Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

We will accelerate the comprehensive improvement of open-pit mines

F: | Au:佚名 | DA:2023-11-27 | 520 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

First, coordinate the implementation of the comprehensive remediation of open-pit mines work tasks

Document No. 22 of Guofa [2018] has made clear deployment arrangements for promoting the comprehensive renovation of open-pit mines, and the main work tasks are detailed and decomposed into four aspects:

(1) A comprehensive survey and investigation of open-pit mines. With the focus on the illegal mining and the loss of the main liability of the opencasts, a comprehensive investigation of the basic situation of the opencasts in the region, on the basis of a comprehensive verification of the development and utilization of the opencasts, environmental protection, mining geological environment restoration and management, land reclamation and other conditions, item-by-item registration and summary, classification of the establishment of a ledger, put forward rectification opinions.

(2) Carry out comprehensive improvement of open-pit mines in accordance with the law. To close open-pit mines that violate laws and regulations on resources and the environment, as well as planning, pollute the environment, destroy ecology, or engage in indiscriminate mining in accordance with the law; Open pit mines that do not regulate pollution shall be ordered to stop production for rectification according to law, and may resume production only after they pass the inspection and acceptance organized by relevant departments; those that refuse to stop production or resume production without authorization shall be forced to close down according to law; For the opencast mines whose main liability is lost, the restoration and greening of the mines shall be strengthened according to local conditions to reduce and suppress atmospheric dust. Comprehensively strengthen the comprehensive treatment of gangue hills to eliminate spontaneous combustion and smoke.

(3) Strengthening ecological restoration in open-pit mines. In accordance with the principle of "who mining, who governance, while mining, while governance", mines are guided to carry out ecological restoration in accordance with the green mine construction industry standards, with environmental impact reports and approvals, mine geological environment protection and land reclamation plans. For open pit mines that are lost to the responsible subjects, in accordance with the principle of "who governs, who benefits", give full play to the guiding role of financial funds, vigorously explore the construction of a new model of mine geological environment restoration and comprehensive management that is "government-led, policy support, social participation, development-oriented governance, and market-oriented operation", and accelerate the progress of ecological restoration.

(4) Strictly control the construction of new open-pit mines. Strictly implement the relevant requirements of GuOFa [2018] 22 document, key areas are prohibited from building new open-pit mine construction projects in principle, and the open-pit mines in key areas that have been approved by the environmental impact assessment document before the issuance of Guofa [2018] 22 document really need to be built, Construction can continue to be approved under the premise of strict implementation of ecological environmental protection, mineral resource planning and green mine construction industry standards. New open-pit mine construction projects in other regions should also strictly implement the requirements of ecological environmental protection, mineral resource planning and green mine construction industry standards.

Second, strengthen the organization and leadership of the comprehensive renovation of open-pit mines

1. Strengthen organizational leadership. The comprehensive improvement of open-pit mines is an important task in the three-year action plan to win the blue sky defense war, in accordance with the requirements of the Guofa [2018] 22 document, local governments at all levels should put this task in an important position, the main leader is the first responsible person in the administrative region, effectively strengthen the organization and leadership, formulate implementation plans, refine and break down the objectives and tasks, and scientifically arrange indicators and progress. It is necessary to ensure that all work is completed effectively and orderly.

2. Strengthening accountability. Improve the list of responsibilities of local governments and relevant departments at all levels, consolidate the responsibilities of all parties, implement them at every level, and strengthen the responsibility of comprehensive remediation of open-pit mines. Organize related departments of natural resources and ecological environment to earnestly perform their work duties and regulatory responsibilities, strictly implement policy requirements, and form a work situation of government leadership, departmental linkage, transparency and rapid progress. In case of insufficient planning, slow action and ineffective promotion of the comprehensive remediation work of open-pit mines, interviews shall be initiated and accountability shall be strictly enforced.

Third, to ensure the effectiveness of the comprehensive remediation of open-pit mines

(1) Formulating policies and measures. In light of the actual local work, all localities have established a long-term mechanism for the comprehensive renovation of open-pit mines, highlighting key regions and key minerals, and formulating and promulgating policies and measures that meet local realities and are practical and feasible to promote the comprehensive renovation of open-pit mines to achieve effective results, focusing on mining access standards, mine upgrading and upgrading, ecological environment management and improving resource security capabilities.

2. Strengthen oversight and management. All localities should, in accordance with the requirements of relevant tasks, establish an evaluation mechanism, improve the supervision system for comprehensive remediation of open-pit mines, strengthen tracking and supervision, ensure that the objectives, progress, and measures are implemented in place, and ensure that the remediation work is successfully completed in 2020. Please inform the Natural Resources Department of the progress of the work in time.


  • Sigmatek MDD111-1 DIAS Drive Axis Module
  • Sigmatek DKL042 05-024-042 Terminal Module
  • Sigmatek DM822 Control Module
  • Sigmatek CDM167 12-008-167-O Module
  • Sigmatek TAE151 Touch Display Unit
  • Sigmatek DCC041 SLIDES Module 05-700-041-D
  • Sigmatek AKM65M-ANC2GBB0 PM Servo Motor
  • Sigmatek ETT221 01-230-221 Operator Terminal
  • Sigmatek SLIDES DAM 124 Analog Module
  • Sigmatek AKM31C-ANCNGBB0 Servo Motor
  • Mannesmann Demag Sigmatek CP626 Central Unit
  • SIGMATEK 0332.554.03 Board 371071000154
  • SIGMATEK 12-250-021 Base Plate Back Panel CM5V020
  • SIGMATEK DM162 S-DIAS Digital Mix Module
  • DEMAG ERGOTECH 061 381 66 Sigmatek 9842.243.02 Circuit Board
  • SIGMATEK CP313-1 PLC Module
  • Sigmatek ETV0551-2 VARAN Touch Terminal
  • Sigmatek SDM 081 FS S-Dias Safety Module
  • DEMAG 05-250-023 Ergotech Motherboard with Sigmatek TMS012
  • Sigmatek CM5V020 12-250-023-K Wiring Base
  • Sigma Tek 5000B-37 Attitude Gyro Indicator
  • Sigmatek SDD120-2 DIAS Drive
  • Sigmatek CME221 Memory Module
  • Sigmatek DCP640 DIAS Central Unit
  • Sigmatek STO040 Safety Output Module
  • Sigmatek CET281 Control Panel
  • Sigmatek CIPC LX800 Demag NC5 CPU
  • Sigmatek DKL093 05-024-093 Terminal Module
  • Sigmatek AI088 20-009-088 Analog Input Module
  • Sigmatek CAI888 Analog Input Module
  • SIGMATEK CCA021 12-025-021 Analog Output Module
  • SIGMATEK 1104.579.05 Control Module
  • SIGMATEK SDI100 Digital Input Module
  • SIGMATEK C-IPC 256MB LX800 Compact Dias
  • SIGMATEK 9423.090.02 Control Module
  • SIGMATEK C-IPC 256 Power Supply 148498
  • SIGMATEK CAI025 Analog Input Module
  • SIGMATEK CTO166 Digital Output Module
  • SIGMATEK CP112 20-004-112 Processor Module
  • SIGMATEK CAI887 12-009-887 Safety Module
  • Sigma-Tek 4000B-31 Directional Gyro 1U262-002-42
  • Sigmatek C-IPC 256MB LX800 IPC Controller
  • Sigmatek C-IPC 01-450-031 Industrial PC LX800
  • Sigmatek C-IPC 256 Industrial PC Controller
  • Sigmatek CCP-531 PLC Processor Module
  • Sigmatek CDI163 Digital Input Module
  • Sigmatek ETV0501 VARAN Terminal 12-230-0501
  • Sigmatek CTMS020 C-DIAS Technology Module
  • Sigmatek CIV512 VARAN Switch Module
  • Sigmatek HU011 20-080-011 Interface Module
  • SIGMATEK SLIDES DAM 124 Module
  • SIGMATEK C-IPC 161 01-450-161L Industrial PC
  • SIGMATEK C-IPC 128MB VIA 733MHz 01-450-024-K
  • SIGMATEK 12-780-012 R8-IPC Geode LX800 Module
  • SIGMATEK CAM124 Analog Module
  • SIGMATEK S1 032-8AF61-R4 EZ Servo Motor
  • SIGMATEK CTO163 Digital Output Module
  • SIGMATEK CCP082 12-004-082 Processor Module
  • SIGMATEK CRCH081 C-DIAS Temperature Module
  • SIGMATEK PC322-K 01-310-322-K Industrial PC
  • SIGMATEK SDD310-2 Servo Drive
  • SIGMATEK AI084 Analog Input Module
  • SIGMATEK CRCH081 12-752-081 Temperature Module
  • Sigma-Tek 5000L-4 Attitude Gyro 1U284-001-3
  • SIGMATEK CM5V020 12-250-023-K Wiring Module
  • Sigma-Tek 4000H-6 Directional Gyro IU262-035-7
  • SIGMATEK Dias DCP160 05-004-160 Processor Module
  • SIGMATEK 0147.395.02 Control Module
  • SIGMATEK A1084 Control Module
  • SIGMATEK DI200 20-006-2000 Digital Input Module
  • Sigmatek DNC115 Encoder Module
  • Sigmatek DAM122 05-017-122 Analog Module
  • Sigmatek 9802.289.01 Control Board TA71 Display
  • Sigmatek TO127 20-007-127 Digital Output Module
  • Sigmatek DNC031 05-011-031 Digital Module
  • Sigmatek VI022 20-003-022 Interface Module
  • Sigmatek CAI085 Analog Input Module
  • Sigmatek CP111 S-DIAS CPU Module
  • Sigmatek CTMS030 Krauss Maffei Module
  • Sigmatek CAM123 Control Module
  • Sigmatek TAE732-P 01-240-732-P Touch Display Unit
  • Sigmatek MDM021 Digital Mixed Module
  • Sigmatek DCP642 DIAS Central Unit
  • Sigmatek CST022 12-014-022 C-DIAS Module
  • Sigmatek SRO021 20-893-021 Safety Relay Output
  • Krauss Maffei MC5 Control System Sigmatek
  • Sigmatek DC061 Module 18-24VDC 300mA
  • Herrmann EVT0855 Ultrasonic Welder Touch Panel
  • Sigmatek CIV521 Control Module 1.4A 2W
  • Sigmatek DDI61 05-006-161 Digital Input Module
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • Cessna S3326-1 Sigma Tek 5000B-67 Gyro 1U149-015-9
  • SIGMATEK PS101 Power Supply Module
  • SIGMATEK 0332.554.03 Control Module 371071000154
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • SIGMATEK CDM163 Control Module
  • SIGMATEK VSV046 16-023-046 Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • SIGMATEK CTS051 12-053-051 Control Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • Sigmatek CSDI161 12-891-161 Safety Input Module
  • Sigma Tek 4000C-1 Directional Gyro Indicator
  • Sigmatek ETV0501 12-230-0501 VARAN Terminal
  • Sigmatek DDM165 SLIDES Module
  • Sigmatek N100 20-011-100 Control Module
  • Sigmatek AKM54K-ANC2R-B0 PM Servo Motor
  • Sigmatek CTO166 Digital Output Module
  • Sigmatek CP212-K 20-004-212-K CPU Module
  • Sigmatek CDI161 Digital Input Module
  • Sigmatek DCC080 05-700-080-2 Control Module
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SRO022 Relay Output Module
  • SIGMATEK MDD 121 Drive Axis Module
  • SIGMATEK DSI021 SLIDES Siemens Interface
  • SIGMATEK DIAS DCP161 Module 05-004-161
  • Sigmatek ETT312 Built-in Touch Terminal
  • SIGMATEK DCP 643 DIAS Controller System
  • SIGMATEK CIO021 Multi I/O Module
  • SIGMATEK CTMS020 Control Module
  • Sigmatek CME 221 Memory Module
  • Sigmatek 0420.615.01 Control Board
  • Sigmatek CP111 20-004-111 CPU Module
  • Sigmatek 9405.065.03 Control Board
  • Sigmatek ETEK 01-450-032-K C-IPC 256MB Industrial PC
  • Sigmatek CTO163 12-007-163 Safety Output Module
  • Sigmatek TO081 20-007-081 Digital Output Module
  • Sigmatek SI021 20-022-021 Safety Input Module