊 点击朗读正文 ❚❚ | Share:

What about the cost? For simplicity, assume that the annual operating cost (including consumables, spare parts, etc.) is 8 million yuan, the management cost is 8 million yuan, and the financial cost is estimated to be about 38 million yuan.

In this way, we can roughly calculate that the annual after-tax net profit of the first to 15 years of the operation period of the waste incineration power generation project is about 24 million yuan, from the 16th to the 28th year (assuming that the franchise period is 30 years, the construction period is 2 years), there is no longer a financial cost, and the annual after-tax net profit is about 52 million yuan.

According to the above calculation, without considering the cancellation of electricity price subsidies, it will take 16 years for waste incineration power generation enterprises to recover their investment, but if you consider the factors such as the production cycle, the cost of rising costs, and the cost of periodic large-scale maintenance, it is expected that it will take about 18 years to recover the investment.

For agricultural and forestry biomass power generation projects, the situation seems to be more severe, although the total investment of such projects will be lower, generally about two to three hundred million yuan, and the benchmark price is higher than the waste incineration power generation project, but agricultural and forestry biomass power generation projects need a huge amount of fuel costs, that is to say, not only there is no waste disposal fee in terms of income, In addition, the cost also increases a lot of fuel acquisition costs, especially in some regions, the fuel market competition is fierce, and the fuel cost is high.

At the same time, because agricultural and forestry biomass power generation projects generally use circulating fluidized bed technology, whether it is the effective use of hours or energy conversion rate, there is a certain gap compared with the use of grate technology waste incineration power generation projects, and the cost of inspection and maintenance will be much higher than the waste incineration power generation project. Taking the above factors into account, the cycle of investment recovery of agricultural and forestry biomass power generation projects is at least not shorter than that of waste incineration power generation projects, and even longer.

It should be emphasized that the above calculation does not take into account the elimination of the tariff subsidy in the 12th year. If this factor is taken into account, the recovery period will be extended by another two years, that is, 20 years. This means that only eight years are really "earning money", the annual after-tax net profit of 35 million yuan, the total return of 280 million yuan, the internal rate of return (IRR) of the whole investment of the project has plummeted from about 7% before the New Deal to about 4.9%. Although the above calculation is relatively simple, but enough to explain the problem, IRR4.9% means what, needless to say.

Where will the biomass power generation industry go?

The issuance of the "Supplementary Notice" may announce the end of the golden age of the biomass power generation industry. The New Deal has become a fact, so how will the biomass power generation industry go in the future, and how should enterprises respond? We may wish to make a forecast from the three levels of policy, industry and enterprise.

Policy level

The purpose of various policies introduced by the state is to regulate and guide the healthy development of the industry, and not to kill a certain industry with one stick. Therefore, we have reason to believe that the relevant departments will introduce supporting policies to make the industry glow with new vitality, and there are two aspects of policy worthy of everyone's expectation.

First, Article 4 clearly points out that "the price authorities will improve the price formation mechanism of waste incineration power generation in a timely manner according to the development needs of the industry and cost changes." On September 11, the National Development and Reform Commission, the Ministry of Finance and the National Energy Administration jointly issued the "Implementation Plan for Improving the construction and operation of biomass power generation projects" (Development and Reform Energy (2020) No. 1421) pointed out that the benchmark price of waste incineration power generation projects in 2020 continued to be determined as 0.65 yuan, which has been implemented for many years. The benchmark price of agricultural and forestry biomass power generation projects is still 0.75 yuan. We may be able to look forward to 0.65 yuan of waste incineration power generation project on-grid benchmark price can be increased in the future.

Second, the "Supplementary Notice" clearly points out that after the biomass power generation project has been connected to the grid for 15 years, regardless of whether the project has reached the full life cycle of subsidized electricity, it no longer enjoys the central financial subsidy funds, and the green certificate is issued to allow participation in the green certificate transaction. At the same time, article 4 also puts the "full implementation of green power certificate trading" in an important position.

  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series