Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

From sand and gravel plants to vegetable fields, abandoned mines "sell resources" to "sell scenery"

F: | Au:佚名 | DA:2023-11-27 | 571 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

At the beginning of the New Year, the abandoned limestone mine in Xijiehe Village, Pu 'an County, Guizhou Province, was "changed". In November last year, through the implementation of a series of measures such as "site leveling + soil covering + soil fertilizer", the former gray crushed mine changed its face in less than two months.

Winter to spring! Soon, this place will come back to life and achieve "green butterfly transformation".

Guizhou Province is a province with large mineral resources and a long history of mining, with large area and wide coverage of historical mines. In 2022, Guizhou Province successfully applied for the ecological restoration demonstration project of historical abandoned mines in the Miaoling Mountains, receiving 300 million yuan of central subsidy funds. The project plans to complete the restoration and management of 17,000 mu of historical mines in southeast Guizhou and South Guizhou, and has been fully implemented; The provincial government arranged 50.9 million yuan of funds to restore 3,200 mu of historical mines, and actively explored market-oriented operations to improve the ecological restoration benefits of historical mines.

Figure out the numbers, planning leads the first

What are the historical mines, how many, where and how big are they? Guizhou Province from the bottom figure, in-depth verification.

Historical mines include abandoned mines left over from the planned economy period, abandoned mines whose responsible persons are lost or difficult to determine, and abandoned mines that are closed due to policy reasons such as withdrawal from protected areas or capacity reduction, and which are clearly assumed by the government to take the responsibility for governance and restoration when the government makes a decision to close.

"After clarifying the scope of the target, we have fully launched the inspection of historical mines!" Li Songlin, Ecological restoration Department of the Provincial Department of Natural Resources, introduced that in July 2021, the Ministry of Natural Resources issued more than 40,000 suspected map spots in Guizhou Province's historical mines, Guizhou Province immediately organized verification, issued work plans and technical regulations, set up special working groups and steering groups, arranged deployment and coordinated promotion in a timely manner, and confirmed that the province's unregulated historical mines have an area of more than 80,000 mu.

Planning leads first. In 2022, Guizhou Province issued the "14th Five-Year Plan" Action Plan for Ecological Restoration of Historical Mines in Guizhou Province, which defines the goals, tasks and implementation paths, guides all localities to carry out ecological restoration of historical mines in a scientific and orderly manner, and will effectively solve the problems of historic mines in key ecological functional areas by 2025, and significantly improve the natural environment of mining areas and surrounding areas. We will promote high-quality development in ecological protection and restoration.

In accordance with local conditions, the project is effective

Wujiang River to the north, came to Tongren City Sinan County, here is one of the important sand bases in the province.

Today, the abandoned sand and stone factory in Flowerpot village, Tangtou Town, has been reclaimed and planted with green vegetables.

From sand and gravel plants to vegetable fields, Chen Xianguo, secretary of the Party Committee and director of the Sinan County Natural Resources Bureau, said, "We aim at areas that can be restored to cultivated land, implement soil covering, make full use of restored cultivated land, and plant vegetables and sweet potatoes in combination with local conditions to improve the economic value of land."

"The Wujiang River is the largest tributary on the south bank of the upper reaches of the Yangtze River. It flows through 13 of Sinan's 28 townships. We must protect Sinan's ecological background." Chen Xianguo said that for areas with poor natural restoration effect, the local implementation of greening projects, which species of trees have good effects, timely planting of trees, improve water sources, stabilize waste, and enhance ecological benefits.

There is no soil on the bald mountain, so we try our best to spread it up; When there are no trees, they encourage the local people to plant them. In Guizhou, there are many other cases like Sinan County that adapt to local conditions and overcome difficulties.

Qianxinan Anlong County Peak lime Factory site is a rare piece of flat land in the local, but the huge legacy mine needs to transport soil to supplement the soil cover, but the nearby transport of soil fertility is not enough, how to do?

"Such a flat land can not be wasted, fertilizer also need to restore this land!" From the engineering investigation and design to the implementation, we will think and plan and finally realize the soil fertilizer, increase the content of organic matter, and achieve the planting conditions.

In the restoration and management of historical mines, faced with the common problems of difficulty, high cost and long cycle, real money and silver are used at all levels, the will of the local people is fully respected, and the restoration and management of historical mines are carried out in accordance with the principle of "ploughing should be cultivated, making forest suitable and grass suitable", and the many "sequelae" brought about by abandoned mines are actively resolved.

We will innovate mechanisms and explore new models for regulatory operation

The pattern spots involved in the restoration of historical mines are numerous, dispersed, and difficult to supervise on the spot, which is a big problem to be solved.

"Through remote sensing monitoring, we have realized the 'intelligent' supervision of mine restoration data!" At the scene, the staff of the Ecological Restoration Department of the Provincial Department of Natural Resources demonstrated the login of Guizhou Province's territorial ecological restoration - mine ecological restoration supervision platform, relying on high-definition remote sensing images as the base map, to achieve unified, standardized and shared supervision and management of mine ecological restoration.

At present, Guizhou Province uses big data means of "sky observation, ground inspection, staring at management, online management" and "Internet + remote sensing" to monitor the restoration and management of mines. The remote sensing monitoring mode of the whole life cycle of mine geological environment restoration and treatment is adopted, and the surface changes in the target area are extracted by using multi-source and multi-phase remote sensing images to verify the mine restoration and treatment.

At the same time, the establishment of a spot check mechanism, the adoption of conventional and regular remote sensing monitoring, the establishment of a spatio-temporal database to monitor mine restoration, better traceability and supervision of mine restoration and management, to ensure the effectiveness of mine restoration.

"By using remote sensing first and then on-site, we have greatly improved the efficiency of monitoring and supervision, and ensured the effectiveness of mine restoration." Li Songlin said.

In order to speed up the ecological restoration of mines and focus on solving the outstanding problems of mine ecological problems such as excessive historical debts, realistic contradictions, and insufficient investment, combined with the actual situation of Guizhou, in 2020, the provincial Department of Natural Resources issued the Implementation Measures for Guizhou Province to Explore the Use of Market-oriented Ways to Promote the ecological restoration of Mines, exploring the modes of cooperation between the government and social capital and independent investment of social capital. Attract social capital to participate in mine ecological restoration. For example, the Wanshan District of Tongren City uses the landscape resources of industrial relics to realize the new model of "Wanshan mercury mine", which changes from "selling resources" to "selling scenery".

Mine ecological restoration is an important work in the construction of ecological civilization. Guizhou is wielding the pen of green, accelerating ecological restoration and increasing efficiency, ushering in new changes in green development, and historic mines will completely become "history".


  • Mannesmann Rexroth VT3006-36 Analog Amplifier Card
  • Bosch Rexroth R900086160 PGF1 Gear Pump
  • Bosch Rexroth R911173263 VDP15.3 Touch Display
  • Bosch Rexroth PPC-R22.1 RJ522 Industrial Controller
  • Bosch Rexroth MSK060C-0300-NN-S1-UG0-NNNN Servo Motor
  • Bosch Rexroth R911325068 NYS04.1 Controller
  • Bosch Rexroth R911335439 CSH01.1C Control Unit
  • Bosch Rexroth R917010287 BODAS RC10 Controller
  • Bosch Rexroth R911329791 CSH01.1C Drive Controller
  • Bosch Rexroth R182432310 Runner Block Guide
  • Bosch Rexroth VT-VSPA2-1-11 Amplifier Card R900021909
  • Bosch Rexroth MKD090B-047-KG1-KN Servo Motor
  • Bosch Rexroth LTU350 Servo Amplifier 0608750108
  • Bosch Rexroth 5610102050 Pneumatic Vacuum Regulator
  • Bosch Rexroth VT5041-23/3-OV PLC Control Board
  • Bosch Rexroth VT3015 S10/E Servo Amplifier Board
  • Bosch Rexroth MSK070D-0300-NN-M2-UG1 Servo Motor
  • Bosch Rexroth 3DREP6C-21 Valve R900955887
  • Bosch Rexroth R151244013 Ball Screw Bearing Unit
  • Bosch Rexroth MSM031C-0300 Servomotor R911325140
  • Bosch Rexroth EMD-B16.1-DC024N Box R911291681
  • Bosch Rexroth MKD071B-061-GP0-KN Servo Motor
  • Bosch Rexroth MSK030C-0900-NN-M1-UG1 Servo Motor
  • Bosch Rexroth EcoDrive DKC01.3-004-3-MGP-01 Servo Controller (299772)
  • Bosch Rexroth DKC02.3-040-7 EcoDrive Controller
  • Bosch Rexroth CLC-D02.3 CLC Motion Control Board
  • Bosch Rexroth HDS05.2-W300N Drive R911190019
  • Bosch Rexroth DKCXX.3-100-7 Servo Drive Unit
  • Bosch Rexroth CSE02.1A-S3-EC Control Unit R911339030
  • Bosch Rexroth MSK040C-0600-NN-S1-UP0 Servo Motor
  • Bosch Rexroth VT3013 S36 R5 Circuit Board Card
  • Bosch Rexroth VT3000-36A Amplifier Card R90020298
  • Bosch Rexroth VPB40.3 IndraControl Module R911374113
  • Bosch Rexroth HCS02.1E-W0054-A-03-NNNN Converter with R911332574 Control Unit
  • Bosch Rexroth MHD071B-061-PG1-UN Servo Motor
  • Bosch Rexroth A2F5/60W-B3-S Piston Motor R909418904
  • Bosch Rexroth HCS01.1E-W0018-A-03-B-ET-EC-NN-NN-NN-FW IndraDrive Cs Converter
  • Bosch Rexroth 4WRPEH 6 C4B40P-2X/G24K0/A1M Proportional Directional Valve (0 811 404 647)
  • Bosch Rexroth R911405975 ctrlX OS PLC Controller
  • Bosch Rexroth CSB02.1B-ET-EC-NN-S4-NN-NN-FW Servo Control Card R911338543
  • Rexroth MSK050B-0300-NN-M1-UG0-NNN Servo Motor
  • Rexroth IndraControl VEPXX.5-ATOM Set R911374889 Panel
  • Rexroth 1070089906-GC1 1070089907-201 Board
  • Rexroth CSB01.1C-SE-ENS-EN2-NN-S-NN-FW Control Unit
  • Rexroth MKD071B-024-KG3-KN Servo Motor
  • Rexroth Indramat DKC02.3-040-7-FW Controller
  • Rexroth HCS02.1E-W0028-A-03-NNNN Servo Module
  • Rexroth HMD01.1N-W0036-A-07-NNNN Drive Module
  • Rexroth MSK050C-0600-NN-M1-UG0-NNN Servo Motor
  • Rexroth DKC02.3-040-7-FW Servo Controller
  • Bosch Rexroth VT-5014S30-R1 Amplifier Card
  • Bosch Rexroth MSK040C-0600-NN-M1-UG1 Servo Motor
  • Bosch Rexroth MKD071B-061-GG0-KN Servo Motor
  • Bosch Rexroth VT5012-S45-R1 Amplifier Card
  • Bosch Rexroth SHL03.1-NNN-S-NNN Encoder Module
  • Bosch Rexroth EFC3600-0K75 Frequency Converter
  • Bosch Rexroth VFC3610-1K50-3P4-MNA-7P-NNNNN-NNNN 1.5kW Frequency Inverter
  • Bosch Rexroth EFC5610-2K20-3P4-MDA-7P-NNNNN-L1NN 2.2kW Frequency Converter
  • Bosch Rexroth XM21 XM2100.01 PLC Control Unit
  • Rexroth CSH01.1C-ET-ENS R911328178 HMS01.1N-W0020 Drive Package
  • April AXI0010 - Single Axis Servo Controller
  • Rexroth DKC10.3-004-3-MGP-01VRS Servo Drive
  • Bosch DKC02.3-040-7-FW Servo Drive
  • Rexroth DKC06.3-040-7-FW Servo Drive Controller
  • Rexroth VPB40.3 SE T R911374113 Control Module
  • Rexroth S20-SSI-AO-1/1 R911172544-AB1 Module
  • Rexroth R911173004 AC1 GH1 PLC Control Set
  • Rexroth VPB40.3D1L-1G0NN-D1D-DN-NN-FW Module
  • Rexroth MDD071B-N-040-N2T-095GB1 Servo Motor
  • Bosch Rexroth DM15K1101-D Servo Drive Module
  • Rexroth CSH01.3C-PB-ENS-MA1-CCD-S2-S-NN-FW Drive
  • Rexroth HMS01.1N-W0036 CSB02.1B Drive Package
  • Rexroth MSK070E-0300-NN-M2-UG0-RNN Servo Motor
  • Rexroth AZPF-1X-004RCB20KB Gear Pump
  • Rexroth NFD03.1-480-055 Powerline Filter
  • Rexroth VT-VARAP1-537-20/V0 Valve Amplifier
  • Rexroth HVE04.2-W075N Supply Module
  • Rexroth HMD01.1N-W0020-A-07-NNNN Drive Controller
  • Rexroth VDP40.3DIN-D1-NN-CG HMI Computer
  • Rexroth HDS05.2-W300N-HS12-01FW Drive Module
  • Rexroth HMS01.1N-W0070-A-07-NNNN Power Section
  • Rexroth Indramat MKD071B-061-GP0-KN Servo Motor
  • Rexroth HDS03.2-W075N-HS12-01-FW Control Unit
  • Rexroth HCS02.1E-W0054-A-03-NNNN Servo Drive
  • Rexroth CML40.2-SP-330-NA-NNNN-NW IndraControl
  • Rexroth CSH01.1C-PB-ENS-NNN-MA1-S2-S-NN-FW Drive
  • Rexroth PPC-R22.1 DAQ03 Servo Drive
  • Rexroth HCS02.1E-W0070-A-03-NNNN Servo Drive
  • Rexroth RF-FLS PB M12 DIO 8/8 M12 Module
  • Rexroth Indramat TBM 1.2-40-W1-024 Servo Bleeder
  • Rexroth Indramat MKD071B-061-KG1-KN Servo Motor
  • Rexroth CML40.2-SP-330-NA-NNNN-NW IndraControl L40
  • Rexroth VCP08.2DTN-003-NN-NN-PW Operator Panel
  • Bosch Rexroth DM30K1101-D Servo Drive 670V DC
  • Rexroth PPC-R22.1N-N-Q1-NN-NN-FW Motion Controller
  • Rexroth MSK040C-0600-NN-M1-UG1-NNNN Servo Motor
  • Rexroth CSH01.1C-S3-ENS-NNN-NNN-S2-S-NN-FW Drive Controller
  • Rexroth PPC-R22.1 Motion Control Module 004566384
  • Rexroth CSH01.1C-PB-ENS-NNN-MA1-S2-S-NN-FW Controller
  • Rexroth CML25.1-3N-400-NN-NNC1-NW IndraControl L25
  • Rexroth MSK030C-0900-NN-M1-UP1-NSNN Servo Motor
  • Rexroth HCS02.1E-W0028-A-03 CSH01.1C-PB Drive Package
  • Bosch Rexroth VT-VARAP 1-537-20/V0 Amplifier
  • Bosch Rexroth PPC-R02.2N R911285402 Control Unit
  • National Instruments PCI-7342 Motion Controller
  • National Instruments PXIe-6535 Digital I/O Module
  • National Instruments PCIe-6738 Analog Output Card
  • National Instruments NI-6583 Digital I/O Adapter Module
  • National Instruments NI TB-9214 Terminal Block
  • National Instruments NI 9222 Simultaneous Analog Input Module
  • National Instruments PXIe-8364 MXI-Express Module
  • National Instruments PXI-8185 Embedded Controller
  • National Instruments PCI-1405 Device
  • National Instruments SCXI-1160 Module
  • National Instruments PCI-MIO-16E-1 Device
  • National Instruments USB-6216 Device
  • National Instruments PXIe-2543 Module
  • National Instruments PCI-5102 Digitizer
  • National Instruments PXI-6284 DAQ Device
  • National Instruments PXI-7330 Controller
  • National Instruments cFP-2100 Controller
  • National Instruments USB-6002 DAQ Device
  • National Instruments PCIe-6374 Multifunction DAQ Card
  • National Instruments PXIe-4610 Power Amplifier Module
  • National Instruments PXIe-4154 Battery Simulator
  • National Instruments PXIe-7858R Reconfigurable I/O Module
  • National Instruments BNC-2090A BNC Terminal Block
  • National Instruments cRIO-9066 CompactRIO Controller