Green mine construction status and existing problems and countermeasures

F: | Au:佚名 | DA:2023-11-27 | 516 Br: | 🔊 点击朗读正文 ❚❚ | Share:

First, construction status

Mining engineering activities, including coal, have played a huge role in ensuring China's economic and social progress and improving people's living standards, especially in the past 40 years of reform and development, especially in the western region, more than 80% of the GDP of many provinces are contributed by mining engineering activities. However, due to many reasons, mining engineering activities have created great wealth for our country, but also caused serious problems of mine ecological environment. These problems mainly include five types: "three wastes" discharge, ground deformation, aquifer structure damage caused by mining induced water discharge (sudden), water supply, ecological and environmental protection contradictions, desertification and soil erosion; In addition, there are also problems in mining area construction planning and design, mining operation management, mining enterprise culture and credit system construction, mining area and mining area harmony. Therefore, in order to build an upgraded version of China's main energy coal industry, it is necessary to walk out of the green road of efficient development of mineral resources, including coal, and coordinated development of the ecological environment through green mine construction and green mining development.

The concrete evaluation index of green mine construction mainly includes six aspects: mining environment, resource development mode, comprehensive utilization of resources, energy saving and emission reduction, scientific and technological innovation and enterprise construction.

Up to now, after enterprise self-assessment, third-party assessment, provincial verification and recommendation, in addition to Beijing and Shanghai, a total of 1,254 mining enterprises in 29 provinces (municipalities and districts) have been selected into the national Green Mine List database, accounting for about 2.1% of the total number of mines in the country. The level of green mines in different regions varies greatly, with the highest proportion of green mines in Jiangsu Province (12.3%) and the lowest in Tianjin City (0.3%).

Among the 1254 green mining enterprises, there are 284 green coal mines. Shanxi, Shaanxi, Inner Mongolia, Henan, Shandong and other provinces and cities, as important coal energy bases in China, have made an important example in the construction of national green mines.

In addition, on December 11, 2020, the Ministry of Natural Resources announced for the first time a list of 50 green mining development demonstration zones. It indicates that China has gradually moved from the point-like green mine construction to the face-like green mining development demonstration area.

In general, China's green mine construction and green mining development after more than ten years of efforts, from "pilot exploration" to "comprehensive promotion", from "single point mine" to "surface demonstration zone" has achieved remarkable results, its performance:

First, green mine construction, as a starting point for the construction of ecological civilization in the mining field, has been promoted as an important work by most provincial (autonomous regions and municipalities) people's governments, and its concept and method have been accepted by the majority of mining enterprises, basically forming a new pattern of green mine construction in the country;

Second, the green mine construction work system of national, provincial, city and county level joint creation, enterprise construction, third-party evaluation and social supervision has been initially established;

Third, under the premise that the overall level of mine construction in the country is not high, green mine construction has set up a number of models for the country and played a leading role in transforming the mining development mode, promoting the ecological environment of mining areas, scientific mining methods, efficient utilization of resources, standardized enterprise management and harmonious mining communities.

2. Existing problems

However, in the process of green mine construction practice, we also found some areas that need to be improved and perfected, the specific problems are as follows:

1, the enterprise has a deviation in the understanding of the connotation of green mine, and the motivation to create is insufficient

Limited to the industry's promotion and training of green mines is not in place, many people's understanding of green mines has a certain bias, mainly reflected in:

First, some localities and enterprises are only forced by the current ecological environmental protection pressure, do not recognize the deep-seated problems of resource exploitation;

Second, the green mine is considered as a "high input, high cost" mine, which indirectly leads to the promotion of green mine is limited;

Third, some localities and enterprises regard the title of green mine as a shield for ecological environmental protection supervision, paying more attention to "creation", thinking less about "construction", and lacking long-term planning.

2, the level of green mine construction needs to be improved

At present, 1,254 mines included in the national green mine list, accounting for only about 2.1% of the total number of mines in the country, and mainly large and medium-sized mines, but the proportion of small and below mines in China accounted for more than 80%, the green mine construction task is still difficult. Taking coal mines as an example, at present, the number of green coal mines created in China is relatively small, and the mines included in the national green mine list account for only 1.5%, and the proportion of green mines built needs to be improved.

3. Uneven regional development of green mine construction layout

The western region is an important development zone for the distribution of energy and mineral resources in China, but among the 661 national green mine pilots, the western region only accounts for less than 36%. Of the 57 coal enterprises' green mines, only about 25.5% are in the west.

Third, countermeasures and suggestions

1. Strengthen the systematic thinking of green mine construction

First, the construction of green mines should be coordinated by multiple departments in the horizontal management and organization.

Mine construction involves the planning scheme of 3 departments and 5 divisions:

(1) The Department of Mineral Rights Management of the Ministry of Natural Resources and the associations of various mineral species are responsible for the review of mine development and utilization plans;

(2) The Department of Territorial and Spatial Ecological Restoration of the Ministry of Natural Resources and the provincial departments of Natural Resources, responsible for the review of land reclamation and mine geological environment protection and management restoration programs;

(3) The Department of Geological Exploration Management of the Ministry of Natural Resources and the departments of Natural resources of each province, responsible for geological disaster investigation, exploration design, evaluation, management and supervision;

(4) The Environmental Impact Assessment Department of the Ministry of Ecological Environment and the ecological environment departments of each province are responsible for the review of the environmental impact assessment reports of mining area planning and projects;

(5) The Department of Soil and Water Conservation of the Ministry of Water Resources and the provincial departments are responsible for the review of soil and water conservation programs.

Second, the construction of green mines should further improve the joint creation mechanism at the national, provincial, city and county levels in the vertical aspect, and decompose and implement the policies, standards and mechanisms from top to bottom.

Third, the green mine construction and green mining development should take the river basin as the implementation unit and be guided by the systematic concept. Because a river basin not only involves all kinds of mining problems, but also agricultural surface pollution, industrial spot pollution, black and smelly water bodies in urban and rural areas, polluted river wetlands, etc., it is necessary to use the concept of large-scale system engineering, closely combined with the overall planning of local social and economic development, watershed territorial spatial planning, ecological environment planning and disaster prevention and reduction planning, and make full use of natural geographical conditions. According to local conditions, integrated management of "mountains, rivers, forests, fields, lakes, grass and sand" will be carried out in the region, and integrated planning and construction of "mineral-agriculture-urban complex" will be strengthened.

The fourth is to build a social supervision system composed of the government, enterprises, the public, associations and other parties, and improve the information disclosure mechanism of green mining enterprises.

2. Release policy potential, encourage mining enterprises to adhere to innovation-driven and increase investment in science and technology, and improve the endogenous power of enterprises to build green mines

First, for the mining enterprises that have been included in the national green mine list, it is proposed to give necessary supporting incentive policies to give priority to meeting their related mining land, resource allocation, capacity conversion, capacity release, financial support, tax incentives, listing financing, issuing green mine bonds, realizing the value of green mine ecological products, carbon peak carbon neutrality and other needs.

The second is to use the economic benefit evaluation method and model of green mine construction, according to the economic benefit calculation results of the new technology adopted in green mine construction, quantitative evaluation of the economic effect and ecological environmental benefit obtained by green mine construction, and encourage mining enterprises to take the initiative to build green mines.

3. Improve the legal system and normative system of green mine construction, improve the dynamic management mechanism of green mine list, and build a third-party evaluation and supervision mechanism

First, we will give play to the binding role of laws and the guiding role of standards and norms. The green mine construction requirements rise to the legal level. In the revised Mineral Resources Law and implementation regulations, the requirements and standards for green mine construction are clearly set forth, and the provisions on liability recovery, economic punishment and subsequent compensation are clearly defined, providing a legal basis for the planning and design of green mines and the formulation and implementation of relevant technical standards.

The second is to improve the normative system of green mine construction, revise and improve the relevant standards, norms, guidelines, guidelines and other contents in a timely manner, and promote the formulation of national standards for green mine construction.

Third, improve the dynamic management of the national green mine list. Establish a dynamic update mechanism for the list, strengthen periodic spot checks in mines, and remove mining enterprises that do not meet the standards from the list in a timely manner.

Fourth, establish a third-party evaluation and supervision mechanism for green mine construction. Strengthen the supervision of third-party evaluation agencies for green mine construction, establish and improve the responsibility system of third-party evaluation agencies, increase the punishment and punishment of third-party violations, and ensure the fairness and openness of selection, evaluation and list management. Explore the adoption of "green certification" into the CNCA voluntary certification field directory, and promote the standardization and standardization of third-party assessment.

4. Encourage "development-type" construction of green mines

The mining environment positive effect resources such as "three wastes" resources, underground space resources, mine surface site resources, residual resources and other resources have been developed and utilized, and efforts have been made to turn waste into treasure and harm into benefit, and the income after the positive effect development and utilization of the mine environment with resource attributes has been used to supplement green mine construction and reduce the re-investment in green mine construction.

5. Accelerate the establishment of ecological restoration funds for abandoned mines left over from history and do a good job in market operation

There are large historical abandoned mines in the country, and the government is responsible for ecological restoration. The treatment of abandoned mines left over from history is an urgent task and a large investment. Depending on the difficulty of treatment, the treatment cost is about 200,000-300,000 yuan/hectare. At present, there is a serious shortage of investment in mine ecological restoration, and the annual special transfer payment from the central government is about 2 billion yuan for the treatment of historical abandoned mines, and local governments generally rarely set up special funds. To achieve the goal of building a beautiful China, we must establish a stable investment mechanism that can meet the needs. Therefore, it is suggested that in the provinces with large coal resources development, such as Shanxi, Shaanxi, Mongolia, Henan and Lu provinces with large coal mining volume in the Yellow River basin, the ecological restoration fund of historical abandoned mines should be established at the provincial level, and the fund should be calculated from the sales income of mineral products of enterprises according to a certain proportion for the ecological restoration of abandoned mines in the whole province. At the same time, with the guidance of the fund, through healthy market operation, who repairs, who benefits, attract social capital investment, and solve the "bottleneck" problem of capital investment.


  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series