Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

8 concepts about green mines

F: | Au:佚名 | DA:2023-11-28 | 478 Br: | 🔊 点击朗读正文 ❚❚ | Share:

"Green" is the main color of nature, green is a symbol of life, health, vitality and hope. But "green" is not a basket into which you can put everything.

With the acceleration of green mine construction, there have been multiple concepts interweaving, such as green exploration, green development, green mine, green mining, mine ecological restoration, mine environmental restoration, mine ecological restoration, mine ecological reconstruction, etc., what is the difference between these words?

It is necessary to distinguish these concepts, can not imitate others, but can not blindly follow, so as not to be "green", so as to enter the "green" misunderstanding.

■ Green exploration

Under the guidance of the concept of green development, green exploration is a new exploration mode that minimizes the negative impact on the ecological environment by adjusting the geological prospecting methods and technologies that have a greater impact on the ecological environment, and adopts advanced prospecting methods, methods, equipment and processes to minimize the environmental impact in the whole process of geological exploration, so as to achieve a win-win situation for both prospecting and environmental protection.

■ Green development

Green development is "green development" in the narrow sense. First of all, it is necessary to clarify the concept of mineral resources development, from the "Interim Measures for the Supervision and Management of Mineral resources" can be seen that one of the preconditions for "mineral resources development" is "mine".

Since it is a mine, "development" is the behavior of mining enterprises that have reached a certain degree of exploration and have been evaluated and registered and obtained mining licenses, including exploration and mining of mining enterprises, but does not include the census, detailed inspection and exploration of geological exploration work that we usually talk about the most.

"Exploration" in "exploitation of mineral resources" refers specifically to the exploration of mining enterprises. Secondly, it refers to the green development of mineral resources, which is a collection of green exploration, clean mining and pollution-free use of mines. It refers to the recovery and reuse of resources and pollutants by using specific machinery and equipment, limiting the discharge of pollutants, and adopting specific technology to carry out green management of the whole process of mineral resources development. Finally achieve the goal of optimizing resources, reducing material consumption, reducing energy consumption, and protecting the environment.

Specifically, the specific machine equipment refers to the mining enterprise after the use of the equipment can save resources, reduce energy consumption, reduce pollutant emissions. Limiting the emission of pollutants means that it is higher than the emission standard in China's technical standards for the control of mine pollution (that is, the allowable content of the pollution contained in the emission of the mine in a unit time).

Specific process technology refers to the mine through the use of some innovative technical means to reduce the emission of pollutants, or the effective treatment of pollutants already produced, so as to improve the utilization efficiency of mineral resources, reduce pollutant emissions. Green management refers to the development of mineral resources in the whole process, formulate the corresponding production, audit, information disclosure and other systems, from a macro level of management, to achieve the goal of harmonious coexistence of mineral resources mining and the environment.

■ Green mine

Green mine is relative to the traditional extensive mine with high exploitation, low utilization and high emission. Green mine refers to the whole process of mineral resources development, not only to strictly implement scientific and orderly mining, but also to control the disturbance of the mining area and the surrounding environment within the range of environmental tolerance.

Green mine is not a simple "green mine", planting trees and grass, but covers the whole industrial chain of mining, safety, production, management, environmental protection, resource utilization, scientific and technological innovation, community harmony, corporate culture and other deep "green", it can be said that green mine construction runs through the whole process of mine development such as mine planning, design, construction, operation and mine closure.

Once the mine is closed, that is to say, the mine that is no longer in production, even the minimum "mine" is not anymore, what is the "green mine"? It can only be regarded as ecological restoration or environmental restoration or ecological restoration or ecological reconstruction of industrial brownfield or abandoned land, because it no longer meets the requirements of green mine construction, and its disposal work is only limited to the improvement of its ecological environment to the maximum extent.

■ Green Mining

Compared with the traditional "black or brown mining", green mining is the product of the third technological revolution and the era of ecological civilization.

Green mining means that under the norms of ecological civilization, the concept of green development runs through all links of mining development such as mineral resources exploration, mining, processing, management and land reclamation in mining areas.

With resource conservation and environmental protection as the basic requirements, green planning, green technology, green production, green policy, green action, green management as the strategic framework;

Scientific mining methods, efficient utilization of resources, standardized enterprise management, environmental protection of production processes, ecological mining environment, mining order harmony into the implementation of the path to achieve economic benefits, social benefits, ecological benefits of the sustainable development of mining.

The connotation of green mining is mainly manifested in two aspects:

On the one hand, the resources themselves, that is, reasonable development, full use;

On the other hand, there are environmental problems caused by mining, that is, to minimize the impact of mineral resources exploitation on the ecological environment. Therefore, green mining is not a simple denial of traditional mining, but the adjustment, transformation, transcendence and innovation of traditional mining.

■ Mine ecological restoration

Mine ecological restoration is to use the principles and methods of ecological engineering or ecological balance and material circulation to improve, improve, restore and reproduce the survival and development state of mining organisms (groups) in polluted, damaged and stressed environments, also known as mine ecosystem restoration.

The emphasis is on the overall reconstruction and improvement of the damaged mine ecosystem by human beings, the necessary conditions for its occurrence, the further improvement and comprehensive improvement of the nature by human beings, and the partial return to the structure and function of the mine ecosystem before the disturbance.

■ Mine environmental restoration

Mine environmental restoration is the restoration of the polluted mine environment, that is, the use of engineering and technical means, physical and chemical means to reduce the concentration of pollutants in the polluted mine environment to the state before pollution, including environmental biological restoration and environmental ecological restoration two levels.

Environmental bioremediation is only the use of biological life metabolic activities to degrade the pollutants in the polluted mine environment, and make them non-toxic and harmless.

Environmental ecological restoration is to restore the mine polluted environment through the self-organization and self-regulation ability of the ecosystem, and to degrade the mine pollutants by selecting special plants and microorganisms and artificially constructing the ecosystem. Mine environmental restoration is an intrinsic part of mine ecological restoration.

■ Mine ecological restoration

Mine ecological restoration means that the disturbed and damaged mine ecosystem (soil, plants and wildlife, etc.) can be restored to the natural state close to its disturbed state by using the ecosystem succession and self-recovery ability under the assisted control of human beings.

It is a full sense of restoration, requiring limited intervention, while emphasizing the return to the original state from the level of natural science and engineering technology, is required to fully return to the structure and function of the mine ecosystem before the disturbance.

It includes the process of returning to the original state, restoring and managing the integrity of the native ecosystem of the mine.

It also includes the perfection and health of the critical range of changes in mine biodiversity, ecological structures and processes, regional and historical content, and sustainable social practices, but does not include the meaning of restoration.

■ Mine ecological reconstruction

The ecological reconstruction of mine refers to the re-establishment and construction of the ecological environment of mine by taking the original ecological environment of mine or the surrounding ecological environment as the main reference.

It includes re-establishing the original ecosystem without improving and trimming it, or abandoning the original ecosystem and establishing a new ecological environment, which must be better than the original ecological system and more suitable for mine production, human survival and sustainable development.

In short, green mine construction is a community of mining environment, resource development mode, comprehensive utilization of resources, energy saving and emission reduction, scientific and technological innovation and digitization (intelligent) mine, enterprise management and corporate image, which is not only indispensable, but also adopts the "double standard" system in the evaluation process, that is, the first level index and the total index of the evaluation index reach the standard at the same time, which is the green mine construction reaches the standard.

In addition, the prerequisites for the application of green mine construction selection are:

(1) The license is legal and valid;

(2) no administrative punishment within three years;

(3) the mining owner is not included in the abnormal list of mining owners;

(4) meet the requirements of new construction and production mines;

(5) The scope and location of the mining area do not involve all types of natural protected areas.

These conditions are met to be included in the green mine selection. Some mining enterprises may think that if they cannot enter the list of green mines, they will not carry out green mine construction, which is wrong.

Because many provinces have set a deadline for green mine construction to meet the standards, such as Inner Mongolia rules that by the end of 2025, all mines must meet the standards of green mine construction, otherwise they can only withdraw from mining activities.

Although the four concepts of mine ecological restoration, mine environmental restoration, mine ecological restoration and mine ecological reconstruction are slightly different, they basically emphasize the greening of the mine, which is an important part of realizing the ecological environment of the mining area and the harmony of the mining area community. The score of the green mine evaluation index system accounts for about 12%. It is basically part of the "mining environment" and "resource development mode" of the first-level indicators, so mining enterprises must pay attention to this point, and cannot think that the completion of the "green mine" will complete the green mine construction.


  • Omron NS5-MQ00B-V2 Touch Screen HMI
  • Siemens 6DP1280-8AB SIMADYN D Control Module
  • Schneider HJA36060U43X PowerPact H Breaker
  • WITTENSTEIN LP120X-MF2-50-1I1-3X-SPE Planetary Gear
  • Omron G9SX-GS226-T15-RT Safety Guard Relay
  • Omron CPM1A-40CDT1-D-V1 Programmable Controller
  • ABB ACH550-01-05A4-4 HVAC Drive 2.2kW
  • Schneider TSXDMZ28DT Modicon TSX Micro I/O Module
  • Siemens 6DL1131-6BH00-0EH1 ET200SP HA DI Module
  • B&R X20IF10E3-1 PROFINET IO Interface Module
  • Siemens QBE3000-D4 Transmitter
  • Inovance H3U-3624MT PLC Controller
  • Inovance AM600-CPU1608TP PLC Module
  • Omron NS8-TV00B-V2 NS8-TV00B-ECV2 HMI
  • Phoenix ILC 151 ETH PLC Module
  • National Instruments NI-9242 Analog Input Module
  • Fanuc A16B-3200-0521 Main Board
  • NLT NL8060BC26-35F 10.4 LCD Screen
  • Pilz PSEN cs1.1P 540050 Safety Switch
  • Keyence VT-SW4 VT-7SR Touch Panel
  • Siemens 6ES7 131-1BL11-0XB0 Digital Input Module
  • Mitsubishi RJ71EIP91 Ethernet IP Module
  • Siemens 3RW4047-1BB14 Soft Starter 55kW
  • Mitsubishi AJ71C21-A PLC Programmable Controller
  • NL8060BC21-06 8.4 Inch LCD Module
  • Siemens 6ES7215-1HG40-0XB0 PLC S7-1200
  • Siemens 3VA2463-5HL32-0AA0 630A Breaker
  • Saginomiya E-UJ-44030-B Control Board
  • Schmersal MV10H330-11y-M20-1348 Safety Switch
  • Fanuc A16B-1211-0301-04A Control Board
  • Siemens 6SN1123-1AB00-0AA2 LT Module
  • A100005506 Compair Delcos 3100 Control Panel
  • Omron ZFV-CA40 Smart Sensor Amplifier
  • Fanuc A16B-2200-0660 I O Board
  • Omron CJ1W-NC471 Position Control Unit
  • Siemens 6SN1112-1AA00-0AA0 Simodrive PWM Module
  • Mitsubishi GT2708 HMI Touch Panel
  • Siemens 3TK2834-1BB40 Safety Switch
  • INSYS EBW-E100 Industrial Ethernet Router
  • Schneider LC1F400 Contactor TeSys F
  • Mitsui RYP-51 PCB Control Board
  • Tamagawa TS2620N941E172 Encoder
  • Pilz PZE 9 Safety Relay
  • Omron C1000H-CPU01-V1 PLC
  • Siemens 6SL3210-1KE21-3UP1 Frequency Converter
  • Allen-Bradley 440E-L22BNSM Rope Pull Switch
  • ABB CI868K01 Interface Module
  • Stein Sohn E 083.1 PLC Rack
  • Mitsubishi GT2508-VTBD GT2508-VTBA HMI
  • ABB 3BSE018161R1 Module
  • CAREL ASD100 PGD1AY0I00 Operation Panel
  • ABB EK370-40-11 Contactor 220-230V
  • Eaton 9PX1500IRTM UPS 1500VA
  • NCV-20NGNMP Programmable Controller
  • Mitsubishi LE-40MTA-E Tension Controller
  • Fanuc A16B-3200-0429 Control Board
  • Mitsubishi GT2310-VTBA HMI Touch Screen
  • 3A99184G 1C31170G PCB Module Rev 10
  • Schneider 140NOM25200 Modicon Quantum Adapter
  • Mitsubishi NV400-SW 400A Circuit Breaker
  • Applied Materials 0190-51102 Heater Controller
  • Omron C200H-DA003 Analog Output Module
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • IAI 12G2-60-250-P-L-C1-SP Intelligent Actuator
  • NLT NL8060BC21-11 8.4 LCD Screen
  • Omron NX502-1300 Controller Unit
  • ABB RVT-6 Power Factor Controller
  • Schneider TM258LF66DT4L PLC Controller
  • NLT NL6448BC26-27D 8.4 LCD Panel
  • NLT NL8060BC21-09 8.4 LCD Screen
  • Keyence XG-8700L Multi-camera Imaging System
  • EPC 50 3183045486 I O Motherboard
  • Nidec Emerson M701-054-00270A CT Drive
  • Therma Wave 18-011040 Controller Assembly
  • Mitsubishi Q03UDECPU PLC CPU Module
  • Allen-Bradley 2002-NX70-MWLINK PLC Module
  • AS-2P-60M-B Industrial PLC Cable
  • Yaskawa JANCD-YCP21-E DX200 CPU Board
  • PASABAN MC-2006 03 CAN PLC Card
  • Mitsubishi RJ71PB91V PROFIBUS DP Module
  • Fanuc A20B-8100-0137 PCB I O Board
  • D0-06DD2-D PLC Module DL06 PLC
  • Kepco BOP100-4M Power Supply Amplifier
  • Allen-Bradley 1785-L60B PLC-5 60 Module
  • Siemens 7MH4900-3AA01 Weighing Module
  • Pilz 773100 PNOZ m1p Safety Controller
  • Omron NS12-TS00B-V2 Graphic Operation Panel
  • EC20-4040BTA Programmable Controller PLC
  • Fanuc A16B-1212-0100-01 Power Unit CNC
  • Siemens 6ES7151-3BB23-0AB0 ET200S Interface Module
  • ATTO Control DU-01 PLC Display System
  • Keyence KV-RC8BXR Programmable Controller
  • Lenze GST04-1GVCK-063C22 Servo Motor
  • CKD AX9000GH AX9210H Control Unit
  • ABB PG6310 DC Trigger Control Board
  • Cutler Hammer 10316H621C Type L Device
  • TAIYO AA-277 EM CY TRIP PCB Card
  • Schneider BMXCPS2010 PLC Power Supply
  • Schneider TSXMRPC007M PLC PCMCIA Card
  • 101182218 Safety Stop Relay SSW301HV-230V
  • Cutler Hammer 9-1875-3 Size 6 Contactor 480V
  • Nidec UNI3401 Drive Module Control Board
  • Delta AS06XA-A PLC Module Analog Mixed IO
  • Lenze EPL 10201 13408978 Servo Drive 24V DC
  • Sigmatek CCP612-K PLC Module DI DO Module
  • Schneider ATS48D38Q Soft Starter Altistart 48
  • Fanuc A20B-3300-0472 Main CPU Board Series 30i
  • Mitsubishi A171SCPU-S3 Servo CPU Module PLC
  • ABB 1SFL597001R7011 700A 100-250V Soft Starter
  • Yaskawa JANCD-YCP21-E DX200 CPU Control Board
  • Schneider NS630N Circuit Breaker 3P 630A
  • Honeywell DPCB21010002 Rack Slot PCB
  • Mitsubishi RJ71EIP91 PLC Module
  • Siemens 3VL5763-1DC36-0AA0 Circuit Breaker
  • Siemens 6GK7542-1AX00-0XE0 Communication Module
  • Siemens 6SL3130-6AE15-0AB1 Smart Line Module
  • HMS Anybus AB7646-F Gateway
  • Honeywell 621-0020 Analog Input Module
  • Siemens 6ES7212-1HF40-0XB0 PLC Controller
  • MAK 1.00.7-36.21.00-40 PCB Module
  • ABB 3BSE006503R1 PFSA140 Power Supply
  • SAACKE F-GDSA 143303 Burner Controller
  • ABB PFSC230 25m Cable Set
  • GE HYDRAN 201Ci-1 Controller
  • ABB NINT-42C main circuit interface board
  • B&R 3AT660 6 Thermocouple Input Module
  • Honeywell EC7850A1080 Programmable Logic Controller
  • Mitsubishi A2ACPU21 CPU Module MELSEC A Series