Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

"1+1+3"! Scientific framework of green intelligent mine construction

F: | Au:佚名 | DA:2023-11-27 | 496 Br: | 🔊 点击朗读正文 ❚❚ | Share:

Intelligent mine

To put it simply, intelligent mine is to use 3D modeling, front-end perception and low-delay information and communication technologies to generate digital twins of mines in computers, and then through various information and communication technologies, digital technologies, Internet of things technologies, so that virtual mines and physical mines to achieve mapping interaction. So as to achieve the purpose of safe and intelligent mining, green environmental protection, fine mine management, efficient utilization of mineral resources and so on.

From the perspective of application, the overall solution of green intelligent mine is to realize the whole element modeling of mine. Based on ore flow, energy flow, information flow, value flow and business flow, the data platform of physical entity object and the diversified correspondence between digital virtual model can be established, and the whole process of data collection, digital transmission, knowledge mining and information feedback can be realized. Realize the whole process of raw material procurement, logistics and transportation, storage management, production process to market prediction and product sales; To realize the overall digital integration of all elements of "human, machine, material, law and environment", and provide mining enterprises with digital integrated solutions of intelligent collaborative control and decision analysis through multi-level digital collaborative computing such as edge computing, cloud computing, intelligent management and terminal applications.

Based on rich practical experience in green intelligent mine construction, Tianwaterway Cloud summarizes the scientific framework of green intelligent mine construction in the emergence stage - "1 network" + "1" + "3 platform".

"1 Network" - mining industrial ring network system

In the entire process of mine intelligent construction, the construction of mining industrial ring network, the application of front-end intelligent equipment, the real-time collection, transmission, processing, storage and analysis capabilities of massive information data, as well as the construction level of various decision-making models and execution capabilities are the core and key factors for the entire mine digital twin system to achieve accurate interaction and effective mapping. This interactive mapping ability and final effect determined by the above factors are the core indicators to measure the level of smart mine construction. Among these determinants, the mining industrial ring network is a "socket type" infrastructure, and its importance is self-evident.

At present, although the communication network of the daily office of the mine service has been basically fully covered, there are many shortcomings in bandwidth, data flow and delay, which is difficult to meet the requirements of the green intelligent construction of the mine. In other words, most of the intelligent upgrading of the mine needs to start from the upgrading of the communication network or the construction of a local area network. At this point, Tianhe Cloud has had a lot of cooperation with mobile, Unicom and telecommunications. In addition, mining is a dynamic excavation process, so the construction of intelligent mines needs to "push one meter in front of the mining work, and further before the construction of the end network."

"1" - 3D visualization of mine real scene

The 3D visualization of mine real scene is the base of mine digital twin, and also the visual carrier of various applications of green intelligent mine. The visualization system highly integrates the 3D reality model of the mine, the geological model of the mine and the visualization of various monitoring and monitoring systems (production automation, safety monitoring, environmental monitoring, slope monitoring, personnel positioning, sound and light alarm, DCS system monitoring data, video monitoring) to achieve the visual experience of the authenticity of the 3D model. Like the mining industry ring network, the three-dimensional visualization of the mine reality has also become a necessary basic application for the green intelligent construction of the mine. Because the application of the technology is relatively mature, the analysis will not be carried out here.

"3 Platforms" - three types of mine application platforms

Next, the construction of intelligent mine should start to build three types of application platforms, mine collaborative management platform, mine centralized control platform and big data decision analysis platform. At this stage, the construction of intelligent mines began to gradually show its function, and the construction of intelligent mines entered the substantive stage.

One kind of platform: mine collaborative management platform

The function definition of the mine collaborative management platform focuses on information management and business collaboration. Through the application of the platform, the barriers of centralized management and sharing of information data in multi-departments, multi-professions, multi-management levels and multi-application scenarios of the mine are broken, the "information island" is broken, and the barriers of business collaboration are removed. On the one hand, it solves the "information flow" problems such as accurate information collection, stable transmission and circulation, centralized storage and update, intelligent statistical analysis, real-time query and call, and realizes the data integration of multiple business systems, so that "data" becomes "data assets"; On the other hand, transform the traditional mining production and operation management mode, and promote the transformation of mining enterprise management from relying too much on human management and system management to relying more on artificial intelligence big data dynamic diagnosis, analysis and decision-making. The platform is not only the infrastructure that carries the initial "information flow" of smart mines, but also the basic content of building digital twin mines.

  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series