Green mine construction status and existing problems and countermeasures

F: | Au:佚名 | DA:2023-11-27 | 596 Br: | 🔊 点击朗读正文 ❚❚ | Share:

First, construction status

Mining engineering activities, including coal, have played a huge role in ensuring China's economic and social progress and improving people's living standards, especially in the past 40 years of reform and development, especially in the western region, more than 80% of the GDP of many provinces are contributed by mining engineering activities. However, due to many reasons, mining engineering activities have created great wealth for our country, but also caused serious problems of mine ecological environment. These problems mainly include five types: "three wastes" discharge, ground deformation, aquifer structure damage caused by mining induced water discharge (sudden), water supply, ecological and environmental protection contradictions, desertification and soil erosion; In addition, there are also problems in mining area construction planning and design, mining operation management, mining enterprise culture and credit system construction, mining area and mining area harmony. Therefore, in order to build an upgraded version of China's main energy coal industry, it is necessary to walk out of the green road of efficient development of mineral resources, including coal, and coordinated development of the ecological environment through green mine construction and green mining development.

The concrete evaluation index of green mine construction mainly includes six aspects: mining environment, resource development mode, comprehensive utilization of resources, energy saving and emission reduction, scientific and technological innovation and enterprise construction.

Up to now, after enterprise self-assessment, third-party assessment, provincial verification and recommendation, in addition to Beijing and Shanghai, a total of 1,254 mining enterprises in 29 provinces (municipalities and districts) have been selected into the national Green Mine List database, accounting for about 2.1% of the total number of mines in the country. The level of green mines in different regions varies greatly, with the highest proportion of green mines in Jiangsu Province (12.3%) and the lowest in Tianjin City (0.3%).

Among the 1254 green mining enterprises, there are 284 green coal mines. Shanxi, Shaanxi, Inner Mongolia, Henan, Shandong and other provinces and cities, as important coal energy bases in China, have made an important example in the construction of national green mines.

In addition, on December 11, 2020, the Ministry of Natural Resources announced for the first time a list of 50 green mining development demonstration zones. It indicates that China has gradually moved from the point-like green mine construction to the face-like green mining development demonstration area.

In general, China's green mine construction and green mining development after more than ten years of efforts, from "pilot exploration" to "comprehensive promotion", from "single point mine" to "surface demonstration zone" has achieved remarkable results, its performance:

First, green mine construction, as a starting point for the construction of ecological civilization in the mining field, has been promoted as an important work by most provincial (autonomous regions and municipalities) people's governments, and its concept and method have been accepted by the majority of mining enterprises, basically forming a new pattern of green mine construction in the country;

Second, the green mine construction work system of national, provincial, city and county level joint creation, enterprise construction, third-party evaluation and social supervision has been initially established;

Third, under the premise that the overall level of mine construction in the country is not high, green mine construction has set up a number of models for the country and played a leading role in transforming the mining development mode, promoting the ecological environment of mining areas, scientific mining methods, efficient utilization of resources, standardized enterprise management and harmonious mining communities.

2. Existing problems

However, in the process of green mine construction practice, we also found some areas that need to be improved and perfected, the specific problems are as follows:

1, the enterprise has a deviation in the understanding of the connotation of green mine, and the motivation to create is insufficient

Limited to the industry's promotion and training of green mines is not in place, many people's understanding of green mines has a certain bias, mainly reflected in:

First, some localities and enterprises are only forced by the current ecological environmental protection pressure, do not recognize the deep-seated problems of resource exploitation;

Second, the green mine is considered as a "high input, high cost" mine, which indirectly leads to the promotion of green mine is limited;

Third, some localities and enterprises regard the title of green mine as a shield for ecological environmental protection supervision, paying more attention to "creation", thinking less about "construction", and lacking long-term planning.

2, the level of green mine construction needs to be improved

At present, 1,254 mines included in the national green mine list, accounting for only about 2.1% of the total number of mines in the country, and mainly large and medium-sized mines, but the proportion of small and below mines in China accounted for more than 80%, the green mine construction task is still difficult. Taking coal mines as an example, at present, the number of green coal mines created in China is relatively small, and the mines included in the national green mine list account for only 1.5%, and the proportion of green mines built needs to be improved.

3. Uneven regional development of green mine construction layout

The western region is an important development zone for the distribution of energy and mineral resources in China, but among the 661 national green mine pilots, the western region only accounts for less than 36%. Of the 57 coal enterprises' green mines, only about 25.5% are in the west.

Third, countermeasures and suggestions

1. Strengthen the systematic thinking of green mine construction

First, the construction of green mines should be coordinated by multiple departments in the horizontal management and organization.

Mine construction involves the planning scheme of 3 departments and 5 divisions:

(1) The Department of Mineral Rights Management of the Ministry of Natural Resources and the associations of various mineral species are responsible for the review of mine development and utilization plans;

(2) The Department of Territorial and Spatial Ecological Restoration of the Ministry of Natural Resources and the provincial departments of Natural Resources, responsible for the review of land reclamation and mine geological environment protection and management restoration programs;

(3) The Department of Geological Exploration Management of the Ministry of Natural Resources and the departments of Natural resources of each province, responsible for geological disaster investigation, exploration design, evaluation, management and supervision;

(4) The Environmental Impact Assessment Department of the Ministry of Ecological Environment and the ecological environment departments of each province are responsible for the review of the environmental impact assessment reports of mining area planning and projects;

(5) The Department of Soil and Water Conservation of the Ministry of Water Resources and the provincial departments are responsible for the review of soil and water conservation programs.

Second, the construction of green mines should further improve the joint creation mechanism at the national, provincial, city and county levels in the vertical aspect, and decompose and implement the policies, standards and mechanisms from top to bottom.

Third, the green mine construction and green mining development should take the river basin as the implementation unit and be guided by the systematic concept. Because a river basin not only involves all kinds of mining problems, but also agricultural surface pollution, industrial spot pollution, black and smelly water bodies in urban and rural areas, polluted river wetlands, etc., it is necessary to use the concept of large-scale system engineering, closely combined with the overall planning of local social and economic development, watershed territorial spatial planning, ecological environment planning and disaster prevention and reduction planning, and make full use of natural geographical conditions. According to local conditions, integrated management of "mountains, rivers, forests, fields, lakes, grass and sand" will be carried out in the region, and integrated planning and construction of "mineral-agriculture-urban complex" will be strengthened.

The fourth is to build a social supervision system composed of the government, enterprises, the public, associations and other parties, and improve the information disclosure mechanism of green mining enterprises.

2. Release policy potential, encourage mining enterprises to adhere to innovation-driven and increase investment in science and technology, and improve the endogenous power of enterprises to build green mines

First, for the mining enterprises that have been included in the national green mine list, it is proposed to give necessary supporting incentive policies to give priority to meeting their related mining land, resource allocation, capacity conversion, capacity release, financial support, tax incentives, listing financing, issuing green mine bonds, realizing the value of green mine ecological products, carbon peak carbon neutrality and other needs.

The second is to use the economic benefit evaluation method and model of green mine construction, according to the economic benefit calculation results of the new technology adopted in green mine construction, quantitative evaluation of the economic effect and ecological environmental benefit obtained by green mine construction, and encourage mining enterprises to take the initiative to build green mines.

3. Improve the legal system and normative system of green mine construction, improve the dynamic management mechanism of green mine list, and build a third-party evaluation and supervision mechanism

First, we will give play to the binding role of laws and the guiding role of standards and norms. The green mine construction requirements rise to the legal level. In the revised Mineral Resources Law and implementation regulations, the requirements and standards for green mine construction are clearly set forth, and the provisions on liability recovery, economic punishment and subsequent compensation are clearly defined, providing a legal basis for the planning and design of green mines and the formulation and implementation of relevant technical standards.

The second is to improve the normative system of green mine construction, revise and improve the relevant standards, norms, guidelines, guidelines and other contents in a timely manner, and promote the formulation of national standards for green mine construction.

Third, improve the dynamic management of the national green mine list. Establish a dynamic update mechanism for the list, strengthen periodic spot checks in mines, and remove mining enterprises that do not meet the standards from the list in a timely manner.

Fourth, establish a third-party evaluation and supervision mechanism for green mine construction. Strengthen the supervision of third-party evaluation agencies for green mine construction, establish and improve the responsibility system of third-party evaluation agencies, increase the punishment and punishment of third-party violations, and ensure the fairness and openness of selection, evaluation and list management. Explore the adoption of "green certification" into the CNCA voluntary certification field directory, and promote the standardization and standardization of third-party assessment.

4. Encourage "development-type" construction of green mines

The mining environment positive effect resources such as "three wastes" resources, underground space resources, mine surface site resources, residual resources and other resources have been developed and utilized, and efforts have been made to turn waste into treasure and harm into benefit, and the income after the positive effect development and utilization of the mine environment with resource attributes has been used to supplement green mine construction and reduce the re-investment in green mine construction.

5. Accelerate the establishment of ecological restoration funds for abandoned mines left over from history and do a good job in market operation

There are large historical abandoned mines in the country, and the government is responsible for ecological restoration. The treatment of abandoned mines left over from history is an urgent task and a large investment. Depending on the difficulty of treatment, the treatment cost is about 200,000-300,000 yuan/hectare. At present, there is a serious shortage of investment in mine ecological restoration, and the annual special transfer payment from the central government is about 2 billion yuan for the treatment of historical abandoned mines, and local governments generally rarely set up special funds. To achieve the goal of building a beautiful China, we must establish a stable investment mechanism that can meet the needs. Therefore, it is suggested that in the provinces with large coal resources development, such as Shanxi, Shaanxi, Mongolia, Henan and Lu provinces with large coal mining volume in the Yellow River basin, the ecological restoration fund of historical abandoned mines should be established at the provincial level, and the fund should be calculated from the sales income of mineral products of enterprises according to a certain proportion for the ecological restoration of abandoned mines in the whole province. At the same time, with the guidance of the fund, through healthy market operation, who repairs, who benefits, attract social capital investment, and solve the "bottleneck" problem of capital investment.


  • Alcatel-Lucent KFA632 WMOTBUKLAA 10G Optical Interface Carrier
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 3DB20474BAAB04 23GHz Microwave Radio
  • Alcatel-Lucent KFA720 WMOTCMVLAB SFP/XFP Optical Interface Carrier
  • Alcatel-Lucent 3AL00114AB Universal Interface Module
  • Alcatel-Lucent BBG9 S1:1 OHCTL Optical Hardware Control Module
  • Alcatel-Lucent FB16401-A-I03 GTD-5 Analog Master/Slave Control Board
  • Alcatel-Lucent MCR1721B Control Module
  • Alcatel-Lucent 9500-MPR 3DB20547ACAA01 ODU MPT-HC 11GHz Microwave Radio
  • Alcatel-Lucent 3HE01014AAAA02 Interface Module
  • Alcatel-Lucent 244-2091-005 High Density Digital Line Card V1.5
  • Alcatel-Lucent LAMBDAXTREME WWAA36 Optical Amplifier Module
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 6GHz 2P-2 Radio 3DB20444BAAA05
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC MPT-XP 6GHz 3DB20442BBAA02
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 23GHz 3DB20476ABAA01 Microwave Radio
  • Alcatel Lucent 3HE01019AAAA01 Module
  • Alcatel CPU5 3BA23071 PCB Card with IO2 3BA23050 Set
  • Alcatel-Lucent 9500-MPR ODU MPT-HC V2 9558HC 6GHz 3DB20443BBAA02
  • Alcatel Lucent 500-1113-211 Rev H Channel Bank Assembly
  • Alcatel Lucent 89-0419-B-2 BA9ATS0FAB Frontal Compute Module
  • Alcatel-Lucent LambdaXtreme 1625 WWAF31 Optical Amplifier CP Module
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA52065 AAAA KAZZB-01
  • Alcatel 3EH08263AAXX000448 OmniPCX Office Large PBX System
  • Alcatel Lucent VSEM-C 3FE62453 XA VAUCAJZKAA 7330 DSLAM Line Card
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20432BAAA04 18GHz Microwave Radio
  • Alcatel-Lucent 9500-MPR ODU MPT-HC 3DB20546ACAA01 11GHz Microwave Radio
  • Alcatel-Lucent 3DB04823AAAA Circuit Board
  • Alcatel-Lucent 3DB04530AAAA Circuit Board
  • Westell MDIU Modular DAS Interface Unit CS21-005-105Q
  • Alcatel-Lucent 90-0423-01 Control Card
  • Alcatel-Lucent 3AL91792AA 01 iL-1.2 Optical Interface LC Connector
  • Alcatel-Lucent 109637454 WA82 SP2B MODL908832 – Interface Module
  • Alcatel-Lucent MDEE DPB11 Part 109773580 – Digital Processing Board
  • Alcatel 3EH76027ADAD OmniPCX Enterprise Communication Server R500/30.4
  • Alcatel-Lucent 3EH73084AEJD Gateway Driver Board GD-3 – Communication Interface
  • Alcatel-Lucent 9500-MPR ODU Radio MPT-HC V2 3DB20476BAAB04 23 GHz Microwave Outdoor Unit
  • Alcatel-Lucent 9396 Digital 2U NodeB Indoor – UMTS Base Station
  • Alcatel-Lucent 3HE03607AA CFM-XP Control Fabric Module – Switch Fabric Controller
  • Alcatel-Lucent 8232 DECT Mobile Handset – Cordless Enterprise Phone
  • Alcatel-Lucent 244-2082-201 Sierra NAC V3.1 Slave Package – Network Access Control
  • Alcatel-Lucent 408154912 CPU Rear I/O Pack Card – Backplane Interface Module
  • Alcatel-Lucent 3AL82037ADAA SFP Module
  • Alcatel-Lucent OMQ 408645968 Optical Module
  • Alcatel-Lucent 9500 MPR 8-Slot Shelf 3DB18485AB
  • Alcatel-Lucent 408154904 CPU I/O Card
  • Alcatel-Annecy 5150 CP Turbo Vacuum Pump
  • Alcatel-Lucent 3EH73084AEJD08 Card
  • Alcatel-Lucent 3EH73050ABAB Interface Card
  • Alcatel-Lucent 3HE06151ABAA01 SFP Line Card
  • Alcatel-Lucent 8DG59242AD Power Filter
  • Alcatel-Lucent IMM48-1GB-TX 48-Port Module
  • Alcatel Lucent 3CM03285MQ02 Module
  • Alcatel 3HE07158BA 7750 SR-12 IMM-2PCA-FP3 Optical Transceiver
  • Alcatel-Lucent 9396 Digital 2U NodeB Outdoor with Indoor Mainframe and Alarm Module
  • Alcatel Lucent MPX-16/64-T-L3 MPX1664TL3 Multiplexer Module
  • Alcatel Lucent 3EH73052AB Power Supply Module
  • Alcatel Lucent ASM2-155FM-2W-4C ASM2155FM2W4C Switch Fabric Module
  • Alcatel Lucent 3AL00124ABAB Interface Card
  • Alcatel-Lucent 1AB429380001 Cable Assembly
  • Alcatel Z24 3BA53065 Analog Extension Card 3BA53065AA
  • Alcatel-Lucent 9500-MPR 11GHz MPT-HC ODU Microwave Packet Radio 3DB20371ACAA01
  • Alcatel-Lucent RRH1900-4x45 Remote Radio Head
  • Alcatel-Lucent 3HE00028AA Ethernet Line Card
  • Alcatel-Lucent 3HE04939CE CWDM SFP Transceiver
  • Nokia Alcatel-Lucent 3FE66546AA Fan Module
  • Alcatel-Lucent SSP-6 Speech Signal Processor Board
  • Alcatel-Lucent 500-1113-212 Channel Bank Assembly
  • Alcatel-Lucent EZ32-2 Board 3BA23265ADKE 01
  • Alcatel-Lucent GSM-FM-2W-4C Filter Module
  • Alcatel-Lucent 3AL00378AF Interface Card
  • Alcatel-Lucent 3AL00124ABAC Interface Module
  • Alcatel-Lucent BJB1 PWPQALGAAG 48V Independent Microprocessor Board
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8506-4 with 13 Modules
  • Alcatel Lucent 3AL00424AA Interface Card
  • Alcatel Lucent 3BA73012AB Power Supply Module
  • Alcatel Lucent ESX-100C-32W ESX100C32W Power Supply Module
  • Alcatel Lucent GSX-K-FM-2W GSXKFM2W Fan Module
  • Alcatel 8DG59247AA Optical Protection Switch Card
  • Alcatel Lucent 91-E03100-B 91E03100B Interface Module
  • Alcatel Lucent FSX-FM-1W FSXFM1W Fan Module
  • Alcatel Lucent RRH2X40-07L-AT Remote Radio Head
  • Alcatel-Lucent 9500-MPR MSS-8 Shelf 3DB18485CA
  • Alcatel Annecy ACP20 Vacuum Pump CP20
  • Alcatel-Lucent 9500 MPR P32E1DS1 E1 PDH Card
  • Alcatel-Lucent J98726AL-2 D4OI210DAA Module
  • Alcatel 409113651 RRH700L1 700MHz Remote Radio Head
  • Alcatel io2 3ba23050 PCB Card
  • Alcatel-Lucent MDR-8000 MDR-8706-8 Digital Radio
  • Alcatel-Lucent ACT2300M Turbo Pump Controller AF042134A
  • Alcatel-Lucent OmniPCX Office Medium PowerCPU PRA-TI
  • Alcatel-Lucent 9500 MPR 23GHz ODU 3DB23045HDAA01
  • Alcatel-Lucent 9500 MPR ODU Outdoor Unit 300 11GHz TX Low HP 3DB23035AAAA01
  • Alcatel-Lucent ECNT-C 3FE25676 BA AK 06 Termination Card
  • Alcatel Lucent MDR-8000 Microwave Digital Radio MDR-8606-45 with 13 Modules
  • Alcatel-Lucent 849144415 KS-24829L1 Remote Radio Head v1.4
  • Alcatel CFF 450 Turbo Pump Controller 137171
  • Alcatel-Lucent ACS108 109579896 004 Access Controller
  • Alcatel-Lucent OS6850-48 Network Switch with PS-126W-AC Power Supply
  • Alcatel Lucent DFP-CM-14B/2T Filter DCMA Base Station
  • Alcatel Lucent ESX-K100C32W4 ESXK100C32W4 Power Supply Module
  • Alcatel Lucent 91-E03100-A 91E03100A Interface Module
  • Alcatel-Lucent STGR-LIM-A2P-72-HBI ADSL2+ High Bandwidth Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20547BBAA02
  • Alcatel Lucent Enterprise 4049-4059 MMK Keyboard Console Kit
  • Alcatel-Lucent RRH4X40-1900 Remote Radio Head
  • Alcatel Lucent OS6450-P48 Switch
  • Alcatel Lucent 625617-000-001 Cable Assembly
  • Alcatel Lucent 108320 Module
  • Alcatel Lucent TN801B Board
  • Alcatel-Lucent RRH2X50-800 LTE Remote Radio Head
  • Alcatel Lucent CPU8 Board 3BA23258AB OmniPCX 4400
  • Alcatel-Lucent 3EM22617AAAE 9500 MPT-HL Microwave Radio Transceiver
  • Alcatel-Lucent CPU7-2 3BA23259AAAD 7750 SR Control Processor Module
  • Alcatel-Lucent 9500 Microwave Packet Radio MPT-3DB20371BCAA01
  • Alcatel-Lucent Enterprise 4059 MMK Keyboard + Phone PAC Kit
  • Alcatel-Lucent Nokia 3HE10329AA 7750 SR Series Router Module
  • Alcatel-Lucent 7705 SAR-W IP MPLS Service Aggregation Router 3HE07349AA
  • Alcatel-Lucent-Nokia 3HE08429AARC01 7750 SR SFM5-7 Switching Module
  • Alcatel-Lucent 3HE00272DB 7750 SR-7 DC Chassis with PEM3+EFT
  • Alcatel-Lucent ACT 1300M/1600M HT Turbo Pump Controller
  • Alcatel Lucent IMM48-1GB-TX 3HE03625AAG01 48-Port 7750 SR-12 Interface Module
  • Alcatel-Lucent AP-500 Wireless Access Point
  • Alcatel-Lucent ATP-150 Power Supply
  • Alcatel-Lucent 622-8603-012 Optical Transceiver
  • Alcatel-Lucent 270-0038-010 10.5 VDC Power Supply
  • Nokia 9500-MPR Microwave Radio Module XPIC-RPS/3DB20116BCAA01
  • Alcatel-Lucent 3DB19017AB EAS Access Switch v2
  • Alcatel-Lucent 3AL81072AA Matrix Enhanced Unit - Cross-Connect Module
  • Alcatel-Lucent MDR-8606-135 6GHz Digital Microwave Radio