Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

We will make every effort to keep the people warm in winter

F: | Au:佚名 | DA:2023-11-21 | 752 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

Recently, a Qatar-based ship "Aldafna" loaded with 260,000 cubic meters of LNG (liquefied natural gas) docked at the wharf of petrochina Tangshan LNG Receiving Station in Caofeidian Port Area of Tangshan Port, Hebei Province, which is the 472nd ship to be unloaded in the 10 years since the LNG terminal was put into operation in 2013. At present, the total storage capacity of the LNG storage tank at the receiving station is at a high level, and the high-load heating mode has been officially opened for 5 months, with the maximum daily export volume reaching 42 million cubic meters, ensuring that the winter heating season "can receive the ship, store the liquid and transport the gas".


"In the face of the tight balance between natural gas supply and demand this winter and next spring, we have continued to expand resource channels and formed a diversified and interconnected resource security system of domestic gas, imported pipeline gas, imported LNG, and gas storage tanks (groups). The annual gas supply accounts for more than 60% of the total natural gas consumption in the country." China Petroleum and natural gas Sales Company related business person introduced.

According to reports, the China Petroleum and Natural Gas Sales Company regards the work of thermal protection as a major people's livelihood project and the people's heart project, and has formulated a graded supply plan that is divided into regions, pipelines and detailed to users. Focus on key periods such as "394" in major northern heating cities, as well as the livelihood of key industries such as urban fuel, gas power generation, and CNG, to ensure that the bottom line of livelihood gas security is maintained under the tight supply of resources. Strengthen the energy supply guarantee for users of "coal to gas", especially for the gas demand in the affected areas of Zhuozhou, Hebei, in this winter and spring heating season, the resource preparation increased by 13% year-on-year, more than 100 million cubic meters, and tested nearly 4,000 kilometers of gas pipeline network, with pipeline natural gas, LNG, CNG and other gas sources, to fully ensure the warmth of Zhuozhou and surrounding areas.


"At present, we are in a critical period for the start of the winter supply guarantee, and we will do a good job in the heating season of natural gas supply this winter and next spring, and use practical actions to fulfill the solemn commitment of 'ensuring the warm winter of the people'." China oil and natural gas sales company related business person said.


Meanwhile, there's good news from the gas reservoir. On November 9, the gas injection volume of China National Petroleum gas storage has reached 17.14 billion cubic meters, an increase of 1.57 billion cubic meters year-on-year, exceeding the target of gas injection this year, and saving enough "confidence" for natural gas supply this winter and next spring.

Gas storage is the mainstay of peak regulation and supply of natural gas in winter, and plays an important role. In order to strengthen the work of "full storage" of gas storage reservoir, CNPC organizes all oil and gas field enterprises to closely track the production and operation dynamics of gas storage reservoir and the progress of injection and production test of pilot test reservoir in accordance with the operation mode of "annual plan, monthly adjustment and daily scheduling", and tracks and evaluates the storage capacity, inventory and remaining gas injection capacity of each gas storage reservoir through dynamic monitoring and testing. Optimize and adjust the gas injection operation plan in time to ensure that the operation indicators are completed as planned.


At present, CNPC has a total of 13 gas storage units in service and 8 gas storage units under construction. Since the beginning of the year, in strict accordance with the national annual list of major projects, petrochina has made concerted efforts in the construction of old and new gas storage reservoirs, and orderly promoted the production, pressure and expansion projects of Dazhangtuo in Dagang Oilfield, Hutubi in Xinjiang Oilfield, Xiangguosi in Southwest Oil and Gas Field, Jing 58 in North China Oil and Gas Field and Suqiao in North China Oil and Gas Field, as well as the Tongluo Gorge and Huangcaoxia in Southwest oil and Gas field. Construction of Nanpu No. 1 gas storage in Jidong Oilfield. Before the heating season, Shuangtaizi gas storage in Liaohe Oilfield, Kekeya Oil field, Wen23 in Huabei Oil Field and Wenxi I in Tuha Oil Field were fully completed and put into operation, and the peak supply protection capacity increased by 30 million cubic meters/day, an increase of 20%, adding new strength to the winter gas supply protection work.

"We must shoulder our responsibility, pay close attention to implementation, be the 'pillar' of energy supply, ensure the safe and stable supply of natural gas, and make new and greater contributions to ensuring national energy security and the warmth of the people over the winter." China Petroleum Group Party secretary, chairman Dai Houliang said.


Recently, CNPC has held the meeting of the leading group of natural gas Winter Supply guarantee and the mobilization and deployment meeting of natural gas winter Supply guarantee, strictly implement the responsibility of supply guarantee in all links of the industrial chain and supply chain, and resolutely win the battle of natural gas supply guarantee this winter and next spring. CNPC Intelligent Operation Center gives full play to the core functions of operation monitoring and dispatching command, develops a balanced plan for natural gas production and sales on a rolling basis, adopts measures to increase gas production in gas storage and increase LNG gasification export volume, and comprehensively guarantees the demand for natural gas for people's livelihood.


  • Sigmatek MDD111-1 DIAS Drive Axis Module
  • Sigmatek DKL042 05-024-042 Terminal Module
  • Sigmatek DM822 Control Module
  • Sigmatek CDM167 12-008-167-O Module
  • Sigmatek TAE151 Touch Display Unit
  • Sigmatek DCC041 SLIDES Module 05-700-041-D
  • Sigmatek AKM65M-ANC2GBB0 PM Servo Motor
  • Sigmatek ETT221 01-230-221 Operator Terminal
  • Sigmatek SLIDES DAM 124 Analog Module
  • Sigmatek AKM31C-ANCNGBB0 Servo Motor
  • Mannesmann Demag Sigmatek CP626 Central Unit
  • SIGMATEK 0332.554.03 Board 371071000154
  • SIGMATEK 12-250-021 Base Plate Back Panel CM5V020
  • SIGMATEK DM162 S-DIAS Digital Mix Module
  • DEMAG ERGOTECH 061 381 66 Sigmatek 9842.243.02 Circuit Board
  • SIGMATEK CP313-1 PLC Module
  • Sigmatek ETV0551-2 VARAN Touch Terminal
  • Sigmatek SDM 081 FS S-Dias Safety Module
  • DEMAG 05-250-023 Ergotech Motherboard with Sigmatek TMS012
  • Sigmatek CM5V020 12-250-023-K Wiring Base
  • Sigma Tek 5000B-37 Attitude Gyro Indicator
  • Sigmatek SDD120-2 DIAS Drive
  • Sigmatek CME221 Memory Module
  • Sigmatek DCP640 DIAS Central Unit
  • Sigmatek STO040 Safety Output Module
  • Sigmatek CET281 Control Panel
  • Sigmatek CIPC LX800 Demag NC5 CPU
  • Sigmatek DKL093 05-024-093 Terminal Module
  • Sigmatek AI088 20-009-088 Analog Input Module
  • Sigmatek CAI888 Analog Input Module
  • SIGMATEK CCA021 12-025-021 Analog Output Module
  • SIGMATEK 1104.579.05 Control Module
  • SIGMATEK SDI100 Digital Input Module
  • SIGMATEK C-IPC 256MB LX800 Compact Dias
  • SIGMATEK 9423.090.02 Control Module
  • SIGMATEK C-IPC 256 Power Supply 148498
  • SIGMATEK CAI025 Analog Input Module
  • SIGMATEK CTO166 Digital Output Module
  • SIGMATEK CP112 20-004-112 Processor Module
  • SIGMATEK CAI887 12-009-887 Safety Module
  • Sigma-Tek 4000B-31 Directional Gyro 1U262-002-42
  • Sigmatek C-IPC 256MB LX800 IPC Controller
  • Sigmatek C-IPC 01-450-031 Industrial PC LX800
  • Sigmatek C-IPC 256 Industrial PC Controller
  • Sigmatek CCP-531 PLC Processor Module
  • Sigmatek CDI163 Digital Input Module
  • Sigmatek ETV0501 VARAN Terminal 12-230-0501
  • Sigmatek CTMS020 C-DIAS Technology Module
  • Sigmatek CIV512 VARAN Switch Module
  • Sigmatek HU011 20-080-011 Interface Module
  • SIGMATEK SLIDES DAM 124 Module
  • SIGMATEK C-IPC 161 01-450-161L Industrial PC
  • SIGMATEK C-IPC 128MB VIA 733MHz 01-450-024-K
  • SIGMATEK 12-780-012 R8-IPC Geode LX800 Module
  • SIGMATEK CAM124 Analog Module
  • SIGMATEK S1 032-8AF61-R4 EZ Servo Motor
  • SIGMATEK CTO163 Digital Output Module
  • SIGMATEK CCP082 12-004-082 Processor Module
  • SIGMATEK CRCH081 C-DIAS Temperature Module
  • SIGMATEK PC322-K 01-310-322-K Industrial PC
  • SIGMATEK SDD310-2 Servo Drive
  • SIGMATEK AI084 Analog Input Module
  • SIGMATEK CRCH081 12-752-081 Temperature Module
  • Sigma-Tek 5000L-4 Attitude Gyro 1U284-001-3
  • SIGMATEK CM5V020 12-250-023-K Wiring Module
  • Sigma-Tek 4000H-6 Directional Gyro IU262-035-7
  • SIGMATEK Dias DCP160 05-004-160 Processor Module
  • SIGMATEK 0147.395.02 Control Module
  • SIGMATEK A1084 Control Module
  • SIGMATEK DI200 20-006-2000 Digital Input Module
  • Sigmatek DNC115 Encoder Module
  • Sigmatek DAM122 05-017-122 Analog Module
  • Sigmatek 9802.289.01 Control Board TA71 Display
  • Sigmatek TO127 20-007-127 Digital Output Module
  • Sigmatek DNC031 05-011-031 Digital Module
  • Sigmatek VI022 20-003-022 Interface Module
  • Sigmatek CAI085 Analog Input Module
  • Sigmatek CP111 S-DIAS CPU Module
  • Sigmatek CTMS030 Krauss Maffei Module
  • Sigmatek CAM123 Control Module
  • Sigmatek TAE732-P 01-240-732-P Touch Display Unit
  • Sigmatek MDM021 Digital Mixed Module
  • Sigmatek DCP642 DIAS Central Unit
  • Sigmatek CST022 12-014-022 C-DIAS Module
  • Sigmatek SRO021 20-893-021 Safety Relay Output
  • Krauss Maffei MC5 Control System Sigmatek
  • Sigmatek DC061 Module 18-24VDC 300mA
  • Herrmann EVT0855 Ultrasonic Welder Touch Panel
  • Sigmatek CIV521 Control Module 1.4A 2W
  • Sigmatek DDI61 05-006-161 Digital Input Module
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • Cessna S3326-1 Sigma Tek 5000B-67 Gyro 1U149-015-9
  • SIGMATEK PS101 Power Supply Module
  • SIGMATEK 0332.554.03 Control Module 371071000154
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • SIGMATEK CDM163 Control Module
  • SIGMATEK VSV046 16-023-046 Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • SIGMATEK CTS051 12-053-051 Control Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • Sigmatek CSDI161 12-891-161 Safety Input Module
  • Sigma Tek 4000C-1 Directional Gyro Indicator
  • Sigmatek ETV0501 12-230-0501 VARAN Terminal
  • Sigmatek DDM165 SLIDES Module
  • Sigmatek N100 20-011-100 Control Module
  • Sigmatek AKM54K-ANC2R-B0 PM Servo Motor
  • Sigmatek CTO166 Digital Output Module
  • Sigmatek CP212-K 20-004-212-K CPU Module
  • Sigmatek CDI161 Digital Input Module
  • Sigmatek DCC080 05-700-080-2 Control Module
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SRO022 Relay Output Module
  • SIGMATEK MDD 121 Drive Axis Module
  • SIGMATEK DSI021 SLIDES Siemens Interface
  • SIGMATEK DIAS DCP161 Module 05-004-161
  • Sigmatek ETT312 Built-in Touch Terminal
  • SIGMATEK DCP 643 DIAS Controller System
  • SIGMATEK CIO021 Multi I/O Module
  • SIGMATEK CTMS020 Control Module
  • Sigmatek CME 221 Memory Module
  • Sigmatek 0420.615.01 Control Board
  • Sigmatek CP111 20-004-111 CPU Module
  • Sigmatek 9405.065.03 Control Board
  • Sigmatek ETEK 01-450-032-K C-IPC 256MB Industrial PC
  • Sigmatek CTO163 12-007-163 Safety Output Module
  • Sigmatek TO081 20-007-081 Digital Output Module
  • Sigmatek SI021 20-022-021 Safety Input Module