Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Analysis on effective measures of mine engineering construction safety management

来源: | 作者:佚名 | 发布时间 :2023-11-27 | 135 次浏览: | Share:

With the continuous development of China's social economy and the continuous improvement of people's living standards, the demand for mineral resources is getting higher and higher. Therefore, it is imperative to optimize the production of mineral resources and increase the output of mineral resources. However, because the mine engineering is relatively complex and the technical content is high, there are different degrees of safety problems in the actual construction, which seriously affect the construction safety of the mine engineering and hinder the normal construction. Therefore, it is necessary to learn the characteristics of mine engineering, master the main factors affecting the safety of mine engineering construction, and take corresponding measures to improve the safety of mine engineering construction and provide a strong guarantee for the normal construction of mine.

First, the three factors affecting the safety management of mine engineering construction

1.1 Environmental Factors

In terms of many factors affecting the current construction safety management of mining projects, the most typical and prominent one is the environmental factor. Usually, the construction environment of mining projects is harsh, the coefficient of change is unstable and the safety risks are frequent, such as the excessively high concentration of dust and unreasonable density of underground gas in mining projects, which easily lead to the casualties of construction personnel. In the event of wind, rain and other bad weather, the construction will stop, resulting in the delay of the construction schedule.

1.2 Material and equipment factors

Safety protection materials used in some mining projects often have hidden dangers of jerry-cutting, and there is no qualified safety protection materials with high safety performance purchased from the initial link, which is difficult to provide a strong guarantee for the life safety of construction personnel, making the probability of safety accidents in mining projects high. In addition, many mining engineering construction equipment in the aging damage and other conditions, the operation is not sensitive caused by disrepair is likely to occur fire, leakage and other accidents, at the same time with the rapid development of science and technology, mining engineering construction by the traditional sense of manual labor is gradually replaced by mechanical equipment. Therefore, the construction of mine engineering must be built on the basis of ensuring the efficient operation of mechanical equipment, in strict accordance with the relevant equipment requirements, the operation and construction of potential safety hazards in the bud.

1.3 It is difficult to guarantee the personal safety of construction personnel

Because there are many unsafe factors in the construction site of mine engineering, often accompanied by various toxic and harmful gases, harsh and high decibel noise, heat and dust and other problems, construction personnel working in this environment for a long period of time seriously threaten their own health due to high-intensity construction load, thus increasing the economic loss cost of mine engineering. In short, it should be deeply recognized that personnel are the main body of mine construction and directly determine the overall quality of mine projects. Therefore, the legitimate personal rights and interests of construction personnel should be fully guaranteed, and relevant government departments should also increase the capital investment in the hardware foundation of mine engineering. Construction personnel themselves should also do a good job of safety protection and carry out construction operations in a safe construction environment.

Second, six effective measures to improve the level of mine engineering construction safety management

2.1 Strengthen device security management and maintenance

The production efficiency of the company is directly related to the operation mechanism of the equipment, and the normal and safe operation of the equipment can ensure the smooth progress of mining activities and the life safety of the staff has a certain guarantee. Generally speaking, the occurrence of equipment accidents is mostly related to its lack of effective system management and maintenance. Regular maintenance work is conducive to timely discovery and timely treatment of problems in the equipment, improve the service life of the equipment, and avoid safety accidents caused by equipment operation problems.

The establishment of testing and information management system can significantly strengthen the safety management of equipment, maintain the normal operation of equipment, and ensure the maintenance quality of equipment. Enterprises should formulate a reasonable equipment management plan according to the actual situation of the project, analyze the use of equipment by each employee and each position, assign equipment maintenance work, and implement the responsibility system, so that when equipment accidents occur, people can be traced.

Enterprises should strengthen safety management, carry out regular training and assessment of maintenance workers, and constantly improve the technology of maintenance personnel to ensure that maintenance personnel can find problems in time and have the ability to deal with problems independently. For those identified equipment hazards that cannot be eliminated in time, a monitoring and tracking plan can be developed, a complete emergency plan can be designed according to the specific and major functions of the equipment, and every relevant staff member is informed. The company needs to carry out regular inspection of operating lines, set up working groups to conduct regular spot checks, and focus on monitoring and management of areas prone to danger.

2.2 Innovative mining safety technology

Nowadays, China's mining industry shows a relatively vigorous development scene, and the requirements of specific construction technology in mining are also constantly improving. As the mining safety consciousness has become an important aspect in the whole construction process, higher requirements have been put forward correspondingly in the mining safety technology. Innovation in mining safety technology can not only ensure the safety of construction personnel during the mining construction process, but also improve the overall level of mining safety technology, so that the overall mining process will have technical support, which will make China's overall mining technology to a greater extent. It will also spread new and innovative mining technologies to a wider range, narrowing the gap between regions.

2.3 Improve the safety awareness of the overall construction personnel

Improving the safety management of mining technology can most directly make the construction personnel and managers aware of the status of safety production in the mining construction process, and can improve the innovation of mining technology. Safety is a modern production process in a variety of topics will not be outdated, at this stage, there are still many mining accidents, these accidents in the construction management and workers' own lives have a huge impact. Therefore, timely increase the safety awareness of construction personnel and managers is not only the requirements of the mining industry at this stage, but also the requirements of ensuring the safety of workers.

2.4 Improve safety protection measures

First of all, we need to increase capital investment and establish a reasonable safety protection system in mineral enterprises. According to the actual situation of mining, the company establishes a targeted safety protection system to ensure the personal safety of front-line staff, equips front-line staff with professional protective equipment, installs professional protective equipment, and adopts professional and scientific construction methods. Establish specific prevention and control opinions, train construction personnel, and configure a full set of safety facilities, including face, head and body protection devices. The construction rest area provides basic medical drugs and various consumable supplies, such as medical bandages and Yunnan Baiyao, etc., and installs eye-catching reminder marks at the construction site, configures safety warning signs and safety passage signs.

2.5 Strengthen the monitoring and management of hazard sources

The danger points of mineral enterprises mainly include underground operation area, explosive storage, subsidence area and tailings reservoir. The company needs to focus on safety inspection in these areas, carry out regular or irregular safety inspection, and find dangerous links in time and deal with them. During the inspection, relevant personnel should analyze the causes and root causes of endangering the company's production safety and various violations, focus on rectification and monitoring of this part of the source of danger, and ensure the smooth progress of the company's mining work.

2.6 Check key items

Mine engineering construction has a certain complexity and risk, so it is very important to do a good job of inspection, especially some key projects need to increase inspection, such as shaft engineering, blasting engineering and so on. In order to achieve this purpose, it is necessary to understand the focus of safety inspection, streamline safety management personnel, improve safety management efforts, and ensure that the relevant safety management personnel fully understand the construction links under their management, and can effectively control the dangerous points in the construction.

The project materials cloud management system focuses on the material and material management business of construction enterprises. Based on the current situation of material management of construction enterprises, it helps construction enterprises establish business logic management control through the business occurrence relationship of materials in the construction enterprise site, enhances the business management point, realizes the demand scenario of continuous and controllable business data, and realizes the tracking and monitoring of materials throughout the whole process. Let the actual business of material input realize the seamless matching management of the information platform and realize the optimization of material management. To help enterprises achieve efficient supply of materials, effective cost control, management level improvement, orderly and standardized work as the core goals. Provide partners with full service from consulting, training to implementation


  • Raymond RE648 - 703 bowl mill feed scroll "NEW" by Alstom Power
  • ALSTOM Power 5415 - NEW combination for GV7 fan, item no: 5415, with gray accessories, new
  • Alstom Power 1BMBR0000090 - Lot of 3 UNC 50 Gram Balance Weights 5/16"
  • GEC Alstom KCC8302 - Thyristor Rectifier Stack Power Module 20X-1310CRL 30Z-2116
  • Alstom Micom P139 - Feeder Management Rack Control Equipment Onebox NFP
  • Alstom Alspa MD2000 - Operation Unit
  • Alstom Single Phase Overcurrent AC Relay KCGG14201T50CEC - by Areva T&D UL Ltd.
  • ALSTOM RP3-77-9786-PT1 - ARM GUIDE FAST SHIPPING!!! (B168)
  • Alstom/Brown Boveri r303772p1 - Cover Gasket, 13335400
  • Alstom R303779P1 - 3/6 Pinion 1-1/2 inch shaft 25 tooth gear
  • Alspa Alstom VF 2002 A - Frequency Converter *H2R39E4*
  • Alstom Bushing 06714-271-00 - NEW!!! FREE SHIPPING!!!
  • ALSTOM MC15-M2 - Gecostat excitation manual control excitation setting
  • CONVERTEAM EPIC III E3-F-FN / EPICIIIE3FFN - Control Module
  • GE FANUC/ALSTOM 316 - FIP CH S2 - IR129 - #NAME?
  • New GE Alstom Cegelec IC693CMM311M - Communications Control Module Alspa 80-35
  • CONVERTEAM ALSTOM MVS3000-4001 - ALSPA MV3000 Drive Data Manager SKU#2
  • ALSTOM MT96-MPSU011,MCMM003,MT93-HXC1XXX015,MCPU020 - MDPCIOC002 Power Supply
  • CONVERTEAM S98101/118 / S98101118 - (New with box)
  • General Electric Alstom Combustion Engineering GP-2375-B - Heavy Hex Jam Nut
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC High Speed Tripping and Control Relay
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED TRIPPING AND CONTROL RELAY
  • ALSTOM MVAAM11BJCJ5516A - PROTECTION RELAY
  • ALSTOM LGPG 111 LGPG11101R551 - EE DIGITAL INTRGRATED GENERATOR PROTECTION RELAY
  • CONVERTEAM 251459-000 / 251459000 - Module
  • NOS Alstom D-996-326-PC25 C161-2991M25 - Threaded Pipe Nipple 4730009866528
  • GE FANUC/ALSTOM 317 - FIP CH S2 - IR129 - #NAME?
  • ALSTOM GE D-984-0579 TP305 A/W REV 02 - FREQUENCY DETECTION BOARD
  • Alstom 01054-000-0N - Throw Rod Bearing NEW!!! !!!
  • ALSTOM Microverter D 3.4/500,029.130 004 - #NAME?
  • Alstom Alspa MD2000 - Operating Unit
  • Alstom Bombardier UMD-125-C - Contactor Coil 4078B71H01
  • ALSTOM MT96-MPSU011,MCMM003,MT93-HXC1XXX015,MCPU020 - MDPCIOC002 Power Supply
  • Alstom Ge D-984-0579 TP305 A/W Rev 02 - Frequency Detection Board
  • Alstom Villeurbanne N895600512D - Card M 1000417012 Board 1040 ECPU1
  • Alstom Ps 421 - PS421 Control Unit
  • GE ALSTOM PIB504 - Fiber Optic Interface Board
  • Alstom Auxiliary Relay VAA23ZG8507F(M) - 110-250V AC/DC
  • Cegelec/Alstom gds1017-4001 - Alstom Improvement Card
  • Alstom 34232-084-01 - Sw Mach Oiler Fitting NEW!!! FREE SHIPPING!!!
  • ALSTOM MVAJM15JA1002A - HIGH SPEED TRIPPING AND CONTROL RELAY
  • Alstom 00441-005-0N - Screw 4PK NEW!!! !!!
  • ALSTOM MT96-MPSU011,MCMM003,MT93-HXC1XXX015,MCPU020 - MDPCIOC002 Power Supply
  • Alstom Limelight FS-100-331 - Flame Spectrometer P/N :FS-100-331 110-220 VAC 50-60 Hz (New with Box)
  • Ge Alstom Combustion Engineering 101-295 - Stud Adjusting Jam Nut NOS
  • CONVERTEAM 20X4498/110C / 20X4498110C - Module
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • ALSTOM MVAJ105JA1002A - TRIPPING CONTROL RELAY
  • Alstom 54549-000-02 - Sw Mach Gear Complete NEW!!! FREE SHIPPING!!!
  • Alstom Alspa gd3000e - Reader Course Board 30v9200/110 With gds1003-4001 Keyboard
  • ALSTOM POWER R461 - PAWL LIFTING LEVEL (1 PC) NEW R-461 132214
  • Alstom 029.069 615 - PCB Board
  • Alstom Power Conversion 20x4496 - PCB Card Rev 0004
  • ALSTOM VTT DEFINITE TIME RELAY VTT11ZG8050LCH - 110-125V AC
  • GEC Alstom KCC8302 - Thyristor Rectifier Stack Power Module 20X-1310CRL 30Z-2116 a
  • Alstom GE Combustion Engineering 94-165 - Hinge Pin NOS
  • ALSTOM GECOSTAT FV223-M2 - EXCITER DIODE FAILURE DETECTOR
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • Alstom 34232-064-02 - Drive .188 Oiler Fitting NEW!!! FREE SHIPPING!!!
  • Alstom Villeurbanne N895604516F - Card ECPU2_2_2GS SOS.512B Board ECPU2 1000268972
  • CONVERTEAM MVDL800-4701 / MVDL8004701 - Module
  • ALSTOM SCN 804D - Measurement Interface Module
  • ALSTOM RP3-77-9783 - NEW Arm Guide for Alstom Grid SPO Precipitator (B278)
  • Alstom Brown Boveri HTGD333336P0049 - Lot of 4 4.5" Inch Key Segment
  • Alstom Bitronics M870D - Remote Display Unit 3773
  • ALSTOM GE D-984-0579 TP305 A/W REV 02 - FREQUENCY DETECTION BOARD
  • Alstom Bitronics M870D - Remote Display Unit 19490 4053
  • Alstom TFM GW-FE Module P701000011S - M 1000742179
  • ALSTOM TYPE A96LC - Relay
  • Alstom S20-0007-02 - Power Hub Accessories * NEW *
  • ALSTOM RS422 - Module * NEW NO BOX *
  • GE ALSTOM PIB315B - PCB Board
  • ALSTOM PRIMA PRS12N04BH - Relay
  • ALSTOM MVAJ105JA1002A - TRIPPING CONTROL RELAY
  • ALSTOM MVAJ105JA1002A - TRIPPING CONTROL RELAY
  • NASG Holdings 7115 - Green-Amber Light Panel Assembly for Alstom Cabs
  • Alstom P241911B2M0600J - Modular Protection Platform
  • ALSTOM MOTPRO MCHNM - Protection Relay MCHNM01H1AB0500A
  • ALSTOM RS100 - 100A 690VAC NSNP
  • ALSTOM MVAJM14JB1002A1 - N/O-2N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • ALSTOM MVAJM14JB1004A1 - N/O-4N/C 220-250VDC HIGH SPEED DUMPING AND CONTROL RELAY
  • ALSTOM CDG - OVER CURRENT RELAY (INVERSE) CDG31FF012SACH
  • ALSTOM PD 521 - Power Drive
  • CONVERTEAM PSF3B / PSF3B - (BRAND NEW)
  • Auburn Engineering 1G-4765-C - NEW! Spark Ignitor Plug Assembly Alstom Free Shipping!
  • Alstom 55153-000-01 - Switch Machine Roller Arm NEW!!! FREE SHIPPING!!!
  • GE Alstom Cegelec Alspa 80-35 IC693PWR324X - New Power Supply Module 30W STD
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • Alstom Bitronics M870D - Remote Display Unit
  • C-E ALSTOM 723 - NEW Mill Grinder Crank Warranty
  • ALSTOM MT96-MPSU011,MCMM003, MT93-HXC1XXX015, MCPU020 - MDPCIOC002 POWER SUPPLY
  • ALSTOM AMS 3300515 - AMS2,AMS3300515
  • ALSTOM 8122-4001 - NSNP
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • ALSTOM MT96-MPSU011,MCMM003, MT93-HXC1XXX015, MCPU020 - MDPCIOC002 POWER SUPPLY
  • GE FANUC/ALSTOM IR139-1 - 063022350 - 80801419 - B0037299 - C259/335
  • Alstom VAA12YF26B - VAA Type Auxiliary Relay 110V DC
  • Alstom Gateway Module P701000010R - M 1000741824
  • NOS Alstom Power MIL-E-17624 F167-149ITEM318 - Roller Tube Cage Assembly
  • ALSTOM MT96-MPSU011,MCMM003, MT93-HXC1XXX015, MCPU020 - MDPCIOC002 POWER SUPPLY
  • Alstom Villeurbanne N895604516F - Card ECPU2 _2_ 2GS SOS.512B Board 1000268972
  • Alstom 20263-001-00 - Bevel Gear NEW!!! FREE SHIPPING!!!
  • Alstom Micom p743 - Generator Protection Numeric Relay p743316a6m0510k
  • ALSTOM 8213-6332 - MULTIGEM IOP 7.5MHZ 512K Central Processor Module NEW
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • ALSTOM 1G-5556 - SPARK PLUG ASSY (LOT OF 2)
  • ALSTOM Micom P139 - Ptb 04 ATEX3044 P1393604544AW00E01
  • ALSTOM S30Z2582/01 - NSMP & Extended technical support
  • ALSTOM VAJC11ZF0754ABA - HIGH SPEED TRIPPING RELAY
  • Alstom Single Phase Overcurrent AC Relay MVTU13T1BA0751H - by Areva T&D UL Ltd.
  • ALSTOM MVAXM31D1CE3005A - Three-Coil Super Relay
  • Alstom D-984-0578 - Intensity and Fault Detection Board A/W Rev 02
  • Alstom Bitronics M870D - Remote Display Unit 19490
  • C-E ALSTOM 723RPS - NEW Pulverizer ball and socket assembly warranty
  • Alstom alspa gd3000e - drive course board 30v9200/110 with gds1003-4001 keypad
  • Alstom M99-40001 - Micro Keyboard 24V7000/10 Alspa Micro 1
  • GE FANUC/ALSTOM 251-1 - 80801399 - /C0300150
  • ALSTOM SKE11BF8003BCH - CHECK SYNCHRONISING RELAY
  • ALSTOM MVAAM - Auxiliary Relay MVAAM11B1BA2530A
  • ALSTOM EPSC-0069 - NSMP Coal flow monitor
  • General Electric Alstom PIB504 PIB-504 - Fiber Optic PIB Module Interface Converteam SKU#1E
  • ALSTOM POWER MP-7848 - SPLIT OIL SEAL (11266-NUP) FOR BOWL MILL
  • Alstom 31v6900/10 - GD Delta Cooling System Build Rev 0015
  • ALSTOM Micom P139 - Ptb 04 ATEX3044 P1393604544AW00E01
  • Cegelec/Alstom gds1017-4001 - Alstom Enhancement Card
  • Alstom GDS1004-4002 - Sigma Client I/O Panel
  • Alstom 20x4506/10 - PCB Circuit Board
  • Alstom 20x4373/10B - Pcb Thyristor Gate Drive VDM25000 Circuit Board