Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

The main problems and prevention measures of mine ecological restoration

来源: | 作者:佚名 | 发布时间 :2023-12-27 | 543 次浏览: | 🔊 Click to read aloud ❚❚ | Share:

Under the background of ecological civilization construction and dual-carbon goal, ecological restoration of mines has become a research hotspot. Based on the analysis of the main problems in mine ecological restoration in China, the corresponding solutions are put forward. It is found that the related concepts of mine ecological restoration are various, but the connotation is similar, and green development is the absolute principle; Affected by factors such as the failure of the supervision mechanism, the misunderstanding of the mine ecological restoration project, and the difficulty of promoting the new technology, China's mine ecological restoration has not paid the old account, the new account is owed, and the failure project is common; In order to promote the ecological restoration of mines in China, it is necessary to strengthen the basic theoretical research, promote the implementation of supervision mechanism, and implement new technologies such as mining and restoration in production mines.

The significance of mine ecological restoration

Mining may bring about ecological and environmental problems such as soil erosion, landslide and desertification. The abandoned industrial and mining land also has many bad soil physical and chemical properties, especially the high content of heavy metals in the soil, and the pollution process of some heavy metals in the soil system is long-term, hidden and irreversible, which often has a serious impact on the ecological environment of the surrounding area. Therefore, the ecological restoration of abandoned mines has important ecological significance. Mine ecological restoration is not only one of the important steps to alleviate desertification and soil erosion, but also one of the important means to tap its social and economic value through mine ecological restoration and transformation. At present, the selection of tourism development mode after ecological restoration has occupied more than half of the mine restoration cases, so considering economic factors has a high restoration value. In practice, the transformation of the abandoned site is mainly to add some humanistic landscape elements on the basis of its unique natural landscape and its own land resources, and at the same time, it is selected to transform into urban park, wetland park, ecological park, mine relic park and other tourist and leisure scenic spots. At present, the concept of ecological restoration at home and abroad mainly regards restoration as the state before destruction, requiring the restoration of forests, water bodies and farmland to the original state, and controlling the deposition of toxic and harmful substances and soil erosion. Ensure that the water table remains at its original level and the surface shape remains unchanged; Keep topsoil in place; Pay attention to the prevention and control of acidic substances and harmful and toxic substances; Prevent mine tailings from landslide and other secondary geological disasters.

1. Principles to be followed for mine ecological restoration

Mine ecological restoration is not only the restoration of damaged terrain, simple greening and so on. Mine ecological restoration is a systematic project, which is a complex project integrating damage investigation, design planning and construction. In order to achieve the result of restoring the damaged ecology, it is necessary to have a deep understanding of the connotation of the restoration goal. At the beginning of the planning, it is necessary to clarify the use of land use after restoration, the ecological structure and the ecological function that should be realized. Therefore, the goal setting of mine ecological restoration needs to comply with the following six principles: respect for nature, people-oriented; Adapt to local conditions and conform to the overall regional planning; Safe, efficient and sustainable use; Priority should be given to ecological and environmental benefits, and attention should be paid to economic benefits. Priority is given to restoring cultivated land, grassland and forest land; End treatment is combined with source and process control.

2. Strengthen the basic research of mine ecological restoration

The practice of mine ecological restoration for more than 40 years shows that the restoration theory lags far behind the practice, and many restoration cases fail due to lack of scientific restoration, which shows that there is a decoupling phenomenon between theory and practice. In order to repair the ecological environment damage caused by mining, many places have carried out spontaneous restoration and utilization of the damaged land and ecological environment. For densely populated areas with rapid economic development, mine ecological restoration is often promoted faster. However, the basic theory of this field and the principles of restoration technology still need to be deeply studied to support and promote the development of this field.

In the face of complex mining environmental damage problems, restoration methods and technologies need to be innovated, enriched and promoted, and the connotation of scientific restoration should be enriched from the scientific, different, advanced and economic aspects of technology, so as to balance the restoration benefits with funds and policy investment. Although there are many kinds of ecological restoration technologies, there are often some basic common technologies for ecological restoration, which is also the key to ecological restoration. Water is the source of life, soil is the basis of life, and plants are the root of life. Therefore, water, soil and plants are the three major elements of ecological restoration, and the restoration technology centering on these three major elements is the common core technology, namely, geomorphic remodeling, soil reconstruction and vegetation restoration.

  • PHOENIX ST-SI-UK4 Fuse Terminal Block
  • PHOENIX FLMC10BASE-T/FO G850 Fiber Media Converter
  • PHOENIX CONTACT QUINT-PS-100-240AC/24DC/40 Power Supply
  • PHOENIX CONTACT QUINT-DIODE/40 Redundancy Module
  • Phoenix Contact 2884208 Wireless I/O MUX
  • Photonetics 3646 HE 1540 Tunable Laser Source
  • PI C-663.12 Mercury Multi-Axis Step Motor Controller
  • PI C-663.10 Mercury Step Motor Controller
  • Pillar CB6687-2L Industrial Communication Board
  • Pilz DE-106712 A.F.051.5/01 Safety Module
  • Pilz 680003 Safety Relay Module Set
  • Pilz 301140 PNOZ X3 Safety Relay
  • Pilz P1U-1NB Safety Relay
  • Pioneer PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3326B-6-1-2-E Power Supply
  • Pioneer Magnetics HYRSP-1500-56 Power Supply
  • Pioneer Magnetics PM3398B-6-1-3-E Power Supply
  • Pioneer Magnetics PM3328BP-6 Power Supply
  • Potter & Brumfield SDAS-01-7Y2S1024 Relay
  • Powec PMP10.48 SIC High-Efficiency Rectifier
  • Powerbox PU200-31C Industrial DC-DC Converter
  • PIONEER MAGNETICS PM3398BP-6-1-3-E Power Supply Module
  • PIONEER MAGNETICS PM1253AL-6-3-Z03 Power Supply Module
  • Powerex PD411811 Rectifier Diode Module
  • Power-One MAP55-1024 AC-DC Power Supply
  • ProSoft MVI56-MDA4 ControlLogix Multi-Protocol
  • POLYSPED PRD2-200 Industrial Drive Module
  • P-OPEN P-OPEN-P4-150 PAC-OP150 Operator Panel
  • ABB Processor 958481321210 350211080320 Rugged CPU
  • ABB Processor 958481320201 350211080460 Safety CPU
  • ABB Processor 958481321200 350211080320 CPU Module
  • ABB Processor 958481321220 350211080320 CPU Module
  • ABB Processor 958481320100 350211080090 CPU Module
  • Pro-Face PL5901-T42-24V HMI Touch Panel
  • PROFIBUS PB3-VME-1-E V1.2.2 Interface Card
  • PROMESS 850040060P Force Displacement Monitor
  • PROSOFT AN-X2-AB-DHRIO DH+ and Remote I/O Gateway
  • PROSOFT RLX2-IFH24E Industrial Wireless Radio Module
  • PROSOFT 5202-DFNT-MCM4 DF1 to EtherNet/IP Gateway
  • PROSOFT PLX35-NB2 EtherNet/IP to Modbus TCP Gateway
  • ProSoft 5201-MNET-MCM-WEB Modbus TCP/Serial Gateway
  • ProSoft 5304-MBP-PDPMV1 Modbus Plus to PROFIBUS DP Master
  • ProSoft 5302-MBP-MCM4 Modbus Plus to Modbus Master/Slave
  • ProSoft 5301-MBP-DH485 Modbus Plus to DH485 Gateway
  • ProSoft 6104-WA-PDPM Wireless PROFIBUS DP Master
  • ProSoft MVI56-LTQ ControlLogix Limitorque Master
  • Prosoft 5304-MBP-PDPM PROFIBUS Master Module
  • Prosoft 1452-25M Relay Output Module
  • Prosoft MVI56-MNETR Modbus TCP/IP Module
  • Prosoft MVI69L-MBS Modbus Serial Module
  • Prosoft PLX32-EIP-SIE Ethernet Gateway
  • Prosoft MVI56-PDPS PROFIBUS DP Slave Module
  • Prosoft PMF1327205 Gateway Module
  • Prosoft PMF1216D61 FOUNDATION Fieldbus Module
  • PROSOFT MVI56-GSC Generic Serial Communication Module
  • PROSOFT 5601-RIO-MCM Remote I/O Communication Module
  • PROSOFT 1454-9F Communication Interface Module
  • PROTECH SYSTEMS PBI-6SA Industrial Single Board Computer
  • PRSTECH DMP10.24-20 DIN-Rail Power Supply
  • PRT PSA300R-81 Industrial Power Supply Module
  • PULS SLA8.100 AS-Interface Power Supply
  • QSI QTERM-K65 Industrial Operator Interface
  • R-2528Z R-2528Z Industrial Specialized Component
  • Radisys SBC486DX66 Single Board Computer
  • Radisys EPC-5 with EXM-13 Embedded System
  • Radisys EPC-16 Embedded Computer
  • Ramix PMC676TX PMC Ethernet Adapter
  • Ramix PMC008A PMC-to-VME Adapter
  • Ramix PMC237C-008EMI PMC Carrier
  • Ramix PMC661J PMC Carrier Board
  • Renata CR2450N Lithium Battery
  • Renault Circuit CU-8593-IND.A Control Module
  • Reotron 567LH-DP24 Voltage Regulator
  • RIFA IC693PWR321U GE Fanuc Series 90-30 Power Supply
  • RKC REX-B871NN-CS1B Intelligent Controller
  • RKC B871-RCU Digital Temperature Control Unit
  • ROBICON 469718 Variable Frequency Drive Control Board
  • IAI ROBO CYLINDER RC-S5-M-50-M Electric Actuator
  • Robo Cylinder RCA-T Electric Actuator
  • Rockwell 0-60066 Relay Output Module
  • Rockwell TC-303-02-4M0 Power Cable
  • Rockwell TC-302-02-4M0 Encoder Cable
  • Rockwell TC-205-02-8M5 Cable Assembly
  • Rockwell SA3100 AC Drive
  • Rockwell Automation T9110 Processor Module
  • Rockwell Automation 56AMXN I/O Module
  • ROD-L M100DC-5-10 High Voltage Dielectric Withstand Tester
  • ROE ELKO RAUH ⅡA 2200MFD 40V Electrolytic Capacitor
  • ROEMHEKD D35321 Hydraulic Clamping and Power Component
  • Rofin Laser HG-24 Industrial Laser Marking and Processing System
  • Ropex RES-402/400VAC Temperature Controller
  • Rorze RD-023MS Stepping Motor Driver
  • Rosemount 3D39861G01 Circuit Board Assembly
  • Rosemount SCL-C-003-M2 Interface Module
  • Rosemount 3051TG2A2B21AB4M5 Pressure Transmitter
  • ROSS 400C79 Pneumatic Valve Coil
  • RPSTECH DMP10.24 SIC DIN Rail Power Supply
  • RS NX-X16D Digital Output Module
  • RVSI SCANSTAR240 Barcode Scanner
  • SABO MPB.533.00 PLM500 PLC Module
  • SAC IOP313 Analog Input Module
  • SAC IOP310 Industrial I/O Module
  • GE P111-6052 Micro Controller Module
  • Samsung D0C-16C Digital I/O Control Module
  • SAMWONTECH TLC990ME-83 Multi-Channel PID Controller
  • SanDisk SDP3B-10 Industrial Flash Storage
  • SAC IOP351 Advanced Processor
  • SAC IOP331 Input/Output Processor Technical
  • Saftronics EZ6 40 Soft Starter Manual
  • Sagemcom 252720938AB Signal Processor
  • Sagemcom 252721117AC Interface Module
  • Sagemcom 252721013AF Controller
  • SAIA PCD2.W610 Analog Output Module
  • SAIA PCD3.R60X Flash Memory Storage Module
  • SAT RM3141-01-02 CM3141-01-02 System
  • SAT CM3142-01-03 CX3147-04 Overview
  • SAT CM3141-02-03 CX3149-05 Technical Manual
  • Sauter AVM234SF132 Valve Actuator Specs
  • SBS PFSK165 3BSE027778R1 Technical Specs
  • SBS VIPC616 91611524 VME Carrier Board
  • SBS PMC-HS-SERIAL Interface Module
  • Schenck FNT-L001 Network Terminal Guide
  • Schenck VEG20400 Weighing Electronics Specs
  • Schiele DL42N-22 Multi-Function Relay
  • Schiele DL22N-22 Monitoring Relay Specs
  • Schleicher SSY52 Safety Control Unit Manual
  • Schleicher UST21 Control Module
  • SanDisk 336A4940EZP1 Industrial SSD